Inspection & Test Plan
Vendor FUTURE PIPE INDUSTRIES – SAUDI ARABIA
Client Gulf Asia Contracting company LLC
PO No. GACC‐042‐287
Project REACTION OFF‐GAS Scrubber System upgrade in PAP Train B
Vendor Doc No. 12‐FPISSC‐000160‐GACT‐INTP001
Client Doc No.
INSPECTION AND TEST PLAN
ITP No. : 1712019 ‐ GRE ‐ GSS ‐ GACC ‐ MPC ‐ Rev. 0
Notes:
1 For pipes of smaller diameters and high thickness,stiffness value is way beyond the requirement; Level A and level B deflection should be calculated as per AWWA C 950
2 FPI have the right to supply maximum 15% of the total length of pipes, in shorther length than the standard length specified. The short length provided shall not vary by
more than 25% of the standard length specified.
Page 2 of 2
INSPECTION AND TEST PLAN
ITP No. : 1722019 ‐ GRV ‐ GSS ‐ GACC ‐ MPC ‐ Rev. 0
Page 1 of 2
INSPECTION AND TEST PLAN
ITP No. : 1722019 ‐ GRV ‐ GSS ‐ GACC ‐ MPC ‐ Rev. 0
Notes:
1 For pipes of smaller diameters and high thickness,stiffness value is way beyond the requirement; Level A and level B deflection should be calculated as per AWWA C 950
2 FPI have the right to supply maximum 15% of the total length of pipes, in shorther length than the standard length specified. The short length provided shall not vary by
more than 25% of the standard length specified.