Contents

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

Contents

Title Page no.


1) INTRODUCTION 1-10
1.1) BACKGROUND
1.2) OBJECTIVE OF THE PROJECT
1.3) NEED OF THE PROJECT
1.4) EXCEPTATION OF THE STUDY
2) LITERATURE REVIEW 11-12
3) STUDY AREAS 13-26
3.1) PROJECT DETAILS
3.2) FOREST LAND UNDER SUBMERGENCE
3.3) VILLAGE SUBMERGED
3.4) AREA TO BE IRRIGATED
3.5) ELECTRICITY TO BE PRODUCED & DRINKING WATER TO
BE SUPLIED
4) STATUS OF COMPLIANCES 27-40
4.1) STATUS OF COMPLIANCES OF APPROVED
CONDITIONALITIES FOR THE PROJECTS.
4.2) SOME MAJOR CONDITIONALITIES
5) PROJECT ATTRIBUTES 41-56
6) IMPACT ON FOREST & WILDLIFE 57-58
7) ADVANTAGES & DISADVANTAGES 59-60
8) CONCLUSION 61
TABLE DETAILS
Table 1: Detail of projects -------------------------------------------------------------- Page-14
Table 2: Details regarding the canal system------------------------------------------- Page-17
Table 3: Land Requirement-------------------------------------------------------------- Page-19
Table 4: Details of land acquired-------------------------------------------------------- Page-20
Table 5: Details of the forest land under submergence------------------------------- Page-21
Table 6: Details of forest area under submergence------------------------------------ Page-22
Table 7: Details of Full reservoir level (FRL) Level---------------------------------- Page-22
Table 8: Details of land under the submergence--------------------------------------- Page-23
Table 9: Details of command area -------------------------------------------------------Page-25
Table 10: Status of compliance of Conditionalities ------------------------------------Page-28
Table 11: Compliances summary of Sanjay Sagar Wah Project----------------------Page 29-32
Table 12: Status of compliances of Omkareshwar Multipurpose Project----------- Page 32-33
Table 13: Status of compliances of Rajeev Sagar Project----------------------------- Page 33-35
Table 14: Details of Compensatory Afforestation site----------------------------------Page-35
Table 15: Action plan for CA for Maksudangarh project ------------------------------Page-37

FIGURE DETAILS
MAP 1---------------------------------------------------------------------------------------Page-13
MAP 2---------------------------------------------------------------------------------------Page-14
FLOW DIAGRAM OF AUTO IRRIGATION SYSTEM ---------------------------Page-52
CIRCUIT DIAGRAM --------------------------------------------------------------------Page-52

You might also like