IRFAN AHMAD
Native Address: Nationality: Pakistani
Village Ralioke PO Baddoke Cheema Tehsil Sambrial Disst Sialkot. Date of Birth: 01,04,1989
Punjab, Pakistan Mobile: 0092-333-4843149
Present Address: E-mail: mirfan1489@gmail.com
Nishat Dyeing & Finishing, Lahore Pakistan

EDUCATION:
B-Tech Electrical 2012
Buhauddin Zikriya University Multan

DAE (Electrical) 2008


Punjab Board of Technical Education Lahore

Matriculation
Board of Intermediate & Secondary Education, Gujranwala

PROFESSIONAL EXPERIENCE
I have 9 years of experience in the field of Thermal Power Plant Technology. I am
working as Sr. Foreman Electrical at 36 MW Nishat Mills Limited Power Plant Lahore
May 04, 2013 to date & Sheikhupura Bhikki since 27.11.2008 ~ 13.04.2013. I had worked
on different posts in my field like Technical Assistant, Electrician, and Supervisor.

Details of my experience in different areas are as follow.

1) - INSTALLATION:

I have supervised the erection and commissioning phase of 9MW Tri Fuel
Wartsilla Engine 20v34df 6MW & 9MW Combine Heat and
Power Plant Project, Caterpillar Gas Engines 3516A,
353516C, 3520C & Diesel Engine 3512, 1.2MW Spilling Steam
Turbine, Gas Compressor Gia Grasso 1365 m3/hr 14bar, Gas
Compressor Gia Grasso 1375 m3/hr 5 bar and Cumin Diesel
Engine 1MW at Nishat Mills Limited Lahore.

2)- Maintenance, Troubleshooting and Operation:

Maintenance, Operation and Troubleshooting on the


following Equipment/Machines:

I. Tuma turbo mach gas turbine C, 40, & S.20 capacity as (3x3.5MW&1x1.2MW) Major,
A Level and B level maintenance carried out respectively.
II. HTC Steam Turbine 6MW Back Pressure
III. Spilling Steam Turbine 1.2MW
IV. CFB Fluidized Bed Wuxi Boiler 2x65 ton (with 3 HT motors with VFD/ Soft-starters,
PLC Based Dedusting System, Ash Handling Systems and Flue Gas Analyzer System )
V. Wartsilla 34v20DF Tri-Fuel Engine
VI. 8DL32 Daihatsu Engine (3x2MW)
VII. HFO MAK Engine capacity (2 x2.5MW).
VIII.Alpha Level Oil Separator, Gia Grasso Oiler Separator, Mitubishi Oil Seperator,
Westfalia Oil Seperator.
IX. Caterpillar gas engine 3516.A, 3516.B, and 3520C (3 x 1 MW)(1 x 1 MW)(1 x 2.2 MW)
X. Caterpillar diesel engine 3512 (3x1 MW).
XI. Package Type Boilers with Saacke, LFL and Lendse and Gerin Controllers 1 ton ~ 20 ton
boilers.
XII. Rice Husk Boiler 1x10 Tons
XIII. Bono Energia waist heat recovery water and fire tube boiler Capacity (25Ton x 1)
(08Ton x 2) (5Ton x 1) (2Ton x 1)
XIV. Enerproject screw type gas compress capacity 885 m3/hr maintenance carried out.
XV. Gas Compressor Gia Grasso 1365 m3/hr 14bar
XVI. Gas Compressor Gia Grasso 1375 m3/hr 5 bar
XVII. LG steam absorption steam fired Chiller 250 ton/h.
XVIII. LG steam absorption steam fired Chiller 120 ton/h.
XIX. Building Cranes
XX. Reverse Osmosis Plant (1x 60 tons), (3x24 tons) and (1x15 ton)
XXI. Demineralization Plant (2x30tons) and (2x45 tons)

3) - Protection and Instrumentation:

During Erection and commissioning I have used following instruments:

i. 25KV High Pot Tester


ii. D.C Resistance Rapid Tester D07 Plus
iii. Fluke 744 process calibrator
iv. Fluke 125 scope meter
v. MI 15KVe Insulation Resistance Tester
vi. PW 430D Universal Relay Tester
vii. Vibration Meter
viii. Earth Resistance Tester
ix. Flue Gas Monitoring System with Dust Collector, Flow Meter, SOx, NOx,
Unburnt Carbon, Oxygen analyzer.
x. Ozone Generator.
xi. HT Cable Termination Kits
xii. Dry-Type Auxiliary Transformer
xiii. 9MW CFB Boiling and Steam Turbine Earthing Project

This plant contains


➔ Back pressure Steam turbine with a 6MW Generator,
➔ 65 T/H circulation fluidized bed boiler,
➔ VFD Bases Fuel conveying system,
➔ PLC based Ash handling system,
➔ Slag handling system,
➔ Transformers and H.T. Switchgear (HT motors with soft starters and VFD).
➔ L.T. Switchgear, power and lighting distribution boards.
➔ Motor control centers.
➔ Relay logic controls.
➔ Power, control and signal cables.
➔ Remote control centers push button stations.
➔ Indoor and outdoor lighting.
➔ Grounding, Earthing and lightning protection.
➔ Field mounted switches and sensors.
➔ Back-up batteries, rectifiers and uninterrupted power supplies.
➔ Generating sets and associated control equipment.
➔ PLC, DCS and SCADA system.
Instrument panels, cabinets, console and relay racks.
➔ Electronics and pneumatic instruments panel and field mounted items.
➔ Tubing, air supplies system.
➔ Process analyzers, conductivity and pH meters.
➔ Control valves, solenoid valves and pressure regulators.
This project enhance my skills related to HT Panels Installation, coupling ,11 KV cables
laying, and HT Termination on medium (11kv) Voltages.
ii. Tuma Turbo Mach industrial gas turbine (C.40 x 1) & with waste Heat Recovery
Water Tube boiler (BONO ENERGIA)
iii. Rice Husk Boiler
iv. Caterpillar Gas Engines 3516B, (1 x 1 MW), 3520C (1x2 MW) & 3520E (1x2MW)
v. Cumins Diesel Engine (1 x 1 MW)

COMPUTER SKILLS

8 Week computer course on Office Automation


Sciyon DCS Training and basic troubleshooting
Usage of internet, Microsoft Office M/S Word, Excel, Power Point, etc
Computer Troubleshooting