PROJECT: PROPOSED WORKSHOP & 3-STOREY BUILDING Al - Ansari

LOCATION: Jubail Saudi Arabia Engineering & Consultants


OWNER: SANEEL CONTRACTING EST. 18098 Real Estate Development.
SUBJECT: BILL OF QUANTITIES ARCH Project Management-Supervision
DATE: 12/16/2018 B.O.Q Design Studies-Land Surveying
DIV TOTAL AMOUNT
DESCRIPTION QTY. UNIT UNIT COST
CODE (SAR)

DIV-01 GENERAL REQUIREMENTS

1.01 PERMITS & TAXES (if applicable)


Construction Permits LS
Others as required in the Contract LS

SUB TOTAL "1.01"

1.02 OVERHEAD (if applicable)


Project Overhead (Project Manager / Field Staff) LS
Office Overhead Chargeable to the Project LS
Project Consultant LS
Others as required in the Contract LS

SUB TOTAL "1.02"

1.03 TEMPORARY FACILITIES (if applicable)


Contractor's Field/Site Office & Furnishings LS
Project Manager Field Office & Furnishings LS
Temporary Contractor's Warehouse/Fabrication Area LS
Temporary Utility Connection LS
Water & Electric Bills MOS
Fencing of Temporary Facilities/Project Site LS
Project Construction Billboards/Signage as per standard LS
(subject to PM or Architect's approval)
Shop Drawings (if applicable) LS
As-Built Drawings (if applicable) LS
Material testing & Commissioning LS
House keeping LS
Service & support equipment for the project LS

SUB TOTAL "1.03"

1.04 EQUIPMENT (Mobilization & Demobilization) LS


1.05 INSURANCE (if applicable) LS
1.06 BONDS (if applicable)
Bid Bonds LS
Performance Bonds LS
Payment Bonds LS
Guarantee Bonds LS
SUB TOTAL "1.04,1.05 & 1.06"
1.07 HEALTH & SAFETY
Safety Personnel & Health facilities for the project LS
Personal Protective Equipment (PPE) LS
Safety Signages LS
SUB TOTAL "1.07"

1.08 OTHERS (contractor to itemized if, any)

TOTAL: DIVISION 01 - "GENERAL REQUIREMENTS"

DIV-02 SITE WORKS

2.01 REFER TO CIVIL-STRUCTURAL B.O.Q (if any)


2.02 OTHERS (contractor to itemized if, any)

TOTAL: DIVISION 02 - "SITE WORKS"

DIV-03 CONCRETE WORKS

3.01 REFER TO CIVIL-STRUCTURAL B.O.Q (if any)


3.02 OTHERS (contractor to itemized if, any)

TOTAL: DIVISION 03 - "CONCRETE WORKS"

DIV-04 MASONRY WORKS

4.01 CHB LAYING (CONCRETE MASONRY UNIT)

000000 18098-BOQ: ARCHITECTURAL (JAS:12/16/2018) SANEEL CONTRACTING EST. 1/6


PROJECT: PROPOSED WORKSHOP & 3-STOREY BUILDING Al - Ansari
LOCATION: Jubail Saudi Arabia Engineering & Consultants
OWNER: SANEEL CONTRACTING EST. 18098 Real Estate Development.
SUBJECT: BILL OF QUANTITIES ARCH Project Management-Supervision
DATE: 12/16/2018 B.O.Q Design Studies-Land Surveying
DIV TOTAL AMOUNT
DESCRIPTION QTY. UNIT UNIT COST
CODE (SAR)
WORKSHOP & 3- STOREY BUILDING

CMU Exterior Walls (4sides)


a. 200mm thk. Insulated CHB wall (less opening) 682 M²

CMU Interior Walls


GROUND FLOOR LEVEL
a. 200mm thk. Insulated CHB wall (less opening) 170 M²
b. 100mm thk. Insulated CHB wall (less opening) 55 M²

FIRST FLOOR LEVEL


a. 200mm thk. Insulated CHB wall (less opening) 200 M²

SECOND FLOOR LEVEL


a. 200mm thk. Insulated CHB wall (less opening) 44 M²

SUB TOTAL "4.01"

4.02 PLASTERING WORKS (CONCRETE MASONRY UNIT)

WORKSHOP & 3- STOREY BUILDING

CMU Exterior Walls

a.Smooth finished cement plaster (2-faces) 1364 M²


b.Smooth plaster on windows & doors opening interior/exterior (1-face) 65 M²
CMU Interior Walls
a. All 200mm thk. CHB internal walls (2-faces) 340 M²
b. All 100mm thk. CHB internal walls (2-faces) 110 M²

SUB TOTAL "4.02"

4.03 OTHERS (contractor to itemized if, any)

TOTAL: DIVISION 04 - "MASONRY WORKS"

DIV-05 METALS

5.01 COMMON METALS - REFER TO STRUCTURAL B.O.Q.

5.02 SPECIALTY METALS


Supply,fabrication & installation of internal epoxy coated metal stair, 1 LOT
railings & handrails @
Warehouse bldg. 3-storey bldg (Ground to Roof deck floor)
Supply, Fabrication & installation of 1.25m x 1.6m metal gate @ roof deck. 1 LOT

SUB TOTAL "5.02"

5.03 METAL ACCESSORIES


Welding & fastners 1 LOT
Non-shrink levelling grout 1 LOT

SUB TOTAL "5.03"


5.04 OTHERS (contractor to itemized if, any)

TOTAL: DIVISION 5 - "METALS"

DIV-06 WOOD & PLASTICS

6.01 Wood (Mouldings, Furnitures etc.) as per owner requirements N/A


6.02 (Cabinetry, Shelving & Drawers,) as per owner requirements N/A

6.03 OTHERS (contractor to itemized if, any)

TOTAL: DIVISION 6 - "WOOD & PLASTICS"

DIV-07 THERMAL & MOISTURE PROTECTION

7.01 VAPOR BARRIER / INSULATIONS / WALL COMPONENTS

000000 18098-BOQ: ARCHITECTURAL (JAS:12/16/2018) SANEEL CONTRACTING EST. 2/6


PROJECT: PROPOSED WORKSHOP & 3-STOREY BUILDING Al - Ansari
LOCATION: Jubail Saudi Arabia Engineering & Consultants
OWNER: SANEEL CONTRACTING EST. 18098 Real Estate Development.
SUBJECT: BILL OF QUANTITIES ARCH Project Management-Supervision
DATE: 12/16/2018 B.O.Q Design Studies-Land Surveying
DIV TOTAL AMOUNT
DESCRIPTION QTY. UNIT UNIT COST
CODE (SAR)
WORKSHOP BUILDING
FRONT ELEVATION
Supply & install Pre-painted insulated metal wall panels 90 M²
Ga. 24 Exterior metal facing galvanized steel in PVDF or SMP
coating system, tongue & groove joinery w/ concealed fastener and
thermal break
Interior metal facing Ga. 26 galvanized steel standard SMP imperial
white coating system or approved equal by owner
Insulation: Factory formed polyisocynutrate (2.1-2.5 pcf density)
Caulking and Sealants etc. 1 LOT

SUB TOTAL "7.01"

7.02 ROOFING SHEETS & ACCESSORIES

WORKSHOP BUILDING
Supply & install Ga. 24 Pre-Painted Longspan pre-insulated metal 252 M²
roof panel (Rib-type)(color as per Architect or client approval)

Flashing, Ga. 24, pre-painted @ fascia 36 LM


Ridge Roll, Ga. 24, pre-painted W18" X L10' (200mm overlap end to end) 18 LM
Ga. 24 Pre-fabricated bended flashing cap (pre-painted) consider 14 LM
(200mm overlap end to end)
Ga. 24 Pre-fabricated & Pre-painted G.I gutter 36 LM
Water Stopper, Ga. 24, pre-painted 1 LOT
S/S Mesh Screen (optional) 1 LOT
Attachment Accessories (rivets,tekscrews, etc.) 1 LOT
Caulking and Sealants 1 LOT
GA. 24 Galvanized iron roof gutter including attchment accessories. 40 LM

SUB TOTAL "7.02"

7.03 OTHERS (contractor to itemized if, any)

TOTAL: DIVISION 7 - "THERMAL & MOISTURE PROTECTION"

DIV-08 DOORS & WINDOWS

8.01 DOORS

3 -STOREY BUILDING
Supply & install double swing analok glass on stainless steel frame w/
complete hardwares & accessories (1-hour fire resistance rating)
a. D1- 1600mm(W) x 2100mm (H) 1 SET
Supply & install single swing hinged type solid panel door including
complete hardwares & accessories.
b. D2- 900mm(W) x 2100mm (H) 11 SETS
Supply & install single swing hinged type hollow core flush door with wood
veneer frames including complete hardwares & accessories.
c. D3- 900mm(W) x 2100mm (H) 1 SET
Supply & install single swing hollow core pvc door with louvers including
complete hardwares & accessories.
d. D4- 800mm(W) x 2100mm (H) 2 SETS
Supply & install single swing hinged type hollow core flush door with wood
veneer frames & glass panel incl. complete hardwares & accessories.
e. D5- 900mm(W) x 2100mm (H) 2 SETS
Supply & install single swing hinged type phenolic door including
complete hardwares & accessories.
f. D6- 700mm(W) x 1850mm (H) 5 SETS

WORKSHOP BUILDING
Supply & install Standard pre-painted aluminum roll up shutter door
including complete hardwares & accessories.
a. D7- 5500mm(W) x 6000mm (H) 1 SET
b. D8- 5800mm(W) x 6000mm (H) 2 SETS

SUB TOTAL "8.01"

8.02 WINDOWS & GLAZINGS

000000 18098-BOQ: ARCHITECTURAL (JAS:12/16/2018) SANEEL CONTRACTING EST. 3/6


PROJECT: PROPOSED WORKSHOP & 3-STOREY BUILDING Al - Ansari
LOCATION: Jubail Saudi Arabia Engineering & Consultants
OWNER: SANEEL CONTRACTING EST. 18098 Real Estate Development.
SUBJECT: BILL OF QUANTITIES ARCH Project Management-Supervision
DATE: 12/16/2018 B.O.Q Design Studies-Land Surveying
DIV TOTAL AMOUNT
DESCRIPTION QTY. UNIT UNIT COST
CODE (SAR)
3 -STOREY BUILDING & WORKSHOP
Supply & install sliding & fixed window combination on anodized aluminum
frame including complete hardwares and accessories.
a. W1- 2500mm(W) x 1800mm (H) 8 SETS
Supply & install sliding & fixed window combination on anodized aluminum
frame including complete hardwares and accessories.
b. W2- 1200mm(W) x 1800mm (H) 9 SETS
Supply & install fixed window on anodized aluminum frame
including complete hardwares and accessories.
c. W3- 1200mm(W) x 1700mm (H) 2 SETS
Supply & install fixed window on anodized aluminum frame
including complete hardwares and accessories.
d. W4- 700mm(W) x 1750mm (H) 1 SET
Supply & install sliding glass window on anodized aluminum frame
including complete hardwares and accessories.
e. W5- 1200mm(W) x 1250mm (H) 2 SETS
Supply & install awning glass window on anodized aluminum frame
including complete hardwares and accessories.
f. W6- 600mm(W) x 600mm (H) 5 SETS

SUB TOTAL "8.02"

TOTAL: DIVISION 8 - "DOORS & WINDOWS"

DIV-09 FINISHES

9.01 FLOORING FINISHES

WORKSHOP BUILDING

GROUND FLOOR LEVEL


a.Workshop Area 165 M²
Industrial Epoxy Floor paint finish (impact/abrasion & water resistant)
Color: Light Gray or approved equal by Architect/client
b. Office & Storage 50 M²
Supply & install 400mmx400mmx3mm THK. polished non-skid porcelain
floor tiles
c. Toilet & Buffet 30 M²
Supply & install 300mmx300mmx3mm THK. unglazed non-skid ceramic
floor tiles.
Color: Beige or Ivory white as per Client approval.

FIRST FLOOR LEVEL


d. Storage 72 M²
Industrial Epoxy Floor paint on smooth concrete finish

3 -STOREY BUILDING

GROUND FLOOR LEVEL


a. Offices,Waiting Area, Stair Area & Lobby 95 M²
Supply & install 400mmx400mmx3mm THK. polished non-skid porcelain
floor tiles
b. Buffet & Toilet 20 M²
Supply & install 300mmx300mmx3mm THK. unglazed non-skid ceramic
floor tiles.
Color: Beige or Ivory white as per Client approval.

FIRST FLOOR LEVEL


a. Offices,Waiting Area, Stair Area & Lobby 97 M²
Supply & install 400mmx400mmx3mm THK. polished non-skid porcelain
floor tiles

SECOND FLOOR LEVEL


a. Offices,Waiting Area, Stair Area & Lobby 97 M²
Supply & install 400mmx400mmx3mm THK. polished non-skid porcelain
floor tiles

SUB TOTAL "9.01"

9.02 CEILING FINISHES

000000 18098-BOQ: ARCHITECTURAL (JAS:12/16/2018) SANEEL CONTRACTING EST. 4/6


PROJECT: PROPOSED WORKSHOP & 3-STOREY BUILDING Al - Ansari
LOCATION: Jubail Saudi Arabia Engineering & Consultants
OWNER: SANEEL CONTRACTING EST. 18098 Real Estate Development.
SUBJECT: BILL OF QUANTITIES ARCH Project Management-Supervision
DATE: 12/16/2018 B.O.Q Design Studies-Land Surveying
DIV TOTAL AMOUNT
DESCRIPTION QTY. UNIT UNIT COST
CODE (SAR)

WORKSHOP BUILDING

GROUND FLOOR LEVEL


a. Offices 46 M²
Supply & install 600x600x12mm moisture resistant gypsum board ceiling
tile on tee runner.
b. Buffet & Toilet 20 M²
Supply & install 600x600x12mm moisture resistant gypsum board ceiling
tile on tee runner.

3 -STOREY BUILDING

GROUND FLOOR LEVEL


a. Offices, Waiting Area, Lobby 92 M²
Supply & install 4' x 8' x 12mm thk. ordinary gypsum board on metal furring.
Skirting: Gypsum board mouldings (optional).
b. Buffet & Toilet 16 M²
Supply & install 600x600x12mm moisture resistant gypsum board ceiling
tile on tee runner.

FIRST FLOOR LEVEL


a. Offices, Waiting Area, Lobby 107 M²
Supply & install 4' x 8' x 12mm thk. ordinary gypsum board on metal furring.
Skirting: Gypsum board mouldings (optional)

SECOND FLOOR LEVEL


a. Offices, Waiting Area, Lobby 107 M²
Supply & install 4' x 8' x 12mm thk. ordinary gypsum board on metal furring.
Skirting: Gypsum board mouldings (optional)

SUB TOTAL "9.02"

9.03 PAINT FINISHES

EXTERIOR WALL PAINTS (ALL BUILDINGS)


a. 1st coat Alkali resistant primer paint or approved equal 724 M²
b. 2nd coat Acrylic Emulsion paint or approved equal 724 M²
c. Top coat Acrylic Texture Emulsion paint or approved equal 724 M²

Field Sample/Mock-up 1 LOT

INTERIOR WALL PAINTS

WORKSHOP BUILDING

a. 1st coat Alkali resistant primer paint or approved equal 368 M²


b. 2nd coat Acrylic Emulsion paint or approved equal 368 M²
c. Top coat Acrylic Texture Emulsion paint or approved equal 368 M²

3 -STOREY BUILDING

GROUND TO ROOF DECK FLOOR (2-faces)


a. 1st coat Alkali resistant primer paint or approved equal 1690 M²
b. 2nd coat Acrylic Emulsion paint or approved equal 1690 M²
c. Top coat Acrylic Texture Emulsion paint or approved equal 1690 M²

SUB TOTAL "9.03"

9.04 OTHERS (contractor to itemized if, any)

TOTAL: DIVISION 9 - "FINISHES"

DIV-10 SPECIALTIES

10.01 TOILET CUBICLE / DRY WALL PARTITIONS


25mm thk. Phenolic toilet partitions including attachment accessories. 1 LOT

Field Sample/Mock-up 1 LOT

000000 18098-BOQ: ARCHITECTURAL (JAS:12/16/2018) SANEEL CONTRACTING EST. 5/6


PROJECT: PROPOSED WORKSHOP & 3-STOREY BUILDING Al - Ansari
LOCATION: Jubail Saudi Arabia Engineering & Consultants
OWNER: SANEEL CONTRACTING EST. 18098 Real Estate Development.
SUBJECT: BILL OF QUANTITIES ARCH Project Management-Supervision
DATE: 12/16/2018 B.O.Q Design Studies-Land Surveying
DIV TOTAL AMOUNT
DESCRIPTION QTY. UNIT UNIT COST
CODE (SAR)
Toilet fixtures & Accessories 1 LOT

SUB TOTAL "10.01"

10.02 INTERNAL STAIR


Supply & install Polished pre-cast marble or granite stair tread 1 LOT
w/ non-skid strips & bullnose
Supply & install Polished pre-cast marble or granite stair landing 1 LOT
Stair stringer (optional) 1 LOT
Touch-up sealer/ silicone sealant 1 LOT

SUB TOTAL "10.02"

10.03 GRANITE COUNTERTOP & BUFFET CABINETS


Supply & install Polished SYNTHETIC granite countertop with splash 1 LOT
guard for buffet & lavatory including overhead and undercounter cabinets

10.04 WATERPROOFING
Three layer composite sheet membrane consisting of 0.41mm (0.016) of 1 LOT
high density polyethelene film 0.64mm (0.025) of specially formulated
synthetic adhesive & 0.03mm (0.001) of protective coating for roof deck
water proofing.

SUB TOTAL "10.03" & "10.04"

10.05 OTHERS (contractor to itemized if, any)

TOTAL: DIVISION 10 - "SPECIALTIES"

GRAND TOTAL: "DIVISION 1" GENERAL REQ'TS. TO "DIVISION 10" SPECIALTIES SAR

NOTE: 1. The above breakdown does not include labor/equipment costs


2. The above unit/quantities/value must be re-checked by the contractor
as per approved complete set of plans for verification purposes.

ABBREVIATIONS:
LS - Lump Sum
MOS - Months
M² - Square Meter
LM - Linear Meter
PCS - Pieces
SET - Complete Set
GALS - Gallons
LOT - All
ARCHITECTURAL:
PVDF - Polyvinylidene Di-Flouride
SMP - Silicone Modified Polyester
Ga. - Galvanized
G.I - Galvanized Iron

000000 18098-BOQ: ARCHITECTURAL (JAS:12/16/2018) SANEEL CONTRACTING EST. 6/6