Download as pdf
Download as pdf
You are on page 1of 2
Save trees use e-Question Paper DOWNLOAD THIS FREE AT www.viuresource.com CRCS Sdhame USN Electrical Estimation and Costing Note: Answer FIVE fall questions, choosing one full question, 1 a. Write the necessity of Estimation and Costing. Go green © r B.E. Degree Examination, Dec.2017/Jan.2@08 Max. ee 30 a osmarts Bb. Explain the following 1) Catalogues i)" Purchase sys (esMark) Mention the diffrent mode of Tendering and explain th (Os marks 2a. Ste the imporant factors which an xm ho preparing an internal witing estimation. (Os Marks) . Explain 1) Oveshead charges i) Prot (oavtare) ©) Write any ourrules of Indian Electricity. (Go Mare) 3a. Listthe general niles suid fines for es os {es Marks B. Estimate the Quantity of material 2€): ‘newly constructed building where plan is shown i fig. Q3(0). Asst ae Bat All dimensions are in meter. i ‘i Mark) z 3 vax, 5 g s Fig.Q3(b) . 5 « = Eg oR, € 4 a. Desoribe the of cables or wires used in intemal wiring of ing. (04 Marks) Sb. Draw. \ingblation plan and estimate the Quantity of material required for the é wiring 4 house plan shown in fig. Q40D. The height ofthe eelling as 3.6m = and (60 W) has to be provided in each room. (2 mane) if ‘Al digensitRagp eter ge oa Pl xen sf paw ; vannbe ; z @ Fisqu ot SRE ; pa) i were? " tied tor? BRANCHES | ALL SEMESTERS | NOTES | QUESTON PAPERS | LAB MANUALS A Viuresource Go Green initiative Save trees use e-Question Paper Go green DOWNLOAD THIS FREE AT www.viuresource.com 151 $a Write short note on Service lines? Coombes) Write the reasons for excess recording of eneray meter. ©. A 1OHP, 415V, 36 , 50 I47 induction motor is t0 be installed in & workshop the plan of which is shown in fig.QS(@). Show the single fine diagram and estimate cityagf material required. (08 Marks) 9% et Set sf Momerominrr Fig. 05(¢) il or 6 List any cight important consideration regardigg motor Wallation, (o4Mtarks) b. Explain the determination of mput power, size ity Wistribution board , main switch and starter (O4Marks) «Find the materials for | § overhead located 10 meter away from pole with following Load lighting 300W ; Heating =2 me safety factor = 2. (os Marks) 7 a. Explain the following : i) C Lighting Arrestor. (06 Marks) b. A pole foran overhead 11 i line is required to be earthed and a stay isto be provided. Make a neat: should be done. Prepare a list of materials required. (10 Marks) oR 8 a Write note on erection. (08 marks) b. Estimate the 32 KV bay at 132 KV grid substations. (03 Marks) ® Module-5 . a pment that must be available in a substation. (6Mtarks) b. I required for the installation of a 400 KVA indoor type 11/0.433 KY (do Marks) oR 10 a tes on Substation auxiliary supply. (06 tar) b ‘Quantity of material required for the augmentation of 33KV grid substation of 500 KVA to 1000 KVA 33/1 KV grid substations. (io Mares) 20f2 BRANCHES | ALL SEMESTERS | NOTES | QUESTON PAPERS | LAB MANUALS A Viuresource Go Green initiative

You might also like