Fpi - QC Inspection Plan

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 5

 

 
 

Inspection & Test Plan 

Vendor  FUTURE PIPE INDUSTRIES – SAUDI ARABIA 
Client  Gulf Asia Contracting company LLC 
PO No.   GACC‐042‐287 
Project  REACTION OFF‐GAS Scrubber System upgrade in PAP Train B 
Vendor Doc No.  12‐FPISSC‐000160‐GACT‐INTP001 
Client Doc No.   

A 21-11-19 Issued for Review Vijayalekshmi Sabarinath Abdul Nassar

Rev Date Revision Description Prepared Checked Approved

   
INSPECTION AND TEST PLAN
ITP No. : 1712019 ‐ GRE ‐ GSS ‐ GACC ‐ MPC ‐ Rev. 0

QUALITY INSPECTION Project : REACTION OFF‐GAS Scrubber System upgrade in PAP Train B


PROGRAM Location : Jubail ‐ Kingdom of Saudi Arabia
Client : Gulf Asia Contracting company LLC
Prepared  Muhammad Iqbal Purchase Order No. : GACC‐042‐287
by QA/QC End User : MA’ADEN PHOSPHATE COMPANY

Date: 14/11/2019 Items : WAVISTRONG® ‐ GRE Pipes & Fittings


FPI Ref. # QUO‐008912‐VETM‐TEC‐SS0‐001‐R4
Inspection Code:          H = Hold Point               W = Witness               RW = Random Witness               SW = Spot Witness               S = Survey               M = Monitoring                R = Review
Test / Place of Inspection Required
Controlling Specification Documentation / 
Activity Description of Test / Activity Frequency Test/ Client /  End 
/ Test Method FPI Certification Required
# Act TPI User
1 Raw Materials Testing

1.1 Refractive Index of Epoxy resin / Hardener FPI Test Method Every Resin Delivery FPI H


ASTM D 2196 Every Resin
1.2 Viscosity of Resin FPI H
FPI test method Delivery
In‐house Test Records
Resin Gel Time, Cure Time and Peak  Every Resin
1.3 FPI Test Method FPI H and
Temperature Delivery
Supplier Certificates
Glass Fibers:Moisture Content, Size / Binder  Every Glass
1.4 FPI Test Method FPI H
Content & Tex Properties Delivery
C‐Veil & W.R Mat: Moisture Content, Size /  Every Glass
1.5 FPI Test Method FPI H
binder content & GM² Delivery
2 Production Testing / Inspection
Pipe Stiffness and Deflection Test ASTM D2412
2.1 One in 100 items FPI H
(Destructive Test) AWWA C950
Axial Tensile Strength of Pipes ASTM D638
2.2 One in 100 items FPI H
(Destructive Test) AWWA C 950
Hoop Tensile Test of Pipes ASTM D 2290
2.3 One in 100 items FPI H
(Destructive Test) AWWA C950
Batch Test Report
Loss On Ignition test, glass content ASTM D 2584
2.4 One in 100 items FPI H
of pipes (Destructive Test) FPI Test Method
Water Absorption (Boil Resistance) ‐ Pipes  ASTM D 570
2.5 One in 100 items FPI H
(Destructive Test) FPI Test Method
ASTM D 3418 Min. One
2.6 Degree of Curing (Tg value) FPI H
FPI Test Method per lot
Page 1 of 2
INSPECTION AND TEST PLAN
ITP No. : 1712019 ‐ GRE ‐ GSS ‐ GACC ‐ MPC ‐ Rev. 0

QUALITY INSPECTION Project : REACTION OFF‐GAS Scrubber System upgrade in PAP Train B


PROGRAM Location : Jubail ‐ Kingdom of Saudi Arabia
Client : Gulf Asia Contracting company LLC
Prepared  Muhammad Iqbal Purchase Order No. : GACC‐042‐287
by QA/QC End User : MA’ADEN PHOSPHATE COMPANY

Date: 14/11/2019 Items : WAVISTRONG® ‐ GRE Pipes & Fittings


FPI Ref. # QUO‐008912‐VETM‐TEC‐SS0‐001‐R4
Inspection Code:          H = Hold Point               W = Witness               RW = Random Witness               SW = Spot Witness               S = Survey               M = Monitoring                R = Review
Test / Place of Inspection Required
Controlling Specification Documentation / 
Activity Description of Test / Activity Frequency Test/ Client /  End 
/ Test Method FPI Certification Required
# Act TPI User
2.7 Barcol Hardness for Pipes & Fittings ASTM D 2583 100% of the products FPI H

2.8 Dimensional Control ASTM D 3567 100% of the products FPI H Inspection Reports

2.9 Visual Inspection ASTM D 2563 100% of the products FPI H


100% of pipes and
Hydrostatic Pressure Test of Pipes and FPI test method
2.10 10% testable fittings  FPI H Hydro test report
testable fittings (flanged) 1.5 x design pr. for 1 minute
(flanged)
3 Other records
As per freq. stated Calibration records are 
3.1 Testing Equipments Calibration FPI ‐ Q.A Manual FPI H
in Q.A. Manual available in‐house
3.2 Product Marking / Identification FPI Standard 100% of the Products FPI H ‐‐‐‐‐
Final Inspection Activities & Review of Certificate of Compliance
3.3 ‐‐‐ 100% Before Delivery FPI H
Documents and batch test report
3.4 Packing ,Crating, End Protection FPI Standard 100% of the products FPI H

FPI = Future Pipe Industries ‐ KSA TPI = Third Party Inspection

Notes:
1 For pipes of smaller diameters and high thickness,stiffness value is way beyond the requirement; Level A and level B deflection should be calculated as per AWWA C 950
2 FPI have the right to supply maximum 15% of the total length of pipes, in shorther length than the standard length specified. The short length provided shall not vary by
more than 25% of the standard length specified.

Page 2 of 2
INSPECTION AND TEST PLAN
ITP No. : 1722019 ‐ GRV ‐ GSS ‐ GACC ‐ MPC ‐ Rev. 0

QUALITY INSPECTION Project : REACTION OFF‐GAS Scrubber System upgrade in PAP Train B


PROGRAM Location : Jubail ‐ Kingdom of Saudi Arabia
Client : Gulf Asia Contracting company LLC
Prepared  Muhammad Iqbal Purchase Order No. : GACC‐042‐287
by QA/QC End User : MA’ADEN PHOSPHATE COMPANY

Date: 14/11/2019 Items : FIBERSTRONG® ‐ GRV Pipes & Fittings


FPI Ref. # QUO‐008912‐VETM‐TEC‐SS0‐001‐R4
Inspection Code:          H = Hold Point               W = Witness               RW = Random Witness               SW = Spot Witness               S = Survey               M = Monitoring                R = Review
Test / Place of Inspection Required
Controlling Specification Documentation / 
Activity Description of Test / Activity Frequency Test/ Client /  End 
/ Test Method FPI Certification Required
# Act TPI User
1 Raw Materials Testing
ASTM D 2196 Every Resin
1.1 Viscosity of Resin FPI H
FPI test method Delivery
Resin Gel Time, Cure Time and Peak  Every Resin
1.2 FPI Test Method FPI H In‐house Test Records
Temperature Delivery
and
Glass Fibers: Moisture Content, Size / Binder  Every Glass
1.3 FPI Test Method FPI H Supplier Certificates
Content & Tex Properties Delivery
C‐Veil & W.R Mat: Moisture Content, Size /  Every Glass
1.4 FPI Test Method FPI H
binder content & GM² Delivery
2 Production Testing / Inspection
Pipe Stiffness and Deflection Test ASTM D2412
2.1 One in 100 items FPI H
(Destructive Test) AWWA C950
Axial Tensile Strength of Pipes ASTM D638
2.2 One in 100 items FPI H
(Destructive Test) AWWA C 950
Batch Test Report
Hoop Tensile Test of Pipes ASTM D 2290
2.3 One in 100 items FPI H
(Destructive Test) AWWA C950
Loss On Ignition test, glass content ASTM D 2584
2.4 One in 100 items FPI H
of pipes (Destructive Test) FPI Test Method
2.5 Barcol Hardness for Pipes & Fittings ASTM D 2583 100% of the products FPI H

2.6 Dimensional Control ASTM D 3567 100% of the products FPI H Inspection Reports

2.7 Visual Inspection ASTM D 2563 100% of the products FPI H

Page 1 of 2
INSPECTION AND TEST PLAN
ITP No. : 1722019 ‐ GRV ‐ GSS ‐ GACC ‐ MPC ‐ Rev. 0

QUALITY INSPECTION Project : REACTION OFF‐GAS Scrubber System upgrade in PAP Train B


PROGRAM Location : Jubail ‐ Kingdom of Saudi Arabia
Client : Gulf Asia Contracting company LLC
Prepared  Muhammad Iqbal Purchase Order No. : GACC‐042‐287
by QA/QC End User : MA’ADEN PHOSPHATE COMPANY

Date: 14/11/2019 Items : FIBERSTRONG® ‐ GRV Pipes & Fittings


FPI Ref. # QUO‐008912‐VETM‐TEC‐SS0‐001‐R4
Inspection Code:          H = Hold Point               W = Witness               RW = Random Witness               SW = Spot Witness               S = Survey               M = Monitoring                R = Review
Test / Place of Inspection Required
Controlling Specification Documentation / 
Activity Description of Test / Activity Frequency Test/ Client /  End 
/ Test Method FPI Certification Required
# Act TPI User
100% of pipes and
Hydrostatic Pressure Test of Pipes and FPI test method
2.8 10% testable fittings  FPI H Hydro test report
testable fittings (flanged) 1.5 x design pr. for 1 minute
(flanged)
3 Other records
As per freq. stated Calibration records are 
3.1 Testing Equipments Calibration FPI ‐ Q.A Manual FPI H
in Q.A. Manual available in‐house
3.2 Product Marking / Identification FPI Standard 100% of the Products FPI H ‐‐‐‐‐
Final Inspection Activities & Review of Certificate of Compliance
3.3 ‐‐‐ 100% Before Delivery FPI H
Documents and batch test report
3.4 Packing ,Crating, End Protection FPI Standard 100% of the products FPI H

FPI = Future Pipe Industries ‐ KSA TPI = Third Party Inspection

Notes:
1 For pipes of smaller diameters and high thickness,stiffness value is way beyond the requirement; Level A and level B deflection should be calculated as per AWWA C 950
2 FPI have the right to supply maximum 15% of the total length of pipes, in shorther length than the standard length specified. The short length provided shall not vary by
more than 25% of the standard length specified.

Page 2 of 2

You might also like