‘DISTRIBUTION ISSUE DATE: January 09,2017
mech. x 08. K “yl
Ethiopian” FEV, No: 00
eas
REV. DATE: January 09,2017
ETHIOPIAN earl
AIRLINES S.C.
MAINTENANCE SERVICE LETTER
NOTE: The information contalns in this Maintenance Service Lever DOES NOT supersede instruction or Information
that contained in the Maintenance or ather approved publications, unless specifically stated,
SUBJECT: Trent 1000 - ENG CONTROL Status Message Due to PS26 Pipe Blocked MM 73-
93951/2 and SAS Valve MM 73-99301/2
REFERENCES:
/A/service Related Problem (SRP) 787-FTD-76-0017, dated 12-JUN-2015
/B/Pleet Team Digest (FID) 787-FTD-73-15003 dated 27-NOV-2016
EFFECTIVITY: 787 AIRCRAFT, POWERED BY TRENT 1000 PACK B OR PACK C ENGINES.
Trent 1000/B787s has been experiencing in-service delays due to ENG
CONTROL Faults set immediately after engine start.
The correlated maintenance messages observed are:
73-93551 “Electronic Engine Controller (Left/Right Engine) PS26 pipe
is blocked or leaking
73-99301 “Secondary Air System Valve (Left/Right Engine) temperature
signals indicate high when commanded low.
Typically, these messages have been observed on ET-ATK in Ethiopian
fleet.
Discussion
All of the events occurred during simultaneous engine start. 75% of
the occurrences of this fault were during engine starts with ambient
temperature less than S®C. In all occurrences the SAS valve message
has shown to be a secondary effect of the PS26 pipe blockage check
failing. This problem has not been encountered at Boeing during
engineering or production flight test, including simultaneous engine
starts. The problem is related to timing of the EEC PS26 Pipe Leak
Check which is conducted during engine start, an engine handling bleed
valve closure that occurs in proximity to this check, and the rate at
which the engine accelerates during engine start. In a small subset of
engine starts, the timing can align in such a way as to cause the
fault. The problem does not occur during single engine starts.
This is therefore, to advise the concerned sections to perform single
engine start (avoid simultaneous engine start) until a final fix is
released from the manufacturer.
[APPROVED BY: Tro S
7 ! _ O8- Fon-
osrgen=2017 |wonave sx ay pare:_O%- Tun
cmon ay bane POE | ba. aa ‘pare: F fon
|