Professional Documents
Culture Documents
Engineering Team Interfaces
Engineering Team Interfaces
FPSO IM Strategy
Engineering Execution
Paul Martyniak Steve Moore
Subsea IM Strategy –
Paul M Operations
Dan Jayson
Projects
Maximo – Nacera / PMRs – Nacera / Steve Moore
Stewart Stewart
Other sources
Upset Register – Steve FPSO Survey – Tom W FSV Survey - Christophe Corrosion Meeting –
E / Dem Lorne
Alert System – Obinna Survey Report – Tom W Survey Report - Out Of Straightness – Analytical Work – Lorne Corrosion & Material As-Built Survey Controls Anomalies – Flow Assurance
Christophe / Dem Austin JPK Anomalies – Lorne Anomalies – Alvaro Alan Anomalies – Thierry
Anomaly TN Rev 01/A1 Anomaly TN Rev A1 – Anomaly TN Rev A1 – Anomaly TN Rev A1 - Anomaly TN Rev A1 – Anomaly TN Rev A1 – Anomaly TN Rev A1 – Anomaly TN Rev A1 – Anomaly TN Rev A1 –
– Obinna / Lorne Tom W MCS Austin Lorne Lorne MCS Alan Lorne
Anomaly Database –
MCS
Close non-FSV Maximo FSV PMR Compliance Non Conformance Evaluation of NCR – FSV Repeat Work –
– Alvaro / Lorne – Drew Report – Drew Lorne Christophe / Dem
Anomaly TN Rev A2 –
Alvaro / Lorne
Corrosion / Erosion KPI Close FSV Maximo – eMOC for PMR Modify PMR – Lorne
Tracking – Seb H Evaluation – Alvaro / Christophe / Dem Modification – Lorne
Lorne
Inspection Dates KPI
Tracking – Jeff C Anomaly Review
Meeting – BP / MCS
Anomaly Management
KPI Tracking – Alvaro Anomaly TN Rev A2 –
Alvaro / SPA