Professional Documents
Culture Documents
6M WWTP PM
6M WWTP PM
1.0 OVERVIEW
Matak has 3 units of WWTP system with a capacity of 50 m3.40 m3 & 10 m3 ENVIRO
RBC Wastewater treatment system that uses a fixed film reactor (embedded growth)
process Rotating biological contractor system.
Based on how to operate the STP equipment there are 2 ways:
- Active equipment group: Equipment in operation that requires drive (motor – driver)
- Passive equipment group: Equipment that does not require movers.
This equipment operates daily and needs to be carried out maintenance / routine inspection
6 / month by the operating operator. This PMR attaches WWTP system maintenance to the
Matak.
Page 1 of 3
Medco E & P Natuna
4.0 ROUTINE
√ : OK
NO DESCRIPTION X : NO
2 Check ampere
Page 2 of 3
Medco E & P Natuna
5.0 COMPLETION
*END OF ROUTINE*
Routine Revision History
Page 3 of 3