Parameter configuration and commissioning


After connect all the cables, turn on the battery breaker and AC input breaker.

Parameters configuration
SN Parameter Default Configured Note
1 System Time Zone GMT8 GMT1
2 System Time Actual time
3 Battery capacity 150 Actual capacity
4 Work Mode Save Safe
5 Battery charge coefficient 0.15C 0.10C
6 LLVD1 45 44.4
7 BLVD 44 43.2

A, Login the system

1, System Time Zone to “GMT1”

2, System Time to actual time

All rights reserved. No spreading without permission of ZTE. 第1页


Internal Use Only▲
3, Battery Capacity
Configure battery capacity from Battery 1 to battery 4, with actual battery capacity, if not
connected, configure “0AH”

Input actual battery


capacity

4, Change “Work Mode” to be “Safe”

5, Battery charge coefficient to “0.10”

0.10C10

6, Configure LLVD1 voltage to “44.4”V

44.4

7, Configure BLVD voltage to “43.2”V

43.2

All rights reserved. No spreading without permission of ZTE. 第2页


Internal Use Only▲
8, Start battery Equalized charge

9, Measure battery voltage, each cell battery voltage should be varied within 0.1V.
10, No alarms in the CSU monitor unit before leaving.

For some alarms:


1, “SMR Comm.Fail”
Cause: The power station monitor system can not communicate with the rectifier.
To make the monitor system to scan the Rectifier again.

2, “Batt.T.Invalid”
Cause: Battery temperature sensor not connected or broken.
To check whether the corresponding battery temperature sensor connected or not.
Or whether the battery capacity configure, follow the Step 3 “Battery Capacity” to check the
actual connection.

All rights reserved. No spreading without permission of ZTE. 第3页


Internal Use Only▲
3, “Batt.Det.Abr”
Cause: Battery not connected or breaker turns off when commissioning.
Start battery detection test for battery discharge 2 minutes and solve the alarm.