RP 126
RP 126
RP 126
(i)
OISD - RP- 126
First Edition, August 1990
Amended edition, August 1999
Amended Edition, August 2007
Prepared by
Functional Committee
(ii)
NOTE
(iii)
FOREWORD
The Coordinator,
Oil Industry Safety Directorate,
7th Floor, New Delhi House
27, Barakhamba Road
New Delhi – 110 001
(iv)
LIST OF FUNCTIONAL COMMITTEE MEMBERS
(v)
CONTENTS
1.0 Introduction 01
2.0 Scope 01
3.0 Definitions 01
09 Equipment Documentation 05
10 References 05
11 Annexure-I 06
12 Annexure-II 07
13 Annexure-III 08
(vi)
Specific Practices for Installation and Maintenance
of
Rotary Equipment
Blowers, Fans, Steam Turbines, Gas 3.3 Lifting Tools & Tackles
Turbines, Compressors, Motors, Generators,
The devices & systems like Slings,
Expanders, Gearboxes and Engines
Chain Blocks, Winches, Shackles, EOT,
installed in hydrocarbon industry.
HOT and Cranes etc that are required to
lift, carry, load & unload, support, install,
2 SCOPE
and remove different equipment in
The following specific maintenance practices
course of various maintenance &
for rotating equipment are covered in these
operational activities.
recommended practices;
3.4 Change Management
a) Equipment Protection & Change
Management System Mechanism to control and manage
changes to operating conditions,
b) Lubricant and lubrication System
protection systems and mechanical
c) Safe Commissioning Practices systems of equipment that affect safe
d) Root Cause Failure Analysis operation of the equipment.
7.3 Root cause failure analysis should be 8.2 Each lifting tool & tackle shall have
based on the following broad steps; unique identification and shall
display the safe working load, testing
a) Data collection, observation and
date and next due date for testing.
organization of data
8.3 Records shall be maintained for
b) Sequence of events leading to
verification
failure
e) Commissioning data
f) Maintenance History
h) Change management
procedures and records
10. REFERENCES
c) API RP - 686
(5)
Appendix –I
Plant
Description
Proposed Setting
Reason for
Change
Remarks
Initiated by:
Approved by:
Change Implemented:
Date & Time
(Note: Authority for Initiating, Approving and implementing these changes shall be spelt out
clearly)
(6)
Appendix – II
1. There shall be no direct contact between the drum and the ground, if storage is for period
4. Drums in long-term storage shall be positioned horizontally. (Grease drums shall be stored
Vertically)
6. Areas where short-term storage of Drums is done shall not have more than 5 drums.
7. For drums provided with valve and nozzle, a tray shall be provided underneath the valve. The
(7)
Appendix –III
UNIT DATE
EQUIPMENT REPORT NO. <<Unique Report No>>
PROBLEM:
<<Brief Description of Failure>>
OBSERVATION:
<<Description of Failures of as observed by Analyst with details of failed parts and patterns of
failure>>
ANALYSIS:
ROOT CAUSE
<< Describe immediate correction, Proposed Corrective Action and Preventive action to prevent
future failures>>
CIRCULATION
(8)