Professional Documents
Culture Documents
Annexure I
Annexure I
1. The technical compliance sheet needs to be duly filled and deviations (if any) shall be
mentioned clearly with proper justifications. The Evaluation Committee reserves the right to
disqualify a bidder in case of non-compliance on any of the points.
2. The technical evaluation testifies the competence, previous experience and overall core
strengths of the invited bidder, which also includes the quality of the equipment and services
offered by the invited bidders. The Committee will also assess the clarity and commitment of
the invited bidder for the execution of the work.
3. The Committee at its own discretion may choose to cross-verify any of the facts presented in
technical bid by collecting feedback from previous clients. The bidder should provide
contact information from clients of major projects in the last 3 years.
4. Technical Bids will be evaluated on a scale of 100 as per Evaluation matrix.
5. Only the bidders having marks 70 and above out of a total 100 shall be considered qualified
for processing of price bids in financial offer.
6. Further discussions related to the awarded scores by the Committee will not be entertained.
Enclosures:
· Technical Compliance Sheet
· Technical Evaluation Sheet
38
Technical Compliance Sheet:
*Attach pictures of the relevant equipment and other accessories for items in points 2 and 3.
In the absence of relevant pictures and documents, the claim may not be validated.
**Attach the work order, report or other relevant documents related to the work done. In the
absence of relevant documents, the claim may not be validated.
39
Technical Evaluation Matrix:
Sr. No. Particulars Max. Marks Marks awarded
1 Quantum of overall work done in terms
of drilling (700 in meters or more) and
done in the last 3 years (attach relevant 35
documents)
* Attach a copy of a specimen project report from one of the relevant previous projects.
**Attach the work order, report or other relevant documents related to the work done. In the
absence of relevant documents, the claim may not be validated.
40
Proposed Schedule of Execution:
41