Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Lead Calculation as per WRD 2018-19 By Lokesh M, AE

Deduct
Up to Total
Material lead Up to 30 km beyond Total Initial Loading Unloading Unit
5km Charges
lead

Stone /Metal 50mtr 30 146.4 +( 25 x 10.40= 260.00 )+( 0 x 9.80= 0.00 )= 406.40 0.00 152.50 76.25 635.15 /Cum

1Km 29 146.4 +( 24 x 10.40= 260.00 )+( 0 x 9.80= 0.00 )= 406.40 101.50 304.90 /Cum

Sand / Murrum 50m 35 111.2 +( 25 x 10.30= 257.50 )+( 5 x 9.70= 48.50 )= 417.20 0.00 129.2 18.1 564.50 /Cum

1Km 34 111.2 +( 25 x 10.30= 257.50 )+( 4 x 9.70= 48.50 )= 417.20 66.60 350.60 /Cum

Cement /Steel 50m 45 106.9 +( 25 x 6.50= 162.50 )+( 15 x 6.40= 91.50 )= 360.90 0.00 139.7 139.7 640.30 /Tonne

1KM 44 106.9 +( 25 x 6.50= 162.50 )+( 14 x 6.40= 85.40 )= 354.80 0.00 139.7 139.7 634.20 /Tonne

You might also like