INSPECTION AND TEST PLAN OF FORM NO. FAB/QMF/01
FORM REV No.2
WELDED FRAME SKID (LP&HP COMPRESSOR)
PROJECT : SKID STRUCTURE FOR LP&HP COMPRESSOR Form Rev. Date: 15/05/2008
SKID
Approved
Check compliance with
1.3 WPS & PQR. AWS D1.1 AWS D1.1 RWC. H A R
specification, procedures. WPS/PQR.
Welder Performance
Welders & Welding operators Check compliance with
1.4 AWS D1.1 AWS D1.1 RWC. Qualification H R R
Qualifications. specifications
Certificates.
Page 2 of 9
INSPECTION AND TEST PLAN OF FORM NO. FAB/QMF/01
FORM REV No.2
WELDED FRAME SKID (LP&HP COMPRESSOR)
PROJECT : SKID STRUCTURE FOR LP&HP COMPRESSOR Form Rev. Date: 15/05/2008
SKID
Page 3 of 9
INSPECTION AND TEST PLAN OF FORM NO. FAB/QMF/01
FORM REV No.2
WELDED FRAME SKID (LP&HP COMPRESSOR)
PROJECT : SKID STRUCTURE FOR LP&HP COMPRESSOR Form Rev. Date: 15/05/2008
SKID
2 PRE-FABRICATION ACTIVITIES
Check materials received
are in line with delivery
Receipt of material in Material QA Report,
note, size, quantity etc. Fabtech material traceability Fabtech material traceability Material
2.1 store/yard (Inspection Before H R R
Dimensional inspection for procedure procedure Inspector. Material list.
Cutting).
received material, Check
the surface conditions.
Page 4 of 9
INSPECTION AND TEST PLAN OF FORM NO. FAB/QMF/01
FORM REV No.2
WELDED FRAME SKID (LP&HP COMPRESSOR)
PROJECT : SKID STRUCTURE FOR LP&HP COMPRESSOR Form Rev. Date: 15/05/2008
SKID
Page 5 of 9
INSPECTION AND TEST PLAN OF FORM NO. FAB/QMF/01
FORM REV No.2
WELDED FRAME SKID (LP&HP COMPRESSOR)
PROJECT : SKID STRUCTURE FOR LP&HP COMPRESSOR Form Rev. Date: 15/05/2008
SKID
Page 6 of 9
INSPECTION AND TEST PLAN OF FORM NO. FAB/QMF/01
FORM REV No.2
WELDED FRAME SKID (LP&HP COMPRESSOR)
PROJECT : SKID STRUCTURE FOR LP&HP COMPRESSOR Form Rev. Date: 15/05/2008
SKID
EXTENT OF NDT
EXTENT OF NDT
4.2 Lifting Trunnion welds. CJP # 100% UT AWS D1.1, NDE Procedures AWS D1.1 QC Engineer. NDT Reports. H R R
&100%MPI
Page 7 of 9
INSPECTION AND TEST PLAN OF FORM NO. FAB/QMF/01
FORM REV No.2
WELDED FRAME SKID (LP&HP COMPRESSOR)
PROJECT : SKID STRUCTURE FOR LP&HP COMPRESSOR Form Rev. Date: 15/05/2008
SKID
Blasting& Priming Check surface profile Approved Painting Approved Painting Procedure Painting Blasting & Painting
5.1 (surface cleanliness check Procedure &Client Spec: & Client Spec: 9090-PI-00- H R R
(SA 2.5). Engineer. Report
before primer coating). 9090-PI-00-1000 1000
Intermediate coat
DFT Inspection & Surface Approved Painting Approved Painting Procedure Painting Blasting & Painting
5.2 (surface cleanliness check H R R
Cleaning. Procedure &Client Spec: & Client Spec: 9090-PI-00- Engineer. Report
before intermediate coating). 9090-PI-00-1000 1000
Final DFT Inspection &
Final Painting (DFT) Approved Painting Approved Painting Procedure Painting Blasting & Painting
5.3 adhesion test as per Procedure &Client Spec: & Client Spec: 9090-PI-00- H W R
Inspection Engineer. Report
project specification. 9090-PI-00-1000 1000
Page 8 of 9
INSPECTION AND TEST PLAN OF FORM NO. FAB/QMF/01
FORM REV No.2
WELDED FRAME SKID (LP&HP COMPRESSOR)
PROJECT : SKID STRUCTURE FOR LP&HP COMPRESSOR Form Rev. Date: 15/05/2008
SKID
6 FINAL INSPECTION
Final dimensional
Check the final assembly
Final Dimensional Inspection inspection Report &
6.1 dimensions as per AWS D1.1 & AFC drawings. AWS D1.1&AFC drawings QC Engineer. H W R
of Skid Structure . Final Acceptance
approved drawing.
Release note.
7 FINAL DOCUMENTATION
Preparation of MDR as per Manufacturing Data
7.1 Review Of Final MDR. QC Engineer. H H R
project specification. As per Project Specification As per Project Specification. Books/Dossier.