Detailed Estimate
Sl.
Description of work No L B D Qty.
No.
1 White washing the trees culverts bridge edge stones guide stones - EB Post etc with
shell lime into two coats including cost and conveyance of shell lime gum Kanjee -
Water binding materials brushes and all other incidental charges etc.,
Km 0/0 - 1/0
km 0/0- 2 E.B, poles 2 x 8 0.40 0.23 1.47
E.B, poles 2 x 9 0.40 0.23 1.66
Km 0/2-4 Trees ( L) 2 x 11 1.00 0.23 5.06
E.B, poles 2 x 5 0.40 0.23 0.92
(R) 2 x 11 1.50 0.23 7.59
E.B, poles 2 x 4 0.40 0.23 0.74
Km 0/4-6 Trees (L) 2 x 8 1.00 0.23 3.68
E.B, poles 2 x 5 0.40 0.23 0.92
(R) 2 x 11 1.20 0.23 6.07
E.B, poles 2 x 7 0.40 0.23 1.29
km 0/6 - 8 E.B, poles 2 x 10 0.40 0.23 1.84
E.B, poles 2 x 9 0.40 0.23 1.66
km 0/8-10 Trees ( L) 2 x 7 1.00 0.23 3.22
E.B, poles 2 x 5 0.40 0.23 0.92
(R) 2 x 9 1.00 0.23 4.14
E.B, poles 2 x 5 0.40 0.23 0.92
Km 0/4 Cut Stone Slab Culvert
parapets Side 2 x 2 2.50 1.50 15.00
Top Surface 2 x 1 2.50 0.20 1.00
Front 2 x 2 1.50 0.30 1.80
Km 0/10 Cut Stone Slab Culvert
parapets Side 2 x 2 2.50 1.50 15.00
Top Surface 2 x 1 2.50 0.20 1.00
Front 2 x 2 1.50 0.30 1.80
Km 1/0 - 2/0
km 1/0- 2 E.B, poles 2 x 6 0.40 0.23 1.10
E.B, poles 2 x 8 0.40 0.23 1.47
Km 1/2-4 Trees (L) 2 x 17 1.20 0.23 9.38
E.B, poles 2 x 15 0.40 0.23 2.76
(R) 2 x 8 1.50 0.23 5.52
E.B, poles 2 x 16 0.40 0.23 2.94
Km 1/4-6 Trees (L) 2 x 7 1.00 0.23 3.22
E.B, poles 2 x 8 0.40 0.23 1.47
(R) 2 x 2 1.00 0.23 0.92
E.B, poles 2 x 12 0.40 0.23 2.21
km 1/6 - 8 Trees ( L) 2 x 3 1.50 0.23 2.07
E.B, poles 2 x 11 0.40 0.23 2.02
E.B, poles 2 x 14 0.40 0.23 2.58
km 1/8-10 E.B, poles 2 x 5 0.40 0.23 0.92
E.B, poles 2 x 5 0.40 0.23 0.92
Km 2/0 - 3/0
km 2/0- 2 Trees ( L) 2 x 5 1.00 0.23 2.30
E.B, poles 2 x 14 0.40 0.23 2.58
(R) 2 x 3 1.00 0.23 1.38
E.B, poles 2 x 14 0.40 0.23 2.58
Km 2/2-4 E.B, poles 2 x 13 0.40 0.23 2.39
E.B, poles 2 x 7 0.40 0.23 1.29
Km 2/4-6 E.B, poles 2 x 14 0.40 0.23 2.58
(R) 2 x 11 1.20 0.23 6.07
E.B, poles 2 x 4 0.40 0.23 0.74
km 2/6 - 8 Trees ( L) 2 x 1 1.00 0.23 0.46
E.B, poles 2 x 11 0.40 0.23 2.02
(R) 2 x 3 1.00 0.23 1.38
E.B, poles 2 x 1 0.40 0.23 0.18
km 2/8-10 Trees ( L) 2 x 1 1.00 0.23 0.46
E.B, poles 2 x 4 0.40 0.23 0.74
E.B, poles 2 x 3 0.40 0.23 0.55
Km 2/4 Box Culvert
parapets Side 2 x 2 5.50 0.60 13.20
Top Surface 2 x 1 5.50 0.55 6.05
Front 2 x 2 0.60 0.30 0.72
Km 3/0 - 4/0
km 3/0- 2 Trees ( L) 2 x 6 1.20 0.23 3.31
E.B, poles 2 x 5 0.40 0.23 0.92
E.B, poles 2 x 12 0.40 0.23 2.21
Km 3/2-4 Trees (L) 2 x 5 1.00 0.23 2.30
E.B, poles 2 x 9 0.40 0.23 1.66
(R) 2 x 4 1.20 0.23 2.21
E.B, poles 2 x 10 0.40 0.23 1.84
Km 3/4-6 Trees (L) 2 x 2 1.00 0.23 0.92
E.B, poles 2 x 14 0.40 0.23 2.58
E.B, poles 2 x 17 0.40 0.23 3.13
km 3/6 - 8 Trees ( L) 2 x 9 1.00 0.23 4.14
E.B, poles 2 x 9 0.40 0.23 1.66
E.B, poles 2 x 17 0.40 0.23 3.13
km 3/8-10 E.B, poles 2 x 9 0.40 0.23 1.66
E.B, poles 2 x 9 0.40 0.23 1.66
Km 3/8 Minor Bridge
parapets Side 2 x 2 8.00 0.85 27.20
Top Surface 2 x 1 8.00 0.45 7.20
Front 2 x 2 0.84 0.45 1.51
Km 3/8 RCC Slab Culvert
parapets Side 2 x 2 4.00 0.60 9.60
Top Surface 2 x 1 4.00 0.45 3.60
Front 2 x 2 0.60 0.45 1.08
Km 4/0 - 5/0
km 4/0- 2 Trees ( L) 2 x 8 1.00 0.23 3.68
E.B, poles 2 x 4 0.40 0.23 0.74
E.B, poles 2 x 4 0.40 0.23 0.74
Km 4/2-4 E.B, poles 2 x 12 0.40 0.23 2.21
(R) 2 x 1 1.50 0.23 0.69
E.B, poles 2 x 3 0.40 0.23 0.55
Km 4/4-6 Trees (L) 2 x 1 1.00 0.23 0.46
E.B, poles 2 x 6 0.40 0.23 1.10
E.B, poles 2 x 7 0.40 0.23 1.29
km 4/6 - 8 Trees ( L) 2 x 1 1.20 0.23 0.55
E.B, poles 2 x 5 0.40 0.23 0.92
E.B, poles 2 x 7 0.40 0.23 1.29
km 4/8-10 E.B, poles 2 x 5 0.40 0.23 0.92
(R) 2 x 2 1.00 0.23 0.92
E.B, poles 2 x 4 0.40 0.23 0.74
Km 4/6 Single Row Pipe Culvert
parapets Side 2 x 2 2.00 0.60 4.80
Top Surface 2 x 1 2.00 0.50 2.00
Front 2 x 2 0.50 0.40 0.80
Km 4/10 RCC Slab Culvert
parapets Side 2 x 2 5.00 0.60 12.00
Top Surface 2 x 1 5.00 0.50 5.00
Front 2 x 2 0.60 0.40 0.96
Total 290.75
Sqm
2 Black banding the trees, guide stones, bridge electric post etc with two coats of coal
tar including cost and conveyance of coal tar brush, cleaning and marking and all
other incidental charges etc.,
Km 0/0 - 1/0
km 0/0- 2 E.B, poles 1 x 8 0.40 0.23 0.74
E.B, poles 1 x 9 0.40 0.23 0.83
Km 0/2-4 Trees ( L) 1 x 11 1.00 0.23 2.53
E.B, poles 1 x 5 0.40 0.23 0.46
(R) 1 x 11 1.50 0.23 3.80
E.B, poles 1 x 4 0.40 0.23 0.37
Km 0/4-6 Trees (L) 1 x 8 1.00 0.23 1.84
E.B, poles 1 x 5 0.40 0.23 0.46
(R) 1 x 11 1.20 0.23 3.04
E.B, poles 1 x 7 0.40 0.23 0.64
km 0/6 - 8 E.B,TB poles 1 x 10 0.40 0.23 0.92
E.B, poles 1 x 9 0.40 0.23 0.83
km 0/8-10 Trees ( L) 1 x 7 1.00 0.23 1.61
E.B, poles 1 x 5 0.40 0.23 0.46
(R) 1 x 9 1.00 0.23 2.07
E.B, poles 1 x 5 0.40 0.23 0.46
Km 1/0 - 2/0 1
km 1/0- 2 E.B, poles 1 x 6 0.40 0.23 0.55
E.B, poles 1 x 8 0.40 0.23 0.74
Km 1/2-4 Trees (L) 1 x 17 1.20 0.23 4.69
E.B, poles 1 x 15 0.40 0.23 1.38
(R) 1 x 8 1.50 0.23 2.76
E.B, poles 1 x 16 0.40 0.23 1.47
Km 1/4-6 Trees (L) 1 x 7 1.00 0.23 1.61
E.B, poles 1 x 8 0.40 0.23 0.74
(R) 1 x 2 1.00 0.23 0.46
E.B, poles 1 x 12 0.40 0.23 1.10
km 1/6 - 8 Trees ( L) 1 x 3 1.50 0.23 1.04
E.B, poles 1 x 11 0.40 0.23 1.01
E.B, poles 1 x 14 0.40 0.23 1.29
km 1/8-10 E.B, poles 1 x 5 0.40 0.23 0.46
E.B, poles 1 x 5 0.40 0.23 0.46
Km 2/0 - 3/0 1
km 2/0- 2 Trees ( L) 1 x 5 1.00 0.23 1.15
E.B, poles 1 x 14 0.40 0.23 1.29
(R) 1 x 3 1.00 0.23 0.69
E.B, poles 1 x 14 0.40 0.23 1.29
Km 2/2-4 E.B, poles 1 x 13 0.40 0.23 1.20
E.B, poles 1 x 7 0.40 0.23 0.64
Km 2/4-6 E.B, poles 1 x 14 0.40 0.23 1.29
(R) 1 x 11 1.20 0.23 3.04
4 0.23
E.B, poles 1 x 0.40 0.37
km 2/6 - 8 Trees ( L) 1 x 1 1.00 0.23 0.23
E.B, poles 1 x 11 0.40 0.23 1.01
(R) 1 x 3 1.00 0.23 0.69
E.B, poles 1 x 1 0.40 0.23 0.09
km 2/8-10 Trees ( L) 1 x 1 1.00 0.23 0.23
E.B, poles 1 x 4 0.40 0.23 0.37
E.B, poles 1 x 3 0.40 0.23 0.28
Km 3/0 - 4/0 1
km 3/0- 2 Trees ( L) 1 x 6 1.20 0.23 1.66
E.B, poles 1 x 5 0.40 0.23 0.46
E.B, poles 1 x 12 0.40 0.23 1.10
Km 3/2-4 Trees (L) 1 x 5 1.00 0.23 1.15
E.B, poles 1 x 9 0.40 0.23 0.83
(R) 1 x 4 1.20 0.23 1.10
E.B, poles 1 x 10 0.40 0.23 0.92
Km 3/4-6 Trees (L) 1 x 2 1.00 0.23 0.46
E.B, poles 1 x 14 0.40 0.23 1.29
E.B, poles 1 x 17 0.40 0.23 1.56
km 3/6 - 8 Trees ( L) 1 x 9 1.00 0.23 2.07
E.B, poles 1 x 9 0.40 0.23 0.83
E.B, poles 1 x 17 0.40 0.23 1.56
km 3/8-10 E.B, poles 1 x 9 0.40 0.23 0.83
E.B, poles 1 x 9 0.40 0.23 0.83
Km 4/0 - 5/0 1
km 4/0- 2 Trees ( L) 1 x 8 1.00 0.23 1.84
E.B, poles 1 x 4 0.40 0.23 0.37
E.B, poles 1 x 4 0.40 0.23 0.37
Km 4/2-4 E.B, poles 1 x 12 0.40 0.23 1.10
(R) 1 x 1 1.50 0.23 0.35
E.B, poles 1 x 3 0.40 0.23 0.28
Km 4/4-6 Trees (L) 1 x 1 1.00 0.23 0.23
E.B, poles 1 x 6 0.40 0.23 0.55
E.B, poles 1 x 7 0.40 0.23 0.64
km 4/6 - 8 Trees ( L) 1 x 1 1.20 0.23 0.28
E.B, poles 1 x 5 0.40 0.23 0.46
E.B, poles 1 x 7 0.40 0.23 0.64
km 4/8-10 E.B, poles 1 x 5 0.40 0.23 0.46
(R) 1 x 2 1.00 0.23 0.46
E.B, poles 1 x 4 0.40 0.23 0.37
Total 79.73
Sqm
3 Painting with two coats of synthetic enamel paint including cost and conveyance
of all materials and including all labour charges and incidential charges etc.,
Board Leg
km 0/4-6 2 x 1 2.3 0.6 2.76
km 0/6-8 2 x 1 2.3 0.6 2.76
km 0/8-10 2 x 2 2.3 0.6 5.52
km 1/0-2 2 x 2 2.3 0.6 5.52
km 1/2-4 2 x 2 2.3 0.6 5.52
km 1/6-8 2 x 1 2.3 0.6 2.76
km 1/8-10 2 x 1 2.3 0.6 2.76
km 2/0-2 2 x 1 2.3 0.6 2.76
km 2/2-4 2 x 2 2.3 0.6 5.52
km 2/4-6 2 x 1 2.3 0.6 2.76
km 3/0-2 2 x 1 2.3 0.6 2.76
km 3/2-4 2 x 1 2.3 0.6 2.76
km 3/4-6 2 x 1 2.3 0.25 1.15
km 3/6-8 2 x 1 2.3 0.25 1.15
km 3/8-10 2 x 2 2.3 0.25 2.3
km 4/6-8 2 x 1 2.6 0.25 1.3
km 4/8-10 2 x 10 2.6 0.25 13
90 cm equilateral triangle
km 0/2 Plus Junction 1 x 2 2
km 0/10 Plus junction 1 x 2 2
km 1/2 SZ 1 x 2 2
km 1/8 T-Junction 1 x 2 2
km 2/6 T-Junction 1 x 2 2
km 2/8 Plus Junction 1 x 2 2
km 3/4 Y-Junction 1 x 2 2
Total 14
Nos
7 Providing and erecting direction and Retro - Reflectorised sign -made out
of cube corner micro prismatic grade sheeting confirming to Type -IV
standards of IRC 67-2012 and ASTMD 4956-09 Specification and fixed
over 2mm thick aluminium asheet fixed ocer a back supporting frame of
25mmx25mmx3mm mild steel angle and supported on a mid steel angle
post 75x75x6mm with clear height not less than 2.1m form the goround
level to the bottom of the signboard and 0.6m below ground level. the sign
post should be painted as per IRC 67-2012 and firmly fixed to the ground
bymeans of properly desingned foundation with M15 grade cement
concrete 45cm x45cm x60cm size including cost and conveyance of all
materials and equipment , machinary and labour with all leads and lifts,
loading charges necessary for satifactory compeletion of the workers
directed by the engineer in charge. micro prismatic grade retro -reflectro
sheet shall consists of minimum co efficient of Retro Reflection as per
table 6.9 of IRC 67-2012. the retro reflective sheeting shall be covered
under 7 year warranty issued for field performnce and a certified copy of
three years outdoor exposure report shall be obtained as per IRC 67-2012
as per MORTH specification no.801 (PLACE IDENTIFICATION BOARD)
(Morethan 0.90 Sqm)
km 1/2 SZ 1 x 2 2
km 2/6 SZ 1 x 2 2
km 2/8 Plus Junction 1 x 2 2
km 4/10 Plus junction 1 x 2 2
Total 8
Nos
8 Provision for clearing scrub jungles in berms, removing soil deposited in
carriage way, High berms cutting & draining of rain water
Km 0/4 - 1/0
km 0/4 1 x 2 120 1 240
km 0/6 1 x 2 120 1 240
km 0/8 1 x 2 100 1 200
km 0/10 1 x 2 160 1 320
km 1/2 - 1/10
km 1/2 1 x 2 120 1 240
km 1/4 1 x 2 160 1 320
km 1/6 1 x 2 100 1 200
km 1/8 1 x 2 120 1 240
km 1/10 1 x 2 120 1 240
km 2/8 - 2/10
km 2/10 1 x 2 120 1 240
km 4/4 - 4/6
km 4/6 1 x 2 120 1 240
Total 2720
Sqm
0.272
Hectare
9 Construction of unlined surface drains of average cross sectional area of 0.40 sqm
in soil to specified lines, grades, levels and dimensions to the requirement of clauses
301 & 309, excavated material to be used in embankment within a lead of 50 metres
(average lead of 25 metres)
ABSTRACT ESTIMATE
Est.Amt. 4.90
Sl.
Description of work Qty Rate
No
1 White washing the trees culverts bridge edge 290.75 19.47
stones guide stones - EB Post etc with shell
lime into two coats including cost and
conveyance of shell lime gum Kanjee - Water
binding materials brushes and all other
incidental charges etc complete
Sub Total
Add GST 12%
Sub Total
Agency Charges 9%
Contingecies
Total
Road in Km 0/0 - 5/0 of NH 49
Lakhs
Per Amount
Hectare 2751.42
Rm 43300.00
Rs.2058.10/100 Sqm
2 Black banding the trees, guide stones, bridge
electric post etc with two coats of coal tar including
cost and conveyance of coal tar brush, cleaning
and marking and all other incidental charges etc
complete.
87.36
812.80
177.50
864.00
5.00
0.34
1947.00
19.47
159.60
512.00
6.50
1.50
679.60
67.96
383.60
998.80
4
1386.40
138.64
20345.62
86.60