JSA Number:

Job Safety Analysis Job Title: RIG DOWN


Revision:

RIG DOWN
Job Title: Job Location: Original Date:
RIG DOWN GDS, SAFETY SHACK, CASCADE & SAFETY EQUIP'T.
Job Description: Revision Date:
Author:
H2S COURSE, HAZARD RECOGNITION (PRINT NAME)
Required Training:
Approver:
HARD HAT, SAFETY GLASS, HAND GLOVES (PRINT NAME)
Required PPE:
Job Steps Hazards Hazard Controls
(List out steps to perform task) What can cause injury? Measures to be taken to minimize the risk of injury
> Hand and finger injury cause by wrong tools for
> Use right tools for the job,
the job,
Prepare all tools for the job and proper PPE
> incorrect type of safety shoes, safety glass, > ensure correct type of approved PPE in the sites are
safety gloves and cover-alls available and worn, as needed
Obtain permits from HSE and Foreman about the > Premature rigging down of GDS, Cascade > Attend safety meetings at all times,
plan rigging down of GDS, Cascade and safety system and safety equipments affecting > discussed in advance the upcoming rig down operation to
equipments personnel safety the HSE and Foreman
> Used proper tools & gloves when turning-off power
Shutting-off Electrical Power Source of Gas source.
> Electrocution
Detection System, Safety Shack and Compressor > Make sure/test that there is zero voltage on the system
prior working on it.
> Electrocution by working with Electrical power > Be sure there is zero voltage in the system before working
source, on it.
Disconnect all lines and cables. Rolling and securing > Proper tools, proper hand & body positioning. Proper
> Slip, trip & fall.
cables & equipment. lifting technique.
> improper body positioning & improper lifting
> Clear working area to avoid slip, trip & fall.
technique. pinch point,

Page 1 of 3
JSA Number:
Job Safety Analysis Job Title: RIG DOWN
Revision:

Bleeding-off air pressure of Cascade Air System > Be sure there is zero pressure in the air system before
> Body injury cause by working with air pressure
prior disconnecting high pressure hoses. working on it.

> Be sure there is zero pressure in the air system before


> Body injury by working with pressure,
working on it.
Disconnecting and rolling/securing of high pressure
> pinch point, improper body positioning &
hose > Proper hand & body positioning. Proper lifting technique.
improper lifting technique.
> Slip, trip & fall > Clear working area to avoid slip, trip & fall.
> Slip, trip & fall. Improper body positioning & > Proper hand and body positioning. Practice proper lifting
Securing GDS (sensors & alarm station) and safety improper lifting technique - Backpain. technique.
equipments to loading area. > Caught in between equipment, pinch point and > Seek assistance if load is heavy. Use mechanical
sprain. equipment (e.g. forklift) if necessary.

> Slip, trip & fall. > Proper hand and body positioning. Watch your step

Drain off water on Safety Shower


> Shower tipping over when lifting to truck - top > Ensure tank is fully drained by opening the shower and
heavy eyewash valves and no more water dripping before lifting

> Falling equipments from the truck or vehicle, > Secure equipments properly in the truck or vehicles,
Loading the GDS, Cascade system and safety > pinch-points, caught in between > proper hand placements, correct body position,
equipments on the truck or vehicles
> good communication, maintain safe distance from vehicle
> mis communication
or truck movements

Good housekeeping after the job. > Slip, trip & fall. > Initiate good housekeeping after the job is done.

> Unauthorized movement of equipments from


Sign-off all documentations from the HSE and > Proper coordination with HSE and Foreman about the
sites, miscommunications about the
Foreman prior to leaving the site activities on-going and planned
whereabouts of equipments andd personnel
TS-HSE-F070
Page 2 of 3 Template Revision: 03
JSA Number:
Job Safety Analysis Job Title: RIG DOWN
Revision:

All employees involved in the job task must sign to prior to each use. By signing below, I acknowledge that I have reviewed and understand the content of
this JSA. NOTE: Employees are expected to complete a JSA card for identified hazards that are not already addressed in this JSA.
Name Signature Date Name Signature Date