Name of work : Urgent Repairs to Madurai - Cochin Road in Km 0/0 - 5/0 of NH 49

Detailed Estimate
Sl.
Description of work No L B D Qty.
No.
1 White washing the trees culverts bridge edge stones guide stones - EB Post etc with
shell lime into two coats including cost and conveyance of shell lime gum Kanjee -
Water binding materials brushes and all other incidental charges etc.,

Km 0/0 - 1/0
km 0/0- 2 E.B, poles 2 x 8 0.40 0.23 1.47
E.B, poles 2 x 9 0.40 0.23 1.66
Km 0/2-4 Trees ( L) 2 x 11 1.00 0.23 5.06
E.B, poles 2 x 5 0.40 0.23 0.92
(R) 2 x 11 1.50 0.23 7.59
E.B, poles 2 x 4 0.40 0.23 0.74
Km 0/4-6 Trees (L) 2 x 8 1.00 0.23 3.68
E.B, poles 2 x 5 0.40 0.23 0.92
(R) 2 x 11 1.20 0.23 6.07
E.B, poles 2 x 7 0.40 0.23 1.29
km 0/6 - 8 E.B, poles 2 x 10 0.40 0.23 1.84
E.B, poles 2 x 9 0.40 0.23 1.66
km 0/8-10 Trees ( L) 2 x 7 1.00 0.23 3.22
E.B, poles 2 x 5 0.40 0.23 0.92
(R) 2 x 9 1.00 0.23 4.14
E.B, poles 2 x 5 0.40 0.23 0.92
Km 0/4 Cut Stone Slab Culvert
parapets Side 2 x 2 2.50 1.50 15.00
Top Surface 2 x 1 2.50 0.20 1.00
Front 2 x 2 1.50 0.30 1.80
Km 0/10 Cut Stone Slab Culvert
parapets Side 2 x 2 2.50 1.50 15.00
Top Surface 2 x 1 2.50 0.20 1.00
Front 2 x 2 1.50 0.30 1.80
Km 1/0 - 2/0
km 1/0- 2 E.B, poles 2 x 6 0.40 0.23 1.10
E.B, poles 2 x 8 0.40 0.23 1.47
Km 1/2-4 Trees (L) 2 x 17 1.20 0.23 9.38
E.B, poles 2 x 15 0.40 0.23 2.76
(R) 2 x 8 1.50 0.23 5.52
E.B, poles 2 x 16 0.40 0.23 2.94
Km 1/4-6 Trees (L) 2 x 7 1.00 0.23 3.22
E.B, poles 2 x 8 0.40 0.23 1.47
(R) 2 x 2 1.00 0.23 0.92
E.B, poles 2 x 12 0.40 0.23 2.21
km 1/6 - 8 Trees ( L) 2 x 3 1.50 0.23 2.07
E.B, poles 2 x 11 0.40 0.23 2.02
E.B, poles 2 x 14 0.40 0.23 2.58
km 1/8-10 E.B, poles 2 x 5 0.40 0.23 0.92
E.B, poles 2 x 5 0.40 0.23 0.92
Km 2/0 - 3/0
km 2/0- 2 Trees ( L) 2 x 5 1.00 0.23 2.30
E.B, poles 2 x 14 0.40 0.23 2.58
(R) 2 x 3 1.00 0.23 1.38
E.B, poles 2 x 14 0.40 0.23 2.58
Km 2/2-4 E.B, poles 2 x 13 0.40 0.23 2.39
E.B, poles 2 x 7 0.40 0.23 1.29
Km 2/4-6 E.B, poles 2 x 14 0.40 0.23 2.58
(R) 2 x 11 1.20 0.23 6.07
E.B, poles 2 x 4 0.40 0.23 0.74
km 2/6 - 8 Trees ( L) 2 x 1 1.00 0.23 0.46
E.B, poles 2 x 11 0.40 0.23 2.02
(R) 2 x 3 1.00 0.23 1.38
E.B, poles 2 x 1 0.40 0.23 0.18
km 2/8-10 Trees ( L) 2 x 1 1.00 0.23 0.46
E.B, poles 2 x 4 0.40 0.23 0.74
E.B, poles 2 x 3 0.40 0.23 0.55
Km 2/4 Box Culvert
parapets Side 2 x 2 5.50 0.60 13.20
Top Surface 2 x 1 5.50 0.55 6.05
Front 2 x 2 0.60 0.30 0.72
Km 3/0 - 4/0
km 3/0- 2 Trees ( L) 2 x 6 1.20 0.23 3.31
E.B, poles 2 x 5 0.40 0.23 0.92
E.B, poles 2 x 12 0.40 0.23 2.21
Km 3/2-4 Trees (L) 2 x 5 1.00 0.23 2.30
E.B, poles 2 x 9 0.40 0.23 1.66
(R) 2 x 4 1.20 0.23 2.21
E.B, poles 2 x 10 0.40 0.23 1.84
Km 3/4-6 Trees (L) 2 x 2 1.00 0.23 0.92
E.B, poles 2 x 14 0.40 0.23 2.58
E.B, poles 2 x 17 0.40 0.23 3.13
km 3/6 - 8 Trees ( L) 2 x 9 1.00 0.23 4.14
E.B, poles 2 x 9 0.40 0.23 1.66
E.B, poles 2 x 17 0.40 0.23 3.13
km 3/8-10 E.B, poles 2 x 9 0.40 0.23 1.66
E.B, poles 2 x 9 0.40 0.23 1.66
Km 3/8 Minor Bridge
parapets Side 2 x 2 8.00 0.85 27.20
Top Surface 2 x 1 8.00 0.45 7.20
Front 2 x 2 0.84 0.45 1.51
Km 3/8 RCC Slab Culvert
parapets Side 2 x 2 4.00 0.60 9.60
Top Surface 2 x 1 4.00 0.45 3.60
Front 2 x 2 0.60 0.45 1.08
Km 4/0 - 5/0
km 4/0- 2 Trees ( L) 2 x 8 1.00 0.23 3.68
E.B, poles 2 x 4 0.40 0.23 0.74
E.B, poles 2 x 4 0.40 0.23 0.74
Km 4/2-4 E.B, poles 2 x 12 0.40 0.23 2.21
(R) 2 x 1 1.50 0.23 0.69
E.B, poles 2 x 3 0.40 0.23 0.55
Km 4/4-6 Trees (L) 2 x 1 1.00 0.23 0.46
E.B, poles 2 x 6 0.40 0.23 1.10
E.B, poles 2 x 7 0.40 0.23 1.29
km 4/6 - 8 Trees ( L) 2 x 1 1.20 0.23 0.55
E.B, poles 2 x 5 0.40 0.23 0.92
E.B, poles 2 x 7 0.40 0.23 1.29
km 4/8-10 E.B, poles 2 x 5 0.40 0.23 0.92
(R) 2 x 2 1.00 0.23 0.92
E.B, poles 2 x 4 0.40 0.23 0.74
Km 4/6 Single Row Pipe Culvert
parapets Side 2 x 2 2.00 0.60 4.80
Top Surface 2 x 1 2.00 0.50 2.00
Front 2 x 2 0.50 0.40 0.80
Km 4/10 RCC Slab Culvert
parapets Side 2 x 2 5.00 0.60 12.00
Top Surface 2 x 1 5.00 0.50 5.00
Front 2 x 2 0.60 0.40 0.96
Total 290.75
Sqm
2 Black banding the trees, guide stones, bridge electric post etc with two coats of coal
tar including cost and conveyance of coal tar brush, cleaning and marking and all
other incidental charges etc.,
Km 0/0 - 1/0
km 0/0- 2 E.B, poles 1 x 8 0.40 0.23 0.74
E.B, poles 1 x 9 0.40 0.23 0.83
Km 0/2-4 Trees ( L) 1 x 11 1.00 0.23 2.53
E.B, poles 1 x 5 0.40 0.23 0.46
(R) 1 x 11 1.50 0.23 3.80
E.B, poles 1 x 4 0.40 0.23 0.37
Km 0/4-6 Trees (L) 1 x 8 1.00 0.23 1.84
E.B, poles 1 x 5 0.40 0.23 0.46
(R) 1 x 11 1.20 0.23 3.04
E.B, poles 1 x 7 0.40 0.23 0.64
km 0/6 - 8 E.B,TB poles 1 x 10 0.40 0.23 0.92
E.B, poles 1 x 9 0.40 0.23 0.83
km 0/8-10 Trees ( L) 1 x 7 1.00 0.23 1.61
E.B, poles 1 x 5 0.40 0.23 0.46
(R) 1 x 9 1.00 0.23 2.07
E.B, poles 1 x 5 0.40 0.23 0.46
Km 1/0 - 2/0 1
km 1/0- 2 E.B, poles 1 x 6 0.40 0.23 0.55
E.B, poles 1 x 8 0.40 0.23 0.74
Km 1/2-4 Trees (L) 1 x 17 1.20 0.23 4.69
E.B, poles 1 x 15 0.40 0.23 1.38
(R) 1 x 8 1.50 0.23 2.76
E.B, poles 1 x 16 0.40 0.23 1.47
Km 1/4-6 Trees (L) 1 x 7 1.00 0.23 1.61
E.B, poles 1 x 8 0.40 0.23 0.74
(R) 1 x 2 1.00 0.23 0.46
E.B, poles 1 x 12 0.40 0.23 1.10
km 1/6 - 8 Trees ( L) 1 x 3 1.50 0.23 1.04
E.B, poles 1 x 11 0.40 0.23 1.01
E.B, poles 1 x 14 0.40 0.23 1.29
km 1/8-10 E.B, poles 1 x 5 0.40 0.23 0.46
E.B, poles 1 x 5 0.40 0.23 0.46
Km 2/0 - 3/0 1
km 2/0- 2 Trees ( L) 1 x 5 1.00 0.23 1.15
E.B, poles 1 x 14 0.40 0.23 1.29
(R) 1 x 3 1.00 0.23 0.69
E.B, poles 1 x 14 0.40 0.23 1.29
Km 2/2-4 E.B, poles 1 x 13 0.40 0.23 1.20
E.B, poles 1 x 7 0.40 0.23 0.64
Km 2/4-6 E.B, poles 1 x 14 0.40 0.23 1.29
(R) 1 x 11 1.20 0.23 3.04

4 0.23
E.B, poles 1 x 0.40 0.37
km 2/6 - 8 Trees ( L) 1 x 1 1.00 0.23 0.23
E.B, poles 1 x 11 0.40 0.23 1.01
(R) 1 x 3 1.00 0.23 0.69
E.B, poles 1 x 1 0.40 0.23 0.09
km 2/8-10 Trees ( L) 1 x 1 1.00 0.23 0.23
E.B, poles 1 x 4 0.40 0.23 0.37
E.B, poles 1 x 3 0.40 0.23 0.28
Km 3/0 - 4/0 1
km 3/0- 2 Trees ( L) 1 x 6 1.20 0.23 1.66
E.B, poles 1 x 5 0.40 0.23 0.46
E.B, poles 1 x 12 0.40 0.23 1.10
Km 3/2-4 Trees (L) 1 x 5 1.00 0.23 1.15
E.B, poles 1 x 9 0.40 0.23 0.83
(R) 1 x 4 1.20 0.23 1.10
E.B, poles 1 x 10 0.40 0.23 0.92
Km 3/4-6 Trees (L) 1 x 2 1.00 0.23 0.46
E.B, poles 1 x 14 0.40 0.23 1.29
E.B, poles 1 x 17 0.40 0.23 1.56
km 3/6 - 8 Trees ( L) 1 x 9 1.00 0.23 2.07
E.B, poles 1 x 9 0.40 0.23 0.83
E.B, poles 1 x 17 0.40 0.23 1.56
km 3/8-10 E.B, poles 1 x 9 0.40 0.23 0.83
E.B, poles 1 x 9 0.40 0.23 0.83
Km 4/0 - 5/0 1
km 4/0- 2 Trees ( L) 1 x 8 1.00 0.23 1.84
E.B, poles 1 x 4 0.40 0.23 0.37
E.B, poles 1 x 4 0.40 0.23 0.37
Km 4/2-4 E.B, poles 1 x 12 0.40 0.23 1.10
(R) 1 x 1 1.50 0.23 0.35
E.B, poles 1 x 3 0.40 0.23 0.28
Km 4/4-6 Trees (L) 1 x 1 1.00 0.23 0.23
E.B, poles 1 x 6 0.40 0.23 0.55
E.B, poles 1 x 7 0.40 0.23 0.64
km 4/6 - 8 Trees ( L) 1 x 1 1.20 0.23 0.28
E.B, poles 1 x 5 0.40 0.23 0.46
E.B, poles 1 x 7 0.40 0.23 0.64
km 4/8-10 E.B, poles 1 x 5 0.40 0.23 0.46
(R) 1 x 2 1.00 0.23 0.46
E.B, poles 1 x 4 0.40 0.23 0.37
Total 79.73
Sqm
3 Painting with two coats of synthetic enamel paint including cost and conveyance
of all materials and including all labour charges and incidential charges etc.,
Board Leg
km 0/4-6 2 x 1 2.3 0.6 2.76
km 0/6-8 2 x 1 2.3 0.6 2.76
km 0/8-10 2 x 2 2.3 0.6 5.52
km 1/0-2 2 x 2 2.3 0.6 5.52
km 1/2-4 2 x 2 2.3 0.6 5.52
km 1/6-8 2 x 1 2.3 0.6 2.76
km 1/8-10 2 x 1 2.3 0.6 2.76
km 2/0-2 2 x 1 2.3 0.6 2.76
km 2/2-4 2 x 2 2.3 0.6 5.52
km 2/4-6 2 x 1 2.3 0.6 2.76
km 3/0-2 2 x 1 2.3 0.6 2.76
km 3/2-4 2 x 1 2.3 0.6 2.76
km 3/4-6 2 x 1 2.3 0.25 1.15
km 3/6-8 2 x 1 2.3 0.25 1.15
km 3/8-10 2 x 2 2.3 0.25 2.3
km 4/6-8 2 x 1 2.6 0.25 1.3
km 4/8-10 2 x 10 2.6 0.25 13

km 0/0-2 1 x 1 2.3 0.6 1.38


km 0/2-4 1 x 3 2.3 0.6 4.14
km 0/4-6 1 x 4 2.3 0.6 5.52
km 0/6-8 1 x 3 2.3 0.6 4.14
km 0/8-10 1 x 1 2.3 0.6 hm 2 1.38
km 1/0-2 1 x 1 2.3 0.6 hm 2 1.38
km 1/2-4 1 x 6 2.3 0.6 8.28
km 1/4-6 1 x 5 2.3 0.6 6.9
km 1/6-8 1 x 6 2.3 0.6 8.28
km 1/8-10 1 x 2 2.3 0.6 2.76
km 2/2-4 1 x 2 2.3 0.6 2.76
km 2/4-6 1 x 3 2.3 0.6 hm 2 4.14
km 2/6-8 1 x 3 2.3 0.6 4.14
km 2/8-10 1 x 1 2.3 0.6 1.38
km 3/0-2 1 x 1 2.3 0.6 bb 1 1.38
km 3/2-4 1 x 1 2.3 0.6 1.38
km 3/4-6 1 x 2 2.3 0.6 2.76
km 3/6-8 1 x 1 2.6 0.6 1.56
km 3/8-10 1 x 1 2.6 0.25 0.65
km 4/0-2 1 x 1 2.6 0.25 0.65
km 4/2-4 1 x 1 2.6 0.25 0.65
km 4/4-6 1 x 1 2.6 0.25 0.65
km 4/8-10 1 x 2.6 0.25 hm 1 0
Sub Tota 129.32
Sqm
Circular Median
km 5/0
Parapet Side 1 x 1 95 0.55 52.25
Top Surface 1 x 1 95 0.45 42.75
Triangular Median
Front
Parapet Sides 1 x 2 81.5 0.25 40.75
Top Surface 1 x 1 81.5 0.15 12.23
Left Side
Parapet Sides 1 x 2 48.5 0.25 24.25
Top Surface 1 x 1 48.5 0.15 7.28
Back Side
Parapet Sides 1 x 2 21.5 0.25 10.75
Top Surface 1 x 1 21.5 0.15 3.23
SubTotal 193.49
Sqm
Retaining wall
km 4/10 (L)
Parapet Side 1 x 2 70 1 140
Top Surface 1 x 1 70 0.2 14
Front 1 x 2 1 0.3 0.6
km 4/10 (R )
Parapet Side 1 x 2 100 1 200
Top Surface 1 x 1 100 0.2 20
Front 1 x 2 1 0.3 0.6
km 5/2 (L)
Parapet Side 1 x 2 131 1 262
Top Surface 1 x 1 131 0.2 26.2
Front 1 x 2 1 0.3 0.6
km 5/2 (R )
Parapet Side 1 x 2 95 1 190
Top Surface 1 x 1 95 0.2 19
Front 1 x 2 1 0.3 0.6
Sub Tota 873.6
Sqm
Total 1196.41
Sqm
4 Clearing and grubbing road land:In area of light jungle-201 Clearing and
grubbing road land including uprooting rank vegetation, grass, bushes, shrubs,
saplings and trees firth upto 300 mm, removal of stumps of trees cut earlier and
disposal of unserviceable materials and stacking of serviceable materials to be used
or auctioned, upto a lead of 1000 m including removal and disposal of top organic
soil not exceeding 150 mm in thickness.

Km 3/6 - 3/8 1 x 2 200 1.5 600


Reduction 40% -240
Total 360
Sqm
0.036
Hectare
5 (Vent Clearance) Earthwork Excavation deploying earth moving machinary for
Culvert channels an forming bunds on either side and depositing the earth on banks
including heavy jungle clearance and removal of high berms up rooting the heavy
jungle clearance etc., Complate (Sl.No. 90)

km 0/4 RCC 2.50 m Span slab culvert


(0.25+0.30)/2
U/S 1 X 1 25 4.50 0.275 30.94
(0.20+0.30)/2
D/S 1 X 1 20 4.50 0.250 22.5
km 0/10 RCC 2.50 m Span slab culvert
(0.30+0.40)/2
U/S 1 X 1 30 4.00 0.350 42
(0.25+0.30)/2
D/S 1 X 1 25 4.00 0.275 27.5
km 2/4 RCC 5.50 m Span slab culvert
(0.25+0.30)/2
U/S 1 X 1 25 6.00 0.275 41.25
(0.25+0.40)/2
D/S 1 X 1 20 6.00 0.325 39
km 3/8 RCC 8.00 m Span Minor Bridge
(0.25+0.30)/2
U/S 1 X 1 25 16.00 0.275 110
(0.25+0.40)/2
D/S 1 X 1 30 16.00 0.325 156
km 3/8 RCC 4.00 m Span slab culvert
(0.25+0.30)/2
U/S 1 X 1 25 6.00 0.275 41.25
(0.25+0.40)/2
D/S 1 X 1 20 6.00 0.325 39
km 4/6 RCC 2.00 m Span slab culvert
(0.25+0.30)/2
U/S 1 X 1 25 4.00 0.275 27.5
(0.25+0.40)/2
D/S 1 X 1 20 4.00 0.325 26
km 4/10 RCC 5.00 m Span slab culvert
(0.25+0.30)/2
U/S 1 X 1 25 8.00 0.275 55
(0.25+0.40)/2
D/S 1 X 1 20 8.00 0.325 52
Sub Total 709.94
Cum
6 Providing and Fixing of Retro - Reflectrorised Caution, Mandatory
and Informatory signs (without definition board) made out of High
Intensity Prismatic Grade Sheeting confirming to Type-IV standards of
IRC67:2012 and ASTM D 4956 -09, specification and fixed over 2mm thick
Aluminium sheet fixed over a back supporting frame of
25mmx25mmx3mm Mild Steel angle and supported on a mild steel angle
post 75X75X6mm with a clear height not less than 2.10m from the ground
level to the bottom of the sign board and 0.60m below ground level. The
sign post should be painted as per IRC 67-2012 and frimly fixed to the
ground by means of properly designed foudation with M15 grade cement
concrete 45cmx45cmx60cm size including cost and conveyance of all
materials, equipment, Machinery and labour with all leads and lifts,
loading charges necessary for satisfactory completion of the work as
directed by the engineeer in charge . High intensity Retro - Reflectro sheet
shal consist of minimum coefficient of Retro - Reflectro as per Table 6.6 of
IRC 67:2012. The retro-reflective sheeting shall be covered under 7 year
warranty issued for field performance and a certied copy of these years
outdoor exposure report shall be obtained as per IRC 67:2012. (as per
MPRT&H Specification No. 801)

90 cm equilateral triangle
km 0/2 Plus Junction 1 x 2 2
km 0/10 Plus junction 1 x 2 2
km 1/2 SZ 1 x 2 2
km 1/8 T-Junction 1 x 2 2
km 2/6 T-Junction 1 x 2 2
km 2/8 Plus Junction 1 x 2 2
km 3/4 Y-Junction 1 x 2 2
Total 14
Nos
7 Providing and erecting direction and Retro - Reflectorised sign -made out
of cube corner micro prismatic grade sheeting confirming to Type -IV
standards of IRC 67-2012 and ASTMD 4956-09 Specification and fixed
over 2mm thick aluminium asheet fixed ocer a back supporting frame of
25mmx25mmx3mm mild steel angle and supported on a mid steel angle
post 75x75x6mm with clear height not less than 2.1m form the goround
level to the bottom of the signboard and 0.6m below ground level. the sign
post should be painted as per IRC 67-2012 and firmly fixed to the ground
bymeans of properly desingned foundation with M15 grade cement
concrete 45cm x45cm x60cm size including cost and conveyance of all
materials and equipment , machinary and labour with all leads and lifts,
loading charges necessary for satifactory compeletion of the workers
directed by the engineer in charge. micro prismatic grade retro -reflectro
sheet shall consists of minimum co efficient of Retro Reflection as per
table 6.9 of IRC 67-2012. the retro reflective sheeting shall be covered
under 7 year warranty issued for field performnce and a certified copy of
three years outdoor exposure report shall be obtained as per IRC 67-2012
as per MORTH specification no.801 (PLACE IDENTIFICATION BOARD)
(Morethan 0.90 Sqm)

km 1/2 SZ 1 x 2 2
km 2/6 SZ 1 x 2 2
km 2/8 Plus Junction 1 x 2 2
km 4/10 Plus junction 1 x 2 2
Total 8
Nos
8 Provision for clearing scrub jungles in berms, removing soil deposited in
carriage way, High berms cutting & draining of rain water

Km 0/4 - 1/0
km 0/4 1 x 2 120 1 240
km 0/6 1 x 2 120 1 240
km 0/8 1 x 2 100 1 200
km 0/10 1 x 2 160 1 320
km 1/2 - 1/10
km 1/2 1 x 2 120 1 240
km 1/4 1 x 2 160 1 320
km 1/6 1 x 2 100 1 200
km 1/8 1 x 2 120 1 240
km 1/10 1 x 2 120 1 240
km 2/8 - 2/10
km 2/10 1 x 2 120 1 240
km 4/4 - 4/6
km 4/6 1 x 2 120 1 240
Total 2720
Sqm
0.272
Hectare
9 Construction of unlined surface drains of average cross sectional area of 0.40 sqm
in soil to specified lines, grades, levels and dimensions to the requirement of clauses
301 & 309, excavated material to be used in embankment within a lead of 50 metres
(average lead of 25 metres)

km 3/4 - 3/6 L.S 1 x 1 170 170


km 3/6 - 3/8 L.S 1 x 1 180 180
km 3/8 - 4/0 L.S 1 x 1 150 150
Total 500
Rm
Name of work : Urgent Repairs to Madurai - Cochin Road in Km 0/0 - 5/0 of NH

ABSTRACT ESTIMATE

Est.Amt. 4.90
Sl.
Description of work Qty Rate
No
1 White washing the trees culverts bridge edge 290.75 19.47
stones guide stones - EB Post etc with shell
lime into two coats including cost and
conveyance of shell lime gum Kanjee - Water
binding materials brushes and all other
incidental charges etc complete

2 Black banding the trees, guide stones, bridge 79.73 67.96


electric post etc with two coats of coal tar
including cost and conveyance of coal tar
brush, cleaning and marking and all other
incidental charges etc complete

3 Painting with two coats of synthetic enamel 1196.41 138.64


paint including cost and conveyance of all
materials and including all labour charges
and incidential charges etc.,

4 Clearing and grubbing road land:In area of 0.04 76428.44


light jungle-201 Clearing and grubbing road
land including uprooting rank vegetation,
grass, bushes, shrubs, saplings and trees firth
upto 300 mm, removal of stumps of trees cut
earlier and disposal of unserviceable materials
and stacking of serviceable materials to be
used or auctioned, upto a lead of 1000 m
including removal and disposal of top organic
soil not exceeding 150 mm in thickness.

5 (Vent Clearance) Earthwork Excavation 709.94 63.60


deploying earth moving machinary for Culvert
channels an forming bunds on either side and
depositing the earth on banks including heavy
jungle clearance and removal of high berms up
rooting the heavy jungle clearance etc.,
Complate (Sl.No. 90)
6 Providing and Fixing of Retro - 14.00 3820.00
Reflectrorised Caution, Mandatory and
Informatory signs (without definition board)
made out of High Intensity Prismatic Grade
Sheeting confirming to Type-IV standards of
IRC67:2012 and ASTM D 4956 -09,
specification and fixed over 2mm thick
Aluminium sheet fixed over a back supporting
frame of 25mmx25mmx3mm Mild Steel angle
and supported on a mild steel angle post
75X75X6mm with a clear height not less than
2.10m from the ground level to the bottom of
the sign board and 0.60m below ground level.
The sign post should be painted as per IRC 67-
2012 and frimly fixed to the ground by means
of properly designed foudation with M15 grade
cement concrete 45cmx45cmx60cm size
including cost and conveyance of all materials,
equipment, Machinery and labour with all
leads and lifts, loading charges necessary for
satisfactory completion of the work as directed
by the engineeer in charge . High intensity
Retro - Reflectro sheet shal consist of
minimum coefficient of Retro - Reflectro as per
Table 6.6 of IRC 67:2012. The retro-reflective
sheeting shall be covered under 7 year
warranty issued for field performance and a
certied copy of these years outdoor exposure
report shall be obtained as per IRC 67:2012.
(as per MPRT&H Specification No. 801)
7 Providing and erecting direction and Retro 8.00 8740.00
- Reflectorised sign -made out of cube corner
micro prismatic grade sheeting confirming to
Type -IV standards of IRC 67-2012 and
ASTMD 4956-09 Specification and fixed over
2mm thick aluminium asheet fixed ocer a back
supporting frame of 25mmx25mmx3mm mild
steel angle and supported on a mid steel angle
post 75x75x6mm with clear height not less
than 2.1m form the goround level to the
bottom of the signboard and 0.6m below
ground level. the sign post should be painted
as per IRC 67-2012 and firmly fixed to the
ground bymeans of properly desingned
foundation with M15 grade cement concrete
45cm x45cm x60cm size including cost and
conveyance of all materials and equipment ,
machinary and labour with all leads and lifts,
loading charges necessary for satifactory
compeletion of the workers directed by the
engineer in charge. micro prismatic grade retro
-reflectro sheet shall consists of minimum co
efficient of Retro Reflection as per table 6.9 of
IRC 67-2012. the retro reflective sheeting shall
be covered under 7 year warranty issued for
field performnce and a certified copy of three
years outdoor exposure report shall be
obtained as per IRC 67-2012 as per MORTH
specification no.801 (PLACE IDENTIFICATION
BOARD) (Morethan 0.90 Sqm)
8 Provision for clearing scrub jungles in berms, 0.27 20345.62
removing soil deposited in carriage way, High
berms cutting & draining of rain water

9 Construction of unlined surface drains of 500.00 86.60


average cross sectional area of 0.40 sqm in soil
to specified lines, grades, levels and
dimensions to the requirement of clauses 301
& 309, excavated material to be used in
embankment within a lead of 50 metres
(average lead of 25 metres)

Sub Total
Add GST 12%
Sub Total
Agency Charges 9%
Contingecies
Total
Road in Km 0/0 - 5/0 of NH 49

Lakhs

Per Amount

Per Sqm 5660.90

Per Sqm 5418.45

Per Sqm 165870.28

Hectare 2751.42

Per Cum 45152.18


Per Nos 53480.00
Per Nos 69920.00
Per 5534.01
Hectare

Rm 43300.00

Sub Total 397087.25


Add GST 12% 47650.00
Sub Total 444737.25
Agency Charges 9% 40026.00
Contingecies 5236.75
Total 490000.00
DATA
Name of work : Urgent Repairs to Madurai - Cochin Road in Km 0/0 - 5/0 of NH 49
Qty. Unit Description Rate
1 White washing the trees culverts bridge edge
stones guide stones - EB Post etc with shell lime
into two coats including cost and conveyance of
shell lime gum Kanjee - water binding materials
brushes and all other incidental charges etc
complete.
0.07 M2 Cost of shell lime 1248
1.60 No Mason II class 508

0.50 No Mazdoor I Class 355


2.70 No Mazdoor II Class 320
Brush
Sundries

Rs.2058.10/100 Sqm
2 Black banding the trees, guide stones, bridge
electric post etc with two coats of coal tar including
cost and conveyance of coal tar brush, cleaning
and marking and all other incidental charges etc
complete.

4.2 kg Cost of coal tar(Sl No 152) 38


1.6 Nos Mazdoor II Class 320
Brush
Sundries

Rs. 1084.80/10 Sqm


3 Painting with two coats of synthetic enamel paint
including cost and conveyance of all materials and
including all labour charges and incidential charges
etc.,

1.40 Lr Synthetic Enamel Paint 274.00


2.20 Nos Painter 1 class 454.00
Sundries For Brush
Rate for 10 Sqm
Rate for 1 Sqm
3 Provision for clearing scrub jungles in berms,
removing soil deposited in carriage way, High
berms cutting & draining of rain water
Rate for 1 Hectare
4 Surface Drains in Soil:309 as per Common Data
2018 - 2019, S.No. 3.24
Rate for 1 meter
0/0 - 5/0 of NH 49
Amount

87.36
812.80

177.50
864.00
5.00
0.34
1947.00
19.47

159.60
512.00
6.50
1.50
679.60
67.96

383.60
998.80
4
1386.40
138.64
20345.62

86.60