Download as pdf or txt
Download as pdf or txt
You are on page 1of 376

RIYADH METRO PROJECT, LINE -3 -STEEL STRUCTURAL

FABRICATION QC DOCUMENTS (SHIPMENT NO: ……

Steel Fabricator: ARABIAN INTERNATIONAL COMPANY (AIC STEEL) – (JEDDAH)


“This Page Left Intentionally Blank”
CONTENTS:

Appendix 1 - INAT Inspection Release Note.


Appendix 2 - Delivery Note
Appendix 3 - Packing List
Appendix 4- Material Traceability Summary & MTC’s
Appendix 5- Drawings
Appendix 6 - Fit up / Dimensional Inspection reports
Appendix 7 - Welding inspection reports
Appendix 8 - NDT Test Reports
Appendix 9 - Final Inspection Reports
Appendix 10 - Surface Preparation and Painting inspection reports
Appendix 1
BVQI Inspection Release Note.
Appendix 2
Delivery Note
Appendix 3
Packing lists
Appendix 4
Material Traceability Report & MTC’s
Appendix 5
Drawings
Appendix6
Fit up / Dimensional Inspection reports
Appendix 7
Welding inspection reports
Appendix 8
NDT Test Reports
Appendix 9
Final Inspection Reports
Appendix 10
Surface Preparation and Painting inspection
report

You might also like