DRAWING CHECKLIST

PEMBANGUNAN TANGKI TIMBUN KAPASITAS 2 X 10.000 KL DI TBBM SURABAYA GROUP AREA EX. LOBP PERAK

NAMA DRAWING PAGE REV. TYPE NO. DRAWING

LAYOUT 0 GENERAL BBG-DWG-PTT-129-00

DENAH, POTONGAN A-A, DAN TAMPAK PAGAR DINDING BATA 0 SIPIL BBG-DWG-PTT-129-14

DENAH DAN TAMPAK PAGAR SENG PENUTUP 0 SIPIL BBG-DWG-PTT-129-17

LAYOUT 1 GENERAL BBG-DWG-PTT-129-TGK-00

LAYOUT 1 GENERAL BBG-DWG-PTT-129-CVL-00

LAYOUT 2 GENERAL BBG-DWG-PTT-129-TGK-00

LAYOUT LEAK DETECTOR 0 MEKANIKAL BBG-DWG-PTT-129-TGK-00-01

TANGKI TIMBUN A PILING PLAN 0 MEKANIKAL BBG-DWG-PTT-129-03

TANGKI TIMBUN A/B PILING PLAN 1 MEKANIKAL BBG-DWG-PTT-129-TGK-01

TANGKI TIMBUN A FOUNDATION DETAIL 0 MEKANIKAL BBG-DWG-PTT-129-04

TANGKI TIMBUN A/B FOUNDATION 1 MEKANIKAL BBG-DWG-PTT-129-TGK-02


DRAWING CHECKLIST
PEMBANGUNAN TANGKI TIMBUN KAPASITAS 2 X 10.000 KL DI TBBM SURABAYA GROUP AREA EX. LOBP PERAK

NAMA DRAWING PAGE REV. TYPE NO. DRAWING

TANGKI TIMBUN A/B FOUNDATION 2 MEKANIKAL BBG-DWG-PTT-129-TGK-02

TANGKI TIMBUN A/B FOUNDATION DETAIL 1 MEKANIKAL BBG-DWG-PTT-129-TGK-03

TANGKI TIMBUN A/B FOUNDATION DETAIL 2 MEKANIKAL BBG-DWG-PTT-129-TGK-03

TANGKI TIMBUN A SHELL PLATE DETAIL 0 MEKANIKAL BBG-DWG-PTT-129-05

TANGKI TIMBUN A/B SHELL PLATE DETAIL 1 MEKANIKAL BBG-DWG-PTT-129-TGK-04

TANGKI TIMBUN A/B SHELL PLATE DETAIL 1 2 MEKANIKAL BBG-DWG-PTT-129-TGK-04

TANGKI TIMBUN A/B SHELL PLATE DETAIL 2 2 MEKANIKAL BBG-DWG-PTT-129-TGK-04

TANGKI TIMBUN A/B SHELL PLATE DETAIL 1 3 MEKANIKAL BBG-DWG-PTT-129-TGK-04

TANGKI TIMBUN A/B SHELL PLATE DETAIL 2 3 MEKANIKAL BBG-DWG-PTT-129-TGK-04

TANGKI TIMBUN A SHELL PLATE CUTTING PLAN 0 MEKANIKAL BBG-DWG-PTT-129-06

TANGKI TIMBUN A/B SHELL PLATE CUTTING PLAN 1 MEKANIKAL BBG-DWG-PTT-129-TGK-05

TANGKI TIMBUN A/B SHELL PLATE CUTTING PLAN 1 MEKANIKAL BBG-DWG-PTT-129-TGK-05


DRAWING CHECKLIST
PEMBANGUNAN TANGKI TIMBUN KAPASITAS 2 X 10.000 KL DI TBBM SURABAYA GROUP AREA EX. LOBP PERAK

NAMA DRAWING PAGE REV. TYPE NO. DRAWING

TANGKI TIMBUN A/B SHELL PLATE CUTTING PLAN 2 MEKANIKAL BBG-DWG-PTT-129-TGK-05

TANGKI TIMBUN A DETAIL BOTTOM PLATE 0 MEKANIKAL BBG-DWG-PTT-129-08

TANGKI TIMBUN A/B DETAIL BOTTOM PLATE 1 MEKANIKAL BBG-DWG-PTT-129-TGK-06

TANGKI TIMBUN A BOTTOM PLATE CUTTING PLAN 0 MEKANIKAL BBG-DWG-PTT-129-07

TANGKI TIMBUN A/B BOTTOM PLATE CUTTING PLAN 1 MEKANIKAL BBG-DWG-PTT-129-TGK-07

TANGKI TIMBUN A/B BOTTOM PLATE CUTTING PLAN 1 MEKANIKAL BBG-DWG-PTT-129-TGK-07

NOZZLE ORIENTATION 0 MEKANIKAL BBG-DWG-PTT-129-02

NOZZLE ORIENTATION 1 MEKANIKAL BBG-DWG-PTT-129-TGK-08

NOZZLE ORIENTATION 2 MEKANIKAL BBG-DWG-PTT-129-TGK-08

NOZZLE ORIENTATION 2 MEKANIKAL BBG-DWG-PTT-129-TGK-08


DRAWING CHECKLIST
PEMBANGUNAN TANGKI TIMBUN KAPASITAS 2 X 10.000 KL DI TBBM SURABAYA GROUP AREA EX. LOBP PERAK

NAMA DRAWING PAGE REV. TYPE NO. DRAWING

TANGKI TIMBUN A 24" SHELL MANHOLE (MH1-2) 0 MEKANIKAL BBG-DWG-PTT-129-09

TANGKI TIMBUN A/B 24" SHELL MANHOLE (MH1-2) 1 MEKANIKAL BBG-DWG-PTT-129-TGK-09

TANGKI TIMBUN A 10" NOZZLE INLET (N1) 0 MEKANIKAL BBG-DWG-PTT-129-10

TANGKI TIMBUN A DETAIL ROOF PLATE 0 MEKANIKAL BBG-DWG-PTT-129-11

TANGKI TIMBUN A/B DETAIL ROOF PLATE 1 MEKANIKAL BBG-DWG-PTT-129-TGK-10

TANGKI TIMTANGKI TIMBUN A ROOF PLATE CUTTING PLAN 0 MEKANIKAL BBG-DWG-PTT-129-12

TANGKI TIMBUN A/B ROOF PLATE CUTTING PLAN 1 MEKANIKAL BBG-DWG-PTT-129-TGK-11

TANGKI TIMBUN A/B 10" NOZZLE OUTLET (N2) 0 MEKANIKAL BBG-DWG-PTT-129-TGK-12

TANGKI TIMBUN A/B 10" NOZZLE WATER DRAIN (N4) 0 MEKANIKAL BBG-DWG-PTT-129-TGK-13
DRAWING CHECKLIST
PEMBANGUNAN TANGKI TIMBUN KAPASITAS 2 X 10.000 KL DI TBBM SURABAYA GROUP AREA EX. LOBP PERAK

NAMA DRAWING PAGE REV. TYPE NO. DRAWING

TANGKI TIMBUN A/B 10" NOZZLE WATER DRAIN (N4) 1 MEKANIKAL BBG-DWG-PTT-129-TGK-13

TANGKI TIMBUN A/B DETAIL ROOF STRUCTURE 0 MEKANIKAL BBG-DWG-PTT-129-TGK-14

TANGKI TIMBUN A/B DETAIL ROOF STRUCTURE 1 1 MEKANIKAL BBG-DWG-PTT-129-TGK-14

TANGKI TIMBUN A/B DETAIL ROOF STRUCTURE 2 1 MEKANIKAL BBG-DWG-PTT-129-TGK-14

TANGKI TIMBUN A/B DETAIL ROOF STRUCTURE 3 1 MEKANIKAL BBG-DWG-PTT-129-TGK-14

TANGKI TIMBUN A/B DETAIL ROOF STRUCTURE 4 1 MEKANIKAL BBG-DWG-PTT-129-TGK-14

TANGKI TIMBUN A/B DETAIL ROOF STRUCTURE 5 1 MEKANIKAL BBG-DWG-PTT-129-TGK-14

TANGKI TIMBUN A/B DETAIL ROOF STRUCTURE 6 1 MEKANIKAL BBG-DWG-PTT-129-TGK-14

TANGKI TIMBUN A/B DETAIL ROOF STRUCTURE 7 1 MEKANIKAL BBG-DWG-PTT-129-TGK-14

TANGKI TIMBUN A/B DETAIL ROOF STRUCTURE 8 1 MEKANIKAL BBG-DWG-PTT-129-TGK-14

TANGKI TIMBUN A/B DETAIL ROOF STRUCTURE 9 1 MEKANIKAL BBG-DWG-PTT-129-TGK-14

TANGKI TIMBUN A/B DETAIL ROOF MANHOLE 0 MEKANIKAL BBG-DWG-PTT-129-TGK-15


DRAWING CHECKLIST
PEMBANGUNAN TANGKI TIMBUN KAPASITAS 2 X 10.000 KL DI TBBM SURABAYA GROUP AREA EX. LOBP PERAK

NAMA DRAWING PAGE REV. TYPE NO. DRAWING

SPRINKLER ORIENTATION 0 MEKANIKAL BBG-DWG-PTT-129-TGK-16

SPRINKLER ORIENTATION 1 MEKANIKAL BBG-DWG-PTT-129-TGK-16

ISOMETRIC SPRINKLER 0 MEKANIKAL BBG-DWG-PTT-129-TGK-17

ISOMETRIC SPRINKLER 1 MEKANIKAL BBG-DWG-PTT-129-TGK-17

ISOMETRIC SPRINKLER 2 MEKANIKAL BBG-DWG-PTT-129-TGK-17

VIEW SECTION, DETAIL SUPPORT SPLINKER 0 MEKANIKAL BBG-DWG-PTT-129-TGK-18

VIEW SECTION, DETAIL SUPPORT SPLINKER 1 MEKANIKAL BBG-DWG-PTT-129-TGK-18

TANGKI TIMBUN A / B 4” NOZZLE PRODUCT DRAIN (N5) 0 MEKANIKAL BBG-DWG-PTT-129-TGK-21

TANGKI TIMBUN A / B 4” NOZZLE PRODUCT DRAIN (N5) 1 MEKANIKAL BBG-DWG-PTT-129-TGK-21

TANGKI TIMBUN A / B 4” NOZZLE PRODUCT DRAIN (N5) 2 MEKANIKAL BBG-DWG-PTT-129-TGK-21


DRAWING CHECKLIST
PEMBANGUNAN TANGKI TIMBUN KAPASITAS 2 X 10.000 KL DI TBBM SURABAYA GROUP AREA EX. LOBP PERAK

NAMA DRAWING PAGE REV. TYPE NO. DRAWING

TANGKI TIMBUN A / B 4” NOZZLE PRODUCT DRAIN (N5) 3 MEKANIKAL BBG-DWG-PTT-129-TGK-21

TANGKI TIMBUN A / B 8” NOZZLE FOAM CHAMBER 0 MEKANIKAL BBG-DWG-PTT-129-TGK-23

TANGKI TIMBUN A / B 8” NOZZLE FOAM CHAMBER 1 MEKANIKAL BBG-DWG-PTT-129-TGK-23

TANGKI TIMBUN A / B 8” NOZZLE FOAM CHAMBER 2 MEKANIKAL BBG-DWG-PTT-129-TGK-23

TANGKI TIMBUN A / B 8” NOZZLE FOAM CHAMBER 3 MEKANIKAL BBG-DWG-PTT-129-TGK-23

DETAIL ATG TANGKI A / B 2 0 MEKANIKAL BBG-DWG-PTT-129-TGK-24

DETAIL ATG TANGKI A / B 3 0 MEKANIKAL BBG-DWG-PTT-129-TGK-24

TANGKI TIMBUN A / B 6” NOZZLE INSPECTION HATCH 0 MEKANIKAL BBG-DWG-PTT-129-TGK-25

TANGKI TIMBUN A / B 6” NOZZLE INSPECTION HATCH 1 MEKANIKAL BBG-DWG-PTT-129-TGK-25

TANGKI TIMBUN A / B 6” NOZZLE INSPECTION HATCH 2 MEKANIKAL BBG-DWG-PTT-129-TGK-25


DRAWING CHECKLIST
PEMBANGUNAN TANGKI TIMBUN KAPASITAS 2 X 10.000 KL DI TBBM SURABAYA GROUP AREA EX. LOBP PERAK

NAMA DRAWING PAGE REV. TYPE NO. DRAWING

DETAIL ANCHOR TANKI 2 X 10.000 0 MEKANIKAL BBG-DWG-PTT-129-TGK-26

DETAIL ANCHOR TANKI 2 X 10.000 1 MEKANIKAL BBG-DWG-PTT-129-TGK-26

DETAIL ANCHOR TANKI 2 X 10.000 1 2 MEKANIKAL BBG-DWG-PTT-129-TGK-26

DETAIL ANCHOR TANKI 2 X 10.000 2 2 MEKANIKAL BBG-DWG-PTT-129-TGK-26

TANGKI TIMBUN A / B 6” NOZZLE DIP HATCH 0 MEKANIKAL BBG-DWG-PTT-129-TGK-22

ATG TANGKI A / B 0 MEKANIKAL BBG-DWG-PTT-129-TGK-24

TANGKI TIMBUN A / B NOZZLE TEMPERATURE TRANSMITTER 0 MEKANIKAL BBG-DWG-PTT-129-TGK-27

TANGKI TIMBUN A / B 8” STILLING WELL 0 MEKANIKAL BBG-DWG-PTT-129-TGK-28

ATG, TEMP. TRANSMITTER, DIP HATCH TANGKI A/B 0 MEKANIKAL BBG-DWG-PTT-129-TGK-29

ATG, TEMP. TRANSMITTER, DIP HATCH TANGKI A/B 1 MEKANIKAL BBG-DWG-PTT-129-TGK-29

ATG, TEMP. TRANSMITTER, DIP HATCH TANGKI A/B 2 MEKANIKAL BBG-DWG-PTT-129-TGK-29

GENERAL ARRANGEMENT OUTSIDE VIEW TANKI 1 1 0 GENERAL BBG-DWG-PTT-129-TGK-30


DRAWING CHECKLIST
PEMBANGUNAN TANGKI TIMBUN KAPASITAS 2 X 10.000 KL DI TBBM SURABAYA GROUP AREA EX. LOBP PERAK

NAMA DRAWING PAGE REV. TYPE NO. DRAWING

GENERAL ARRANGEMENT OUTSIDE VIEW TANKI 1 1 1 GENERAL BBG-DWG-PTT-129-TGK-30

GENERAL ARRANGEMENT OUTSIDE VIEW TANKI 1 1 2 GENERAL BBG-DWG-PTT-129-TGK-30

GENERAL ARRANGEMENT OUTSIDE VIEW TANKI 1 1 3 GENERAL BBG-DWG-PTT-129-TGK-30

GENERAL ARRANGEMENT OUTSIDE VIEW TANKI 1 1 3 GENERAL BBG-DWG-PTT-129-TGK-30

GENERAL ARRANGEMENT OUTSIDE VIEW TANKI 2 2 0 GENERAL BBG-DWG-PTT-129-TGK-30

GENERAL ARRANGEMENT OUTSIDE VIEW TANKI 2 2 1 GENERAL BBG-DWG-PTT-129-TGK-30

GENERAL ARRANGEMENT OUTSIDE VIEW TANKI 2 2 2 GENERAL BBG-DWG-PTT-129-TGK-30

GENERAL ARRANGEMENT OUTSIDE VIEW TANKI 2 2 3 GENERAL BBG-DWG-PTT-129-TGK-30

GENERAL ARRANGEMENT OUTSIDE VIEW TANKI 1 1 3 GENERAL BBG-DWG-PTT-129-TGK-30

GENERAL ARRANGEMENT TANKI 1 3 0 GENERAL BBG-DWG-PTT-129-TGK-30

GENERAL ARRANGEMENT TANKI 1 3 1 GENERAL BBG-DWG-PTT-129-TGK-30

GENERAL ARRANGEMENT TANKI 1 3 2 GENERAL BBG-DWG-PTT-129-TGK-30

GENERAL ARRANGEMENT TANKI 1 3 3 GENERAL BBG-DWG-PTT-129-TGK-30

GENERAL ARRANGEMENT TANKI 1 3 3 GENERAL BBG-DWG-PTT-129-TGK-30


DRAWING CHECKLIST
PEMBANGUNAN TANGKI TIMBUN KAPASITAS 2 X 10.000 KL DI TBBM SURABAYA GROUP AREA EX. LOBP PERAK

NAMA DRAWING PAGE REV. TYPE NO. DRAWING

GENERAL ARRANGEMENT TANKI 2 4 0 GENERAL BBG-DWG-PTT-129-TGK-30

GENERAL ARRANGEMENT TANKI 2 4 1 GENERAL BBG-DWG-PTT-129-TGK-30

GENERAL ARRANGEMENT TANKI 2 4 2 GENERAL BBG-DWG-PTT-129-TGK-30

GENERAL ARRANGEMENT TANKI 2 4 3 GENERAL BBG-DWG-PTT-129-TGK-30

GENERAL ARRANGEMENT TANKI 1 4 3 GENERAL BBG-DWG-PTT-129-TGK-30

ORIENTASI TANGGA TANGKI 0 MEKANIKAL BBG-DWG-PTT-129-TGK-19

DETAIL TANGGA, HANDRAIL TANGGA DAN ROOF HANDRAIL 0 MEKANIKAL BBG-DWG-PTT-129-TGK-20

DETAIL TANGGA, HANDRAIL TANGGA DAN ROOF HANDRAIL 1 MEKANIKAL BBG-DWG-PTT-129-TGK-20

SPIRAL STAIRWAY TANKI 1 1 1 MEKANIKAL BBG-DWG-PTT-129-TGK-32

SPIRAL STAIRWAY TANKI 2 2 1 MEKANIKAL BBG-DWG-PTT-129-TGK-32

ROOF RAILING 3 1 MEKANIKAL BBG-DWG-PTT-129-TGK-32

SPIRAL STAIRWAY ASSEMBLY 4 1 MEKANIKAL BBG-DWG-PTT-129-TGK-32


DRAWING CHECKLIST
PEMBANGUNAN TANGKI TIMBUN KAPASITAS 2 X 10.000 KL DI TBBM SURABAYA GROUP AREA EX. LOBP PERAK

NAMA DRAWING PAGE REV. TYPE NO. DRAWING

TANGKI TIMBUN A / B 8” NOZZLE FREE VENT 0 MEKANIKAL BBG-DWG-PTT-129-TGK-34

TANGKI TIMBUN A / B 8” NOZZLE FREE VENT 1 MEKANIKAL BBG-DWG-PTT-129-TGK-34

ISOMETRIK KABEL ATG 0 MEKANIKAL BBG-DWG-PTT-129-TGK-35

ISOMETRIK PIPA INLET OUTLET 0 PIPING BBG-DWG-PTT-129-TGK-36

ISOMETRIK PIPA INLET OUTLET 1 1 PIPING BBG-DWG-PTT-129-TGK-36

ISOMETRIK PIPA INLET 0 PIPING BBG-DWG-PTT-129-TGK-36

ISOMETRIK PIPA INLET 1 PIPING BBG-DWG-PTT-129-TGK-36

ISOMETRIK PIPA INLET TANKI 1 2 2 PIPING BBG-DWG-PTT-129-TGK-36

ISOMETRIK PIPA INLET 0 PIPING BBG-DWG-PTT-129-TGK-36

ISOMETRIK PIPA INLET 1 PIPING BBG-DWG-PTT-129-TGK-36


DRAWING CHECKLIST
PEMBANGUNAN TANGKI TIMBUN KAPASITAS 2 X 10.000 KL DI TBBM SURABAYA GROUP AREA EX. LOBP PERAK

NAMA DRAWING PAGE REV. TYPE NO. DRAWING

ISOMETRIK PIPA INLET TANKI 1 3 2 PIPING BBG-DWG-PTT-129-TGK-36

ISOMETRIK PIPA OUTLET 0 PIPING BBG-DWG-PTT-129-TGK-36

ISOMETRIK PIPA OUTLET 1 PIPING BBG-DWG-PTT-129-TGK-36

ISOMETRIK PIPA OUTLET 2 PIPING BBG-DWG-PTT-129-TGK-36

ISOMETRIK PIPA OUTLET 4 3 PIPING BBG-DWG-PTT-129-TGK-36

ISOMETRIK PIPA OUTLET TANKI 1 4 4 PIPING BBG-DWG-PTT-129-TGK-36

ISOMETRIK PIPA OUTLET 0 PIPING BBG-DWG-PTT-129-TGK-36

ISOMETRIK PIPA OUTLET 1 PIPING BBG-DWG-PTT-129-TGK-36

ISOMETRIK PIPA OUTLET 2 PIPING BBG-DWG-PTT-129-TGK-36

ISOMETRIK PIPA OUTLET 5 3 PIPING BBG-DWG-PTT-129-TGK-36

ISOMETRIK PIPA OUTLET TANKI 2 5 4 PIPING BBG-DWG-PTT-129-TGK-36


DRAWING CHECKLIST
PEMBANGUNAN TANGKI TIMBUN KAPASITAS 2 X 10.000 KL DI TBBM SURABAYA GROUP AREA EX. LOBP PERAK

NAMA DRAWING PAGE REV. TYPE NO. DRAWING

WELDING SEQUENCE ARRANGEMENT 0 MEKANIKAL BBG-DWG-PTT-129-TGK-37

ISOMETRIK FOAM LINE A (TANGKI 1) 1 2 PIPING BBG-DWG-PTT-129-TGK-38-A

ISOMETRIK FOAM LINE A (TANGKI 1) 2 3 PIPING BBG-DWG-PTT-129-TGK-38-A

ISOMETRIK FOAM LINE B (TANGKI 1) 1 3 PIPING BBG-DWG-PTT-129-TGK-38-B

ISOMETRIK FOAM LINE B (TANGKI 1) 2 3 PIPING BBG-DWG-PTT-129-TGK-38-B

ISOMETRIK FOAM LINE A (TANGKI 2) 1 0 PIPING BBG-DWG-PTT-129-TGK-38-C

ISOMETRIK FOAM LINE A (TANGKI 2) 1 1 PIPING BBG-DWG-PTT-129-TGK-38-C

ISOMETRIK FOAM LINE A (TANGKI 2) 1 2 PIPING BBG-DWG-PTT-129-TGK-38-C

ISOMETRIK FOAM LINE A (TANGKI 2) 2 0 PIPING BBG-DWG-PTT-129-TGK-38-C


DRAWING CHECKLIST
PEMBANGUNAN TANGKI TIMBUN KAPASITAS 2 X 10.000 KL DI TBBM SURABAYA GROUP AREA EX. LOBP PERAK

NAMA DRAWING PAGE REV. TYPE NO. DRAWING

ISOMETRIK FOAM LINE A (TANGKI 2) 2 1 PIPING BBG-DWG-PTT-129-TGK-38-C

ISOMETRIK FOAM LINE A (TANGKI 2) 2 2 PIPING BBG-DWG-PTT-129-TGK-38-C

ISOMETRIK FOAM LINE A (TANGKI 2) 2 3 PIPING BBG-DWG-PTT-129-TGK-38-C

ISOMETRIK FOAM LINE B (TANGKI 2) 1 0 PIPING BBG-DWG-PTT-129-TGK-38-D

ISOMETRIK FOAM LINE B (TANGKI 2) 1 1 PIPING BBG-DWG-PTT-129-TGK-38-D

ISOMETRIK FOAM LINE B (TANGKI 2) 1 2 PIPING BBG-DWG-PTT-129-TGK-38-D

ISOMETRIK FOAM LINE B (TANGKI 2) 2 2 PIPING BBG-DWG-PTT-129-TGK-38-D

ISOMETRIK FOAM LINE B (TANGKI 2) 1 3 PIPING BBG-DWG-PTT-129-TGK-38-D

ISOMETRIK FOAM LINE B (TANGKI 2) 2 3 PIPING BBG-DWG-PTT-129-TGK-38-D

ISOMETRIK FOAM LINE B (TANGKI 2) 2 4 PIPING BBG-DWG-PTT-129-TGK-38-D

DETAIL EARTH LUG 0 MEKANIKAL BBG-DWG-PTT-129-TGK-39


DRAWING CHECKLIST
PEMBANGUNAN TANGKI TIMBUN KAPASITAS 2 X 10.000 KL DI TBBM SURABAYA GROUP AREA EX. LOBP PERAK

NAMA DRAWING PAGE REV. TYPE NO. DRAWING

ISOMETRIK HEADER FOAM LINE 2 1 PIPING BBG-DWG-PTT-129-TGK-41

ISOMETRIK HEADER FOAM LINE 3 0 PIPING BBG-DWG-PTT-129-TGK-41

ISOMETRIK HEADER FOAM LINE 3 1 PIPING BBG-DWG-PTT-129-TGK-41

ISOMETRIK HEADER FOAM LINE 4 0 PIPING BBG-DWG-PTT-129-TGK-41

ISOMETRIK HEADER FOAM LINE 4 1 PIPING BBG-DWG-PTT-129-TGK-41

ISOMETRIK HEADER FOAM LINE 1 2 PIPING BBG-DWG-PTT-129-TGK-41

ISOMETRIK HEADER FOAM LINE 2 2 PIPING BBG-DWG-PTT-129-TGK-41

ISOMETRIK HEADER FOAM LINE 3 2 PIPING BBG-DWG-PTT-129-TGK-41

ISOMETRIK HEADER FOAM LINE 1 3 PIPING BBG-DWG-PTT-129-TGK-41

ISOMETRIK HEADER FOAM LINE 2 3 PIPING BBG-DWG-PTT-129-TGK-41

ISOMETRIK HEADER FOAM LINE 2 4 PIPING BBG-DWG-PTT-129-TGK-41

ISOMETRIK HEADER FOAM LINE 3 3 PIPING BBG-DWG-PTT-129-TGK-41

ISOMETRIK HEADER FOAM LINE 3 4 PIPING BBG-DWG-PTT-129-TGK-41

ISOMETRIK HEADER FOAM LINE 4 3 PIPING BBG-DWG-PTT-129-TGK-41


DRAWING CHECKLIST
PEMBANGUNAN TANGKI TIMBUN KAPASITAS 2 X 10.000 KL DI TBBM SURABAYA GROUP AREA EX. LOBP PERAK

NAMA DRAWING PAGE REV. TYPE NO. DRAWING

ISOMETRIK HEADER FOAM LINE 4 4 PIPING BBG-DWG-PTT-129-TGK-41

ISOMETRIK GOOSENECK A (TANKI 1) 1 0 PIPING BBG-DWG-PTT-129-TGK-42-A

ISOMETRIK GOOSENECK A (TANKI 1) 1 1 PIPING BBG-DWG-PTT-129-TGK-42-A

ISOMETRIK GOOSENECK A (TANKI 1) 1 2 PIPING BBG-DWG-PTT-129-TGK-42-A

ISOMETRIK GOOSENECK A (TANKI 1) 2 0 PIPING BBG-DWG-PTT-129-TGK-42-A

ISOMETRIK GOOSENECK A (TANKI 1) 2 1 PIPING BBG-DWG-PTT-129-TGK-42-A

ISOMETRIK GOOSENECK A (TANKI 1) 2 2 PIPING BBG-DWG-PTT-129-TGK-42-A

ISOMETRIK GOOSENECK B (TANKI 2) 2 0 PIPING BBG-DWG-PTT-129-TGK-42-B

ISOMETRIK GOOSENECK B (TANKI 2) 2 1 PIPING BBG-DWG-PTT-129-TGK-42-B

ISOMETRIK GOOSENECK B (TANKI 2) 1 2 PIPING BBG-DWG-PTT-129-TGK-42-B


DRAWING CHECKLIST
PEMBANGUNAN TANGKI TIMBUN KAPASITAS 2 X 10.000 KL DI TBBM SURABAYA GROUP AREA EX. LOBP PERAK

NAMA DRAWING PAGE REV. TYPE NO. DRAWING

ISOMETRIK GOOSENECK B (TANKI 2) 4 0 PIPING BBG-DWG-PTT-129-TGK-42-B

ISOMETRIK GOOSENECK B (TANKI 2) 4 1 PIPING BBG-DWG-PTT-129-TGK-42-B

ISOMETRIK GOOSENECK B (TANKI 2) 2 2 PIPING BBG-DWG-PTT-129-TGK-42-B

ISOMETRIK HEADER PMK 1 0 PIPING BBG-DWG-PTT-129-TGK-43

ISOMETRIK HEADER PMK 1 1 PIPING BBG-DWG-PTT-129-TGK-43

ISOMETRIK HEADER PMK 2 0 PIPING BBG-DWG-PTT-129-TGK-43

ISOMETRIK HEADER PMK 2 1 PIPING BBG-DWG-PTT-129-TGK-43

ISOMETRIK RISER PIPE A (TANGKI 1) 1 0 PIPING BBG-DWG-PTT-129-TGK-44-A

ISOMETRIK RISER PIPE A (TANGKI 1) 1 1 PIPING BBG-DWG-PTT-129-TGK-44-A

ISOMETRIK RISER PIPE A (TANGKI 1) 1 2 PIPING BBG-DWG-PTT-129-TGK-44-A

ISOMETRIK RISER PIPE A (TANGKI 1) 1 3 PIPING BBG-DWG-PTT-129-TGK-44-A


DRAWING CHECKLIST
PEMBANGUNAN TANGKI TIMBUN KAPASITAS 2 X 10.000 KL DI TBBM SURABAYA GROUP AREA EX. LOBP PERAK

NAMA DRAWING PAGE REV. TYPE NO. DRAWING

ISOMETRIK RISER PIPE A (TANGKI 1) 1 4 PIPING BBG-DWG-PTT-129-TGK-44-A

ISOMETRIK RISER PIPE A (TANGKI 1) 2 0 PIPING BBG-DWG-PTT-129-TGK-44-A

ISOMETRIK RISER PIPE A (TANGKI 1) 2 1 PIPING BBG-DWG-PTT-129-TGK-44-A

ISOMETRIK RISER PIPE A (TANGKI 1) 2 2 PIPING BBG-DWG-PTT-129-TGK-44-A

ISOMETRIK RISER PIPE B (TANGKI 1) 1 0 PIPING BBG-DWG-PTT-129-TGK-44-B

ISOMETRIK RISER PIPE B (TANGKI 1) 1 1 PIPING BBG-DWG-PTT-129-TGK-44-B

ISOMETRIK RISER PIPE B (TANGKI 1) 1 2 PIPING BBG-DWG-PTT-129-TGK-44-B

ISOMETRIK RISER PIPE B (TANGKI 1) 1 3 PIPING BBG-DWG-PTT-129-TGK-44-B

ISOMETRIK RISER PIPE B (TANGKI 1) 1 4 PIPING BBG-DWG-PTT-129-TGK-44-B

ISOMETRIK RISER PIPE B (TANGKI 1) 2 2 PIPING BBG-DWG-PTT-129-TGK-44-B


DRAWING CHECKLIST
PEMBANGUNAN TANGKI TIMBUN KAPASITAS 2 X 10.000 KL DI TBBM SURABAYA GROUP AREA EX. LOBP PERAK

NAMA DRAWING PAGE REV. TYPE NO. DRAWING

ISOMETRIK RISER PIPE A (TANGKI 2) 1 0 PIPING BBG-DWG-PTT-129-TGK-44-C

ISOMETRIK RISER PIPE A (TANGKI 2) 1 1 PIPING BBG-DWG-PTT-129-TGK-44-C

ISOMETRIK RISER PIPE A (TANGKI 2) 1 2 PIPING BBG-DWG-PTT-129-TGK-44-C

ISOMETRIK RISER PIPE A (TANGKI 2) 1 3 PIPING BBG-DWG-PTT-129-TGK-44-C

ISOMETRIK RISER PIPE A (TANGKI 2) 1 4 PIPING BBG-DWG-PTT-129-TGK-44-C

ISOMETRIK RISER PIPE A (TANGKI 2) 1 5 PIPING BBG-DWG-PTT-129-TGK-44-C

ISOMETRIK RISER PIPE A (TANGKI 2) 2 0 PIPING BBG-DWG-PTT-129-TGK-44-C

ISOMETRIK RISER PIPE A (TANGKI 2) 2 1 PIPING BBG-DWG-PTT-129-TGK-44-C

ISOMETRIK RISER PIPE A (TANGKI 2) 2 2 PIPING BBG-DWG-PTT-129-TGK-44-C

ISOMETRIK RISER PIPE A (TANGKI 2) 2 3 PIPING BBG-DWG-PTT-129-TGK-44-C

ISOMETRIK RISER PIPE B (TANGKI 2) 1 0 PIPING BBG-DWG-PTT-129-TGK-44-D

ISOMETRIK RISER PIPE B (TANGKI 2) 1 1 PIPING BBG-DWG-PTT-129-TGK-44-D


DRAWING CHECKLIST
PEMBANGUNAN TANGKI TIMBUN KAPASITAS 2 X 10.000 KL DI TBBM SURABAYA GROUP AREA EX. LOBP PERAK

NAMA DRAWING PAGE REV. TYPE NO. DRAWING

ISOMETRIK RISER PIPE B (TANGKI 2) 1 2 PIPING BBG-DWG-PTT-129-TGK-44-D

ISOMETRIK RISER PIPE B (TANGKI 2) 1 3 PIPING BBG-DWG-PTT-129-TGK-44-D

ISOMETRIK RISER PIPE B (TANGKI 2) 1 4 PIPING BBG-DWG-PTT-129-TGK-44-D

ISOMETRIK RISER PIPE B (TANGKI 2) 1 5 PIPING BBG-DWG-PTT-129-TGK-44-D

ISOMETRIK RISER PIPE B (TANGKI 2) 2 0 PIPING BBG-DWG-PTT-129-TGK-44-D

ISOMETRIK RISER PIPE B (TANGKI 2) 2 1 PIPING BBG-DWG-PTT-129-TGK-44-D

ISOMETRIK RISER PIPE B (TANGKI 2) 2 2 PIPING BBG-DWG-PTT-129-TGK-44-D

ISOMETRIK PIPA HYDRANT BARAT 1 0 PIPING BBG-DWG-PTT-129-TGK-46-A

ISOMETRIK PIPA HYDRANT TIMUR 2 0 PIPING BBG-DWG-PTT-129-TGK-46-B

ISOMETRIK PIPA HYDRANT BARAT 1 0 PIPING BBG-DWG-PTT-129-TGK-45-A

ISOMETRIK PIPA HYDRANT TIMUR 2 0 PIPING BBG-DWG-PTT-129-TGK-45-B


DRAWING CHECKLIST
PEMBANGUNAN TANGKI TIMBUN KAPASITAS 2 X 10.000 KL DI TBBM SURABAYA GROUP AREA EX. LOBP PERAK

NAMA DRAWING PAGE REV. TYPE NO. DRAWING

TITIK SUPPORT HEADER FOAM LINE 1 0 MEKANIKAL BBG-DWG-PTT-129-TGK-46

TITIK SUPPORT HEADER FOAM LINE 1 1 MEKANIKAL BBG-DWG-PTT-129-TGK-46

TITIK SUPPORT HEADER FOAM LINE 1 2 MEKANIKAL BBG-DWG-PTT-129-TGK-46

TITIK SUPPORT HEADER FOAM LINE 1 3 MEKANIKAL BBG-DWG-PTT-129-TGK-46

LAYOUT TITIK SUPPORT PIPA 2 0 MEKANIKAL BBG-DWG-PTT-129-TGK-46

DETAIL SUPPORT PIPA 2 0 MEKANIKAL BBG-DWG-PTT-129-TGK-46

JALUR PIPA PRESSURE RELIEF 1 0 MEKANIKAL BBG-DWG-PTT-129-TGK-47

GENERAL LAYOUT 1 0 GENERAL BBG-DWG-PTT-129-TGK-48

DENAH, POTONGAN A-A, DAN TAMPAK PAGAR DINDING BATA 0 SIPIL BBG-DWG-PTT-129-14
DRAWING CHECKLIST
PEMBANGUNAN TANGKI TIMBUN KAPASITAS 2 X 10.000 KL DI TBBM SURABAYA GROUP AREA EX. LOBP PERAK

NAMA DRAWING PAGE REV. TYPE NO. DRAWING

DENAH PAGAR PAS, DINDING BATA 1 SIPIL BBG-DWG-PTT-129-CVL-01

SECTION PAGAR DINDING BATA 0 SIPIL BBG-DWG-PTT-129-15

POTONGAN A-A, DAN SECTION PAGAR SENG PENUTUP 0 SIPIL BBG-DWG-PTT-129-18

POT. A-A PAGAR PAS, DINDING BATA (SECTION 1-4) 1 SIPIL BBG-DWG-PTT-129-CVL-02

POTONGAN B-B, C-C DETAIL PONDASI TELAPAK DETAIL BALOK, KOLOM, SLOOF 0 SIPIL BBG-DWG-PTT-129-16

POT. B-B DAN POT. C-C PAGAR PAS. DINDING BATA DETAIL PENULANGAN DAN DETAIL 1 SIPIL BBG-DWG-PTT-129-CVL-03
PONDASI TELAPAK
POT. B-B DAN POT. C-C PAGAR PAS. DINDING BATA DETAIL PENULANGAN DAN DETAIL
2 SIPIL BBG-DWG-PTT-129-CVL-03
PONDASI TELAPAK

DENAH, POTONGAN A-A, DAN TAMPAK PAGAR DINDING BATA 0 SIPIL BBG-DWG-PTT-129-14

TAMPAK DEPAN PAGAR PAS. DINDING BATA 1 SIPIL BBG-DWG-PTT-129-CVL-04

LAYOUT, TAMPAK BELAKANG PAGAR SENG SEMENTARA, POTONGAN PAGAR SENG 0 SIPIL BBG-DWG-PTT-129-19
SEMENTARA
DRAWING CHECKLIST
PEMBANGUNAN TANGKI TIMBUN KAPASITAS 2 X 10.000 KL DI TBBM SURABAYA GROUP AREA EX. LOBP PERAK

NAMA DRAWING PAGE REV. TYPE NO. DRAWING

LAYOUT, TAMPAK BELAKANG PAGAR SENG SEMENTARA, POTONGAN PAGAR SENG 1 SIPIL BBG-DWG-PTT-129-19
SEMENTARA

DETAIL PONDASI PILE CAP TIANG PANCANG, DETAIL PENULANGAN PILE CAP 0 SIPIL BBG-DWG-PTT-129-TGK-03A

FOUNDATION PLAN SECTION AND DETAIL 0 SIPIL BBG-DWG-PTT-129-01

ISOMETRIK RISER PIPE A (TANGKI 1) 3 0 PIPING BBG-DWG-PTT-129-TGK-44-A

ISOMETRIK RISER PIPE A (TANGKI 1) 4 0 PIPING BBG-DWG-PTT-129-TGK-44-A

ISOMETRIK RISER PIPE A (TANGKI 1) 5 0 PIPING BBG-DWG-PTT-129-TGK-44-A

ISOMETRIK RISER PIPE A (TANGKI 1) 6 0 PIPING BBG-DWG-PTT-129-TGK-44-A

ISOMETRIK RISER PIPE B (TANGKI 1) 2 0 PIPING BBG-DWG-PTT-129-TGK-44-B

ISOMETRIK RISER PIPE B (TANGKI 1) 3 0 PIPING BBG-DWG-PTT-129-TGK-44-B

ISOMETRIK RISER PIPE B (TANGKI 1) 4 0 PIPING BBG-DWG-PTT-129-TGK-44-B

ISOMETRIK RISER PIPE B (TANGKI 1) 5 0 PIPING BBG-DWG-PTT-129-TGK-44-B


DRAWING CHECKLIST
PEMBANGUNAN TANGKI TIMBUN KAPASITAS 2 X 10.000 KL DI TBBM SURABAYA GROUP AREA EX. LOBP PERAK

NAMA DRAWING PAGE REV. TYPE NO. DRAWING

ISOMETRIK RISER PIPE B (TANGKI 1) 6 0 PIPING BBG-DWG-PTT-129-TGK-44-B

ISOMETRIK RISER PIPE B (TANGKI 1) 7 0 PIPING BBG-DWG-PTT-129-TGK-44-B

ISOMETRIK RISER PIPE A (TANGKI 2) 3 0 PIPING BBG-DWG-PTT-129-TGK-44-C

ISOMETRIK RISER PIPE A (TANGKI 2) 4 0 PIPING BBG-DWG-PTT-129-TGK-44-C

ISOMETRIK RISER PIPE A (TANGKI 2) 5 0 PIPING BBG-DWG-PTT-129-TGK-44-C

ISOMETRIK RISER PIPE A (TANGKI 2) 6 0 PIPING BBG-DWG-PTT-129-TGK-44-C

ISOMETRIK RISER PIPE B (TANGKI 2) 3 0 PIPING BBG-DWG-PTT-129-TGK-44-D

ISOMETRIK RISER PIPE B (TANGKI 2) 4 0 PIPING BBG-DWG-PTT-129-TGK-44-D

ISOMETRIK RISER PIPE B (TANGKI 2) 5 0 PIPING BBG-DWG-PTT-129-TGK-44-D

ISOMETRIK RISER PIPE B (TANGKI 2) 6 0 PIPING BBG-DWG-PTT-129-TGK-44-D

ISOMETRIK RISER PIPE B (TANGKI 2) 7 0 PIPING BBG-DWG-PTT-129-TGK-44-D

ROTATING PIPE RING SPRINKLER 1 0 PIPING BBG-DWG-PTT-129-TGK-44-E

NOZZLE SPRINKLER ORIENTATION 2 0 PIPING BBG-DWG-PTT-129-TGK-44-E

ROTATING PIPE RING SPRINKLER 1 1 PIPING BBG-DWG-PTT-129-TGK-44-E


DRAWING CHECKLIST
PEMBANGUNAN TANGKI TIMBUN KAPASITAS 2 X 10.000 KL DI TBBM SURABAYA GROUP AREA EX. LOBP PERAK

NAMA DRAWING PAGE REV. TYPE NO. DRAWING

NOZZLE SPRINKLER ORIENTATION 2 1 PIPING BBG-DWG-PTT-129-TGK-44-E

NOZZLE SPRINKLER ORIENTATION 3 1 PIPING BBG-DWG-PTT-129-TGK-44-E


N KAPASITAS 2 X 10.000 KL DI TBBM SURABAYA GROUP AREA EX. LOBP PERAK

WING PAGE REV. TYPE NO. DRAWING TANGGAL SUBMIT TANGGAL REV

0 GENERAL BBG-DWG-PTT-129-00 Tuesday, October 02, 2018 Tuesday, October 16

DING BATA 0 SIPIL BBG-DWG-PTT-129-14 Friday, October 26, 2018 Tuesday, October 30

0 SIPIL BBG-DWG-PTT-129-17 Friday, October 26, 2018 Tuesday, October 30

1 GENERAL BBG-DWG-PTT-129-TGK-00 Monday, November 12, 2018 Thursday, November 1

1 GENERAL BBG-DWG-PTT-129-CVL-00 Monday, November 12, 2018 Thursday, November 1

2 GENERAL BBG-DWG-PTT-129-TGK-00 Thursday, November 22, 2018 Monday, November 2

0 MEKANIKAL BBG-DWG-PTT-129-TGK-00-01 Monday, May 20, 2019 Thursday, May 23,

0 MEKANIKAL BBG-DWG-PTT-129-03 Tuesday, October 02, 2018 Tuesday, October 16

1 MEKANIKAL BBG-DWG-PTT-129-TGK-01 Monday, November 12, 2018 Thursday, November 1

0 MEKANIKAL BBG-DWG-PTT-129-04 Tuesday, October 02, 2018 Tuesday, October 16

1 MEKANIKAL BBG-DWG-PTT-129-TGK-02 Monday, November 12, 2018 Thursday, November 1


N KAPASITAS 2 X 10.000 KL DI TBBM SURABAYA GROUP AREA EX. LOBP PERAK

WING PAGE REV. TYPE NO. DRAWING TANGGAL SUBMIT TANGGAL REV

2 MEKANIKAL BBG-DWG-PTT-129-TGK-02 Thursday, November 22, 2018 Monday, November 2

1 MEKANIKAL BBG-DWG-PTT-129-TGK-03 Monday, November 12, 2018 Thursday, November 1

2 MEKANIKAL BBG-DWG-PTT-129-TGK-03 Thursday, November 22, 2018 Monday, November 2

0 MEKANIKAL BBG-DWG-PTT-129-05 Tuesday, October 02, 2018 Tuesday, October 16

1 MEKANIKAL BBG-DWG-PTT-129-TGK-04 Monday, November 12, 2018 Thursday, November 1

1 2 MEKANIKAL BBG-DWG-PTT-129-TGK-04 Wednesday, January 16, 2019 Friday, January 31,

2 2 MEKANIKAL BBG-DWG-PTT-129-TGK-04 Wednesday, January 16, 2019 Friday, January 31,

1 3 MEKANIKAL BBG-DWG-PTT-129-TGK-04 Friday, February 07, 2020 -

2 3 MEKANIKAL BBG-DWG-PTT-129-TGK-04 Friday, February 07, 2020 -

0 MEKANIKAL BBG-DWG-PTT-129-06 Tuesday, October 02, 2018 Tuesday, October 16

1 MEKANIKAL BBG-DWG-PTT-129-TGK-05 Monday, November 12, 2018 Thursday, November 1

1 MEKANIKAL BBG-DWG-PTT-129-TGK-05 Thursday, November 22, 2018 Monday, November 2


N KAPASITAS 2 X 10.000 KL DI TBBM SURABAYA GROUP AREA EX. LOBP PERAK

WING PAGE REV. TYPE NO. DRAWING TANGGAL SUBMIT TANGGAL REV

2 MEKANIKAL BBG-DWG-PTT-129-TGK-05 Wednesday, December 26, 2018 Thursday, January 03

0 MEKANIKAL BBG-DWG-PTT-129-08 Tuesday, October 02, 2018 Tuesday, October 16

1 MEKANIKAL BBG-DWG-PTT-129-TGK-06 Monday, November 12, 2018 Thursday, November 1

0 MEKANIKAL BBG-DWG-PTT-129-07 Tuesday, October 02, 2018 Tuesday, October 16

N 1 MEKANIKAL BBG-DWG-PTT-129-TGK-07 Monday, November 12, 2018 Thursday, November 1

AN 1 MEKANIKAL BBG-DWG-PTT-129-TGK-07 Thursday, November 22, 2018 Monday, November 2

0 MEKANIKAL BBG-DWG-PTT-129-02 Tuesday, October 02, 2018 Tuesday, October 16

1 MEKANIKAL BBG-DWG-PTT-129-TGK-08 Wednesday, January 09, 2019 Monday, January 14

2 MEKANIKAL BBG-DWG-PTT-129-TGK-08 Thursday, January 16, 2020 Friday, January 31,

2 MEKANIKAL BBG-DWG-PTT-129-TGK-08 Friday, January 31, 2020 Friday, January 31,


N KAPASITAS 2 X 10.000 KL DI TBBM SURABAYA GROUP AREA EX. LOBP PERAK

WING PAGE REV. TYPE NO. DRAWING TANGGAL SUBMIT TANGGAL REV

0 MEKANIKAL BBG-DWG-PTT-129-09 Wednesday, October 17, 2018 Tuesday, October 23

2) 1 MEKANIKAL BBG-DWG-PTT-129-TGK-09 Monday, November 12, 2018 Thursday, November 1

0 MEKANIKAL BBG-DWG-PTT-129-10 Wednesday, October 17, 2018 Tuesday, October 23

0 MEKANIKAL BBG-DWG-PTT-129-11 Wednesday, October 17, 2018 Tuesday, October 23

1 MEKANIKAL BBG-DWG-PTT-129-TGK-10 Monday, November 12, 2018 Thursday, November 1

G PLAN 0 MEKANIKAL BBG-DWG-PTT-129-12 Wednesday, October 17, 2018 Tuesday, October 23

1 MEKANIKAL BBG-DWG-PTT-129-TGK-11 Monday, November 12, 2018 Thursday, November 1

0 MEKANIKAL BBG-DWG-PTT-129-TGK-12 Monday, November 12, 2018 Thursday, November 1

4) 0 MEKANIKAL BBG-DWG-PTT-129-TGK-13 Monday, November 12, 2018 Thursday, November 1


N KAPASITAS 2 X 10.000 KL DI TBBM SURABAYA GROUP AREA EX. LOBP PERAK

WING PAGE REV. TYPE NO. DRAWING TANGGAL SUBMIT TANGGAL REV

N4) 1 MEKANIKAL BBG-DWG-PTT-129-TGK-13 Thursday, November 22, 2018 Monday, November 2

0 MEKANIKAL BBG-DWG-PTT-129-TGK-14 Monday, November 12, 2018 Thursday, November 1

1 1 MEKANIKAL BBG-DWG-PTT-129-TGK-14 Friday, January 31, 2020 Friday, January 31,

2 1 MEKANIKAL BBG-DWG-PTT-129-TGK-14 Friday, January 31, 2020 Friday, January 31,

3 1 MEKANIKAL BBG-DWG-PTT-129-TGK-14 Friday, January 31, 2020 Friday, January 31,

4 1 MEKANIKAL BBG-DWG-PTT-129-TGK-14 Friday, January 31, 2020 Friday, January 31,

5 1 MEKANIKAL BBG-DWG-PTT-129-TGK-14 Friday, January 31, 2020 Friday, January 31,

6 1 MEKANIKAL BBG-DWG-PTT-129-TGK-14 Friday, January 31, 2020 Friday, January 31,

7 1 MEKANIKAL BBG-DWG-PTT-129-TGK-14 Friday, January 31, 2020 Friday, January 31,

8 1 MEKANIKAL BBG-DWG-PTT-129-TGK-14 Friday, January 31, 2020 Friday, January 31,

9 1 MEKANIKAL BBG-DWG-PTT-129-TGK-14 Friday, January 31, 2020 Friday, January 31,

0 MEKANIKAL BBG-DWG-PTT-129-TGK-15 Monday, November 12, 2018 Thursday, November 1


N KAPASITAS 2 X 10.000 KL DI TBBM SURABAYA GROUP AREA EX. LOBP PERAK

WING PAGE REV. TYPE NO. DRAWING TANGGAL SUBMIT TANGGAL REV

0 MEKANIKAL BBG-DWG-PTT-129-TGK-16 Wednesday, January 09, 2019 Monday, January 14

1 MEKANIKAL BBG-DWG-PTT-129-TGK-16 Friday, January 31, 2020 Friday, January 31,

0 MEKANIKAL BBG-DWG-PTT-129-TGK-17 Wednesday, January 09, 2019 Monday, January 14

1 MEKANIKAL BBG-DWG-PTT-129-TGK-17 Friday, February 22, 2019 Monday, February 25

2 MEKANIKAL BBG-DWG-PTT-129-TGK-17 Wednesday, March 06, 2019 Tuesday, March 12,

0 MEKANIKAL BBG-DWG-PTT-129-TGK-18 Wednesday, January 09, 2019 Monday, January 14

1 MEKANIKAL BBG-DWG-PTT-129-TGK-18 Friday, February 22, 2019 Monday, February 25

N5) 0 MEKANIKAL BBG-DWG-PTT-129-TGK-21 Monday, April 30, 2018 Monday, May 06, 2

N5) 1 MEKANIKAL BBG-DWG-PTT-129-TGK-21 Monday, May 13, 2019 Tuesday, May 14, 2

N5) 2 MEKANIKAL BBG-DWG-PTT-129-TGK-21 Friday, May 17, 2019 Thursday, May 23,
N KAPASITAS 2 X 10.000 KL DI TBBM SURABAYA GROUP AREA EX. LOBP PERAK

WING PAGE REV. TYPE NO. DRAWING TANGGAL SUBMIT TANGGAL REV

N (N5) 3 MEKANIKAL BBG-DWG-PTT-129-TGK-21 Wednesday, May 29, 2019 Wednesday, May 29

0 MEKANIKAL BBG-DWG-PTT-129-TGK-23 Monday, April 30, 2018 Monday, May 06, 2

1 MEKANIKAL BBG-DWG-PTT-129-TGK-23 Monday, May 13, 2019 Tuesday, May 14, 2

2 MEKANIKAL BBG-DWG-PTT-129-TGK-23 Friday, May 17, 2019 Thursday, May 23,

R 3 MEKANIKAL BBG-DWG-PTT-129-TGK-23 Wednesday, May 29, 2019 Wednesday, May 29

2 0 MEKANIKAL BBG-DWG-PTT-129-TGK-24 Thursday, May 02, 2019 Friday, May 10, 2

3 0 MEKANIKAL BBG-DWG-PTT-129-TGK-24 Thursday, May 02, 2019 Friday, May 10, 2

H 0 MEKANIKAL BBG-DWG-PTT-129-TGK-25 Monday, April 30, 2018 Monday, May 06, 2

H 1 MEKANIKAL BBG-DWG-PTT-129-TGK-25 Monday, May 13, 2019 Tuesday, May 14, 2

CH 2 MEKANIKAL BBG-DWG-PTT-129-TGK-25 Friday, May 17, 2019 Thursday, May 23,


N KAPASITAS 2 X 10.000 KL DI TBBM SURABAYA GROUP AREA EX. LOBP PERAK

WING PAGE REV. TYPE NO. DRAWING TANGGAL SUBMIT TANGGAL REV

0 MEKANIKAL BBG-DWG-PTT-129-TGK-26 Monday, April 30, 2018 Monday, May 06, 2

1 MEKANIKAL BBG-DWG-PTT-129-TGK-26 Monday, May 13, 2019 Tuesday, May 14, 2

1 2 MEKANIKAL BBG-DWG-PTT-129-TGK-26 Friday, January 31, 2020 Friday, January 31,

2 2 MEKANIKAL BBG-DWG-PTT-129-TGK-26 Friday, January 31, 2020 Friday, January 31,

0 MEKANIKAL BBG-DWG-PTT-129-TGK-22 Monday, April 30, 2018 Monday, May 06, 2

0 MEKANIKAL BBG-DWG-PTT-129-TGK-24 Monday, April 30, 2018 Monday, May 06, 2

SMITTER 0 MEKANIKAL BBG-DWG-PTT-129-TGK-27 Monday, April 30, 2018 Monday, May 06, 2

0 MEKANIKAL BBG-DWG-PTT-129-TGK-28 Monday, April 30, 2018 Monday, May 06, 2

0 MEKANIKAL BBG-DWG-PTT-129-TGK-29 Monday, May 13, 2019 Tuesday, May 14, 2

1 MEKANIKAL BBG-DWG-PTT-129-TGK-29 Friday, May 17, 2019 Thursday, May 23,

B 2 MEKANIKAL BBG-DWG-PTT-129-TGK-29 Wednesday, May 29, 2019 Wednesday, May 29

1 0 GENERAL BBG-DWG-PTT-129-TGK-30 Monday, May 27, 2019 Wednesday, May 29


N KAPASITAS 2 X 10.000 KL DI TBBM SURABAYA GROUP AREA EX. LOBP PERAK

WING PAGE REV. TYPE NO. DRAWING TANGGAL SUBMIT TANGGAL REV

1 1 GENERAL BBG-DWG-PTT-129-TGK-30 Thursday, June 13, 2019 Tuesday, June 18, 2

1 2 GENERAL BBG-DWG-PTT-129-TGK-30 Friday, June 21, 2019 Monday, June 24, 2

1 3 GENERAL BBG-DWG-PTT-129-TGK-30 Thursday, January 16, 2020 Friday, January 31,

1 3 GENERAL BBG-DWG-PTT-129-TGK-30 Friday, January 31, 2020 Friday, January 31,

2 0 GENERAL BBG-DWG-PTT-129-TGK-30 Monday, May 27, 2019 Wednesday, May 29

2 1 GENERAL BBG-DWG-PTT-129-TGK-30 Thursday, June 13, 2019 Tuesday, June 18, 2

2 2 GENERAL BBG-DWG-PTT-129-TGK-30 Friday, June 21, 2019 Monday, June 24, 2

2 3 GENERAL BBG-DWG-PTT-129-TGK-30 Thursday, January 16, 2020 Friday, January 31,

1 3 GENERAL BBG-DWG-PTT-129-TGK-30 Friday, January 31, 2020 Friday, January 31,

3 0 GENERAL BBG-DWG-PTT-129-TGK-30 Monday, May 27, 2019 Wednesday, May 29

3 1 GENERAL BBG-DWG-PTT-129-TGK-30 Thursday, June 13, 2019 Tuesday, June 18, 2

3 2 GENERAL BBG-DWG-PTT-129-TGK-30 Friday, June 21, 2019 Monday, June 24, 2

3 3 GENERAL BBG-DWG-PTT-129-TGK-30 Thursday, January 16, 2020 Friday, January 31,

3 3 GENERAL BBG-DWG-PTT-129-TGK-30 Friday, January 31, 2020 Friday, January 31,


N KAPASITAS 2 X 10.000 KL DI TBBM SURABAYA GROUP AREA EX. LOBP PERAK

WING PAGE REV. TYPE NO. DRAWING TANGGAL SUBMIT TANGGAL REV

4 0 GENERAL BBG-DWG-PTT-129-TGK-30 Monday, May 27, 2019 Wednesday, May 29

4 1 GENERAL BBG-DWG-PTT-129-TGK-30 Thursday, June 13, 2019 Tuesday, June 18, 2

4 2 GENERAL BBG-DWG-PTT-129-TGK-30 Friday, June 21, 2019 Monday, June 24, 2

4 3 GENERAL BBG-DWG-PTT-129-TGK-30 Thursday, January 16, 2020 Friday, January 31,

4 3 GENERAL BBG-DWG-PTT-129-TGK-30 Friday, January 31, 2020 Friday, January 31,

0 MEKANIKAL BBG-DWG-PTT-129-TGK-19 Wednesday, January 09, 2019 Monday, January 14

NDRAIL 0 MEKANIKAL BBG-DWG-PTT-129-TGK-20 Wednesday, January 09, 2019 Monday, January 14

NDRAIL 1 MEKANIKAL BBG-DWG-PTT-129-TGK-20 Friday, February 22, 2019 Monday, February 25

1 1 MEKANIKAL BBG-DWG-PTT-129-TGK-32 Friday, January 31, 2020 Friday, January 31,

2 1 MEKANIKAL BBG-DWG-PTT-129-TGK-32 Friday, January 31, 2020 Friday, January 31,

3 1 MEKANIKAL BBG-DWG-PTT-129-TGK-32 Friday, January 31, 2020 Friday, January 31,

4 1 MEKANIKAL BBG-DWG-PTT-129-TGK-32 Friday, January 31, 2020 Friday, January 31,


N KAPASITAS 2 X 10.000 KL DI TBBM SURABAYA GROUP AREA EX. LOBP PERAK

WING PAGE REV. TYPE NO. DRAWING TANGGAL SUBMIT TANGGAL REV

0 MEKANIKAL BBG-DWG-PTT-129-TGK-34 Friday, May 24, 2019 Tuesday, May 28, 2

1 MEKANIKAL BBG-DWG-PTT-129-TGK-34 Thursday, June 13, 2019 Tuesday, June 18,

0 MEKANIKAL BBG-DWG-PTT-129-TGK-35 Monday, May 27, 2019 Wednesday, May 29

0 PIPING BBG-DWG-PTT-129-TGK-36 Friday, May 24, 2019 Tuesday, May 28, 2

1 1 PIPING BBG-DWG-PTT-129-TGK-36 Thursday, June 13, 2019 Tuesday, June 18,

0 PIPING BBG-DWG-PTT-129-TGK-36 Wednesday, July 17, 2019 Friday, July 19, 20

1 PIPING BBG-DWG-PTT-129-TGK-36 Friday, July 26, 2019 Monday, July 29, 2

2 2 PIPING BBG-DWG-PTT-129-TGK-36 Tuesday, July 30, 2019 Wednesday, August 0

0 PIPING BBG-DWG-PTT-129-TGK-36 Wednesday, July 17, 2019 Friday, July 19, 20

1 PIPING BBG-DWG-PTT-129-TGK-36 Friday, July 26, 2019 Monday, July 29, 2


N KAPASITAS 2 X 10.000 KL DI TBBM SURABAYA GROUP AREA EX. LOBP PERAK

WING PAGE REV. TYPE NO. DRAWING TANGGAL SUBMIT TANGGAL REV

3 2 PIPING BBG-DWG-PTT-129-TGK-36 Tuesday, July 30, 2019 Wednesday, August 0

0 PIPING BBG-DWG-PTT-129-TGK-36 Wednesday, July 17, 2019 Friday, July 19, 20

1 PIPING BBG-DWG-PTT-129-TGK-36 Friday, July 26, 2019 Monday, July 29, 2

2 PIPING BBG-DWG-PTT-129-TGK-36 Tuesday, July 30, 2019 Wednesday, August 0

4 3 PIPING BBG-DWG-PTT-129-TGK-36 Friday, August 23, 2019 Tuesday, August 27,

4 4 PIPING BBG-DWG-PTT-129-TGK-36 Friday, January 31, 2020 Friday, January 31,

0 PIPING BBG-DWG-PTT-129-TGK-36 Wednesday, July 17, 2019 Friday, July 19, 20

1 PIPING BBG-DWG-PTT-129-TGK-36 Friday, July 26, 2019 Monday, July 29, 2

2 PIPING BBG-DWG-PTT-129-TGK-36 Tuesday, July 30, 2019 Wednesday, August 0

5 3 PIPING BBG-DWG-PTT-129-TGK-36 Friday, August 23, 2019 Tuesday, August 27,

5 4 PIPING BBG-DWG-PTT-129-TGK-36 Friday, January 31, 2020 Friday, January 31,


N KAPASITAS 2 X 10.000 KL DI TBBM SURABAYA GROUP AREA EX. LOBP PERAK

WING PAGE REV. TYPE NO. DRAWING TANGGAL SUBMIT TANGGAL REV

0 MEKANIKAL BBG-DWG-PTT-129-TGK-37 Wednesday, May 29, 2019 Wednesday, May 29

1 2 PIPING BBG-DWG-PTT-129-TGK-38-A Wednesday, August 28, 2019 Monday, September 0

2 3 PIPING BBG-DWG-PTT-129-TGK-38-A Wednesday, September 11, 2019 Monday, September 2

1 3 PIPING BBG-DWG-PTT-129-TGK-38-B Wednesday, September 11, 2019 Monday, September 2

2 3 PIPING BBG-DWG-PTT-129-TGK-38-B Wednesday, September 11, 2019 Monday, September 2

1 0 PIPING BBG-DWG-PTT-129-TGK-38-C Monday, July 15, 2019 Friday, July 19, 20

1 1 PIPING BBG-DWG-PTT-129-TGK-38-C Friday, July 26, 2019 Tuesday, August 06,

1 2 PIPING BBG-DWG-PTT-129-TGK-38-C Wednesday, August 28, 2019 Monday, September 0

2 0 PIPING BBG-DWG-PTT-129-TGK-38-C Monday, July 15, 2019 Friday, July 19, 20


N KAPASITAS 2 X 10.000 KL DI TBBM SURABAYA GROUP AREA EX. LOBP PERAK

WING PAGE REV. TYPE NO. DRAWING TANGGAL SUBMIT TANGGAL REV

2 1 PIPING BBG-DWG-PTT-129-TGK-38-C Friday, July 26, 2019 Tuesday, August 06,

2 2 PIPING BBG-DWG-PTT-129-TGK-38-C Wednesday, August 28, 2019 Monday, September 0

2 3 PIPING BBG-DWG-PTT-129-TGK-38-C Wednesday, September 11, 2019 Monday, September 2

1 0 PIPING BBG-DWG-PTT-129-TGK-38-D Monday, July 15, 2019 Friday, July 19, 20

1 1 PIPING BBG-DWG-PTT-129-TGK-38-D Friday, July 26, 2019 Tuesday, August 06,

1 2 PIPING BBG-DWG-PTT-129-TGK-38-D Wednesday, August 28, 2019 Monday, September 0

2 2 PIPING BBG-DWG-PTT-129-TGK-38-D Wednesday, August 28, 2019 Monday, September 0

1 3 PIPING BBG-DWG-PTT-129-TGK-38-D Wednesday, September 11, 2019 Monday, September 2

2 3 PIPING BBG-DWG-PTT-129-TGK-38-D Wednesday, September 11, 2019 Monday, September 2

2 4 PIPING BBG-DWG-PTT-129-TGK-38-D Tuesday, October 29, 2019 Wednesday, November

0 MEKANIKAL BBG-DWG-PTT-129-TGK-39 Wednesday, May 29, 2019 Wednesday, May 29


N KAPASITAS 2 X 10.000 KL DI TBBM SURABAYA GROUP AREA EX. LOBP PERAK

WING PAGE REV. TYPE NO. DRAWING TANGGAL SUBMIT TANGGAL REV

2 1 PIPING BBG-DWG-PTT-129-TGK-41 Friday, July 26, 2019 Tuesday, August 06,

3 0 PIPING BBG-DWG-PTT-129-TGK-41 Monday, July 15, 2019 Friday, July 19, 20

3 1 PIPING BBG-DWG-PTT-129-TGK-41 Friday, July 26, 2019 Tuesday, August 06,

4 0 PIPING BBG-DWG-PTT-129-TGK-41 Monday, July 15, 2019 Friday, July 19, 20

4 1 PIPING BBG-DWG-PTT-129-TGK-41 Friday, July 26, 2019 Tuesday, August 06,

1 2 PIPING BBG-DWG-PTT-129-TGK-41 Wednesday, August 28, 2019 Monday, September 0

2 2 PIPING BBG-DWG-PTT-129-TGK-41 Wednesday, August 28, 2019 Monday, September 0

3 2 PIPING BBG-DWG-PTT-129-TGK-41 Wednesday, August 28, 2019 Monday, September 0

1 3 PIPING BBG-DWG-PTT-129-TGK-41 Wednesday, September 11, 2019 Monday, September 2

2 3 PIPING BBG-DWG-PTT-129-TGK-41 Wednesday, September 11, 2019 Monday, September 2

2 4 PIPING BBG-DWG-PTT-129-TGK-41 Tuesday, October 29, 2019 Wednesday, November

3 3 PIPING BBG-DWG-PTT-129-TGK-41 Wednesday, September 11, 2019 Monday, September 2

3 4 PIPING BBG-DWG-PTT-129-TGK-41 Tuesday, October 29, 2019 Wednesday, November

4 3 PIPING BBG-DWG-PTT-129-TGK-41 Tuesday, October 29, 2019 Monday, September 2


N KAPASITAS 2 X 10.000 KL DI TBBM SURABAYA GROUP AREA EX. LOBP PERAK

WING PAGE REV. TYPE NO. DRAWING TANGGAL SUBMIT TANGGAL REV

4 4 PIPING BBG-DWG-PTT-129-TGK-41 Tuesday, October 29, 2019 Wednesday, November

1 0 PIPING BBG-DWG-PTT-129-TGK-42-A Friday, July 26, 2019 Tuesday, August 06,

1 1 PIPING BBG-DWG-PTT-129-TGK-42-A Wednesday, August 28, 2019 Monday, September 0

1 2 PIPING BBG-DWG-PTT-129-TGK-42-A Wednesday, September 11, 2019 Monday, September 2

2 0 PIPING BBG-DWG-PTT-129-TGK-42-A Friday, July 26, 2019 Tuesday, August 06,

2 1 PIPING BBG-DWG-PTT-129-TGK-42-A Wednesday, August 28, 2019 Monday, September 0

2 2 PIPING BBG-DWG-PTT-129-TGK-42-A Wednesday, September 11, 2019 Monday, September 2

2 0 PIPING BBG-DWG-PTT-129-TGK-42-B Friday, July 26, 2019 Tuesday, August 06,

2 1 PIPING BBG-DWG-PTT-129-TGK-42-B Wednesday, August 28, 2019 Monday, September 0

1 2 PIPING BBG-DWG-PTT-129-TGK-42-B Wednesday, September 11, 2019 Monday, September 2


N KAPASITAS 2 X 10.000 KL DI TBBM SURABAYA GROUP AREA EX. LOBP PERAK

WING PAGE REV. TYPE NO. DRAWING TANGGAL SUBMIT TANGGAL REV

4 0 PIPING BBG-DWG-PTT-129-TGK-42-B Friday, July 26, 2019 Tuesday, August 06,

4 1 PIPING BBG-DWG-PTT-129-TGK-42-B Wednesday, August 28, 2019 Monday, September 0

2 2 PIPING BBG-DWG-PTT-129-TGK-42-B Wednesday, September 11, 2019 Monday, September 2

1 0 PIPING BBG-DWG-PTT-129-TGK-43 Monday, July 15, 2019 Friday, July 19, 20

1 1 PIPING BBG-DWG-PTT-129-TGK-43 Friday, July 26, 2019 Tuesday, August 06

2 0 PIPING BBG-DWG-PTT-129-TGK-43 Monday, July 15, 2019 Friday, July 19, 20

2 1 PIPING BBG-DWG-PTT-129-TGK-43 Friday, July 26, 2019 Tuesday, August 06

1 0 PIPING BBG-DWG-PTT-129-TGK-44-A Monday, July 15, 2019 Friday, July 19, 20

1 1 PIPING BBG-DWG-PTT-129-TGK-44-A Friday, July 26, 2019 Tuesday, August 06,

1 2 PIPING BBG-DWG-PTT-129-TGK-44-A Wednesday, August 28, 2019 Monday, September 0

1 3 PIPING BBG-DWG-PTT-129-TGK-44-A Wednesday, September 11, 2019 Monday, September 2


N KAPASITAS 2 X 10.000 KL DI TBBM SURABAYA GROUP AREA EX. LOBP PERAK

WING PAGE REV. TYPE NO. DRAWING TANGGAL SUBMIT TANGGAL REV

1 4 PIPING BBG-DWG-PTT-129-TGK-44-A Tuesday, October 29, 2019 Wednesday, November

2 0 PIPING BBG-DWG-PTT-129-TGK-44-A Monday, July 15, 2019 Friday, July 19, 20

2 1 PIPING BBG-DWG-PTT-129-TGK-44-A Friday, July 26, 2019 Tuesday, August 06,

2 2 PIPING BBG-DWG-PTT-129-TGK-44-A Wednesday, August 28, 2019 Monday, September 0

1 0 PIPING BBG-DWG-PTT-129-TGK-44-B Monday, July 15, 2019 Friday, July 19, 20

1 1 PIPING BBG-DWG-PTT-129-TGK-44-B Friday, July 26, 2019 Tuesday, August 06,

1 2 PIPING BBG-DWG-PTT-129-TGK-44-B Wednesday, August 28, 2019 Monday, September 0

1 3 PIPING BBG-DWG-PTT-129-TGK-44-B Wednesday, September 11, 2019 Monday, September 2

1 4 PIPING BBG-DWG-PTT-129-TGK-44-B Tuesday, October 29, 2019 Wednesday, November

2 2 PIPING BBG-DWG-PTT-129-TGK-44-B Wednesday, August 28, 2019 Monday, September 0


N KAPASITAS 2 X 10.000 KL DI TBBM SURABAYA GROUP AREA EX. LOBP PERAK

WING PAGE REV. TYPE NO. DRAWING TANGGAL SUBMIT TANGGAL REV

1 0 PIPING BBG-DWG-PTT-129-TGK-44-C Monday, July 15, 2019 Friday, July 19, 20

1 1 PIPING BBG-DWG-PTT-129-TGK-44-C Friday, July 26, 2019 Tuesday, August 06,

1 2 PIPING BBG-DWG-PTT-129-TGK-44-C Wednesday, August 28, 2019 Monday, September 0

1 3 PIPING BBG-DWG-PTT-129-TGK-44-C Wednesday, September 11, 2019 Monday, September 2

1 4 PIPING BBG-DWG-PTT-129-TGK-44-C Tuesday, October 29, 2019 Wednesday, November

1 5 PIPING BBG-DWG-PTT-129-TGK-44-C Friday, January 31, 2020 Saturday, February 0

2 0 PIPING BBG-DWG-PTT-129-TGK-44-C Monday, July 15, 2019 Friday, July 19, 20

2 1 PIPING BBG-DWG-PTT-129-TGK-44-C Friday, July 26, 2019 Tuesday, August 06,

2 2 PIPING BBG-DWG-PTT-129-TGK-44-C Wednesday, August 28, 2019 Monday, September 0

2 3 PIPING BBG-DWG-PTT-129-TGK-44-C Wednesday, September 11, 2019 Monday, September 2

1 0 PIPING BBG-DWG-PTT-129-TGK-44-D Monday, July 15, 2019 Friday, July 19, 20

1 1 PIPING BBG-DWG-PTT-129-TGK-44-D Friday, July 26, 2019 Tuesday, August 06,


N KAPASITAS 2 X 10.000 KL DI TBBM SURABAYA GROUP AREA EX. LOBP PERAK

WING PAGE REV. TYPE NO. DRAWING TANGGAL SUBMIT TANGGAL REV

1 2 PIPING BBG-DWG-PTT-129-TGK-44-D Wednesday, August 28, 2019 Monday, September 0

1 3 PIPING BBG-DWG-PTT-129-TGK-44-D Wednesday, September 11, 2019 Monday, September 2

1 4 PIPING BBG-DWG-PTT-129-TGK-44-D Tuesday, October 29, 2019 Wednesday, November

1 5 PIPING BBG-DWG-PTT-129-TGK-44-D Friday, January 31, 2020 Saturday, February 0

2 0 PIPING BBG-DWG-PTT-129-TGK-44-D Monday, July 15, 2019 Friday, July 19, 20

2 1 PIPING BBG-DWG-PTT-129-TGK-44-D Friday, July 26, 2019 Tuesday, August 06,

2 2 PIPING BBG-DWG-PTT-129-TGK-44-D Wednesday, August 28, 2019 Monday, September 0

1 0 PIPING BBG-DWG-PTT-129-TGK-46-A Friday, July 31, 2020 Wednesday, August 0

2 0 PIPING BBG-DWG-PTT-129-TGK-46-B Friday, July 31, 2020 Wednesday, August 0

1 0 PIPING BBG-DWG-PTT-129-TGK-45-A Friday, January 31, 2020 Saturday, February 0

2 0 PIPING BBG-DWG-PTT-129-TGK-45-B Friday, January 31, 2020 Saturday, February 0


N KAPASITAS 2 X 10.000 KL DI TBBM SURABAYA GROUP AREA EX. LOBP PERAK

WING PAGE REV. TYPE NO. DRAWING TANGGAL SUBMIT TANGGAL REV

1 0 MEKANIKAL BBG-DWG-PTT-129-TGK-46 Friday, August 23, 2019 Wednesday, August 2

1 1 MEKANIKAL BBG-DWG-PTT-129-TGK-46 Monday, September 09, 2019 Tuesday, September 2

1 2 MEKANIKAL BBG-DWG-PTT-129-TGK-46 Tuesday, October 29, 2019 Wednesday, November

1 3 MEKANIKAL BBG-DWG-PTT-129-TGK-46 Friday, January 31, 2020 Saturday, February 0

2 0 MEKANIKAL BBG-DWG-PTT-129-TGK-46 Friday, February 07, 2020 -

2 0 MEKANIKAL BBG-DWG-PTT-129-TGK-46 Friday, February 07, 2020 -

1 0 MEKANIKAL BBG-DWG-PTT-129-TGK-47 Friday, February 07, 2020 -

1 0 GENERAL BBG-DWG-PTT-129-TGK-48 Friday, February 07, 2020 -

DING BATA 0 SIPIL BBG-DWG-PTT-129-14 Friday, October 26, 2018 Tuesday, October 30
N KAPASITAS 2 X 10.000 KL DI TBBM SURABAYA GROUP AREA EX. LOBP PERAK

WING PAGE REV. TYPE NO. DRAWING TANGGAL SUBMIT TANGGAL REV

1 SIPIL BBG-DWG-PTT-129-CVL-01 Monday, November 12, 2018 Thursday, November 1

0 SIPIL BBG-DWG-PTT-129-15 Friday, October 26, 2018 Tuesday, October 30

UP 0 SIPIL BBG-DWG-PTT-129-18 Friday, October 26, 2018 Tuesday, October 30

1 SIPIL BBG-DWG-PTT-129-CVL-02 Monday, November 12, 2018 Thursday, November 1

AIL BALOK, KOLOM, SLOOF 0 SIPIL BBG-DWG-PTT-129-16 Friday, October 26, 2018 Tuesday, October 30

ETAIL PENULANGAN DAN DETAIL 1 SIPIL BBG-DWG-PTT-129-CVL-03 Monday, November 12, 2018 Thursday, November 1
DETAIL PENULANGAN DAN DETAIL
2 SIPIL BBG-DWG-PTT-129-CVL-03 Wednesday, December 26, 2018 Thursday, January 03

DING BATA 0 SIPIL BBG-DWG-PTT-129-14 Friday, October 26, 2018 Tuesday, October 30

1 SIPIL BBG-DWG-PTT-129-CVL-04 Monday, November 12, 2018 Thursday, November 1

ARA, POTONGAN PAGAR SENG 0 SIPIL BBG-DWG-PTT-129-19 Thursday, January 03, 2019 Thursday, January 10
N KAPASITAS 2 X 10.000 KL DI TBBM SURABAYA GROUP AREA EX. LOBP PERAK

WING PAGE REV. TYPE NO. DRAWING TANGGAL SUBMIT TANGGAL REV

TARA, POTONGAN PAGAR SENG 1 SIPIL BBG-DWG-PTT-129-19 Thursday, January 10, 2019 Monday, January 28

L PENULANGAN PILE CAP 0 SIPIL BBG-DWG-PTT-129-TGK-03A Wednesday, March 06, 2019 Tuesday, March 12,

0 SIPIL BBG-DWG-PTT-129-01 Tuesday, October 02, 2018 Tuesday, October 16

3 0 PIPING BBG-DWG-PTT-129-TGK-44-A Monday, July 15, 2019 Friday, July 19, 20

4 0 PIPING BBG-DWG-PTT-129-TGK-44-A Monday, July 15, 2019 Friday, July 19, 20

5 0 PIPING BBG-DWG-PTT-129-TGK-44-A Monday, July 15, 2019 Friday, July 19, 20

6 0 PIPING BBG-DWG-PTT-129-TGK-44-A Monday, July 15, 2019 Friday, July 19, 20

2 0 PIPING BBG-DWG-PTT-129-TGK-44-B Monday, July 15, 2019 Friday, July 19, 20

3 0 PIPING BBG-DWG-PTT-129-TGK-44-B Monday, July 15, 2019 Friday, July 19, 20

4 0 PIPING BBG-DWG-PTT-129-TGK-44-B Monday, July 15, 2019 Friday, July 19, 20

5 0 PIPING BBG-DWG-PTT-129-TGK-44-B Monday, July 15, 2019 Friday, July 19, 20


N KAPASITAS 2 X 10.000 KL DI TBBM SURABAYA GROUP AREA EX. LOBP PERAK

WING PAGE REV. TYPE NO. DRAWING TANGGAL SUBMIT TANGGAL REV

6 0 PIPING BBG-DWG-PTT-129-TGK-44-B Monday, July 15, 2019 Friday, July 19, 20

7 0 PIPING BBG-DWG-PTT-129-TGK-44-B Monday, July 15, 2019 Friday, July 19, 20

3 0 PIPING BBG-DWG-PTT-129-TGK-44-C Monday, July 15, 2019 Friday, July 19, 20

4 0 PIPING BBG-DWG-PTT-129-TGK-44-C Monday, July 15, 2019 Friday, July 19, 20

5 0 PIPING BBG-DWG-PTT-129-TGK-44-C Monday, July 15, 2019 Friday, July 19, 20

6 0 PIPING BBG-DWG-PTT-129-TGK-44-C Monday, July 15, 2019 Friday, July 19, 20

3 0 PIPING BBG-DWG-PTT-129-TGK-44-D Monday, July 15, 2019 Friday, July 19, 20

4 0 PIPING BBG-DWG-PTT-129-TGK-44-D Monday, July 15, 2019 Friday, July 19, 20

5 0 PIPING BBG-DWG-PTT-129-TGK-44-D Monday, July 15, 2019 Friday, July 19, 20

6 0 PIPING BBG-DWG-PTT-129-TGK-44-D Monday, July 15, 2019 Friday, July 19, 20

7 0 PIPING BBG-DWG-PTT-129-TGK-44-D Monday, July 15, 2019 Friday, July 19, 20

1 0 PIPING BBG-DWG-PTT-129-TGK-44-E Friday, July 26, 2019 Tuesday, August 06,

2 0 PIPING BBG-DWG-PTT-129-TGK-44-E Friday, July 26, 2019 Tuesday, August 06,

1 1 PIPING BBG-DWG-PTT-129-TGK-44-E Wednesday, August 28, 2019 Monday, September 0


N KAPASITAS 2 X 10.000 KL DI TBBM SURABAYA GROUP AREA EX. LOBP PERAK

WING PAGE REV. TYPE NO. DRAWING TANGGAL SUBMIT TANGGAL REV

2 1 PIPING BBG-DWG-PTT-129-TGK-44-E Wednesday, August 28, 2019 Monday, September 0

3 1 PIPING BBG-DWG-PTT-129-TGK-44-E Wednesday, August 28, 2019 Monday, September 0