Professional Documents
Culture Documents
Wosked Firefly 2019
Wosked Firefly 2019
JN:CA2-6-006
DURING C CHECK.
JN:323300-FUT-10000-01
JN: ( 13-12-19)
9M-MWE
AMM : 522200-OPT-10010
JN : H029510 OR 522200-OPT-10010-01/ITEM-1
ASSISTED IN CARRYING OUT DRAINING OF PROPELLER HUB OIL
DURING C CHECK.
AMM: 611100-DRN-10000
JN:MW-005/RH PROPELLER
C CHECK.
AMM : 215159-CHK-10000
JN : ….(3/1/2020) mus
FOUND REAR STROBE LIGHT NOT ILLUMINATE.
JN:IRC-00001 (22/1/2020) B2
AMM: 273100-CHK-10010
DURING A CHECK.
JN:IRC00039 (18/1/20)
FOUND ENGINE NO 1 HP BLEED VALVE INTERMITTENLY OPEN AND CLOSE DURING EGR
UNSERVICEABLE AND REPLACEMENT BE CARRIED OUT AS PER AMM JIC 361164 RAI 10010.
A CHECK.
AMM JIC 242261 RAI 10000. OPERATIONAL TEST AND LEAK TEST FOUND
SATISFACTORY.
9M-FYK 2D+2C+4A
DURING D CHECK.
OUT AS PER AMM JIC 334132 RAI 10000. OPERATIONAL TEST CARRIED OUT
FOUND SATISFACTORY.
9M-MWH
PARTICIPATED IN CARRYING OUT REPLACEMENT OF AFT SHOCK MOUNT ON ENGINE NO 2
DUE TO CRACK FOUND DURING D CHECK.
AMM 712261 RAI 10000
JN : IRC 00125 (RAFIQ) 3/2/20