Professional Documents
Culture Documents
Adhesives Feasibility Study
Adhesives Feasibility Study
Introduction &
Project Back Ground
1- INTRODUCTION:-
The Project Co. has acquired the industrial license No. 11097 dated
16-03-1433H. The factory is located in the city of Al-Khobar.
- Operational efficiency
2- The Project
FLOOR LAYOUT for ADHESIVE and Dry Mortar Plant Production Capacity: Adhesive Plant ‐100 MT/Day, Dry Mortar
Plant ‐1,000 MT/Day
3-1- Definition:-
Y o u c a n o n l y c o n v e r t u p t o 5 p a g es i n t h e t r i a l v e r s i o n .
http://cbs.wondershare.com/go.php?pid=970&m=db