Details of CA sites, Parks and Open Spaces in BDA Layout West Division, BDA, Bangalore.

CA Sites Parks Details

No of No. of sites
No. of sites As per
Sl sites allotted by As per approved Plan Measurement as Measurment
Name of the Layout approved by Relingquished approved Existing Relingquished
No. released Society to per existing in Sq ft
BDA plan
by BDA Member
Site No. Extent [Sq ft]
1 2 3 4 5 6 7 8 9 10 11 12 13
No.1 Sub Division
1 Rajajinagar, 1st N Block 3 14620 14620
2 Rajajinagar, 1st N Block 27 28080 28080
3 Rajajinagar, 1st N Block - - 431/E 10.000 10.000 Relingquished
4 Rajajinagar, 1st N Block 94/A, 94/C 16650 16650
5 Rajajinagar, 1st N Block 2 28000 28000
6 Rajajinagar, 1st N Block 521/C 17396 17396
7 12 8835 8835 P1 327104
Play
8 26 68314 68314 87730
Ground
9 15 42120 42120
10 23 126440 126440
11 Rajajinagar 2nd Block 20 30000 30000 Relingquished Relingquished
12 18 60000 60000
13 14 15 Acres 15 Acres
14 13 12 Acres 12 Acres
15 17 13370 13370
16 608/C 9145.5 9145.5
17 338/A 7290 7290
Rajajinagar, 3rd Block Relingquished -
18 1839 19379.5 19379.5
19 1050/A 45805 45805 P1 150640
20 1 596.5 596.5 P2 219740
21 682/A 8346 8346
Rajajinagar, 4th Block, 4th N
22 76G 1536 1536 Relingquished Relingquished
Block, 4th E Block
23 81 703.91 703.91
24 28 2079 2079
25 682/D 19140 19140
Page 1
Details of CA sites, Parks and Open Spaces in BDA Layout West Division, BDA, Bangalore.

CA Sites Parks Details

No of No. of sites
No. of sites As per
Sl sites allotted by As per approved Plan Measurement as Measurment
Name of the Layout approved by Relingquished approved Existing Relingquished
No. released Society to per existing in Sq ft
BDA plan
by BDA Member
Site No. Extent [Sq ft]
1 2 3 4 5 6 7 8 9 10 11 12 13
No.1 Sub Division
26 117 18160 18160 P1 218966 Relingquished
Rajajinagar, 5th Block
27 118 48420 48420

28 1 36450 36450
29 3 9500 9500
30 2 30510 30510 Relingquished
31 1036/A 4416.5 4416.5
32 1036/A 18817.5 18817.5
33 1035/A 14520 14520
34 49 81824 81824
35 177/A 6400 6400
36 177/B 8990 8990 -
- - - P1 289228
Rajajinagar, 6th Block Relingquished
- - - P2 23672
37 Rajajinagar 2nd Stage 25 43810 43810 Relingquished -
38 1 6750 6750 Relingquished -
39 3 30584 30584 Relingquished -
40 4 31255 31255 Relingquished -
41 909/A 8833.5 8833.5 Relingquished -
42 Rajajinagar 3rd Stage 5 31913 31913 Relingquished -
43 1 29642 29642 Relingquished -
44 6 19580 19580 Relingquished -
45 7 220 220 Relingquished -
P1 33599
P2 6929
P3 16570
Rajeev Gandhi Nagar Layout - P4 7061 Relingquished
Page 2
Details of CA sites, Parks and Open Spaces in BDA Layout West Division, BDA, Bangalore.

CA Sites Parks Details

No of No. of sites
No. of sites As per
Sl sites allotted by As per approved Plan Measurement as Measurment
Name of the Layout approved by Relingquished approved Existing Relingquished
No. released Society to per existing in Sq ft
BDA plan
by BDA Member
Site No. Extent [Sq ft]
1 2 3 4 5 6 7 8 9 10 11 12 13
No.1 Sub Division
P5 9374
Play
9374
Ground
46 Nandhini SFHS 1 300 300 Relingquished P1 23069 Relingquished
47 2 324 324 Relingquished P2 526347 Relingquished
48 3 300 300 Relingquished P3 311685 Relingquished
49 4 18819 18819 Relingquished P4 211165 Relingquished
50 5 5670 5670 Relingquished P5 35162 Relingquished
51 6 3351 3351 Relingquished P6 52890 Relingquished
52 6B 6477 6477 Relingquished P7 74062 Relingquished
53 6C 17108 17108 Relingquished P8 87627 Relingquished
54 7 33689.56 33689.56 Relingquished -
55 7A 25569 25569 Relingquished -
56 8 5568 5568 Relingquished -
57 9 13206 13206 Relingquished -
58 10 44191 44191 Relingquished -
59 11 13988 13988 Relingquished -
Laggere Sy No. 13, Nandhini - - - - P1 3277 Relingquished
Layout - - - - Play ground 20617 Relingquished

Nandhini layout 1st Block - - - - P1 11029 Relingquished

Laggere Sy no. 88,89,229,


- - - - P1 10205 Relingquished
Nandhini Layout
Okalipuram, 1Stage & 2nd - - - - Relingquished
P1 215307
Stage - Relingquished
Page 3
Details of CA sites, Parks and Open Spaces in BDA Layout West Division, BDA, Bangalore.

CA Sites Parks Details

No of No. of sites
No. of sites As per
Sl sites allotted by As per approved Plan Measurement as Measurment
Name of the Layout approved by Relingquished approved Existing Relingquished
No. released Society to per existing in Sq ft
BDA plan
by BDA Member
Site No. Extent [Sq ft]
1 2 3 4 5 6 7 8 9 10 11 12 13
No.1 Sub Division
60 West of Chord Road, 2nd 3 23220 23220 Relingquished P1 74088 Relingquished
61 9 4042 4042 Relingquished -
62 8 67800 67800 Relingquished -
63 10 8383.75 8383.75 Relingquished -
64 7 86872 86872 Relingquished -
65 7C 6050 6050 Relingquished -
66 2 24462 24462 Relingquished -
67 6B 7500 7500 Relingquished -
68 666 12066 12066 Relingquished -
69 1 6600 & 87165 6600 & 87165 Relingquished -
70 5B 40467 40467 Relingquished -
71 5 49248 49248 Relingquished -
72 4 24000 24000 Relingquished -
73 6 53000 53000 Relingquished -
74 6A 67498 67498 Relingquished -
75 683 15162.75 15162.75 Relingquished -
76 10 11026.31 11026.31 Relingquished -
77 9 3772 & 12800 3772 & 12800 Relingquished -
WCR 2nd Stage, 2nd Phase P1 7087
78 6&7 135936&5565 135936&5565 Relingquished -

P1 & Play
79 1 14414 14414 Relingquished 39195 -
ground
Mahalaxmi Layout
80 2A 30306.6 30306.6 Relingquished -
81 3/1 12012 12012 Relingquished -
82 3/C 4185 4185 Relingquished -
83 3/L 14410 14410 Relingquished -
Page 4
Details of CA sites, Parks and Open Spaces in BDA Layout West Division, BDA, Bangalore.

CA Sites Parks Details

No of No. of sites
No. of sites As per
Sl sites allotted by As per approved Plan Measurement as Measurment
Name of the Layout approved by Relingquished approved Existing Relingquished
No. released Society to per existing in Sq ft
BDA plan
by BDA Member
Site No. Extent [Sq ft]
1 2 3 4 5 6 7 8 9 10 11 12 13
No.1 Sub Division
84 37/A 4393.2 4393.2 Relingquished
85 Mahalaxmi layout Further 1 13810.4 13810.4 Relingquished P1 6000 Relingquished
Extension
86 2 25691.6 25691.6 Relingquished

42166.25 & 42166.25 &


87 Industrial Town, Rajajinagar 1 Relingquished -
51527 51527

Basaveshwaranagar, WCR,
88 1 112812 112812 Relingquished -
3rd Stage, 1st Block
Basaveshwaranagar, WCR,
89 12 8326 8326 Relingquished -
3rd Stage, 2nd Block
Basaveshwaranagar, WCR,
90 2 220000 220000 Relingquished -
3rd Stage, 3rd Block
91 7A 19188 19188 Relingquished
92 Basaveshwaranagar, WCR, 8 19188 19188 Relingquished
P1 94080 Relingquished
93 3rd Stage, 4th Block 629 & 630 3300 3300 Relingquished
94 3 330 330 Relingquished
Basaveshwaranagar, WCR,
95 7 24412.5 24412.5 Relingquished -
4rd Stage, 4th Block
Basaveshwaranagar, WCR,
96 8 31007.5 31007.5 Relingquished P1 55705
4rd Stage, 3rd Block Relingquished
97 Industrial Works layout 1 3000 3000 Relingquished P1 55705
98 2 565 565 Relingquished -
2 2
99 Peenya 2nd Stage 3 1828M 1828M Relingquished -
100 1(a) 4400 4400 Relingquished -
101 1(b) 4200 4200 Relingquished -
Page 5
Details of CA sites, Parks and Open Spaces in BDA Layout West Division, BDA, Bangalore.

CA Sites Parks Details

No of No. of sites
No. of sites As per
Sl sites allotted by As per approved Plan Measurement as Measurment
Name of the Layout approved by Relingquished approved Existing Relingquished
No. released Society to per existing in Sq ft
BDA plan
by BDA Member
Site No. Extent [Sq ft]
1 2 3 4 5 6 7 8 9 10 11 12 13
No.1 Sub Division
No.2 Sub Division - -
102 Dg惡 §qÁªÀuÉ 1, 2 4312.26 sqm 4312.26 sqm Relingquished -
103 3&4 4312.26 4312.26 Relingquished -
104 5 9814.53 9814.53 Relingquished -
105 6 1766.2 1766.2 Relingquished -
106 7,9 3495.44 3495.44 Relingquished -
107 8 1546 1546 Relingquished -
108 10 3358.98 3358.98 Relingquished -
109 11 2022 2022 Relingquished -
110 12 & 13 - - - -
111 14 3160 3160 Relingquished -
112 15 3388 3388 Relingquished -
113 16 - - - -
114 17 659.09 659.09 Relingquished -
115 20 & 21 - - - -
116 22 - - - -
117 23 12364.39 12364.39 Relingquished -
118 24 4773.75 4773.75 Relingquished -
119 25& 26 - -
120 27 - - - -
121 28 - -
122 29 2173.91 2173.91 Relingquished -
Page 6
Details of CA sites, Parks and Open Spaces in BDA Layout West Division, BDA, Bangalore.

CA Sites Parks Details

No of No. of sites
No. of sites As per
Sl sites allotted by As per approved Plan Measurement as Measurment
Name of the Layout approved by Relingquished approved Existing Relingquished
No. released Society to per existing in Sq ft
BDA plan
by BDA Member
Site No. Extent [Sq ft]
1 2 3 4 5 6 7 8 9 10 11 12 13
No.1 Sub Division
123 29(p) - -
124 31 & 32 - -
125 JADgï¹Dgï 1 4544.25sqm 4544.25sqm Relingquished -
126 2 5882.25 5882.25 Relingquished -
127 3 2937.6 2937.6 Relingquished -
128 CA-1 1903.08 1903.08 Relingquished -
129 CA1A1 765.19 765.19 Relingquished -
130 CA-3 8590.18 8590.18 Relingquished -
131 CA-17 & 18 11748 11748 Relingquished -
132 CA-6 2924 2924 Relingquished -
133 CA-7 & 8 4024.8 4024.8 Relingquished -
134 CA-5 3045 3045 Relingquished -
135 CA-22 2690 2690 Relingquished -
136 CA-16 741.75 741.75 Relingquished -
137 CA 139.5 139.5 Relingquished -
138 CA 189 189 Relingquished -
139 CA 2475 2475 Relingquished -
140 CA - - - -
141 CA-16 663.08 663.08 Relingquished -
142 CA 1021.75 1021.75 Relingquished -
143 CA 2001 78.75 78.75 Relingquished -
144 CA-1/B 1862 1862 Relingquished -
Page 7
Details of CA sites, Parks and Open Spaces in BDA Layout West Division, BDA, Bangalore.

CA Sites Parks Details

No of No. of sites
No. of sites As per
Sl sites allotted by As per approved Plan Measurement as Measurment
Name of the Layout approved by Relingquished approved Existing Relingquished
No. released Society to per existing in Sq ft
BDA plan
by BDA Member
Site No. Extent [Sq ft]
1 2 3 4 5 6 7 8 9 10 11 12 13
No.1 Sub Division
145 CA 139.29 139.29 Relingquished -
146 CA-1307 876.8 876.8 Relingquished -
147 CA-23&24 743 743 Relingquished -
148 CA-1 & 2 256.42 & 256.42 & Relingquished -
149 CA-2C 531.91
1147.5 531.91
1147.5 Relingquished -
150 CA 307.2 307.2 Relingquished -
151 CA-3 922.5 922.5 Relingquished -
152 CA-10 2594.37 2594.37 Relingquished -
153 CA 2528.6 2528.6 Relingquished -
154 CA-4 5680.08 5680.08 Relingquished -
155 CA2 1920 1920 Relingquished -
156 CA 12380.4 12380.4 Relingquished -
157 CA-12 - -
158 CA-1428 18.25 18.25 Relingquished -
- - - -
159 CA 54.00 54.00 Relingquished
160 1 892.18 Sqmt 892.18 Sqmt Relingquished
161 2 892.18 Sqmt 892.18 Sqmt Relingquished
162 3 892.18 Sqmt 892.18 Sqmt Relingquished
163 ZÀAzÁæ §qÁªÀuÉ, 4 892.18 Sqmt 892.18 Sqmt Relingquished
164 ¸ÀªÉð £ÀA. 345 PɦJ 5 892.18 Sqmt 892.18 Sqmt Relingquished
165 6 9002.20 Sqm 9002.20 Sqm Relingquished
Page 8
Details of CA sites, Parks and Open Spaces in BDA Layout West Division, BDA, Bangalore.

CA Sites Parks Details

No of No. of sites
No. of sites As per
Sl sites allotted by As per approved Plan Measurement as Measurment
Name of the Layout approved by Relingquished approved Existing Relingquished
No. released Society to per existing in Sq ft
BDA plan
by BDA Member
Site No. Extent [Sq ft]
1 2 3 4 5 6 7 8 9 10 11 12 13
No.1 Sub Division
166 7 1087.50 Sqm 1087.50 Sqm Relingquished
167 8 892.18 Sqmt 892.18 Sqmt Relingquished
168 9 892.18 Sqmt 892.18 Sqmt Relingquished
169 10 1560.67 1560.67 Relingquished
£ÁUÀgÀ¨sÁ«, 1£Éà ºÀAvÀ
170 §qÁªÀu É CA sy no 52 1725.00 sqm 1725.00 sqm Relingquished -

Nagarbhavi 2nd stage 1st 3 390.60 Sqm 390.60 Sqm


171 Relingquished
block
Nagarbhavi 2nd stage 1st 1 (a) 4400.00 Sqm 4400.00 Sqm
172 Relingquished
block
173 -do- 1 (b) 4200.00 Sqm 4200.00 Sqm Relingquished
-do- 2 21409.00 21409.00 Sqm
174 Relingquished
Sqm
Nagarbhavi 2nd stage 2nd 1 1680.00 Sqm 1680.00 Sqm
175 Relingquished
block
176 -do- 2 1830.57 Sqm 1830.57 Sqm Relingquished
Nagarbhavi 2nd stage 3rd 1 18391.00 18391.00 Sqm
177 Relingquished
block Sqm
178 -do- 2
Nagarbhavi 2nd stage 5th 1 12051.00 12051.00 Sqm
179 Relingquished
block Sqm
180 -do- 2 2528.00 Sqm 2528.00 Sqm Relingquished
Nagarbhavi 2nd stage 8th 9 814.00 Sqm 814.00 Sqm
181 Relingquished
block
Page 9
Details of CA sites, Parks and Open Spaces in BDA Layout West Division, BDA, Bangalore.

CA Sites Parks Details

No of No. of sites
No. of sites As per
Sl sites allotted by As per approved Plan Measurement as Measurment
Name of the Layout approved by Relingquished approved Existing Relingquished
No. released Society to per existing in Sq ft
BDA plan
by BDA Member
Site No. Extent [Sq ft]
1 2 3 4 5 6 7 8 9 10 11 12 13
No.1 Sub Division
Nagarbhavi 2nd stage 10th 6\1 13556.85 13556.85 Sqm
182 Relingquished
block Sqm
183 -do- 6\3 900.00 Sqm 900.00 Sqm Relingquished
184 -do- 6\4 900.00 Sqm 900.00 Sqm Relingquished
185 -do- 6\5 900.00 Sqm 900.00 Sqm Relingquished
186 -do- 6\6 630.00 Sqm 630.00 Sqm Relingquished
187 -do- 6\7 3993.00 Sqm 3993.00 Sqm Relingquished
188 -do- 6\8A 3004.98 Sqm 3004.98 Sqm Relingquished
189 -do- 6\8B 1720.00 Sqm 1720.00 Sqm Relingquished
Nagarbhavi 2nd stage 10th 6\9 2126.00 Sqm 2126.00 Sqm
190 Relingquished
block
-do- 6\10 40530.00 40530.00 Sqm
191 Relingquished
Sqm
192 -do- 6\11 2507.92 Sqm 2507.92 Sqm Relingquished
-do- 6\12 10421.81 10421.81 Sqm
193 Relingquished
Sqm
-do- 6\13 32373.76 32373.76 Sqm
194 Relingquished
Sqm
Nagarbhavi 2nd stage 11th 16/1-9 55.75 55.75
195 Relingquished
block
196 16\11 243.75 243.75 Relingquished
197 -do- 16\12 134.37 134.37 Relingquished
198 -do- 687\B 417.57 Sqm 417.57 Sqm Relingquished
199 -do- 687\C 139.29 Sqm 139.29 Sqm Relingquished
200 -do- 17 713.00 Sqm 713.00 Sqm Relingquished
Page 10
Details of CA sites, Parks and Open Spaces in BDA Layout West Division, BDA, Bangalore.

CA Sites Parks Details

No of No. of sites
No. of sites As per
Sl sites allotted by As per approved Plan Measurement as Measurment
Name of the Layout approved by Relingquished approved Existing Relingquished
No. released Society to per existing in Sq ft
BDA plan
by BDA Member
Site No. Extent [Sq ft]
1 2 3 4 5 6 7 8 9 10 11 12 13
No.1 Sub Division
Nagarbhavi 2nd stage 13th 283 1943 1943
201 Relingquished
block
Nagarbhavi 2nd stage 14th CA-1 - -
202
block
203 -do- CA-2 - -
No.3 Sub Division - -
Gnanabharathi Layout CA - 1 2200.00 2200.00 P-1 8400.00
204 Scheme Nagadevanahally, Relingquished
2nd Block.
205 CA - 4 5250.00 5250.00 Relingquished P-2 2350.00
206 CA - 5 7500.00 7500.00 Relingquished P-3 2418.00 Relingquished
207 CA - 6 1875.00 1875.00 Relingquished
Gnanabharathi Layout CA - 1 450.00 450.00 P-1 744.00
208 Scheme Nagadevanahally, Relingquished
Valagerahally 3rd Block.
Gnanabharathi Layout P-5 37
Scheme Nagadevanahally, - -
Block - 4
209 CA - 2 925.00 925.00 Relingquished -
Gnanabharathi Layout CA - 3 4350.00 4350.00
210 Scheme Nagadevanahally, Relingquished -
Valageerahally 1st Block.
211 CA - 4 2294.00 2294.00 Relingquished -
Chandra Layout, 1st Stage, CA - 1 988.00 988.00
212 Relingquished -
2st Phase
213 Nagarabhavi 1st Stage CA - 1 2772.00 2772.00 Relingquished -
Page 11
Details of CA sites, Parks and Open Spaces in BDA Layout West Division, BDA, Bangalore.

CA Sites Parks Details

No of No. of sites
No. of sites As per
Sl sites allotted by As per approved Plan Measurement as Measurment
Name of the Layout approved by Relingquished approved Existing Relingquished
No. released Society to per existing in Sq ft
BDA plan
by BDA Member
Site No. Extent [Sq ft]
1 2 3 4 5 6 7 8 9 10 11 12 13
No.1 Sub Division
Chandra Layout, 1st Stage, P -1 5400.00
-
1st Phase
Relingquished
Chandra Layout, 1st Stage, P -1 6525.00
-
3rd Phase
¸Àgï.JA.«±ÉéñÀégÀAiÀÄå £ÀUÀgÀ §qÁªÀuÉ 1, jAzÀ 6 - -

214 1 £Éà ¨ÁèPï CA 1 11067 11067 Relingquished Park 1 2619.26 2619.26 Relingquished
215 CA 2& 3 22157.8 22157.8 Relingquished Park 2 15434.42 15434.42 Relingquished
216 CA 4 16562.22 16562.22 Relingquished Park 2A 4438.86 4438.86 Relingquished
217 CA 5 9547.45 9547.45 Relingquished Park 2B 583.96 583.96Relingquished
218 CA 6 786.84 786.84 Relingquished Park 3 3832.69 3832.69Relingquished
219 CA 7 7390.04 7390.04 Relingquished Park 4 25648.42 25648.42Relingquished
220 CA 8 838.5 838.5 Relingquished Park 5 16884.28 16884.28Relingquished
221 CA 9 2484 2484 Relingquished Park 6 17173.98 17173.98Relingquished
222 CA 10 1076.58 1076.58 Relingquished Park 7 65058.43 65058.43Relingquished
223 CA 11 1027.84 1027.84 Relingquished Park 8 564.01 564.01Relingquished
224 CA 12 4528.17 4528.17 Relingquished Park 9 1249.43 1249.43Relingquished
225 CA 13 7000.09 7000.09 Relingquished - - - -
226 2 £Éà ¨ÁèPï CA 1 2240 2240 Relingquished Park 1 4465.99 4465.99 Relingquished
227 CA 2 3432 3432 Relingquished Park 2 2813.52 2813.52 Relingquished
228 CA 3 2802.97 2802.97 Relingquished Park 3 3949.45 3949.45 Relingquished
229 CA 4 9567.24 9567.24 Relingquished Park 4 89057.92 89057.92 Relingquished
230 CA 5 2524.3 2524.3 Relingquished Park 5 11778.02 11778.02 Relingquished
231 CA 6 3724.85 3724.85 Relingquished Park 6 5352.98 5352.98 Relingquished

Page 12
Details of CA sites, Parks and Open Spaces in BDA Layout West Division, BDA, Bangalore.

CA Sites Parks Details

No of No. of sites
No. of sites As per
Sl sites allotted by As per approved Plan Measurement as Measurment
Name of the Layout approved by Relingquished approved Existing Relingquished
No. released Society to per existing in Sq ft
BDA plan
by BDA Member
Site No. Extent [Sq ft]
1 2 3 4 5 6 7 8 9 10 11 12 13
No.1 Sub Division
232 CA 7 6120.92 6120.92 Relingquished Park 7 3288.26 3288.26 Relingquished
233 CA 8 5735 5735 Relingquished Park 8 641.87 641.87 Relingquished
234 CA 9 6726.79 6726.79 Relingquished - - - -
235 CA 10 3220.33 3220.33 Relingquished - - - -
236 CA 10A 6931.54 6931.54 Relingquished - - - -
237 CA 11 881 881 Relingquished - - - -
238 CA 12 1928.03 1928.03 Relingquished - - - -
239 CA 12A 463.54 463.54 Relingquished - - - -
240 CA 13 1230.76 1230.76 Relingquished - - - -
241 CA 14 1026.65 1026.65 Relingquished - - - -
242 CA 15 1357.11 1357.11 Relingquished - - - -
243 CA 16 7215.78 7215.78 Relingquished - - - -
244 3 £Éà ¨ÁèPï CA 1 9413.83 9413.83 Relingquished Park 1 24844.17 24844.17 Relingquished
245 CA 2 2952.23 2952.23 Relingquished Park 2 3359.99 3359.99 Relingquished
246 CA 3 350 350 Relingquished Park 3 12612.05 12612.05 Relingquished
247 CA 4 2722.83 2722.83 Relingquished Park 3A 4443.16 4443.16 Relingquished
248 CA 5 569.76 569.76 Relingquished Park 4 12089.05 12089.05 Relingquished
249 CA 6 5075.56 5075.56 Relingquished Park 5 28730.13 28730.13 Relingquished
250 CA 7 2460 2460 Relingquished Park 6 13939.92 13939.92 Relingquished
251 CA 8 12714.95 12714.95 Relingquished - - - -
252 CA 9 2610.15 2610.15 Relingquished - - - -
253 CA 9A 925.49 925.49 Relingquished - - - -
254 CA 10 5119.97 5119.97 Relingquished - - - -
255 CA 11 10759.12 10759.12 Relingquished - - - -
256 CA 12 4040.55 4040.55 Relingquished - - - -
Page 13
Details of CA sites, Parks and Open Spaces in BDA Layout West Division, BDA, Bangalore.

CA Sites Parks Details

No of No. of sites
No. of sites As per
Sl sites allotted by As per approved Plan Measurement as Measurment
Name of the Layout approved by Relingquished approved Existing Relingquished
No. released Society to per existing in Sq ft
BDA plan
by BDA Member
Site No. Extent [Sq ft]
1 2 3 4 5 6 7 8 9 10 11 12 13
No.1 Sub Division
257 CA 13 13335.21 13335.21 Relingquished Park 1 1149.47 1149.47 Relingquished
258 4 £Éà ¨ÁèPï CA 1 1232.82 1232.82 Relingquished Park 2 5589.87 5589.87 Relingquished
259 CA 2 2596.21 2596.21 Relingquished Park 3 21095.61 21095.61 Relingquished
260 CA 3 14503.72 14503.72 Relingquished Park 4 2405.11 2405.11 Relingquished
261 CA 4 840 840 Relingquished Park 5 15510.94 15510.94 Relingquished
262 CA 5 527.6 527.6 Relingquished Park 6 6777.96 6777.96 Relingquished
263 CA 5A 1158.46 1158.46 Relingquished Park 7 11704.83 11704.83 Relingquished
264 CA 6 1197 1197 Relingquished Park 8 4979.73 4979.73 Relingquished
265 CA 7 3014.31 3014.31 Relingquished Park 9 3689.12 3689.12 Relingquished
266 CA 8 13557.43 13557.43 Relingquished Park 10 27566.03 27566.03 Relingquished
267 CA 9 7221.82 7221.82 Relingquished Park 12 18817.29 18817.29 Relingquished
268 CA 9A 8706.91 8706.91 Relingquished - - - -
269 CA 10 2860.58 2860.58 Relingquished - - - -
270 CA 11 1155.62 1155.62 Relingquished - - - -
271 CA 12 6684.37 6684.37 Relingquished - - - -
272 CA 13 924.13 924.13 Relingquished - - - -
273 CA 14 14242.52 14242.52 Relingquished - - - -
274 CA 15 4312.61 4312.61 Relingquished - - - -
275 CA 16 2163.29 2163.29 Relingquished - - - -
276 5 £Éà ¨ÁèPï CA 1 549.01 549.01 Relingquished Park 1 23270.87 23270.87 Relingquished
277 CA 2 2169.75 2169.75 Relingquished Park 2 2337.61 2337.61 Relingquished
278 CA 3 3263.24 3263.24 Relingquished Park 3 56223.66 56223.66 Relingquished
279 CA 4 3200.83 3200.83 Relingquished Park 4 15890.12 15890.12 Relingquished
280 CA4B 1073.57 1073.57 Relingquished Park 5 89439.07 89439.07 Relingquished
281 CA 4A 1122.99 1122.99 Relingquished Park 6 31480.32 31480.32 Relingquished
Page 14
Details of CA sites, Parks and Open Spaces in BDA Layout West Division, BDA, Bangalore.

CA Sites Parks Details

No of No. of sites
No. of sites As per
Sl sites allotted by As per approved Plan Measurement as Measurment
Name of the Layout approved by Relingquished approved Existing Relingquished
No. released Society to per existing in Sq ft
BDA plan
by BDA Member
Site No. Extent [Sq ft]
1 2 3 4 5 6 7 8 9 10 11 12 13
No.1 Sub Division
282 CA 5 1191.31 1191.31 Relingquished Park 7 911 911 Relingquished
283 CA 6 5161.71 5161.71 Relingquished Park 8 7054.88 7054.88 Relingquished
284 CA 7 418.18 418.18 Relingquished Park 9 2339.73 2339.73 Relingquished
285 CA 8 9116.58 9116.58 Relingquished Park 10 3701.48 3701.48 Relingquished
286 CA 9 3693.99 3693.99 Relingquished - - - -
287 CA 10 4291.84 4291.84 Relingquished - - - -
288 CA 11 10781.63 10781.63 Relingquished - - - -
289 6 £Éà ¨ÁèPï CA 1 1971.88 1971.88 Relingquished Park 1A 672.8 672.8 Relingquished
290 CA 2 1156.01 1156.01 Relingquished Park 1B 850.24 850.24 Relingquished
291 CA 3 11676.21 11676.21 Relingquished Park 1C 1137.85 1137.85 Relingquished
292 CA 4 3724.15 3724.15 Relingquished Park 2 9962.71 9962.71 Relingquished
293 CA 5 9572.61 9572.61 Relingquished Park 3 5448.73 5448.73 Relingquished
294 CA 6 3584 3584 Relingquished Park 3A 699.6 699.6 Relingquished
295 CA 7 10209.26 10209.26 Relingquished Park 3B 824.93 824.93 Relingquished
296 CA 8 18229.56 18229.56 Relingquished Park 4 19596.1 19596.1 Relingquished
297 CA 9 1127.7 1127.7 Relingquished Park 5 10748.73 10748.73 Relingquished
298 CA 10 1022.14 1022.14 Relingquished Park 6 19204.63 19204.63 Relingquished
299 CA 11 2318.2 2318.2 Relingquished Park 7 1963.42 1963.42 Relingquished
300 CA 12 3666 3666 Relingquished Play gr 11808.78 11808.78 Relingquished
301 CA 13 2232.3 2232.3 Relingquished - - - -
302 CA 14 1305 1305 Relingquished - - - -
303 CA 14A 1230.18 1230.18 Relingquished - - - -
304 CA 15 13171.46 13171.46 Relingquished - - - -
305 CA 16 16668.75 16668.75 Relingquished - - - -

Page 15
Details of CA sites, Parks and Open Spaces in BDA Layout West Division, BDA, Bangalore.

CA Sites Parks Details

No of No. of sites
No. of sites As per
Sl sites allotted by As per approved Plan Measurement as Measurment
Name of the Layout approved by Relingquished approved Existing Relingquished
No. released Society to per existing in Sq ft
BDA plan
by BDA Member
Site No. Extent [Sq ft]
1 2 3 4 5 6 7 8 9 10 11 12 13
No.1 Sub Division

ªÀÄÄAzÀĪÀgÉzÀ ¸Àgï.JA.«±ÉéñÀégÀAiÀÄå. §qÁªÀuÉ 7 jAzÀ 9 - -

306 7 £Éà ¨ÁèPï CA 1 2217.31 2217.31 Relingquished Park 1 3218.94 3218.94 -


307 CA 2 3537.3 3537.3 Relingquished Park 2 6477.94 6477.94Relingquished
308 CA 3 3170.97 3170.97 Relingquished Park 3 22757.56 22757.56Relingquished
309 CA 4 1707.33 1707.33 Relingquished Park 4 1728.36 1728.36Relingquished
310 CA 5 759.71 759.71 Relingquished Park 5 3580.96 3580.96Relingquished
311 CA 6 21867.3 21867.3 Relingquished Park 6 587.56 587.56Relingquished
312 CA 7 8371.75 8371.75 Relingquished Park 7 3930.27 3930.27Relingquished
313 CA 9 625.33 625.33 Relingquished Park 8 1608.7 1608.7Relingquished
314 CA 10 8181.22 8181.22 Relingquished Park 9 302089.47 302089.5Relingquished
315 CA 14 1530.53 1530.53 Relingquished -
316 CA 15 3075.86 3075.86 Relingquished -
317 CA 17 964.26 964.26 Relingquished -
318 CA 18 8617.95 8617.95 Relingquished -
319 CA 19 3377.02 3377.02 Relingquished -
320 CA 21 2564.19 2564.19 Relingquished -
321 CA 23 1480.83 1480.83 Relingquished -
322 8 £Éà ¨ÁèPï CA 1 642.55 642.55 Relingquished Park 1 3170.49 3170.49 Relingquished
323 CA 2 993.2 993.2 Relingquished Park 6 577.6 577.6 Relingquished
324 CA 3 7391.11 7391.11 Relingquished Park 9 -
325 CA 4 466.94 466.94 Relingquished -

Page 16
Details of CA sites, Parks and Open Spaces in BDA Layout West Division, BDA, Bangalore.

CA Sites Parks Details

No of No. of sites
No. of sites As per
Sl sites allotted by As per approved Plan Measurement as Measurment
Name of the Layout approved by Relingquished approved Existing Relingquished
No. released Society to per existing in Sq ft
BDA plan
by BDA Member
Site No. Extent [Sq ft]
1 2 3 4 5 6 7 8 9 10 11 12 13
No.1 Sub Division
326 CA 5 6953.31 6953.31 Relingquished -
327 CA 6 8103.48 8103.48 Relingquished -
328 CA 7 3647.44 3647.44 Relingquished -
329 CA 8 1986.29 1986.29 Relingquished -
330 CA 9 3538.09 3538.09 Relingquished -
331 CA 10 4009.39 4009.39 Relingquished -
332 CA 11 1519.39 1519.39 Relingquished -
333 CA 12 1606.87 1606.87 Relingquished -
334 CA 13 476.67 476.67 Relingquished -
335 CA 14 286.2 286.2 Relingquished -
336 CA 15 343.31 343.31 Relingquished -
337 CA 16 344.1 344.1 Relingquished -
338 9 £Éà ¨ÁèPï CA 1 838.84 838.84 Relingquished -
339 CA 2 2456.86 2456.86 Relingquished -
340 CA 3 1754.98 1754.98 Relingquished -
341 CA 4 562.85 562.85 Relingquished -
342 CA 5 4579.75 4579.75 Relingquished -
343 CA 6 2632.7 2632.7 Relingquished -
344 CA 7 7514.11 7514.11 Relingquished -
345 CA 11 2331.39 2331.39 Relingquished -
346 CA 12 1637.84 1637.84 Relingquished -
347 CA 13 3562.36 3562.36 Relingquished -
348 CA 14 5272.75 5272.75 Relingquished -
349 CA 15 805.3 805.3 Relingquished -
350 CA 16 1494.68 1494.68 Relingquished -
Page 17
Details of CA sites, Parks and Open Spaces in BDA Layout West Division, BDA, Bangalore.

CA Sites Parks Details

No of No. of sites
No. of sites As per
Sl sites allotted by As per approved Plan Measurement as Measurment
Name of the Layout approved by Relingquished approved Existing Relingquished
No. released Society to per existing in Sq ft
BDA plan
by BDA Member
Site No. Extent [Sq ft]
1 2 3 4 5 6 7 8 9 10 11 12 13
No.1 Sub Division

Executive Engineer
West Division
BDA., Bangalore

Page 18
Details of CA Sites, Parks and Open Spaces in Bangalore Development Authority & Private Layout Pertains to west Division
CA Sites Parks Details Relinquished
No of Sites As per approved plan
No of sites Measuremen As per As per approved Measuremen
Sl no allotted by
No of Sites released t as per Relinquished Purpose approved plan t as per Relinquished
Name of the layout Society to Extent
approved by by BDA existing plan (measurement) existing
Member Site No
BDA
1 2 3 4 5 6 7 8 9 10 11 12
No. 1 Sub Division
2051.84 sq 2051.84 sq
1 1 P1 7655.96 sq mtr
mtr mtr
Upkar Layout, 3514.92sq
2 2 3514.92sq mtr P2 481.25sq mtr
formed in sy no 344 344 mtr Yes Yes
56/p, 61/2 etc… 1280.97sq
3 3 1280.97sq mtr P3 3347.5 sq mtr
mtr
P4 4883.4 sq mtr
4 1 162360 162360 P1 11405sq mtr
HMT Employ
5 2 69866 69866 P2 2822sq mtr
HBCS in
6 3 6600 6600 P3 7755sq mtr
Nagasandra, SY
P4 4619sq mtr
no. 103A, 48/1 &
1326 1198 Yes P5 6066sq mtr Yes
2, 49 etc &
P6 3631sq mtr
Nelakadhirenahalli
Sy no. 5/1-2, 6/7- play ground 4693sq mtr
10 etc
P12 8917.75sq mtr
Padmashree P1 752.48sq mtr
Yes
Shantha Rao Pvt P2 493.07sq mtr
Railway Mens
P1 & Play
HBCS 181 181 2146 sq mtr Yes
ground
(Shankarnagar)

Kirloskar HBCS
7 sy no 176,177,193 113 113 1 7350 7350 Yes P1 25600 sq mtr Yes
of Laggere

Kirloskar HBCS
sy no ,192 of 64 64
Laggere
Kirloskar HBCS
Yes
sy no 25,26/1,26/2
of 131 131 P1 1885.87 sq mtr
Sanneguruvanahall
i
Shishkara HBCS 27 27 P1 395.50sq mtr
SBI officers HBCS
Yes
saneguruvanahalli 75 75 P1 30600sq mtr
sy no. 27

Page 1
CA Sites Parks Details Relinquished
No of Sites As per approved plan
No of sites Measuremen As per As per approved Measuremen
Sl no allotted by
No of Sites released t as per Relinquished Purpose approved plan t as per Relinquished
Name of the layout Society to Extent
approved by by BDA existing plan (measurement) existing
Member Site No
BDA
Sathyanarayana
147 147 P1 1400sq mtr Yes
HBCS , 1st Stage
BEML Officers 385 P1 74880sq mtr
HBCS 385 Yes
play ground 4849. sq mtr
Saneguruvanahalli
1st
BEMLStage Sy no.
Officers 75 P1 74880sq mtr Yes
HBCS 75
play ground 4849. sq mtr Yes
Saneguruvanahalli
2nd Stage
Maruthi Sy no.
HBCS in 510.92 sq
8 80 80 1 510.92 sq mtr Yes P1 3625sq mtr Yes
sy no. 6 mtr
Gayathri HBCS in 165 P1 20160sq mtr
105 Yes
sy no 5 P2 14500sq mtr
Adharsha HBCS
74 74 P1 18850. sq mtr Yes
sy no 6 & 7
Venkateshwara
Krupa HBCS sy
112 112 P1 13300sq mtr Yes
no. 203,208,211 of
Laggere
BFW HBCS sy no. P1 23750sq mtr Yes
14 & 15 of P2 11264sq mtr Yes

Co-op Employees
HBCS sy no. 173 P1 13824sq mtr Yes
of K M Hally

9 F T I HBCS sy no. 29 1 3295 3295 P1 2304sq mtr


10 of J B Kaval 29 2 5130 5130 Yes Yes
11 3 766 766
Athmeeya 13 13 P1 1920sq mtr
Yes
Geleyara Balagha P2 38250sq mtr
Railway Men's
HBCS
Ramakrishnanagar P2 36960sq mtr Yes
sy no. 1 of J B
Kaval

BHEL Employees
12 HBCS sy no 14 97 97 1 717 717 Yes P1 66560sq mtr Yes
and 15 of Laggere

Kempegowda 69 P1 231.04sq mtr


Rural House P2 1576.27sq mtr
69 Yes
Building Co-
Page 2
CA Sites Parks Details Relinquished
No of Sites As per approved plan
No of sites Measuremen As per As per approved Measuremen
Sl no allotted by
No of Sites released t as per Relinquished Purpose approved plan t as per Relinquished
Name of the layout Society to Extent
approved by by BDA existing plan (measurement) existing
Member Site No
BDA 69 Yes
Building Co- P3 320.85sq mtr
operative Society, P4 407sq mtr
sy no. 52/12 of
Yeshwanthapura 120 P1 1647.21sq mtr
Hobli, Ullal 72 P2 798.07sq mtr Yes
Village sy no. 59/2 P3 1757.91sq mtr
(p)
WCR 1st Stage,
2nd phase
Shashikanth Shet,
13 & Kanthilal Shet 58 58 1 918.85 sqm 918.85 sqm Yes
HBCS, Sy no.
20/4,21/2,21/3,22/
3

WCR 2nd Stage,


Laggere sy no.
169/1- 2720.00 sq
14 1 2720.00 sq ft Yes
3,172/1,173/1-3 ft
Sathyanarayana
Layout
15 WCR 2nd Stage 107 1 6090 sq ft 6090 sq ft
107 Yes
16 Kirloskar 2 26400 Sqft 26400 Sqft

WCR 2nd Stage


Vyalikaval HBCS 1238.95
17 171 171 1 1238.95 sqm Yes
sy no. 178 & 179 sqm
of Laggere

18 1(p) 1240 sqm 1240 sqm Yes


Kirloskar HBCS
sy no 195 of 44 44
Laggere
19 WCR 3rd Stage 44 1 16.000 16.000 Yes
4th Block National 44 517.37 sq
20 2 517.37 sq m Yes
HBCS 2nd Stage, m
Magadi Road, SG
WCR 3rd Stage
4th Block National
1225.81Sq
21 HBCS Magadi 158 158 1 1225.81Sqm Yes
m
Road, SG Halli Sy
no. 86/1-3

WCR 3rd Stage 1069.17 sq


22 109 1 1069.17 sq m
Astagrama HBCS m
109 Yes
Sy No. 69 of SG 278.81 sq
23 2 278.81 sq m
Halli m

Page 3
CA Sites Parks Details Relinquished
No of Sites As per approved plan
No of sites Measuremen As per As per approved Measuremen
Sl no allotted by
No of Sites released t as per Relinquished Purpose approved plan t as per Relinquished
Name of the layout Society to Extent
approved by by BDA existing plan (measurement) existing
Member Site No
BDA
WCR 3rd Stage
4th Block Model 809.55
24 30 30 1 809.55 Sqm Yes
HBCS sy no. 20 & Sqm
21 of SG Halli
WCR 3rd
Stage,Gruhalaxmi
7791.19 sq
25 HBCS, 1st Stage 1 7791.19 sq m
m
sy no. 29/1-5 of
SG Halli
Yes
WCR 3rd
Stage,Gruhalaxmi
3068.55
26 HBCS, 2nd Stage 185 185 2 3068.55 sqm
sqm
sy no. 29/1-5 of
SG Halli

WCR 3rd Stage


University HBCS 96 96 P1 14760 sq ft Yes
S G halli sy no. 7

WCR 3rd Stage


Karnataka HBCS
27 Laggere Sy no. 171 168 1 23300 sqm 23300 sqm Yes
184,185,186 &
338

WCR 3rd Stage


Vinayaka 1st Stage
28 HBCS Magadi 54 54 1 223.03 sqm 223.03 sqm
road, sy no. 69/2
SG Halli

WCR 2nd Stage


Gelayara Balaga 1197.17 1197.17
29 1
HBCS 2nd stage J sqm sqm
K Kaval sy no 1
30 WCR 3rd Stage. 59 8 6693 sq ft 6693 sq ft
59
31 4th Block, 8/A

Sathyanarayana Yes
HBCS S G halli sy
32 170 170 1 248.32 248.32
no. 20/1-2,197, of
Laggere

Page 4
CA Sites Parks Details Relinquished
No of Sites As per approved plan
No of sites Measuremen As per As per approved Measuremen
Sl no allotted by
No of Sites released t as per Relinquished Purpose approved plan t as per Relinquished
Name of the layout Society to Extent
approved by by BDA existing plan (measurement) existing
Member Site No
BDA
Karnataka HBCS
Laggere sy no. 172 172 P1 57502 sq ft
136/172/172
33 1 763.26Sq 763.26Sq
34 2 651.37 651.37
kethamaranahally
35 273 266 3 773.69 773.69
HBCS
36 4 678.08 678.08
37 5 4882.08 4882.08

No.2 Sub Division


Ambedkar Layout
63 63 59 - - - 1 1200.00sq mtrs
at K P Agrahara

Telecom HBCS
38 Layout at K P 374 150 310 CA-1 2335.00 2335.00 No Parks Not Relinguished
Agrahara
Relinguished
39 CA-1 2150 2150 P1 849.25
Kalyan Co made
357 357 357
40 operative HBCS CA-2 1620.2 1620.2 P2 1315.11
41 CA-3 2721.55 2721.55
P1 1240.47sqm Not Relinquished
Vyalikaval HBCS Not
42 371 90 371 1 4748.44 4748.44 P2 1100
at K P Agrahara Relinquished
P3 848
P4 1659.97
Relinquished
P1 3317.25
The Accountant made
43 General, HBCS, 252 226 252 CA 1 10603.9 10603.9 Yes P2 4021.11
Ullal. P3 3018.63
P4 2815.42
Amarajyothi
HBCS,Sy no.
44 431/1 of K P 24 - 24 - - - - Not Relinquished
Agrahara

Amarajyothi
HBCS,Sy no.
45 421 of K P 12 - 12 1 1762.20sqm 1762.20sqm Yes - Not Relinquished
Agrahara

Page 5
CA Sites Parks Details Relinquished
No of Sites As per approved plan
No of sites Measuremen As per As per approved Measuremen
Sl no allotted by
No of Sites released t as per Relinquished Purpose approved plan t as per Relinquished
Name of the layout Society to Extent
approved by by BDA existing plan (measurement) existing
Member Site No
BDA
Amarajyothi
HBCS,
46 45 - 45 2 - - - Not Relinquished
Sy no. 435/1,2,3
of K P Agrahara
Amarajyothi
HBCS,
47 42 - 42 1 - - - Not Relinquished
Sy no. 417 of K
P Agrahara
Amarajyothi
HBCS,Sy no.
48 418/1,418/2 of K 92 - 92 - - - 1 Not Relinquished
P Agrahara

National
HBCS,Sy no.
49 443/1 of K P 25 - 25 - - - - Not Relinquished
Agrahara

50 - 1 717.72 sqm 717.72 sqm Yes - Not Relinquished


Yes Not Relinquished
National HBCS,
Yes Not Relinquished
Sy no. 422/1-5,
Yes Not Relinquished
423/1,424,427 &
Yes Not Relinquished
428/2 of K P 169 169
Yes Not Relinquished
Agrahara
51 2 937.02 937.02 Yes - Not Relinquished
(Modified)
52 3 424.08 424.08 Yes - Not Relinquished
53 4 304.92 304.92 Yes - Not Relinquished
54 5 1206 1206 Yes Not Relinquished
55 - 1 Not Relinquished
- 2 Not Relinquished
- 3 Not Relinquished
National
- 4 Not Relinquished
HBCS,Sy no.
- 5 Not Relinquished
428/1, 430/1 of 157 157 - -
- 6 Not Relinquished
K P Agrahara
- 7 Not Relinquished
- 8 Not Relinquished
- 9 Not Relinquished
- 10 Not Relinquished

Page 6
CA Sites Parks Details Relinquished
No of Sites As per approved plan
No of sites Measuremen As per As per approved Measuremen
Sl no allotted by
No of Sites released t as per Relinquished Purpose approved plan t as per Relinquished
Name of the layout Society to Extent
approved by by BDA existing plan (measurement) existing
Member Site No
BDA
City Chikepet
HBCS,Sy no.
56 353,354 of K P 107 107 2 1686.00sqm 1686.00sqm Yes 1 Not Relinquished
Agrahara

City Chikepet
HBCS,
48 48 - - - - Not Relinquished
Sy no. 413/1 of
K P Agrahara
Binnimill Labour
HBCS,Sy no.
57 186,189 of K P 116 116 1 2323.23 sqm 2323.23 sqm Yes - Not Relinquished
Agrahara

Bapuji HBCS,Sy
no. 406 to 410 of
58 440 440 4 - - 1 Not Relinquished
K P Agrahara

Vinayaka
HBCS,Sy no.
59 383/4,384/1 & 2 129 129 1 - - 1 Not Relinquished
of K P Agrahara

60 Vinayaka 1 - - 1 Not Relinquished


152 152
61 HBCS,Sy no. - - - 2 Not Relinquished
62 GKW HBCS sy 228 228 1 2560.00sqm 2560.00sqm Yes - Not Relinquished
63 no. 377/1 of KP 2 Odd site Odd site Yes - Not Relinquished
64 Agrahara 3 1161.84sqm 1161.84sqm Yes - Not Relinquished
RPF HBCS sy
65 no. 385/1 of K P 93 93 1 - - 2 Not Relinquished
Agrahara
66 Basaveshwara 1 689.00sqm 689.00sqm Yes 2 Not Relinquished
132 132
67 HBCS, 2&3 - - Not Relinquished

Basaveshwara
HBCS,
68 152 152 1 713.27 sqm 713.27 sqm Yes 3 Not Relinquished
sy no. 360 & 362
of K P Agrahara

Page 7
CA Sites Parks Details Relinquished
No of Sites As per approved plan
No of sites Measuremen As per As per approved Measuremen
Sl no allotted by
No of Sites released t as per Relinquished Purpose approved plan t as per Relinquished
Name of the layout Society to Extent
approved by by BDA existing plan (measurement) existing
Member Site No
BDA
Venkateshwara
HBCS,
69 45 45 1 - - - Not Relinquished
Sy no. 431

WIDIA HBCS,
70 116 116 2 - - 3 Not Relinquished
sy no. 327, 328
Central Excise
HBCS,
129 129 - - - - Not Relinquished
sy no. 186/A of
K P Agrahara
Munilaxmamma
HBCS,
10 10 - - - 2 Not Relinquished
sy no. 349/6 of
K P Agrahara
Kempegowda
HBCS,
35 35 - - - 1 Not Relinquished
sy no. 439/1 of
K P Agrahara
Hariram oil Das
HBCS,
71 40 40 1 - - - Not Relinquished
sy no. 442/1 to 6
of K P Agrahara
Syndicate Bank
Employers
72 HBCS 49 49 2 - - - Not Relinquished
sy no. 66,67 of K
P Agrahara
No 3 sub division
Karnataka Income Tax Modified layout plan in sy.nos P-1 1748.00 1748.00
48/9, 48/12,
142 48/p, 54/1 & 79 of Nagarabhavi
132 132 P-2 535.10 535.10
P-3 356.73 356.73
P-4 401.32 401.32
Relinquished
P-5 222.96 222.96
P-6 111.48 111.48
P-7 557.40 557.40
P-8 1114.80 1114.80

73 BEL HBCSin sy no 53/1,2 54, 56/1,57 to 62 of CA 2000 2000 P-1 12036.00 12036.00
74 Herohally
855 845 845 CA 162 162 P-2 6345.00 6345.00

Page 8
CA Sites Parks Details Relinquished
No of Sites As per approved plan
No of sites Measuremen As per As per approved Measuremen
Sl no allotted by
No of Sites released t as per Relinquished Purpose approved plan t as per Relinquished
Name of the layout Society to Extent
approved by by BDA existing plan (measurement) existing
Member Site No
BDA
2064.00 2064.00
75 CA 1147 1147 Relinquished P-3
3240.00 3240.00
Relinquished
76 CA 777 777 P-4 744.00 744.00
77 CA 2812 2812 P-5 7003.00 7003.00
P-6 3822.00 3822.00
P-7 11424.00 11424.00

78 Rajajinagara HBCS II Stage in sy no 20,21,22,27,of CA-1 346.5 346.5 P-1 2376.91 2376.91
79 Srigandada
920 Kaval 920 920 CA-2 793.72 793.72 P-2 231.14 231.14
80 CA-3 140.4 140.4 P-3 1075.14 1075.14
Relinquished
81 CA-4 782 782 P-4 2955.75 2955.75
82 CA-5 917.56 917.56 P-5 177.51 177.51
83 CA-6 866.25 866.25 P-6 9553.35 9553.35
P-7 5208.00 5208.00
Relinquished
P-8 6308.75 6308.75
P-9 535.50 535.50
P-10 4128.00 4128.00
P-11 2462.14 2462.14
P-12 2772.00 2772.00
P-13 3780.00 3780.00
P-14 1660.80 1660.80

84 Karnataka State Govt., Group 'D' HBCS Srigandada CA-1 2160.00 2160.00 P-1 3876.00 3876.00
85 Kaval 1228 723 723 CA-2 1892.00 1892.00 Relinquished P-2 124.80 124.80
86 CA-3 3240.00 3240.00 P-3 1485.00 1485.00
P-4 4510.50 4510.50
P-5 256.00 256.00 Relinquished
P-6 545.60 545.60 (but part of CA &
P-7 579.30 579.30 Parks are built
P-8 2707.50 2707.50 up)
P-9 20037.62 20037.62
P-10 395.20 395.20
P-11 1478.70 1478.70

87 Health & Family Welfare HBCS in sy no 27/1, 41/H of CA-1 2266.28 2266.28 P-1 3412.50 3412.50
88 Srigandadakaval
593 558 558 CA-2 5319.05 5319.05
89 CA-3 4152.21 4152.21 Relinquished Relinquished
90 CA-4 2451.71 2451.71
91 CA-5 3623.4 3623.4

92 Rajajinagara HBCS I Stage in sy no 38(p), 39(p), 40(p) CA-1 4697.94 4697.94 P-1 3910.00 3910.00
Relinquished Relinquished
93 of Srigandadakaval
678 678 678 CA-2 378.84 378.84 P-2 2594.75 2594.75

Page 9
CA Sites Parks Details Relinquished
No of Sites As per approved plan
No of sites Measuremen As per As per approved Measuremen
Sl no allotted by
No of Sites released t as per Relinquished Purpose approved plan t as per Relinquished
Name of the layout Society to Extent
approved by by BDA existing plan (measurement) existing
Member Site No
BDA
Kendra Upadhya Sangha in sy no 1/2 to 7, 50,55,53,54 P-1 1980.00 1980.00
of Nagarabhavi
425 350 350 P-2 858.50 858.50 Relinquished
P-3 5460.00 5460.00

Lokaseva Housing Co-op Society Ltd,in sy no 24,25 of P-1 3127.00 3127.00


Nagadevanahalli
200 187 187 P-2 875.00 875.00
P-3 1679.00 1679.00
Relinquished
P-4 512.00 512.00
P-5 442.00 442.00
P-6 476.00 476.00

94 Intelligence Burea HBCS in sy no CA-1 1696.80 1696.80 P-1 4275.00 4275.00


95 44/5a,45/2a,2b,45/3,4
95 of Valagerehally95 95 CA-2 195.39 195.39 Relinquished
Relinquished
96 CA-3 2001.00 2001.00

97 Gavipuram Extension HBCS Ltd, in Sy No.42 CA-1 2821.00 2821.00 P-1 3072.00 3072.00
Relinquished
98 (Nagadevanahalli)
72 72 72 CA-2 P-2 540.00 540.00

99 Forest Officers HBCS in sy no 21 of Kenchanahalli CA-1A 266.8 266.8 P-1 1000.00 1000.00
100 321 321 321 CA-1B 266.8 266.8 P-2 2400.00 2400.00
101 CA-1C 574.75 574.75 P-3 1400.00 1400.00
Relinquished Relinquished
102 CA-2 846.4 846.4 P-4 2101.00 2101.00
103 CA-3 654.26 654.26 P-5 5430.00 5430.00
104 CA-4 623 623 P-6 3900.00 3900.00

Banglore Employees Social welfare HBCS Ltd., P-1 880.00 880.00


(Vidyagiri
290 layout)in Sy No. 123, 128,
279139, 141 & 142
279 P-2 7076.00 7076.00
P-3 1692.00 1692.00
P-4 225.00 225.00
Relinquished
P-5 525.00 525.00
P-6 720.00 720.00
P-7 360.00 360.00
P-8 639.00 639.00

105 Bangalore City Employees HBCS, in Sy No 48 (old 141 CA-1 256.82 256.82 P-1 432.00 432.00
Relinquished Relinquished
& 142) 28 28 28 P-2 450.00 450.00
Padma Upadhyaya Layout in SY.No.31, 32/1, 35/p of
106 Nagadevanahalli CA-1 12620.00 12620.00 P-1 300.00
Relinquished
319 P-2 216.00
P-3 30.00
P-4 540.00
P-5 288.00 Not Relinquished
P-6 256.00

Page 10
CA Sites Parks Details Relinquished
No of Sites As per approved plan
No of sites Measuremen As per As per approved Measuremen
Sl no allotted by
No of Sites released t as per Relinquished Purpose approved plan t as per Relinquished
Name of the layout Society to Extent
approved by by BDA existing plan (measurement) existing
Member Site No
BDA
P-7 384.00
P-8 60.00
P-9 240.00

Mico HBCS Sy No 46/3,4,5, of Devetegeramanahalli P-1 6537.00 6537.00


Relinquished
80 80 80
Chamarajpet Silks and Handloom weavers HBCS in sy
107 333/1 of Kempapura agrahara CA-1 378.00 378.00 P-1 720.00
Relinquished
108 223 223 223 CA-2 2664.00 2664.00 P-2 1080.00
P-3 365.00 Relinquished
P-4 1087.00
P-5 3470.00
Food corporation in sy no 31/2 of
Deevatigeramanahalli P 1636.00 Relinquished

109 Gavipuram sy no 42 HBCS Mallathahalli CA-1 225.00 225.00 P-1 600.00


Relinquished Relinquished
110 CA-2 506.00 506.00 P-2 675.23

111 BCC Gangondahalli (Sy.no.44/1,2,3, 49/1,2,3 & 7, 14 CA -1 148.00 148.00 P-1 2400.00
Relinquished
&18 of Gangondanahalli
351 324 324 P-2 1410.00
P-3 1309.00
P-4 3600.00
P-5 4363.00
P-6 1145.00 Relinquished
P-7 410.12
P-8 482.00
P-9 2377.00
P-10 372.00
P-11 350.00
ITI HBCS IN SY NO 53/1,2,3,,54,55,56/1,57 OF
112 Nayandahalli CA-1 1042.63 1042.63 P-1 5672.00
Relinquished
384 122 P-2 5320.42
Not Relinquished
P-3 333.64
(Built up)
P-4 3558.85
P-5 834.00
Venkateshwara HBCS in sy no 49/4,5,6 of
113 Deevatigeramanahalli CA-1 222.42 222.42 P-1 1112.14
Relinquished Relinquished
114 93 93 CA-2 602.4 602.4 P-2 444.86
Ananda HBCS layout in sy no 47(p) 48(p) of
Valagerehalli @ Dubasipalya P-1 508.63
27 27 P-2 685.73 Relinquished
P-3 133.18

Page 11
CA Sites Parks Details Relinquished
No of Sites As per approved plan
No of sites Measuremen As per As per approved Measuremen
Sl no allotted by
No of Sites released t as per Relinquished Purpose approved plan t as per Relinquished
Name of the layout Society to Extent
approved by by BDA existing plan (measurement) existing
Member Site No
BDA
Government press HBCS in sy no 107/2 of
Mallathahalli
133 P-1 2078.00 Relinquished
P-2 2150.00
NGEF HBCS in sy no 2,3,8,52,53,54,57,102 of
Mallathahalli
Not
115 CA 1 32384.00 32384.00 Reqlinquishe
591 470 Not known d Park 1 1071.00
116 CA 2 25864.00 25864.00 Park 2 3686.00
117 CA 3 46432.00 46432.00 Park 3 2643.00
Not Relinquished
Park 4 1214.00
Park 5 7403.00
Park 6 5855.00
Park 7 9447.00

MPM HBCS in sy no 3,5,6,7,8,14,15,16,17, of


Mallathahalli
564 402 402 Park 1 3990.75
Park 2 282.5 Relinquished
Park 3 2198.85

ITI HBCS in sy no Mallathahalli


Not
118 875 250 Not known CA 1 7436 Sqm 7436 Sqm Reqlinquishe 30652 4246.88
d Park 1 Relinquished
Park 2 6528 5992.48
Govt Secretariate in 23,24,27 of
HBCS Mallathahalli
243 0 0 Park 1 404.94 Sqm
Park 2 1323.43
Park 3 350.89
Not Relinquished
Park 4 481.83
Park 5 389.00
Park 6 6027.00

119 NGEF HBCS in sy no 13,14,15 of Nagarabhavi CA-1 1338.00 1338.00 Yes P-1 6971.00
120 675 550 550 CA-2 1561.00 1561.00 Yes P-2 813.00
121 CA-3 3321.00 3321.00 Yes P-3 5560.00
Relinquished
P-4 3002.78
P-5 1459.68
P-6 2780.00
NGEF HBCS in sy no 12 (old sy no 124) 2nd stage,
Nagarabhavi

Page 12
CA Sites Parks Details Relinquished
No of Sites As per approved plan
No of sites Measuremen As per As per approved Measuremen
Sl no allotted by
No of Sites released t as per Relinquished Purpose approved plan t as per Relinquished
Name of the layout Society to Extent
approved by by BDA existing plan (measurement) existing
Member Site No
BDA
Court
122
162 98 98 CA 8364.00 8364.00 litigation
No.4 Sub Division
¨ÉAUÀ¼ÀÆgÀÄ zÀQët vÁ®ÆèPÀÄ PÉAUÉÃj ºÉÆç½,
gÁªÀĸÀAzÀæ UÁæªÀÄ zÀ ¸ÀªðÉ .£ÀA. 176 (ºÀ¼É £ÀA. 39/6) CA.Site. 27M x Park -1 27.00 x
123 48 48 408.03 Relinquished 27.00 x 92.75 Relinquished
No.1 15.11M 92.75
7.90+9.6/2 x 7.90+9.6/2 x
Relinquis Park -1
…. … …. … 46.00 46.00
hed

Relinquis Park -2 3.60+23.3/2 x 3.60+23.3/2


…. … …. …
hed 775.00 x 775.00
169 x
22.50+24.50
169 x
/2
22.50+24.50/2
185 185 16.00x Relinquished
16.00x 24.50 +
24.50 +
26.6/2
Relinquis Park -3 26.6/2
…. … …. … 81.00 x
hed 81.00 x
26.60+21.40/2
26.60+21.40
1/2 x 2.30 x
/2
22.50
1/2 x 2.30 x
22.50

¨ÉAUÀ¼ÀÆgÀÄ zÀQët vÁ®ÆèPÀÄ,PÉAUÉÃj ºÉÆç½, ¸ÀÆ°PÉgÉ


UÁæªÀÄzÀ ¸ÀªÉð.£ÀA.06(¦) ªÀÄvÀÄÛ 9/2 gÀ°è£À MlÄÖ 08
1/2 x 26.07 x 1/2 x 26.07
43.27 x 43.27
1/2 x 43.27 x 1/2 x 43.27
Relinquis
…. … …. … 93.18 x 93.18
hed
1/2 x 114.17 x 1/2 x 114.17
17.17 x 17.17
Park -1 1/2 x 17.17 x 1/2 x 17.17
5.09 x 5.09

Page 13
CA Sites Parks Details Relinquished
No of Sites As per approved plan
No of sites Measuremen As per As per approved Measuremen
Sl no allotted by
No of Sites released t as per Relinquished Purpose approved plan t as per Relinquished
Name of the layout Society to Extent
approved by by BDA existing plan (measurement) existing
Member Site No
BDA

47.34 x
136 82 Relinquished
26.05
47.34 x 26.05 4.75 x 26.05
4.75 x 26.05 53.29 x 6.42
Relinquis
…. … …. … 53.29 x 6.42 1/2 x 9.30 x
hed
1/2 x 9.30 x 53.09
53.09 1/2 x 1.92 x
/2 x 1.92 x 6.46 6.46
- Rg礀 - Rg礀
Park -2 «¹ÛÃtð «¹ÛÃtð
278.77 278.77
Relinquis
…. … …. …
hed Open Space 1/2 x 2.93 x 6.061/2 x 2.93 x 6.06
¨ÉAUÀ¼ÀÆgÀÄ zÀQët vÁ®ÆèPÀÄ,PÉAUÉÃj ºÉÆç½, PÉAZÀ£À¥ÀÄgÀ UÁæªÀÄzÀ ¸ÀªÉð.£ÀA.44 ªÀÄvÀÄÛ 56(¦) gÀ°è£À MlÄÖ 03 JPÀgÉ 29.64 UÀÄAmÉ
«¹ÛÃtðzÀ ¥ÀæzÉñÀzÀ°è ªÀ¸Àw §qÁªÀuÉ £ÀPÉëAiÀÄ£ÀÄß ²æà J.PÀĪÀiÁgï ©£ï r.CAPÀ¥Àà, ²æà «.ZÀ£Àß±ÉÃRgï, ²æà J¯ï.gÁdÄ ªÀÄvÀÄÛ ²æà §¸ÀªÀgÁdÄ 1/2 x 94.00
1/2 x 94.00 x x 19.55
Relinquis 19.55 1/2 x 14.19
53 32 …. … …. …
hed 1/2 x 14.19 x x 1.81
Park -1 1.81 14.25 x
14.25 x 94.00 94.00

Page 14
CA Sites Parks Details Relinquished
No of Sites As per approved plan
No of sites Measuremen As per As per approved Measuremen
Sl no allotted by
No of Sites released t as per Relinquished Purpose approved plan t as per Relinquished
Name of the layout Society to Extent
approved by by BDA existing plan (measurement) existing
Member Site No
BDA
1/2 x 90.78 x
7.12
1/2 x 78.12 x
1/2 x 90.78 x 7.44
7.12 1/2 x 6 x
1/2 x 78.12 x 11.46
7.44 1/2 x 27.2 x
1/2 x 6 x 11.46 94.38
1/2 x 27.2 x 1/2 x 11.46 x
Relinquis 94.38 21.20
…. … …. … 1/2 x 11.46 x 1/2 x 3.32 x
hed
21.20 6.264
222 133 1/2 x 3.32 x 2.95 x 37.79 Relinquished
6.264 1/2 x 3.31 x
2.95 x 37.79 32.39
1/2 x 3.31 x 1/2 x 2.95 x
32.39 45.45.02
1/2 x 2.95 x 1/2 x 0.31 x
45.45.02 9.66
Park -A 1/2 x 0.31 x 9.66 1/2 x 0.31 x
1/2 x 0.31 x 1.93 1.93
1/2 x 27.43 x 1/2 x 27.43 x
30.20 30.20
…. … …. … 9.284 x 9.15 9.284 x 9.15
Park -B 1/2 x 9.284 x 1/2 x 9.284 x
8.43 8.43

1/2 x 32.00 x
1/2 x 32.00 x 35.983
35.983 26.10 x 15.00
…. … …. …
26.10 x 15.00 6x3
6x3 10.09 x 4.46
Park -C 10.09 x 4.46 1/2 x 4.46 x
1/2 x 4.46 x 4.91 4.91

1/2 x 24.33 x 1/2 x 24.33 x


10.288 10.288
1/2 x 13.65 x 1/2 x 13.65 x
…. … …. …
96.05 96.05
10.68 x 83.82 10.68 x 83.82
Park -D 1/2 x 10.68 x 1/2 x 10.68 x
12.235 12.235

Page 15
CA Sites Parks Details Relinquished
No of Sites As per approved plan
No of sites Measuremen As per As per approved Measuremen
Sl no allotted by
No of Sites released t as per Relinquished Purpose approved plan t as per Relinquished
Name of the layout Society to Extent
approved by by BDA existing plan (measurement) existing
Member Site No
BDA
1/2 x 20.71 x 1/2 x 20.71 x
18.3 18.3
1/2 x 20.55 x 1/2 x 20.55 x
…. … …. …
18.21 18.21
Park -E 3.84 x 18.3 3.84 x 18.3
0.09 x 20.55 0.09 x 20.55
1/2 x 59.213 x 1/2 x 59.213
8.414 x 8.414
…. … …. … Park -F 1/2 x 9.4642 x 1/2 x 9.4642
8.414 x 8.414
1/2 x 46.99 x
18.03
1/2 x 46.99 x 1/2 x 35.07 x
18.03 18.03
1/2 x 35.07 x 1/2 x 7.48 x
…. … …. …
18.03 8.44
1/2 x 7.48 x 8.44 19.94 x 8.44
19.94 x 8.44 13.2 x 27.43
Park -G 13.2 x 27.43 1/2 x 4.173 x
1/2 x 4.173 x 83 83

17.01 x 80.52
6.5 x 65.66
1/2 x 6.5 x
1.95
1/2 x 5.48 x
17.01 x 80.52 7.32
6.5 x 65.66 1/2 x 5.48 x
1/2 x 6.5 x 1.95 21.32
Relinquis 1/2 x 5.48 x 7.32 1/2 x 17 x
…. … …. … 1/2 x 5.48 x 23.04
hed
21.32 0.364 x 76.58
1/2 x 17 x 23.04 1/2 x 3.35 x
0.364 x 76.58 60.9
1/2 x 3.35 x 60.9 3.35 x 15.68
3.35 x 15.68 1/2 x 0.86 x
1/2 x 0.86 x 15.68 Relinquished
15.68 4.58 x 22.69
4.58 x 22.69 1/2 x 15.14 x
1/2 x 15.14 x 22.69
Park -H 22.69 1/2 x 0.36 x
1/2 x 0.36 x 1.24 1.24

Page 16
CA Sites Parks Details Relinquished
No of Sites As per approved plan
No of sites Measuremen As per As per approved Measuremen
Sl no allotted by
No of Sites released t as per Relinquished Purpose approved plan t as per Relinquished
Name of the layout Society to Extent
approved by by BDA existing plan (measurement) existing
Member Site No
BDA

1/2 x 68.22 x
1/2 x 68.22 x 59.21
59.21 1/2 x 37.25 x
1/2 x 37.25 x 41.42
41.42 53.08 x 41.42
…. … …. … 53.08 x 41.42 1/2 x 3.24 x
1/2 x 3.24 x 26.37
26.37 3.24 x 30.04
3.24 x 30.04 1/2 x 2.5 x
1/2 x 2.5 x 30.05 30.05
Park -I 1/2 x 5.74 x 1/2 x 5.74 x
10.91 10.91

Page 17
CA Sites Parks Details Relinquished
No of Sites As per approved plan
No of sites Measuremen As per As per approved Measuremen
Sl no allotted by
No of Sites released t as per Relinquished Purpose approved plan t as per Relinquished
Name of the layout Society to Extent
approved by by BDA existing plan (measurement) existing
Member Site No
BDA
7.79 x 81.82
1/2 x 7.79 x
7.79 x 81.82 10.50
1/2 x 7.79 x 1/2 x 3.18 x
10.50 13.32
1/2 x 3.18 x 1/2 x 3.63 x
13.32 15.25
1/2 x 3.63 x 1/2 x 3.63 x
15.25 15.24
1/2 x 3.63 x 1/2 x 3.63 x
Park -J 15.24 15.24
…. … …. … Relinquished
1/2 x 3.63 x 3.18 x 68.5
Relinquis 15.24 3.63 x 53.26
hed 3.18 x 68.5 3.63 x 38.02
3.63 x 53.26 3.63 x 22.78
3.63 x 38.02 1/2 x 5.43 x
3.63 x 22.78 22.78
1/2 x 5.43 x 1/2 x 0.79 x
22.78 3.3
1/2 x 0.79 x 3.3 3.3 x 21.29
3.3 x 21.29 1/2 x 8.7 x
1/2 x 8.7 x 22.08 22.08
¨ÉAUÀ¼ÀÆgÀÄ GvÀÛgÀ vÁ®ÆèPÀÄ
AiÀıÀªÀAvÀ¥ÀÄgÀºÉÆç½, ªÀÄ®èvÀÛºÀ½î UÁæªÀÄzÀ
11.10+13.0+1
124 53 53 CA.Site-1 228.78Sqm 2.80 x 18.60 Yes Park-1
42.60+4.20/2 x 42.30+45.70/2
42.60+4.20/2 x 42.30+45.70/2

Executive Engineer
West Division
BDA., Bangalore.

Page 18
Details of CA Sites in BDA Layout and Private Layouts Pertaining to East Division

Actually in Not in
Sl CA Site North -
Name of the Layout East - West Area Possession Possession Remarks
No. No South
of BDA of BDA
CA Sites at BDA Layout
1 1 22 69.0+68.00 50.60+51.0 3593.16 Yes ---- Allotted to Telephone Dept (
HSR Layout Sector 1 2 2 Temporary Building constructed)
2 43.60 2.60 113.36 Yes ---- Allotted to Mitra Jyoti Blind School
(building under Construction )
3 25(P) a 56.50 45.10 2548.15 Yes ---- Allotted to Deepayana Edu Trust

4 25/1A 4193.50 Yes ---- Allotted to Syndicate Bank (office)

5 27 100.30+99.00 159.0+144.30 15111.92 Yes ---- Vacant


2 2
6 28 37.75 53.00 2000.75 Yes ---- Allotted to Cambridge School
(building Constructed)
7 28(P)1 75.45 52.50+51.50 3923.00 Yes ---- Hospital
2
8 28(P)2 44.55+36.75 50.30 2052.24 Yes ---- Manava Trust Committee Hall
2
9 29/A (a) 31.00+22.70 26.85+26.90 2851.44 Yes ---- Allotted to Central Govt Ground
2 2 Water Dept. (building Constructed)
10 (b) 30.50 19.50 594.75 Yes ---- Allotted to Homeopathi Hospital

11 (c) 36.50 36.63 1337.00 Yes ---- Allotted to Petrol Bunk is under
working
12 (d) 16.77+14.06 36.68 560.50 Yes ---- Allotted to Police Station
2
13 (e) 73.43+76.90 23.57 1771.43 Yes ---- Keonics office
2
14 (f) 32.35+48.52 16.96 575.00 Yes ---- Sri Vasavi Education Trust
2
15 (g) 71.67+73.43 30.90 2730.00 Yes ---- Allotted to Education Trust
2
16 31 a) 78.2 32.60+42.70 2944.23 Yes ---- Allotted to Education Department,
2 for Construdtion of Public College

Page 1 of 17
Actually in Not in
Sl CA Site North -
Name of the Layout East - West Area Possession Possession Remarks
No. No South
of BDA of BDA
17 b) 78.8 38.80+17.30 5154.57 Yes ---- Allotted to Education Department
2
18 31/A ½ x 75.00 118.00 4425.00 Yes ---- Allotted to Transport Department

19 36/P2 Yes ---- PU College

20 HSR Layout Sector 2 13 81.50 42.50+50.80 3801.97 Yes ---- Allotted to Cosmopolitan Education
2 Trust & School Building is
constructed
21 17 42.50 91.50+104.50 2082.50 Yes ---- Allotted to Siddartha Education
2 Trust & Building is under
constructed
22 17/A 91.50+104.50 2082.50 Yes ---- Allotted to Samrudha Education
2 Trust
23 19 81.00+29.00 21.00+13.00 1360.00 Yes ---- BWSSB
2 2
24 23 39.00+22.00 168.80+168.0 5131.62 Yes ---- KPTCL
2 2
25 11/A 24.80+24.70 84.60+84.50 2092.67 Yes ---- Allotted to I B P
2 2
26 11/B 25.20 26.20+25.20 647.64 Yes ---- Hospital
2
27 HSR Layout Sector 3 1 63.20+64.20 23.00+20.70 1391.85 Yes ---- Allotted to T.K.Patil Benakatti
2 2 Charitable Trust
28 3 106.90+111.80 91.40+96.40 8469.00 Yes ---- Proposed for Sports Complex
2 2
29 12 70.50+66.20 130.00+129.50 8868.40 Yes ---- HSR Club
2 2
30 HSR Layout Sector 4 32 140.20 96.20 13459.20 Yes ---- Notified to Educational Institution

31 32/P 42.67 96.00 4096.32 Yes ---- To Social Welfare dept for SC & ST
Hostel
32 32/P1 7988.00 Yes ---- Childrens Education Society

33 32/P2 3954.92 Yes ---- NAFL Education Trust

34 32/P3 1343.16 Yes ---- Shakunthala Education Trust

Page 2 of 17
Actually in Not in
Sl CA Site North -
Name of the Layout East - West Area Possession Possession Remarks
No. No South
of BDA of BDA
35 38 170.00 175.00+48.00 18995.00 Yes ---- To BMTC
2
36 38/P ½ x 59.00 48 1416.00 Yes ---- To I O C

37 39 83.00 39.00+34.00 3029.50 Yes ---- Notified for Kannada Medium


2 School
HSR Layout Sector 5 No CA Sites formed

38 HSR Layout Sector 6 3A 2224.00 Yes ---- 3A allotted to Cauvery Education


Society (Lawrence School)

39 3B 47.90+47.00 181.5+180.0 1464.00 Yes ---- Vacant


2 2

40 3C 4888.00 Yes ---- Vacant

41 4A 11090.76 Yes ---- Allotted to JSS College

42 4B 334.25+324.0 117.2+116.0 20416.61 Yes ---- Allotted to HSR BDA Complex


2 2
43 4C 2789.37 Yes ---- Siddartha Charitable Trust

44 4D 4079.26 Yes ---- Shankar Netralaya

45 HSR Layout Sector 7 6(P) 33.80 53.00 1791.40 Allotted to Childerns Play Ground

46 7 59.50+39.40 53.70+62.00 2860.68 Allotted to Srinivasa Education &


2 2 Charitable Trust
47 8 27.20+43.30 56.00+54.30 1944.03 Allotted to Ministry of Company
2 2 Affairs Government of India.
2 48 BTM 4th Stage 1st Block 1a 39.60 33.50 1326.60 Yes ---- Nightingale Educational Institution

49 1b 27.45 33.50 919.57 Yes ---- ---- do ----

50 2a 21.7 41.4 898.38 Yes ---- BWSSB

51 2b 12.7 41.40+26.00 427.49 Yes ---- ---- do ----


2

Page 3 of 17
Actually in Not in
Sl CA Site North -
Name of the Layout East - West Area Possession Possession Remarks
No. No South
of BDA of BDA
52 BTM 4th Stage 2nd Block 4a 51.10 26.35 1346.49 Yes ---- Petrol Bunk

53 4b 93.40 25.00+35.00 2802.00 Yes ---- Vacant


2
54 4c 40.00+60.00 35.00+47.00 2050.00 Yes ---- Notified to Library
2 2
55 5a ½ x 17.55 33.50 293.96 Yes ---- Notified for Kalayana Mantapa

56 5b(1) 100.6 67 6740.20 Yes ---- Notified for Shopping Complex

57 5b(2) 42.3 75.85+33.50 784.38 Yes ---- ---- do ----


2
58 7a 70.80+60.70 41.10+49.60 2983.57 Yes ---- K PTCL
2 2
59 7b 67.80+68.70 90.00+99.40 6463.28 Yes ---- Notified for Transport Yard
2 2
60 10 116 13.20+48.80 3565.00 Yes ---- Notified for Ward Office
2
61 11 123 50.00+69.60 7355.40 Yes ---- Notified for BTS Depot
2
62 13 37.00+53.00 50.00+75.00 2812.50 Yes ---- Playground
2 2
63 14 32.00+32.65 14.00+26.00 620.00 Yes ---- Vacant
2 2
64 18 75.00 45.00 3375.00 Yes ---- Existing Burial Ground

65 19 ½ x 44.00 34.50 759.00 Yes ---- ---- do ----

66 23 19.75+20.20 40.20+43.00 832.00 Yes ---- Vacant


2 2
3 67 BTM 6th Stage 1st Phase 24.60+37.20 88.40 2731.56 Yes ---- Vacant
2
4 Koramangala 1st Block No CA Sites formed ---- ----

Koramangala 2nd Block No CA Sites formed ---- ----

Page 4 of 17
Actually in Not in
Sl CA Site North -
Name of the Layout East - West Area Possession Possession Remarks
No. No South
of BDA of BDA
68 Koramangala 3rd Block 25 30738.28 Yes ---- Reddy Jana Sangha Building
Constructed
69 26 135.00 51.00 6885.00 Yes ---- BDA Complex

70 39/A 1535.02 Yes ---- Allotted to Anand Education Trust,


60.00+51.00 physically vacant
45.70
71 42 2 2536.35

72 40 37.00 24.50 906.50 Yes ---- Post Office building constructed

73 41 45.70 61.50 2810.55 Yes ---- Rashtra Basha Parishat, Allotted


physical vacant
74 Koramangala 4th Block 20/A ½ x 60.00 65.00 1950.00 Yes ---- Telephone Exchange Building
Constructed
75 ½ x 65.00 72.00 4680.00 Yes ----

76 ½ x 19.77 65.00 642.50 Yes ----

77 - ½ x 13.00 25.00 162.50 Yes ----

78 Totlot 134.00+132.00 17.00+13.00 1995.00 Yes ---- Childrens playground handedover


2 2 to BMP & Park
79 CA 55.00 35.00+3.00 2 1045.00 Yes ---- HOPCOM's, Nandini Milk Booth
area 20 x 15 feet balance vacant
80 29 63.00+65.00 41.00+49.00 2909.50 Yes ---- Allotted to Boggaram Trust,
2 2 Physically vacant
81 30/B 41.00+49.00 65.00+68.00 2992.50 Yes ---- Allotted to Fuel Depot ( Gas
2 2 Agency) & partial vacant
82 30/A 43.00+52.00 68.00+74.00 3372.50 Yes ---- Burial Ground (Chruch Building
2 2 Constructed)
83 30 33.00+25.00 74 2146.00 Yes ---- Burial Ground
2
84 31 50.00+45.00 74.00+79.00 3633.50 Yes ---- Chinmaya Vidyalaya Building
2 2 constructed

Page 5 of 17
Actually in Not in
Sl CA Site North -
Name of the Layout East - West Area Possession Possession Remarks
No. No South
of BDA of BDA
85 32 55.00 74.00+86.00 4537.50 ---- ---- Litigation Partial building existing
2 and balance is vacant
86 33 28.00 32.30 904.50 Yes ---- Private Building constructed by
S.N.Ankanreddy
87 Koramangala 6th Block 6 60.00+57.50 45.00+47.20 2708.34 Yes ---- Allotted to Indian Heritage
2 2 Academy Building Constructed
88 7 61.50+59.70 47.20+49.00 2919.66 Yes ---- FMR India Partially Built Up
2 2
89 7/P 1020.25 Yes ---- Ladies Hostel

90 8 59.00+58.00 50.00+51.00 2908.90 Yes ---- Police Station Building Constructed


2 2
91 9 109.50+110.00 51.50+57.00 5954.00 Yes ---- Bethany School Building
2 2 Constructed
92 12 25.4 36.60 893.00 Yes ---- Allotted to KH Trust

93 13 28.5 35.00 1567.50 Yes ---- Allotted to Telecommunication,


Post office building constructed
94 14 26 55.00 1430.00 Yes ---- Allotted to Padmanayaka Sangha
Building constructed
95 15 32.70+33.60 55.00+54.00 1806.67 Yes ---- Allotted to Kalayana Mantapa
2 2 building Constructed
96 CA 40.30+42.70 82.60+65.50 3073.00 ---- ---- Fenced (Vacant) High Tention wire
2 2 crossing
97 17 100.00+96.00 94x5+96.00 8858.25 Yes ---- Allotted to Koramangala
2 2 Residential Association Club
98 Koramangala 7th Block CA 42 42.00 1764.00 Yes ---- Allotted to Uppara Balaga Sangha

99 CA 25 25.00 825.00 Yes ---- Earmarked for Unnapla

100 CA ½ x 37 51.00 943.50 Yes ---- Park

101 CA ½ x 25.5 46.00 586.50 Yes ---- Temple

Page 6 of 17
Actually in Not in
Sl CA Site North -
Name of the Layout East - West Area Possession Possession Remarks
No. No South
of BDA of BDA
102 Koramangala 8th Block 2 15.5 28.50+35.00 492.13 Yes ---- Park
2
103 3 53.5 20.00+26.00 1230.5 Yes ---- Park
2
104 4 76.00+53.50 15.50+24.50 1295 Yes ---- Park
2 2
5 105 Binnamangala 1st & 2nd Stage 100.00 30.00+15.00 2250.00 Yes ---- Allotted to Smt. Nazare.V.Rajvathi
2 Bai Trust
106 145 6.00+15.00 1522.50 Yes ---- Existing Compound wall Not
2 Developed
107 169/1 36.6 48.75 1784.25 Yes ---- KNE Trust

108 169/2 36.6 18.29 669.41 Yes ---- Allotted Bharathi Vrunde

109 169/3 36.6 21.33 780.68 Yes ---- Special Buerau Cabinet Secretriate

110 169/4 36.6 18.29 669.41 Yes ---- Allotted to Holy Shepherd Edutl
Society
111 169/5 36.6 27.40 1002.84 Yes ---- Veenna Maharaj Kalyana Mantapa

112 169/6 36.6 27.40 1002.84 Yes ---- Arya Samaj Mandira

113 183 100.00+45.0 13267.50 Yes ---- Allotted to Hindi Samaj Society
2
114 53 64.00 3392.00 Yes ---- Allotted to Kaveri School

115 166.00+25.0 287.00 23706.37 Yes ---- Allotted Spastic Society


2
116 43.00 91.00 3913.00 Yes ---- Allotted Deaf & Dum School

117 ½ x 137 50.00 3425.00 Yes ---- Allotted to Muslim Minority Edutl
Society
118 148.00+83.00 190.00+220.5 23706.37 Yes ---- Indiranagar Shopping Complex
2 2

Page 7 of 17
Actually in Not in
Sl CA Site North -
Name of the Layout East - West Area Possession Possession Remarks
No. No South
of BDA of BDA
119 89.3 82.30 7349.39 Yes ---- Allotted to LIC of India

120 89.3 53.30 4759.69 Yes ---- Allotted to BMTC

121 89.3 47.25 4219.43 Yes ---- Allotted to KUIDFC

6 122 HAL 2nd Stage 95.5 46.70 4459.85 Yes ---- Alloted to National Eng School

123 42.6 33.50 1427.10 Yes ---- Allotted to Indiranagar Methodist


Chruch
124 54.8 30.50 1671.40 Yes ---- Chief Librarian Central Library

125 30.5 36.50 1113.25 Yes ---- Allotted to HAL Employees


Association
126 8 61 27.40 1671.40 Yes ---- Alloted to President East Cultural
Association
127 65.5 29.50 1932.25 Yes ---- Allotted to Chairman MD Krishna
Rao memorial Trust
128 62 137 106.70 14617.90 Yes ---- Allotted to Sathya Sai Trust

129 61.00+51.80 54.00+55.50 3087.90 Yes ---- Allotted to Kodava Samaj


2 2
130 31.5 46.45 1463.18 Yes ---- Allotted to K P T C L

131 5 47.40+47.00 60.00+59.60 3392 Yes ---- Allotted to Kaveri School


2 2
132 57.00 57.00 3249.00 Yes ---- Allotted to Indiranagar Sangeetha
Sabha
133 4.50 6.10 27.45 Yes ---- Allotted to HOPCOM

134 43.00 91.00 3913.00 Yes ---- Allotted to HOPCOM

135 18.47 25.00 461.75 Yes ---- Allotted to BWSSB

136 18.59 47.30+52.40 926.71 Yes ---- Allotted to Medical Service Trust
2

Page 8 of 17
Actually in Not in
Sl CA Site North -
Name of the Layout East - West Area Possession Possession Remarks
No. No South
of BDA of BDA
137 97.50 120.00 11700.00 Yes ---- Allotted to Indiranagar Social
Cultural Trust
138 a) 36.60 19.00 693.50 Yes ---- Allotted to Indiranagar Sangeetha
Sabha
139 b) 31.00 51.00 1581.00 Yes ---- Allotted to Indiranagar Club

140 Dookanahally 89.30 47.25 4219.43 Yes ---- Allotted to Little Flower School

141 33.50 56.00 1876.00 Yes ---- Allotted to BMP

142 48.00 28.00 1344.00 Yes ---- Unauthorized shed existing


proposal for demolotion is under
143 Kodihally 1 79.36+88.00 22.50+75.60 4104.5 Yes ---- process
Allotted to K P T C L
2 2
144 HAL 2nd Stage 1st Cross 18.28 110.00 2010.80 Yes ---- Allotted to Pragathi Edutl Society

145 Dookanahally 99.00 42.00 4158.00 Yes ---- Allotted to Dr.Ambedkar


Educational Society
146 99.00 91.50 9058.50 Yes ---- Allotted to Dr.Ambedkar
Educational Society
147 1) 128.00 157.00 20096.00 Yes ---- Allotted to E S I Hospital

148 2) 128.00 42.00+73.00 7360.00 Yes ---- Allotted to E S I Hospital


2
149 100 Feet Road 45.70 96.00 4387.20 Yes ---- Allotted to New Horizon Education
society
150 33.50 18.28 612.38 Yes ---- Allotted to Sathya Sai Trust

7 151 33.50 16.70 559.45 Yes ---- Allotted to Postal Dept

152 80 Feet Road 82.00 115.00 9430.00 Yes ---- Allotted to Chinamaya Trust

153 Konnena Agrahara 33.50 15.50+5.50 351.75 Yes ---- Vacant


2

Page 9 of 17
Actually in Not in
Sl CA Site North -
Name of the Layout East - West Area Possession Possession Remarks
No. No South
of BDA of BDA
154 JB Nagar 97.50 45.70 4455.75 Yes ---- Allotted to Postal Dept

155 45.70 45.70 2088.49 Yes ---- Allotted to Womens and Childrens
Association
156 36.50 67.00 2445.50 Yes ---- Allotted Yenkay Education Society

157 JB Nagar 1 30.50 22.00 671.00 Yes ---- Allotted to Public Instuctions

158 JB Nagar 22.00 18.29 402.38 Yes ---- Allotted to Kalayana Mantapa
building Construction
159 JB Nagar 45.70 45.70 2088.49 Yes ---- Allotted to Karnataka Handicapped
Association
160 72.50 73.10 5299.75 Yes ---- Allotted to Poornaprajnya
Education Society
161 HAL 3rd Stage 73.10 72.50 5299.75 Yes ---- Indiranagar Cambridge Educational
Society
162 61.00 27.40+30.50 1765.95 Yes ---- Allotted to Miranda Educational
2 Society
163 JB Nagar 34.00 91.00 3094.00 Yes ---- Allotted to BMTC Bus Stand

164 5.00 6.00 30.00 Yes ---- Allotted to KMF

165 Thippasandra 31.50 25.00 787.50 Yes ---- Allotted to Bangalore Medical
Centre
166 Komangatha 3 59.40 31.00 1841.40 Yes ---- Allotted to BWSSB

167 24.39+79.60 79.26 4121.12 Yes ---- Allotted JSS Maha Vidya Peeta
2
168 Sy.No. 41 of Thippasandra 7.00 6.00 42.00 Yes ---- Allotted to KMF

169 Geethanjali Layout 4.60 6.10 28.06 Yes ---- Allotted to HOPCOM

170 JB Nagar 6 37.20 18.28 680.02 Yes ---- Allotted to Bangalore Round Table

171 7 40.00 50.00 2000.00 Yes ---- Allotted to Sneha Trust

Page 10 of 17
Actually in Not in
Sl CA Site North -
Name of the Layout East - West Area Possession Possession Remarks
No. No South
of BDA of BDA
172 HAL 3rd Stage 33.8 15.50+43.00 988.42 Yes ---- Allotted to BCC ( I P P )
2
173 39.30 15.20 597.36 Yes ---- Allotted to JB Nagar Police Station

174 39.30 30.00 1179.00 Yes ---- Allotted to Bharat Petroleum

175 32.95 42.70 1406.97 Yes ---- Proposed for Police Station

176 JB Nagar 2 P(1) 40.00 24.00 960.00 Yes ---- Allotted to P & T dept

177 2 P(2) 40.00 25.00 1000.00 Yes ---- Allotted to Kodava Samaj

178 2 P(3) 47.00 23.00 1081.00 Yes ---- allotted to Humble Charity Trust

179 2 P(4) 39.00 54.40 2121.60 Yes ---- Allotted to Magaveera Sangha

180 71.50 56.00 4004.00 Yes ---- Allotted to Horticultural Dept

181 38.00 86.00 3268.00 Yes ---- vacant using as Playground

182 Geethanjali Layout 19.50 36.00 702.00 Yes ---- Allotted to University Womens
Association
183 ½ x 10.00 19.50 97.50 Yes ---- Allotted to University Womens
Association
8 184 Indiranagar 1st Cross 18.28 51.80 946.90 Yes ---- Allotted to BWSSB

185 JB Nagar Road 33.50 24.30 814.05 Yes ---- Allotted to BWSSB

186 39.00 26.00 1014.00 Yes ---- Allotted to Safal Dairy Fresh

187 39.00 26.00 1014.00 Yes ---- Allotted to NGO WARDS

188 JB Nagar 100.00 18.30 1830.00 Yes ---- Allotted to Karnataka English
school
189 JB Nagar Main Road 73.00 99.00 7227.00 Yes ---- Allotted to Nethaji S.C.Bose School

Page 11 of 17
Actually in Not in
Sl CA Site North -
Name of the Layout East - West Area Possession Possession Remarks
No. No South
of BDA of BDA
190 HAL 3rd Stage 28.50 29.50 840.75 Yes ---- Vacant Proposed for Notification

191 Thippasandra 36.50 22.85 834.03 Yes ---- Allotted to Postal Dept

192 143.25 68.50+6.50 5371.87 Yes ---- Allotted to Poornaprajnya


2 Education Society
193 HAL 3rd Stage 6(B) 36.50 46.60 1700.90 Yes ---- Proposed for ISRO Employees
Hospital
194 515 CWC 1 15.00+18.00 6.50+13.00 160.87 Yes ---- Vacant Proposed for Notification
2 2
195 2 ½ x 13.50 12.50 84.37 Yes ---- Vacant Proposed for Notification

196 3 ½ x 28.00 16.00 224.00 Yes ---- Vacant Proposed for Notification

197 B M Kaval 1(A) 17.50 19.50 341.25 Yes ---- Vacant Proposed for Notification

198 1(B) ½ x 27.50 14.30 196.62 Yes ---- Vacant Proposed for Notification

199 Domlur 2nd Stage ½ x 74.50 12.50 465.62 Yes ---- Vacant Proposed for Notification

9 200 S T Bed 1 5763.4 Yes ---- Bethany school

10 201 Wilson Garden 1/1 30.48 45.72 1393.55 Yes ---- Sri Ramaseva Mandali Trust

202 1/3 20.73+24.38 27.43 618.68 Yes ---- P & T Dept


2
203 1/2 26.82 30.48 817.47 Yes ---- Wilson Garden Education Trust

11 204 Sonnenahalli 1 49 16 784.00 Yes ---- BMTC Bus Stand

205 2 3.48+32.16 107.9 3403.7 Yes ---- Police Station


2

Page 12 of 17
Actually in Not in
Sl CA Site North -
Name of the Layout East - West Area Possession Possession Remarks
No. No South
of BDA of BDA
206 19.81 13.41+14.02 271.69 Yes ---- Shanthinagar Education Society
2
207 10.06 15.54 156.33

208 59.00 26.30+7.30 2 991.2 Yes ---- Sri Ramaseva Mandali Trust

12 209 Sampigehalli 1 20.42 8.38+8.08 168.06 Yes ---- Hospital


2
210 2 28.35 19.81+20.12+2 570.31 Yes ---- M/s Chidananda Ashrama Trust
0.42
3
13 211 Austin Town 6.20 6.90+6.60
2
376.95
212 33.50 11.0+10.20
2
213 12 34.60 39.78+67.25 1851.61
2
214 12 36.60 42.05 1539.03

215 12 64.50 50.50+52.50 3266.63


2
216 12 9.14 9.14 83.54

217 12 840.98

218 Layout in Sy.No. 26/1 of Kadubeesanahalli 1 33 14 462 Yes ---- Vacant proposed for KPTCL

691333.32 Sqmt OR
TOTAL 170.84 Acres

Page 13 of 17
Actually in Not in
Sl CA Site North -
Name of the Layout East - West Area Possession Possession Remarks
No. No South
of BDA of BDA

CA Sites of Private Layout


1 1 Reliaable Lake dew Phase 1 formed at Haralur Village, 1 35.97 + 4.26 32.62 +9.15 2 184.22 Yes ---- Notified for allotment & Allotment is
Varthur Hobli 2 under process, physically vacant

2 2 27.745+27.74 42.68+42.68 2 1184.91 Yes ---- - do -


2
3 3 31.09+16.15 87.63 1959.08 Yes ---- - do -
2
2 4 Reliaable Lake dew Phase 2 formed at Haralur Village, 1 12.9+12.6 10.67+10.67 2 136.04 Yes ---- - do -
Varthur Hobli 2
5 2 27.46+27.66 68.62+63.78 2 1819.62 Yes ---- - do -
2
6 3 8.27+10.21 18.62+18.33 2 164.72 Yes ---- - do -
2
7 4 42.37+28.96 2 21.34+21.95 2 707.93 Yes ---- - do -

8 5 12.06+9.81 73.53+71.74 2 794.26 Yes ---- - do -


2
3 9 Reliaable Lake dew Phase 3 formed in Sy.No. 76/3 and 1 ½ x 62.31 13.71 427.14 Yes ---- - do -
others at Haralur Village, Varthur Hobli
10 2 8.91+14.43 40.09+41.95 2 478.70 Yes ---- - do -
2
4 11 Reliaable Tranquil formed at Haralur Village Varthur Hobli 1 9.0+8.30 11.50+13.30 999.48 Yes ---- Applied for Modified Layout Plan
2 2
10.30+7.2 75.00+74.0 2
2
5 12 Reliaable Woods formed at Arlur Village Varthur Hobli 1 33.00x26.32 34.50+15.00 1386.36 Yes ---- Notified for allotment & Allotment is
under process, physically vacant

13 2 22.12 45.00 995.83 Yes ---- Vacant


6 14 Concorde Cilicon valley formed in Sy.No.85(P), 164(P) and 1 44..00+14.34 68.00+83.00 2202.60 Yes ---- Vacant
166(P) of Doddathogur Village, Begur Hobli, Blore South 2 2
Taluk
15 2 Odd Shape 2452.50 Yes ---- Vacant
7 16 Residential Layout formed in Sy.No.108 of Doddathogur 17.59 18.49 325.16 Yes ---- Vacant
Village, Begur Hobli, Blore South Taluk in F/o Tony Vincent
8 17 Residential layout for Celbrity Classic Housing formed in 1 40.00 7.7+27.00 2 694.00 Yes ---- Vacant
Sy.No. 110(P) Doddathogur village, Begur hobli, Blore South
Tq.

Page 14 of 17
Actually in Not in
Sl CA Site North -
Name of the Layout East - West Area Possession Possession Remarks
No. No South
of BDA of BDA
18 2 13.00 17.00 221.00 Yes ---- Vacant
9 19 Celebrity Paradise layout formed in Sy.No.79/1, 79/4, 93/1-2, 1 60.60+75+40.8 78.60 4622.00 Yes ---- Vacant
94/2-3-4-5 and 94/6 of Doddathogur village Begur hobli, 03
Blore South Tq
10 20 Residential layout formed in Sy.No 27/1,2,3 and 4 Begur 1 21.85 73.10 1597.40 Yes ---- Vacant
village Begur hobli, Blore South Taluk
11 21 Residential layout formed in Sy.No 51 to 59, 60/1,2,3,4, 1 55.55+53.34 28.19+30.23 1557.75 Yes ---- Vacant
61/1,2 of basapura Village, and Sy.No.140/2 144, 146 of 2 2
Begur Village Blore South Tq
12 22 Residential Layout at Kannamangala Sy.No. 198 and 199 of 1 61.50+10.00 54.43+50.56 1601.00 Yes ---- ---- do ----
Kannamangala Village, Allaiance Housing Society 2 2
13 23 Residential Layout Chaitnya Samarpan at Sy.No. 154/1 and 1 Odd site 9192.58 Yes ---- ---- do ----
155 of Kannamangala
14 24 Red stone Residential layout at Sy.No. 24/4, 24/7A, 7B, 7C, 1 24.00+25.50 75.00+85.00 1976.25 Yes ---- ---- do ----
24/8,9,10 of Seegehalli Village, Bidarahalli and Sy.No. 151/1, 2 2
151/2 of Kannamangala Village
15 25 Air force Naval housing board Benniganahalli, Sy.No. 29, 30 Odd Shape 2884.88 Yes ---- ---- do ----
and 32 of Bennigahalli, KR Puram
16 26 Residential Layout in Sy No. 203/P of Kadugodi village, Odd Shape 167.32 Yes ---- ---- do ----
Bidarahalli hobli, Bangalore East Taluk.
17 27 Residential Layout for AECS Ltd., in Sy. No. 7/1,2,3,4,5,6, 1 Odd Shape 294.84 Yes ---- Vacant
7/8, 8(P), 9/1, 28, 29/1,2, 30/1,2, 31/1, 37, 38/1,2,3, 39/2,4,5,
40, 41/1, 42/1,2, 43, 44/1(P), 44/1B,1C,1D, 45, 46, 46/2 of
Kudlu Village, Sarjapura Hobli, Anekal Taluq and Sy Nos.
6/1,2, 8/1,2,3,4,6, 10/1,3, 15/1(P), 2P, 17(P), 18, 19, 21/1,2,3,
22/1,2, 23/1to11,12,13, 25/1to6, 26/1,3, 27/1A,1B,2,
28/1A,1B,2to5, 29/1,2, 30/1,2, 31, 32/2,3, 36, 38, 39, 43/1,
44/1to6, 46, 61/1,2, 62, 63, 64(P), 67/1,2,3, 68/1, 72/1,2,4, 73,
74, 75/1to9, 76/1(P),3,4, 77/1,2,3,5,6, 78, 79/1to8, 80,
81/1,2A,2B,2C, 81/3A,3B, 83, 84, 85, 91/1(P),2, 94/1,2, 95,
96/1(P),2,3, 97/1B, 97/2, 102/1,2, 103/1,3,4, 103/6(P), 104/2,
105/1(P), 105/3, 106/1,2,5,6 and 109 of Singasandra village,
Begur Hobli, Bangalore South Taluk.

28 2 Odd Shape 35.35 Yes ---- ---- do ----


29 3 Odd Shape 930.45 Yes ---- ---- do ----
18 30 Residential Development Plan in Sy No. 53/1P & 54/P of Odd Shape 1821.07 Yes ---- ---- do ----
Kasavanahalli village, Varthur Hobli, Bangalore East Taluk.

19 31 Residential Layout in Sy No. 22/2, 23/1P & 24/2P of Odd Shape 832.70 Yes ---- ---- do ----
Sadaramangala village, K.R.Puram hobli, Bangalore East
Taluk.
20 32 Residential Layout in Sy No. 91/2 of Belathur village, Odd Shape 425.73 Yes ---- ---- do ----
Bidarahalli hobli, Bangalore East Taluk.

Page 15 of 17
Actually in Not in
Sl CA Site North -
Name of the Layout East - West Area Possession Possession Remarks
No. No South
of BDA of BDA
21 33 Residential Layout in Sy No. 5/1,2,3, 6/1,2, 17/1,2,3, 18/1,2,3, 1 Odd Shape 449.58 Yes ---- ---- do ----
19/1,3 & 20 of Kurudu Sonnenahalli village, Bidarahalli hobli,
Bangalore East Taluk.
34 2 Odd Shape 372.81 Yes ---- ---- do ----
35 3 Odd Shape 488.04 Yes ---- ---- do ----
36 4 Odd Shape 350.77 Yes ---- ---- do ----
22 37 Residential Development Plan in Sy No. 352/1(P), 352/3(P), Odd Shape 5578.27 Yes ---- ---- do ----
352/4(P), 352/8(P), 354/1, 354/2, 355, 356/1, 356/2, 356/3,
356/4A, 356/4B, 356/5, 356/6, 357/4(P), 357/5, 357/8, 358/1,
358/2, 358/3, 358/4(P), 359(P), 360/1(P), 360/2(P) & 371/2(P)
of Begur village, Begur hobli, Bangalore South Taluk

23 38 Residential Development Plan in Sy No. 2/1P, 3/1BP & 4/P of Odd Shape 1467.50 Yes ---- ---- do ----
Sadaramangala village, K.R.Puram hobli, Bangalore East
Taluk
24 39 Residential Development Plan in Sy No. 2/1B & 2/1C of 1 Odd Shape 1624.76 Yes ---- ---- do ----
Whitefield village, K.R.Puram hobli, Bangalore East Taluk.

40 2 Odd Shape 2025.00 Yes ---- ---- do ----


25 41 Residential Development Plan in Sy No. 21/P & 53/1 of Odd Shape 1600.53 Yes ---- Vacant
Jakkasandra village, Begur hobli, Bangalore South Taluk and
Site No.1 Koramangala Industrial Layout.
26 42 Residential Development Plan in Sy No. 42, 157/P & 160 of Odd Shape 1497.34 Yes ---- ---- do ----
Pattandur Agrahara village (Sy No. 2/1B of Whitefield village,
K.R.Puram hobli, Bangalore East Taluk.

27 43 Residential & Non-Residential (Commercial) Development 1 Odd Shape 19224.28 Yes ---- ---- do ----
Plan in Sy No. 70,71,72,73,74/1,74/2,77/1A, 77/2A, 78/1,
77/1B, & 77/2B of Sadaramangala village & Sy No 129/2 &
130/P of Hoodi village, K.R.Puram Hobli, Bangalore East
Taluk.
44 2 Odd Shape 2613.98 Yes ---- ---- do ----
45 3 Odd Shape 3262.01 Yes ---- ---- do ----
46 4 Odd Shape 2223.60 Yes ---- ---- do ----
28 47 Residential Development Plan in Sy No. 60/1B, 60/1B2 & Odd Shape 1164.13 Yes ---- ---- do ----
63/1B of Pattandur Agrahara village, K.R.Puram hobli,
Bangalore East Taluk.

Page 16 of 17
Actually in Not in
Sl CA Site North -
Name of the Layout East - West Area Possession Possession Remarks
No. No South
of BDA of BDA
29 48 Amarjyothi Layout, Domlur 1 Odd Shape 3189.50 Yes ---- Area of 1113 Sqm has been
allotted to Jawaharlal Nehru
Education Trust & balance land is
under court litigation vide No. OS
1089/02
49 2 Odd Shape 2327.78 Yes ---- Land is earmarked for School &
Construction of Overhead Water
Tank, now land is physically vacant
on demand of public the land is
handed over to Residential Welfare
Association for Maintenance &
Beautification as park.

50 3 Odd Shape 1000.00 Yes ---- Allotted to BWSSB for construction


of wet well.
30 51 MCHS Layout, Sector-4 of HSR layout Odd Shape 1275.00 Yes ---- Allotted to Petrol Bunk
97807.75 Sqmt OR
TOTAL 23.92 Acres

Page 17 of 17
C.A SITE DETAILS PERTAINGS TO SOUTH DIVISION, BANGALORE DEVELOPMENT AUTHORITY
B.D.A LAYOUTS
Dimension Allotment Details
Area in Sq.
SL NO Name of Layout CA Site No Remarks
Mtr
North-South East-West Allotted to Whom Purpose Present Usage

01 02 03 04 05 06 07 08 09 10

1 J.P.Nagar 8th Phase 5 (28+22+18.50+17.00+24.0 2430.00 Jayanagar Association Cultural - -


Ist Block 0x 111.0)/2 Bangalore Activities

2 J.P.Nagar 8th Phase II 6 (52.0+43.0)/2 85 4037.50 Allotted to J.S.S. Maha - - -


Block Vidya Peeta
3 J.P.Nagar 8th Phase II 8 (31.0+44.0)/2 102 3825.00 Jamiya Maszid & Education - -
Block Charitalbe fund trust
4 J.P.Nagar 8th Phase 1 (117.50+138.5 (104+90.50 12448.00 - Bus Depot - OS.No.8827/9
III Block 0)/2 )/2 6 case is
pending Area
earmarked for
Bus depot
5 J.P.Nagar 9th Phase 1 - - 743.20 BBMP Health Center Vacant -
Sy.No.4/1 alahalli
6 Anjanapura Town 1 - - 700.00 Koramangala Educational Vacant -
Ship Block II Kalaniketan Education Institution
society
7 Anjanapura Town 1/A - - - Not allotted - Vacant -
Ship II Block
8 Anjanapura 2 - - 585.00 Green land medical Health Center - -
Township II Block centre
9 Anjanapura 3 - - 1944.00 Not allotted Water Supply -
Township III Block board

10 Anjanapura 4 - - 477.50 KJ Ecucation Society NS & PS - -


Township III Block

Page 1 of 35
Dimension Allotment Details
Area in Sq.
SL NO Name of Layout CA Site No Remarks
Mtr
North-South East-West Allotted to Whom Purpose Present Usage

01 02 03 04 05 06 07 08 09 10
11 _do_ 5 - - 3000.00 - Rajeev Gandhi School -
Housing
Corporation

12 Anjanapura 5/A - - 280.44 Not allotted BSNL - -


Township III Block
13 _do_ 5/B - - 303.81 Not allotted - - -
14 Anjanapura 6 30 10 300.00 Flourence English NS & PS School -
Township IV Block NS & PS
15 Anjanapura 7 - - 250.00 Raju Education NS & PS School -
Township VII Block Association

16 Anjanapura 8 - - 16000.00 Not allotted BDA Vacant -


Township VII Block Commercial
Complex
17 Anjanapura 8A - - 15000.00 - KPTCL Vacant -
Township VII Block

18 Anjanapura 9 - - 748.00 Not allotted Hospital Vacant Notified vide


Township VIII Block Notification
No.903/04-
05date:28.01.2
005
19 Anjanapura 9A - - - - - -
Township VIII Block

20 Anjanapura 10 - - 1389.75 Not Allotted High School Vacant -


Township V Block
21 Anjanapura 11 - - 310.00 Nehru Vidya Kendra NS & PS Vacant -
Township V Block Kannada NS & PS

Page 2 of 35
Dimension Allotment Details
Area in Sq.
SL NO Name of Layout CA Site No Remarks
Mtr
North-South East-West Allotted to Whom Purpose Present Usage

01 02 03 04 05 06 07 08 09 10
22 Anjanapura 12 - - 2144.00 Allotted to St. Pauls School Vacant Alltted to
Township V Block School St.Pauls school
& further file
is send to DC
for want of
clarification
land as Mazare

23 Anjanapura 13 - - 2300.00 - Bus Terminal Vacant -


Township V Block
24 Anjanapura 13A - - 2717.18 - Existing Vacant -
Township VI Block Temple
25 Anjanapura Further 14 - - 7654.00 BMTC Bus Terminal Vacant but an -
Extension X Block structure of
compound wall
26 Anjanapura Further 15 - - 600.00 Post Office Post office Vacant -
Extension X Block

27 Anjanapura Further 16 - - 728.00 Not Allotted - Vacant -


Extension IX Block

28 Anjanapura Further 17 - - 870.00 BBMP Gymnasium Vacant -


Extension IX Block

29 Anjanapura Further 18 - - 2606.17 Not Allotted Hospital Vacant -


Extension XI Block

30 Anjanapura Further 19 - - 1180.00 Kaimagga & Javali Javali Bhavan Vacant -


Extension X Block Nigama

Page 3 of 35
Dimension Allotment Details
Area in Sq.
SL NO Name of Layout CA Site No Remarks
Mtr
North-South East-West Allotted to Whom Purpose Present Usage

01 02 03 04 05 06 07 08 09 10
31 Anjanapura Further 20 - - 1320.00 Not Allotted - Vacant -
Extension XI Block

32 Anjanapura Further 21 - - 200.00 Not Allotted - Vacant -


Extension IX Block

33 Anjanapura Further 22 - - 468.00 Not Allotted - Vacant -


Extension IX Block

34 Anjanapura Further 23 - - 1619.57 Lalitakala Academy Academy Vacant -


Extension X Block

35 Anjanapura Further 24 - - 5780.00 Not Allotted - Vacant -


Extension X Block

36 Anjanapura Further 25 - - 3150.00 Physically Hostel and Vacant -


Extension X Block handicapped welfare training
dept. centre
37 Anjanapura Further 26 - - 690.00 Not Allotted - Vacant -
Extension X Block

38 Anjanapura Further 27 - - 200.00 Not Allotted - Vacant -


Extension XI Block

39 Anjanapura Further 28 - - 638.00 Not Allotted - Vacant -


Extension XI Block

40 SY NO 13/2 12 - - 277.00 BHAJANA MANDIRA BHAJANA Bhajana Mandir


SUNKENAHALLI I MANDIRA functioning
STAGE
41 BSK III STAGE III 8 - - 1795.50 PONNAIAH LALITHA ART & functioning
PHASE KALA ACODEMY CULTURAL
CENTER

Page 4 of 35
Dimension Allotment Details
Area in Sq.
SL NO Name of Layout CA Site No Remarks
Mtr
North-South East-West Allotted to Whom Purpose Present Usage

01 02 03 04 05 06 07 08 09 10
42 BSK III/II/IV 10 &B - - 772-99 PANCHAVATI VIDYA KANNADA Vacant
MANDIR MEDIUM
NURSERY
SCHOOL
43 BSK III STAGE ITI 2(P) - - 3186.49 LITTLE FLOWER SCHOOL Purpose utilized
HBCS KATHRIGUPPA EDUCATION SOCIETY

44 BSK III STAGE III 1 - - 2754.00 HOYSALA TRUST STUDENT Hostel building
PHASE SY NO HOSTEL existing
95,96,121 & 122 OF
(HSK)
45 BSK III STAGE III 1 - - 2754.00 SREE VEMANA STUDENT Building existing
PHASE SY NO CHARITABLE TRUST HOSTEL
95,96,121 AND 122
OF HSK
46 BSK III STAGAE 15 20 300.00 MOTHER DAIRY KMF MILK Existing
AVALAHALLI DISTRIBUTIO
NS
47 SY NO 95,96,121 - - 28.06 MOTHER DAIRY KMF MILK Existing
AND 122 OF DISTRIBUTIO
HOSKEREHALLI BSK NS
III STAGE
48 BSK III STAGAE IV 1 - - 39.36 MOTHER DAIRY KMF MILK BOOTH Existing
BLOCK
49 BSK (AVALAHALLI) - - KPTCL Sub station
Sub Station
functioning
50 BSK III/IV (KGP 1 - - 1794.30 BHAGIRATHA UPPARA COMMUNITY Building existing
EAST) DHARMIKA TRUST HALL /
HOSTEL
CULTURAL &
EDUCATION
BUILDING

Page 5 of 35
Dimension Allotment Details
Area in Sq.
SL NO Name of Layout CA Site No Remarks
Mtr
North-South East-West Allotted to Whom Purpose Present Usage

01 02 03 04 05 06 07 08 09 10
51 PALAGRARA 97,98,99 40 60 2400.00 98 AND 99 UNION building under
GRAMASTARA SRI SUNKENAHALLI SY NO construction
RAMA UNION 31 AND 32 OF
HANUMANTHA
NAGAR
52 J P NAGAR I PHASE 40 165 220 36300.00 CHILDRENS NURSRY AND functioning
EDUCTION SOCIETY ® PRIMARY
SCHOOL

53 J P NAGAR I PHASE 40(P) 200 199 39800.00 CHILDRENS SCHOOL this CA site is
EDUCTION SOCIETY ® BUILDING alloted as play
ground & play
ground existing
54 SARAKKI II PHASE 27 - - 176'+190' , RAGIGUDDADA SRI BHAKTA Temple existing
PART 2 120+176/2 PRASANNA ANJANEY MANDALI
1/2 SWAMY BHAKLA
176+280/2 MANDALI TRUST

55 SRK II PHASE 36/2(P) - - 1354.50 SANKETH TRUST THEATRE OF Theater is


FINE OF ARTS existing

56 SARAKKI III PHASE 1/B - - 640'+680'/2 SRI RAMANA INSTITUTION Institution


233+0' MAHARSHI ACADEMY BUILDING functioning
FOR THE BLIND

57 SRK IV PHASE - - 1890.00 NEW COSMO VIDYA ENGLISH School


DOLLARS LAYOUT SAMSTE MEDIUM functioning
SCHOOL

Page 6 of 35
Dimension Allotment Details
Area in Sq.
SL NO Name of Layout CA Site No Remarks
Mtr
North-South East-West Allotted to Whom Purpose Present Usage

01 02 03 04 05 06 07 08 09 10
58 SY NO 40 - - 2349.00 CITY JETTY SOCIAL AND This CA site was
MARENAHALLI COMMUNITY DODDA CULTURAL encroched
GARADI AND SRI ACTIVITIES earlier. The
NIMBAJA DEVI encroachment
TEMPLE TRUST BVK was removed and
IYENGAR ROAD vacant CA site
handed over to
the community
during 2009 &
they have
submitted the
building plan for
approval

59 SARAKKI 37 565 440 248600.00 RASTREEYA COLLEGE college


SHIKSHANA SAMSTE BUILDING functioning
TRUST
60 J P NAGAR IV PHASE 58 85 4930.00 SHREE ANANDA BHAGWATH Bhagavan Bhavan
MAYEE TRUST BHAVAN is existing

61 SRK V PHASE 13 - - 278'+291'/2X4 A V EDUCTION HIGH SCHOOL college


7'+83/2 SOCIETY AND functioning
COLLEGE

62 SRK VI PHASE 10 - - 250'+269'/2X9 NAVEEN VIDYA SCHOOL to be verified


6'+160'/2 MANDIRA TRUST
63 J P NAGAR I PHASE - - 743.00 BANGALORE HELTH Existing
MAHANAGARA CENTER
PALIKE (HEALTH
CENTER)
64 J P NAGAR III PHASE CA 'A' - - 1507.75 INDIRA SCHOOL School building
PIYADARSHINI BUILDING functioning

Page 7 of 35
Dimension Allotment Details
Area in Sq.
SL NO Name of Layout CA Site No Remarks
Mtr
North-South East-West Allotted to Whom Purpose Present Usage

01 02 03 04 05 06 07 08 09 10
65 SRK III PHASE 1) - - 1)140.51 SHANESWARA PARK AND Existing
2) 31 2) 780.00 SWAMY BHAKA TEMPLE
3) 3)72'+12.51/2 MANDALI CHARIOT &
TEMPLE
ACTIVITIES
66 BSK III/IV/VIII - - 3244.15 BANASHANKARI HOSPITAL Vacant
BLOCK MEDICAL AND
ANCOLOGY RESERCH
CENTER
67 BSK III/III/IV STAGE 2 - - 3326.86 BTL EDUCATION KANNADA School
TRUST FOR RURAL MEDIUM functioning
DEVELOPMENT SCHOOL FILM
WORK SHOP

68 JAYA NAGAR I AND 2 - - 1/2 VASAVI VEDHA NIDHI VEDHA PATA Existing
III EAST BLOCK SHALA
BUILDING
69 JAYANAGAR IV BTB 1A 45 39 1755 MARIYAMMA TEMPLE TEMPLE Existing
AREA
70 J N VII BLOCK 11/A - - 119'+143X2,28 AYURVEDA COLLEGE Partially buillding
6' PRATHISTANA BUILDING constructed

71 J N VII BLOCK 3&4 - - CHANNAMMA WITH functioning


MEMOURIAL SCHOOL DRAWAL
LETTER
72 J N VII BLOCK 244/D - - 60'X80' ADARSHA VANITHA VANITHA functioning
SAMAJA SAMAJA
73 J N IV BLOCK - - 140+880'/2X1 JAYANAGAR CULTURAL functioning
20'+95'/2 CULTURAL AND ACTIVITIES
CIVILV ASSOCIATION

74 J N IV 'E' BLOCK 5 - - 200+220'/2 CHRISTU CHURCH functioning


PRABHALAYA

Page 8 of 35
Dimension Allotment Details
Area in Sq.
SL NO Name of Layout CA Site No Remarks
Mtr
North-South East-West Allotted to Whom Purpose Present Usage

01 02 03 04 05 06 07 08 09 10
75 J N VII BLOCK 244/A 100 165 16500 BANGALORE GENERAL functioning
UNIVERSICTY HOSTEL
76 J N IV BLOCK 22 120 102 12240 VIJAYA VIJNANA SAMITHI functioning
SHALA
77 J N II BLOCK 107 200 21400 SREE RAMA TRUST SREE RAMA functioning
COMMITTEE VIDYA
MANDIR
SCHOOL AND
KAYANA
MANTAPA

78 J N VII BLOCK - - 268'-6X110'-0 SOCIAL WELFARE OF HOSTEL functioning


KARNATAKA BULDING
79 J N IX BLOCK - - 35-11 HOPCOMS FRUITS & functioning
VEGITABLE
STALL
80 J N IV BLOCK 5 200 80 16000 SANATHANA KALA ARTS Building
KSHETRA EDUCATION constructed in a
AND corner position.
CULTURAL Rest of the site is
ACTIVITIES vacant. The site is
cancelled but
there is a court
stay order
81 J N IV BLOCK 1 - - 210'+86'/2 SRI RAJASTAN JAIN TEMPLE functioning
SWETHAMBAR HOSTEL
MURUTHI POOJK DHARAMASH
SANGHA ALA
QUARTES
AND ASHRAM

82 J N IV BLOCK 4 100 80 8000 MODEL EDUCTION SCHOOL functioning


SOCIETY BUILDING

Page 9 of 35
Dimension Allotment Details
Area in Sq.
SL NO Name of Layout CA Site No Remarks
Mtr
North-South East-West Allotted to Whom Purpose Present Usage

01 02 03 04 05 06 07 08 09 10
83 JAYANAGARA BOVI 40 - - MAHAGANAPTHY MAHAGANPA functioning
COLONY DURGADEVI TRUST THI
BYRASANDRA DURGADEVI
VILLAGE TRUST
84 JAYANGAR III BLOCK 22 - - 6781 COSMO POLITIAN OUT DOOR functioning
CLUB ACTIVITIES
85 J N V BLOCK 1) 523 - - 1) 150'X102' SRI KRISHNA SEVA HOSPITAL functioning
2) 2) 150'X100' ASHRAM TRUST
86 J N II BLOCK 29 99 120 11880 SRI RAMA SEVA SAMITHI & functioning
SAMITHI KALYANA
MANTAP
87 J N V BLOCK 525 150 100 15000 SRI LAKSHMI FOR WHICH Building existing
VENKATESWARA ALLOTTED
KAIGARIKA TO EARLIES
SAHAKARA SANGHA
88 J N I BLOCK - - 529,1/2 SQ RANI SARALADEVI SCHOOL functioning
EDUCTIONAL BUILDING
INSTITUTE
89 J N II BLOCK - - 4112 KUCHALAMBA KAYANA Existing
CHOULTIES MANTAPA
90 J N IV T BLOCK 2/B - - 85'X100' PATTABHI RAMA BAJANA Existing
SEVA MANDALI MANDIR AND
KALYANA
MANTAP

91 J N IV T BLOCK 2 - - 1560.76 RASTREEYA HOSTEL Existing


SHIKSHANA SAMITHI
TRUST
92 BTM II STAGE I 2 - - 1820 MODEL EDUCATION SCHOOL functioning
PHASE SOCIETY
93 BTM II STAGE I 3 - - 656.75 BTM LAYOUT TEMPLE Temple existing
PHASE WELFARE BULIDING
ASSOCATION

Page 10 of 35
Dimension Allotment Details
Area in Sq.
SL NO Name of Layout CA Site No Remarks
Mtr
North-South East-West Allotted to Whom Purpose Present Usage

01 02 03 04 05 06 07 08 09 10
94 BTM I STAGE I 6 - - 1416.10 PUBLIC EDUATION HIGH SCHOOL School running
PHASE SOCIETY
95 BSK III (CKA) - - - 1524.48 SREEKANTESWARA TEMPLE Temple existing
TEMPLE TRUST
96 JAYANAGAR V 524 - - 100'X150' RAGHAVENDRA INSTITUTION Temple existing
BLCOK SWAMY, BUILDING
BRUNDAVANA
SANNIDHANA
97 J.P.NAGAR II PHASE 36/A - - 3969 INSFREE HIGHER SCHOOL functioning
SCHOOL
98 SY NO 120 OF KGP - - 80'+67'/2X140 POORNA PRAJNA PUSHKARANI Purpose utilized
VILLAGE BSK III ' VIDYA PEETA AND FLOWER
STAGE GARDEN

99 BSK III ( HSK) 1 - - 1956.72 LITTLE FLOWER SCHOOL School


PUBLIC SCHOOL functioning
100 BSK III STAGE II 6 - - 1849.60 AUDEN INSTITUTE OF SCHOOL functioning
PHASE EDUCATION
101 BSK III STAGE III 1(P) - - 1473.12 TELE COM DIST TELEPHONE Existing
BLOCK SY NO 95,96 EXCHAGE
121 AND 122 OF
HOSAKERE HALLI

102 SY NO 19 TO 25 AND - - 1319.47 BANGALORE TELEPHONE Existing


PART OF BSK III TELEPHONE DIST EXCHAGE
STAGE
103 BSK III/II /VII 15 20 300 HOPCOMS FRUITS & Existing
BLOCK VEGITABLE
STALL

Page 11 of 35
Dimension Allotment Details
Area in Sq.
SL NO Name of Layout CA Site No Remarks
Mtr
North-South East-West Allotted to Whom Purpose Present Usage

01 02 03 04 05 06 07 08 09 10
104 BSK III STAGE II 5 147 105 15435 KHAMMAVARI HOSPITAL Kalyana
PHASE SANGHA Manatapa has
been constructed
for violation site
has been
cancelled but
Hospital &
Kalyana Mantapa
existing

105 BSK III STAGE III 8 20 12 240 HOPCOMS FRUITS & Existing
PHASE VEGITABLE
STALL
106 BSK III (CKA) 8 - - 26.83 KMF MILK BOOTH Existing

107 BSK III STAGE - - 743.20 BANGALORE DISPENSARY Vacant at spot


MAHANAGARA
PALIKE(IPP)
108 KATHRIGUPPA - - 743.20 BANGALORE HEALTH Vacant at spot
LAYOUT MAHANAGARA CENTER
PALIKE(IPP)
109 BSK III/II/VII BLOCK 5 - - 1306.12 GIRI NAGAR POLICE POLICE it is learnt that
SATION STATION site has been
cancelled.
Recently they
have submitted
the building plan
for sanction

Page 12 of 35
Dimension Allotment Details
Area in Sq.
SL NO Name of Layout CA Site No Remarks
Mtr
North-South East-West Allotted to Whom Purpose Present Usage

01 02 03 04 05 06 07 08 09 10
110 SY NO 31 AND 32 OF - - 2533.33 SQ BALAJI VIDYA SCHOOL Purpose utilized
SUNKENA HALLI NIKETHAN BUILDING
HANUMANTHA
NAGAR

111 BSK III/II/III BLOCK 4 - - 3741 PUBLIC INSTRUCTION APEX LEVEL (to be verified)
DEPT INSTITUTE
112 BSK III (HSK) 3(P) - - 19747 DDPI GOVT Center Govt.
SCHOOL building is
existing
113 SUNKENAHALLI 145 - - 175+162'/2X9 KAMMAVARI HOSTEL AND Purpose utilized
4+75'/2 SANGHUM KALYANA
MANTAPA

114 SY NO 19 TO 25 100 103 10300 DADA AMAR SCHOOL it is observed that


AVALAHALLI OF BSK CHARITABLE TRUST BBMP has
III STAGE developed has a
park &
constructed
auditorium
115 SY.NO.69 GAVIPURA - - 2967.00 MAGAJI DONDUSA CHARITIES it is learnt site
CHOULTRY BUILDING has been
cancelled & court
stay order
116 BSK III STAGE (HSK) 5 - - 691.77 SRI RAMA LALITHA REE RAMA to be verified
KALA MANDIR LALITHA
KALA
MANDHIR
AND STAFF
QUARTS

Page 13 of 35
Dimension Allotment Details
Area in Sq.
SL NO Name of Layout CA Site No Remarks
Mtr
North-South East-West Allotted to Whom Purpose Present Usage

01 02 03 04 05 06 07 08 09 10
117 BSK III STAGE 3 - - 600.00 BANASHANKARI SRISREE Temple Existing
(HSK)SY.NO.95,96,12 SARVAJNA SEVA RAGHAVAND
1&122 BALAGA RA SWAMY
TEMPLE
118 SY.NO.3 GAVIPURA - - 175'+167'/2'X AMBA BHAVANI SEVA TEMPLE Temple Existing
VILLAGE BHAVANI 160'+184'/2 SANGHA
NAGAR
119 12/D,12/E,13/D,13/ 37 40 1480.00 VENKATESWARA BAJANA Bhajana Mandir
E,SY.NO.72 OF BHAJANA MANDIR MANDIR functioning
GAVIPURA
120 SY.NO.42&43 OF BSK - - 109'+81/2 VINAYAKA SCHOOL to be verified
III STAGE 'X133'+115'/2 EDUCATION SOCIETY

121 BSK III STAGE 1 - - 3419.46 KESHAVA TRUST HOSPITAL Hospital is


SY.NO.95,96,121,&12 existing
2 OF HSK
122 BSK 3 STAGE, - - 3001.00 BTS BUS Existing
MUNESHWARA TERMINAL
BLOCK
123 BSK 2 ITTAMADU 1 - - 1094.00 KEB OFFICE Existing
BUILDING
124 J P NAGAR II PHASE I - - 3124.92 MOBILITY OF INDIA HOSPITAL Existing
ST AND IST A CROSS REHABITITA
TION CENTRE

125 J P N II PHASE 36(P) - - 2480.00 DEPT OF YOUTHS & SPORTS Existing


SPORTS YOUTH COMPLEX
CENTER
126 J N VIII PHASE I 5 - - 2430.90 JAYANAGAR SOCIAL AND Building
BLOCK ASSOCIATION CULTURAL constructed
ACTIVITIES
127 J P NAGAR II PHASE 36(P) 43 31.50 1354.5 SATYA SAI TRUST CULTURAL functioning
ACTIVITIES

Page 14 of 35
Dimension Allotment Details
Area in Sq.
SL NO Name of Layout CA Site No Remarks
Mtr
North-South East-West Allotted to Whom Purpose Present Usage

01 02 03 04 05 06 07 08 09 10
128 SRK II PHASE - - VOKKALIGARA Sangha Existing
SANGHA
129 J P NAGAR II PHASE 18(P) - - 1512 VOKKALIGARA HOSTEL Existing
SANGHA
130 J P NAGAR I PHASE - - 28.06 HOPCOMS FRUITS & Existing
VEGITABLE
STALL
131 J P NAGAR III PHASE 20 15 300 HOPCOMS FRUITS & Existing
VEGITABLE
STALL
132 J P NAGAR 2 PHASE - - 28.06 HOPCOMS FRUITS & Existing
VEGITABLE
STALL
133 SRK 3 PHASE 12/B - - 42.50X50+52M BANGALORE TELEPHONE Existing
/2 TELECOM DIST EXCHAGE
134 JP NAGAR 3 PHASE - - 1063.30 SAINT PAUL'S HRBAL Herbal garden
ENGLISH SCHOOL GARDEN not formed,
instead used as a
play ground
135 JP NAGAR 2 PHASE 36(P) - - 1354.00 COMMISSIONER OF POLICE Existing
POLICE STATION
136 JP NAGAR 2 PHASE 23(P) - - 929.03 ANIMAL HUSBANDRY VENTERNARY it is converted in
& VETEVNARY HOSPITAL to a park &
SERVICE handed over to
BBMP
137 JP NAGAR 4TH - - 2023.00 KARNATAKA TRUST functioning
PHASE DOLLARS CHINMAYA SEVA ACTIVITIES
SCHEEM LAYOUT TRUST
138 SRK 4TH PHASE - - 1050.00 CHRISTU KRUPALAYA CHURCH OF functioning
DOLLARS LAYOUT SOUTH INDIA
TRUST ASSN

Page 15 of 35
Dimension Allotment Details
Area in Sq.
SL NO Name of Layout CA Site No Remarks
Mtr
North-South East-West Allotted to Whom Purpose Present Usage

01 02 03 04 05 06 07 08 09 10
139 JP NAGAR 3 PHASE 20 100 60 6000.00 SUPDT OF POST POST OFFICE to be verified
OFFICE
140 JP NAGAR 5TH PASE 3 - - 692.96 J P NAGAR II PHASE RESIDENT functioning
RESIDENTS WEL FARE RECREATION
AND CULTURAL CENTER
ASSOCIATION

141 JP NAGAR 4 PHASE 18 330 330 108900.00 VASAVI EDUCATION SCHOOL Purpose utilized
TRUST
142 SRK 2 PHASE 27 - - 18500.04 RAGIGUDDADA SRI KALYANA functioning
PRASANNA ANJANEY MANTAP
SWAMY BHAKLA
MANDALI TRUST

143 J P NAGAR 6TH 11 140 130 18200.00 NATIONAL SOCIETY SCHOOL Kashi
PHASE FOR OPPORTUNILIES BUILDING Vishwanatha
FOR THE Temple is
HANDICAPPED existing in one
end. The rest of
the land is vacant

144 SRK 3 PHASE 1/A - - 16160.00 SHREE SHIVA SHIVA BALA functioning
BALAYOGI YOGI MAHA
MAHARUTA TRUST RATHA
TRUST
145 JP NAGAR 1 PHASE 4 - - 1302.00 KEB SUB DIV functioning
OFFICE AND
QTRS
146 JP NAGAR 1 PHASE & - - 805.30 SAMATVAM SCIENCE EASTABLISHI functioning
1 A CORSS AND REASERCH FOR NG CENTER
HUMAN WELFARE
TRUST

Page 16 of 35
Dimension Allotment Details
Area in Sq.
SL NO Name of Layout CA Site No Remarks
Mtr
North-South East-West Allotted to Whom Purpose Present Usage

01 02 03 04 05 06 07 08 09 10
147 JP NAGAR 8TH PASE 8 - - 3825.00 JAMIA MASJID AND EDUCATIONA site is vacant
2 BLOCK MUSLIM CHARITABLE L
FUND TRUST INSTITUTION

148 J P NAGAR 2 PHASE 43 - - 3422.40 JP NAGAR CLUB CLUB Functioning


ACTIVITIES
149 JAYANAGAR 4 5 - - 1333⅓SQFT RASTROTHANA RESERCH functioning
BLOCK PARISHAT CENTER
LIBREARY
READING
ROOM
STUDENT
HOSTEL
150 JAYANAGAR 4 TH 1 - - 10190.21 BANGALORE HIGHER SCHOOL functioning
BLOCK SECONDARY SCHOOL

151 JAYANGAR 1 BLOCK 170/A - - 1012.00SQMT SARASWATHI VIDYA School functioning


R MANDIR ASSON

152 JAYANAGAR 1 141 46 90 4140.00 JAYANGARA STRI ACTIVITIES functioning


BLOCK SAMAJA OF SAMATHA

153 JAYANAGARA 8TH 192/A 120 80 9600.00 JAYARAMA SEVA COMMUNITY functioning
BLOCK MANDALI CENTER
154 JAYANAGARA 6TH - - 7800SFT PRABATH ART & this is handed
BLOCK PRATHISTANA CULTURE over to the BBMP
as park
155 JAYANGAR T BLOCK 524 100 180 18000.00 RAGHAVENDRA RAGHAVEND functioning
SWAMY MUTT RA SWAMY
NANJANAGUDU BRUN

Page 17 of 35
Dimension Allotment Details
Area in Sq.
SL NO Name of Layout CA Site No Remarks
Mtr
North-South East-West Allotted to Whom Purpose Present Usage

01 02 03 04 05 06 07 08 09 10
156 JAYANAGAR 8TH 27/B - - DR AN NURSING functioning
BLOCK BALASUBRAMANYAN HOME

157 JAYANGARA 4TH 20/A - - 4444.4SQFT BANGALORE TELEPHONE functioning


BLOCK TELEPHONES EXCHAGE
158 LALBHAG - - 100+130.0/2X HARTICULTURE DEPT PRIMARY functioning
SIDDAPURA 33 SCHOOL
BUILDING
159 JAYANAGAR IV T 3 & 3/A - - 190'.0X100'+3 HALLIKARARA COMMUNITY Gayathri Temple
BLOCK 61/2 SANGHA HALL is existing, no
community hall
existing

160 JAYANAGAR IV T 11 - - 1540.50 RASTREEYA HEALTH Existing


BLOCK SHIKSHANA SAMITHI CENTER
TRUST
161 JAYANAGAR IV T 17 - - 11050.74 RASTREEYA ENGLISH functioning
BLOCK SHIKSHANA SAMITHI MEDIUM
TRUST SCHOOL
162 JAYANAGAR III 2 - - 1) 492.97 KARNATAKA NATURE Existing
BLOCK 2) 21.50 SQM PRAKRUTHI CHIKISTA CURE
PRACHURA TRUST HOSPITEL

163 JAYANAGAR IV 4 - - 2320.00 YUVAKA SANGHA SAMITHI functioning


BLOCK BUILDING
164 JAYANAGARA VII - - 21840.00 NATIONAL PLAY Existing
BLOCK EDUCATION SOCIETY GROUND
OF KARNATAKA

165 JAYANGARA IV T 1 - - 11375.00 SENIOR SUPTD OF POST OFFICE Existing


BLOCK POST OFFICE

Page 18 of 35
Dimension Allotment Details
Area in Sq.
SL NO Name of Layout CA Site No Remarks
Mtr
North-South East-West Allotted to Whom Purpose Present Usage

01 02 03 04 05 06 07 08 09 10
166 JAYANGARA I BLOCK - - 6750 SQ FEET MAHA BHODI MEDICAL Medical Centre is
MAITHRI MANDALA CENTRE Existing (Mallige
Nursing Home)

167 JAYANGAR IV T 11 - - 1540.56 KARNATAKA SOCIAL YOGA AND to be verified


BLOCK FOURM OTHER
CHARITABLE
ACTIVITIES

168 JAYANGAR VII 244/C - - 802.65 NEHRU SMARAKA SCHOOL Existing


BLOCK VIDYA KENDRA BUILDING
169 JAYANAGA IV T 2 - - 15970.00 RAGHAVENDRA SEVA SAMITHI Existing
BLOCK SAMITHI BUILDING
170 JAYANGAR I BLOCK 315 - - 1) 89'+140 DAKSHINA KANNADA KALYANA functioning
2)160'+10/2X SANATHANA DHARAM MANTAP
43+90/2 , SHALA FREE
167+40/2 DISPENSURS
BAJAN
MANDIR
171 JAYANGAR III BLOCK 450 500 225000.00 VIJAYA EDUCATION COLLEGE functioning
SOCIETY BUILDING
172 JAYANGAR VIII 27/A - - 90'+70'/2X100 L S BOREGOWDA NURSING small residential
BLOCK ' HOME building is
existing
173 JAYANGAR VII - - THE DIRECTOR OF Hostel Existing
BLOCK WEL FARE DEPT
174 JAYANGAR II BLOCK 406 - - 40+52/2X54+6 SARVODAYA SCHOOL Existing
0/2 INSTITUTE OF
ENGINEERING
175 JAYANGAR VII 244/B 154 106 16324.00 BANGALORE INSTITUTION Building is
BLOCK INSTITUTE OF BUILDING existing
ENGINEERING

Page 19 of 35
Dimension Allotment Details
Area in Sq.
SL NO Name of Layout CA Site No Remarks
Mtr
North-South East-West Allotted to Whom Purpose Present Usage

01 02 03 04 05 06 07 08 09 10
176 JAYANGAR I BLOCK 275 - - 80+48/2X80 MYSORE STATE CANCELLATI Hostel building is
CHATADA SHREE ON ORDER running in the
VAISHNAVA ISSUED ON back side of the
ASSOCIATION 18.4.1969 CA site & esisting
commercial
building
constructed in
the front is at
present vacant

177 JAYANGAR II BLOCK - - 1660.59 COMMUNITY CENTRE HIGH SCHOOL functioning


AND OTHER
EDUCATIONA
L
INSTITUTION
S

178 JAYANGAR IV T 27 - - A) 243 B) BHARATH EDUCATION functioning


BLOCK 243+150/2 C) EDUCATION SOCIETY PURPOSE
190
D)XA)490+475
/2 B0
132(AREA) C)
269 (D)
1/2X187
179 JAYANAGAR VII 27/2 - - 2743.80 SQM JAYANGAR PUC AND functioning
BLOCK EDUCATION SOCIETY DEGREE
COLLEGE
180 JAYANGAR I BLOCK 125 - - 150+60/2X104 POST OFFICE POST OFFICE functioning
BUILDING

Page 20 of 35
Dimension Allotment Details
Area in Sq.
SL NO Name of Layout CA Site No Remarks
Mtr
North-South East-West Allotted to Whom Purpose Present Usage

01 02 03 04 05 06 07 08 09 10
181 BTM EWS LAYOUT 5 - - 676.33 IDARE SIRATAL MOSQUE AND functioning
MUSTAQEEM TRUST MADARASA

182 BTM II STAGE I 4 - - 954.45 MANJU DISTRIBUTERS LPG STATION functioning


PHASE
183 BTM II / I EWS 6 - - 2590.00 BANGALORE TELEPHONE functioning
TELECOM DIST EXCHAGE
184 BTM IISTAGE I - - 27.87 HOPCOMS FRUITS & functioning
PHASE VEGITABLE
STALL
185 BTM II STAGE I - - 1477.26 BMTC BMTC BUS Existing
PHASE BAY
186 SY NO 47 OF - - 7083.22 MANJISLE IDD GAH functioning
TAVAREKERE BTM I MUNTAZIMA MANJIDE MOSQUE
STAGE I PHASE MUKKURRAM

187 BTM I STAGE I 3(P) 68.6 36.58 2509.39 BHARATH PETROL functioning
PHASE TAVAREKERE PETROLIAM BUNK
SY NO 12 & 14

188 BTM I STAGE I CA (P) - - BHARATH PETROL functioning


PHASE TAVAREKERE PETROLIAM BUNK
SY NO 12 & 14

189 BTM II MICO HBCS I 10 - - 3070.86 CITY CENTRAL CITY Vacant at sopt
STAGE LIBRARY CENTRAL
LIBRARY
190 BTM II STAGE MICO 10(P) - - 557.19 INDIAN WATER OFFICE Existing
HBCS I STAGE WORKS ASSOCIATION BUILDING

191 BTM IPHASE I STA - - 1122.00 SADGURU SAINATHA COCIAL AND Sai Baba temple
KEB LAYOUT SEVA SAMITHI ® CULTURAL is existing
ACTIVITES

Page 21 of 35
Dimension Allotment Details
Area in Sq.
SL NO Name of Layout CA Site No Remarks
Mtr
North-South East-West Allotted to Whom Purpose Present Usage

01 02 03 04 05 06 07 08 09 10
192 DR AMBEDKAR 1 - - 350.00 GANGA SCHOOL functioning
SLUM SY NO 95 HSK RABINDRANATH
BSK III STAGE TAGORE EDUCATION
SOCIETY

193 BTM IV STAGE II 19 - - 661.00 SEETHAMMA SCHOOL Pertains to East


BLOCK MANJAPPA Division
EDUCATIONAL TRUST

194 BTM II STAGE I 3 - - 1868.25 COMMISSIONER OF MICO Station existing


PHASE EWS LAYOUT POLICE LAYOUT
POLICE
STATION
195 BSK III STAGE SY NO 2(P) - - 908.90 IOC PETROL Running
90 OF HSK BUNK
196 J P NAGAR II PHASE 36(P) - - 1848.48 HPC PETROL the CA site is
BUNK cancelled & this
CA site alloted to
ANAKRU
foundation, site is
vacant at spot,
there is a court
stay
197 JAYANGAR IV T 12 - - 1355.62 BPC PETROL Running
BLOCK BUNK
198 BSK III STAGE III 5 - - 1314.04 BANGALORE TELEPHONE Existing
BLOCK CKA TELECOM DIST EXCHANGE

199 BSK III STAGE - - 659.58 KPTCL KPTCL Existing


AVALAHALLI OFFICE
200 JAYANAGAR IV 5 - - 743.20 HOLY CHRIST SCHOOL Existing
BLOCK EDUCATION SOCIETY

Page 22 of 35
Dimension Allotment Details
Area in Sq.
SL NO Name of Layout CA Site No Remarks
Mtr
North-South East-West Allotted to Whom Purpose Present Usage

01 02 03 04 05 06 07 08 09 10
201 JAYANGAR 9TH - - FLORENCEE ENGLISH MOSQUE School running
BLOCK SCHOOL BUILDING
202 SY NO 10 AND 11 OF - - 2411.50 SANJEEVAMMA TRUST KALYANA is developed in to
TAVARE KERE BTM I MANTAPA a park & handed
STAGE I PHASE over to the BBMP

203 BSK III STAGE 9 - - 550.34 INDIAN INSTITUTE OF EDUCATION Vacant


ARCHITECTS CENTER
204 BSK III STAGE SY NO 4 - - 2615.29 BMP HEALTH Vacant
95,96,121 & 122 OF CENTER
HSK
205 BSK III STAGE 1 - - MODEL EDUCATION & School
AVALAHALLI WELFARE
ASSOCIATION
206 BSK III CKA - - 19110.00 BMTC BUS Existing
TERMINUS
207 BTM II STAGE I - - 2566.40 TONTADA SOCIAL AND functioning
PHASE SIDDALINGESWARA CULTURAL
KAINKARYA SEVA ACTIVITES
SANGHA
208 JAYANGAR IX BLOCK - - 375X324+320/ MYSORE SCHOOL functioning
2 EDUCATIONAL AND BUILDING
WELFARE
ASSOCIATION
209 JAYANGAR II BLOCK - - 1) 450X5002) VIJAYA COLLAGE BHS INTERMEDIA functioning
11X175 TE COLLEGE
ADDITIONAL
LAND
210 BASAVANAGUDI 263 - - 55732 SQM KALAMANDIR KALAMANDIR Purpose utilized
SUNKENHALLI SCHOOL
211 Sarakki 4 phase CA (P) - - 1638 NEW COSMO VIDYA Play GROUND Existing
Dollor layout SAMSTE
212 J N IV T BLOCK 17/A - - P&T postoffice Existing

Page 23 of 35
Dimension Allotment Details
Area in Sq.
SL NO Name of Layout CA Site No Remarks
Mtr
North-South East-West Allotted to Whom Purpose Present Usage

01 02 03 04 05 06 07 08 09 10
213 JP NAGAR II PHASE 43 - - 2366 MOTHER DIARY FOOD CASH & it is cancelled, it
PROCESSING LTD. CARRY SHOP is maintained as a
(SAFAL MARKET) park by BBMP

214 BSK III STG. 5 - - 388.57 SIR M. BANK The BBMP


CHENNAMMANNA VISHWESHWARAIAH started
KERE, ACHUKATTU CO-OP BANK LTD. construction of a
library building,
it was stopped by
BDA and present
there is a court
stay on this site

215 BSK 3rd Stage 5 - - 388.57 Sir. M. Vishweraiah Co- Bank it is repeated vide
Operative Bank Sl. No. 340
216 BTM 1st stage, 1st 1/A - - 1000.00 St. Thomas Acqinas Education (Nimhans HBCS)
Phase site is vacant

217 BTM 1st stage, 1st 1/B - - 967.43/- Nimhans Deemed (Nimhans) they
Phase University have submitted
the building plan
for santion
218 BSK 3rd Stage 1/P - - 2154.07 Little Flower Public Education functioning
School
219 J.P.Nagar 4th Phase - - - 36.60 HOP COMS HOP COMS Existing
220 BSK 3rd Stage 1/C - - 3008.55 Saptharshi Foundation Community Vacant
Trust hall
221 BSK 3rd Stage 1A - - 2000.31 BMTC Community Vacant
Hall
222 BSK 3rd Stage 1B - - 2057.20 Vokkaligara sangha Community Vacant
hall

Page 24 of 35
Dimension Allotment Details
Area in Sq.
SL NO Name of Layout CA Site No Remarks
Mtr
North-South East-West Allotted to Whom Purpose Present Usage

01 02 03 04 05 06 07 08 09 10
223 BSK 3rd Stage 1&2 - - 2626.70 Bhagavan Mahaveer Hospital the building plan
Avalahalli Jain Trust is sanctioned by
BDA on
30.06.2010 the
building to be
constructed

224 BSK 6th stg 7th block 01 - - 30240.00 BESCOM Sub Station Vacant

225 J.P.Nagar II Phase 23/A - - 58.53 Omkara Sathya Sai Temple Existing
Trust
226 J.P.Nagar IInd phase 43/(p) - - 1268.19 DR.Baba Sahib Community it is learnt that
Ambedkar Edn Society Hall(Res for the CA site is
S.C) cancelled
227 Sy.No.120 of C.A - - 2805.49 OM Shakthi Temple Religious Purpuse utilized
Katriguppa,BSKIII trust Purpose
stage
228 JP Nagar 6h Phase 2 - - 1690.78 Prarthana Edn Society Kannada site is vacant
Medium
School (Res
for S.C)
229 JP Nagar III Phase 16 115 194 22310 Sarakki Edn Society Nursery / 357/16.9.91
Primary
school
230 Jayanagar I st Block` 76 - - 347.5 P&T Department Post OFFICE repeated

231 Jayanagar 4 th Block` 17 - - 98.6 East West Education Education functioning


trust
232 Jayanagar III Block( syno102,104 - - - Patalamma temple Temple Existing
Byrasandra)

233 Jayanagar 4 th T CA - - 142.82 Nirmala Cultural Cultural to be verified


Block` Centre Centre

Page 25 of 35
Dimension Allotment Details
Area in Sq.
SL NO Name of Layout CA Site No Remarks
Mtr
North-South East-West Allotted to Whom Purpose Present Usage

01 02 03 04 05 06 07 08 09 10
234 Jayanagar 4 th T 12 - - 1383.74 Bharath Petrolium Petrol Bunk repeated
Block` Corpn
235 Jayanagar 5 th Block 527 - - 1605.2 Sri Krishna Samithi Samithi Repeated

236 Jayanagar 5 th Block 528 - - 1605.2 Karmikara sangha Karmikara Existing


sangha
237 Jayanagar 4 th Block` CA - - 384.76 Sarvodaya Edn. Society School Existing

238 JPNagar 2 phase 36(p) - - 1640 A.Naa.Kru.Bhavan A.Naa.Kru.Bha Vacant at spot


van
239 BSK III Stage.Sy no CA2 - - 966.05 BWSSB tank site is vacant at
95,96, 122,etc of spot
Hosakerehalli
240 Sy No. 120 CA - - 1097.81 sq mtr S.S. Mother Dairy CASH & Vacant
Katriguppa (Safal Market) CARRY Stores
Banashankari 3rd
Stage
241 Banashankari 6th 5 - - 6000 J.S.S. Maha vidhya peta Kannada Vacnat
Stage 8th Block Midium
School
242 Banashankari 3rd 1 - - 27.28 Hopcams Fruts & Vacant
Stage, Avalahalli Vegitabals
243 BTM 2nd stage, 1st 117 - - 352.9 Home Pathic Home Pathic to be verified
Phase, Belekahalli Foundation Foundation
244 J.P. Nagar II Phase 36/A(2) - - 1000 Bharath Maddur Labour site is vacant
Sangha Education &
Training
Centre
245 BSK VI Stage. I Block 1 45.00 1/2 X47.00 1057.50 Allotted -

246 II Block 1 84.00 48.00 4032.00 - -


247 do 2 (D26445.00+8 140.00 9310.00 - -
8.00)/2

Page 26 of 35
Dimension Allotment Details
Area in Sq.
SL NO Name of Layout CA Site No Remarks
Mtr
North-South East-West Allotted to Whom Purpose Present Usage

01 02 03 04 05 06 07 08 09 10
248 do 3 (22.00+52.00) 135.00 4995.00 - BMTC
/2
249 do 4 (60.00+20.00) 135.00 15800.00 - BMTC
/2
120.00 75.00
250 III Block 1 67.00 (157.00+13 9782.00 - -
5.00)/2
251 do 2 180.00 (52.00+7.0 5310.00 - -
0)/2
252 do 3 (45.00+150.00 (260.00+28 26568.00 - BDA
)/2 5.00)/2 Commercial
coplex
253 do 4 45.00 45.00 2025.00 Allotted to BBMP for -
ward office
254 IV Block 1 82.00 (97.00+108 8405.00 Allotted to RV -
.00).2 Education Socity
255 do 2 45.00 67.00 3105.00 - -
256 do 3 90.00 (39.00+37) 4920.00 Handed over to BWSSB BWSSB
/2
75.00 (37.00+3.0
0).2
257 do 4 37.00 52.00 1924.00 - -
258 do 5 67.00 (37.00+60. 3249.00 Saffal India -
00)/2
259 do 6 40.00 30.00 1200.00 - -
260 do 6A 30.00 30.00 900.00 - -
261 do 7 161.43 (94.98+67. 5A-10G - Burial ground
50)/2
161.43 (1/2
X101.00)/2

Page 27 of 35
Dimension Allotment Details
Area in Sq.
SL NO Name of Layout CA Site No Remarks
Mtr
North-South East-West Allotted to Whom Purpose Present Usage

01 02 03 04 05 06 07 08 09 10
262 do 8 141.00 (7.00+73.5 13A-23G Handed over to BWSSB BWSSB
0)/2 to construct GLR
172.50 (73.50+90.
00)/2
192.00 (72.00+172
.50)/2
129.40 (82.50+95.
00)/2
263 V Block 1 (49.00X68.00) (48.00X54. 2644.00 - -
/2 00)/2
264 do 1A 24.00 22.00 506.00 Allotted to BSNL -
265 do 2 (51.00X29.00) (66.00+65. 2925.00 - -
/2 00)/2
266 do 3 (177.00+165.0 48.50 8293.00 - -
0)/2
267 do 4 90.00 39.00 2160.00 - -
268 XI Block 1 (86.00+100)/2 (37.00+59. 4464.00 Handicraft emporium -
00)/2
269 do 2 (72.00+30.00) (60.00+69. 3159.00 - BMTC
/2 00)/2
270 do 3 (46.80+33.70) (21.70+32. 1090.77 Kanaka Bhavana -
/2 50)/2
271 do 5 44506.00 Allotted to BBMP -
272 Sy.No.3 of 1 1116.49 Stay W.P NO.38128 & -
Bikasipura, BSK V 38375/02
Stage
273 Sy.No.5&6 of 1 1701.66 Vacant Notified on -
Bikasipura BSK V 28.01.05
Stage
274 Sy. NO.17 & 18 of 1 4820.25 Vacant Notified on -
Vasanthapura BSK V 28.01.06
Stage

Page 28 of 35
Dimension Allotment Details
Area in Sq.
SL NO Name of Layout CA Site No Remarks
Mtr
North-South East-West Allotted to Whom Purpose Present Usage

01 02 03 04 05 06 07 08 09 10
275 Sy.NO.9, 10 & 11 of 1 2968.40 Vacant Notified on -
Vaddarapalya, BSK V 28.01.07
Stage
276 Kumaraswamy 19 821.00 - Education
layout II stage Dpartment
277 kumaraswamy 21 1209.32 - BMTC
layout I stage
278 kumaraswamy 25 217.46 - Veda Vyesa
layout I stage Sharma Trust

279 kumaraswamy 26(p) 1800.00 - Atma


layout I stage Darshana
Yogasharama
Trust
280 Sy.No.50 of 27 1647.00 Allotted to BBMP -
Govinayakanahally
Kumaraswamy
layout II stage.
281 kumaraswamy 1 13144.16 - BWSSB
layout I stage
282 kumaraswamy 5 2575.00 - Commissione
layout II stage r Public
Instruction
283 kumaraswamy 6 3749.99 Allotted to petrol bunk -
layout I stage Bharath
284 kumaraswamy 10 1824.00 - BMP
layout I stage
285 kumaraswamy 10-A 2475.00 Handed over to BBMP -
layout I stage

Page 29 of 35
Dimension Allotment Details
Area in Sq.
SL NO Name of Layout CA Site No Remarks
Mtr
North-South East-West Allotted to Whom Purpose Present Usage

01 02 03 04 05 06 07 08 09 10
286 kumaraswamy 11(p) 294.50 Portion of C.A allotted -
layout I stage Hopcomes & dairy.
Remaining as park
handed over to BBMP

287 kumaraswamy 15 3717.00 Allotted to Hospital to


layout I stage Vasavi Trust
288 kumaraswamy 17 866.25 - Education
layout II Department
stage(Chandranagar)

289 kumaraswamy 18 1297.50 As per the direction of -


layout II stage hon'ble incharge
ministre of bangalore
south handed over to
BBMP

290 BSK II Stage 9 8452.86 - Aurabindo


Memorial
school
291 BSK II Stage 15/B 585.48 - Asha Ramji
Trust
292 BSK II Stage, C.T. Bed C.A 698.01 - Sri
Raghavendra
Seva Samithi
293 BSK III Stage, IV C.A 3244.15 Handed over to BBMP Sri Bangalore
Phase VII Blcok to Mention as park Medical &
Onclolgy
Research
centre

Page 30 of 35
Dimension Allotment Details
Area in Sq.
SL NO Name of Layout CA Site No Remarks
Mtr
North-South East-West Allotted to Whom Purpose Present Usage

01 02 03 04 05 06 07 08 09 10
294 BSK II Stage 9 2903.19 - Devalaya
Nirmana
Sangha
295 BSK II Stage 29 1057.05 - Lakshmi
devanna &
Nanjppa
memorial
Trust
296 BSK II Stage C.A 7588.12 - Canara Bank
relief &
welfare
society
297 BSK II Stage 36 268.07 - Suchitra
Cinema
Academy
center
298 BSK II Stage 14 1430.69 - Gokulam EDN
Centre
299 BSK II Stage C.A 9602.72 - BMTC
300 BSK II Stage C.A 312.13 - KEB(KPTCL)
301 BSK II Stage C.A 111.11 - KEB(KPTCL)
302 BSK II Stage C.A6 16913.41 - Bhagirathi Bai
Narayanaman
e Trust

303 BSK II Stage C.A 213.67 - Varaganapath


i Seva Sangha

304 BSK II Stage C.A 1323.85 - Our School


305 BSK II Stage C.A 619.00 - Commissione
r of Police

Page 31 of 35
Dimension Allotment Details
Area in Sq.
SL NO Name of Layout CA Site No Remarks
Mtr
North-South East-West Allotted to Whom Purpose Present Usage

01 02 03 04 05 06 07 08 09 10
306 BSK II Stage 39 2430.86 - B.Ramamurth
y
Construction
& engineering
society for
nursing home
(saraswathi
nurshing
home)

307 BSK II stage 2 25.31, 24.05, - Sri


(Marginal land) 45.35, 53.00 Sharaswathi
vidya Mandir

308 BSK II Stage C.T bed 3 12850 - ESI


Corporation
309 BSK II Stage 15/A 7172.50 - Commission
of Police
310 BSK II Stage 21(p) 3068.39 - Post Office
311 BSK II Stage C.A 1393.62 - P&T
Department
312 BSK II Stage C.A 3359.82 - KEB (KPTCL)
(between)junction of
80' &100' road)
313 BSK II Stage 9 2903.19 - New Age
Edun. Socity
314 BSK II Stage C.A 3422.22 - Karnataka
Fire Servie
315 BSK II Stage 8 2483.83 - Jayanagar
Club
316 BSK II Stage 45 477.98 - Mahila
Samaja

Page 32 of 35
Dimension Allotment Details
Area in Sq.
SL NO Name of Layout CA Site No Remarks
Mtr
North-South East-West Allotted to Whom Purpose Present Usage

01 02 03 04 05 06 07 08 09 10
317 BSK II Stage C.A 576.30 - Amma
Kodava
Associaton
318 BSK II Stage 24 1222.37 - Devagiriguru
Seva Samithi
319 BSK II Stage 5 708.68 - Sri Rama
Laitha Kala
Mandira
320 BSK II Stage Sy.No.8&9 4422.60 - Yadav Hostel
karisandra
321 C.T Be, BsK II Stage 1 1752.18 - Samajaseva
Mandali
322 C.T Be, BsK II Stage 919.27 - Govt. Model
Kannada
Primary
School
323 BSK II Stage, 2 1896.55 - AHLE-
Yarabnagar Sunhathal-
Jamath-E-
Hanifimahale

324 BSK II Stage, Yadiyur- CA-B 3532.80 - Bangalore


Nagasandra Telecome
District
325 BSK II Stage CA-A 2982.45 - Karnata
Vignana
Parishat
326 BSK II Stage 13 15000.00 - Ramachandra
Mission
327 Yadiyur village, BSK Sy.No.56 14025.00 - Kumaran
II Stage Children
Home

Page 33 of 35
Dimension Allotment Details
Area in Sq.
SL NO Name of Layout CA Site No Remarks
Mtr
North-South East-West Allotted to Whom Purpose Present Usage

01 02 03 04 05 06 07 08 09 10
328 BSK II Stage 21, 19(p) 1008.00, - Vokkaligara
403.50, 553.50, Sangha,
656.00 Kempegowda
Institute Of
Medical
Science
329 BSK II Stage, Yarab 583 55.80 - Church of
Nagar jesus Christ
330 BSK I stage, II Block 15 6514.75 - Karnataka
Pradesh,
Kurubara
Sangha
331 BSK I stage. C.A 300.00 - Manivilasa
EDN Assn.
332 BSK I stage. 10 93500.00 - People EDN
Socity
333 BSK I stage. 14 2612.50 - Gokulam EDN
Centre
334 BSK I stage, II Block 15/A 18000.00 - Rajarajeswari
EDN Socity
335 BSK I stage. 13 24000.00 - Police Dept
336 BSK I stage. 5/A 1802.78 - Swamy
Vivekanada
Vidyashala
337 BSK I stage. 6/10 31000.00 - BWSSB
Bangaore
338 BSK I stage, II Block 11 12206.75 - Guru
Shanidevara
Bhaktha
mandali
339 BSK I stage 14Ato14F 26082.00 - Marketing
yard BCC

Page 34 of 35
Dimension Allotment Details
Area in Sq.
SL NO Name of Layout CA Site No Remarks
Mtr
North-South East-West Allotted to Whom Purpose Present Usage

01 02 03 04 05 06 07 08 09 10
340 BSK I stage C.A 24000.00 - Commissione
r of Police,
invanty road
341 Sunkenahalli Extn, 263 900.98 - Kalamandir
H.Nagar School & Art.

Executive Engineer,
South Division,
Bangalore Development Authority,
Bangalore

Page 35 of 35
C.A. DETAILS - BDA LAYOUT
Main Sub C.A. Site
Name of the Layout Area in Sq.M Name of the Allottee Purpose Present Status
Sl No Sl. No. No
H.B.R. 1ST STAGE
1 1 HBR 1st Stgae, 2nd Block 5(1) 8800.00 JSS Education Society Public Office JSS Public School
2 2 HBR 1st Stgae, 2nd Block 5(II) 16758.00 B.D.A Public Office BDA Complex
3 3 HBR 1st Stgae, 2nd Block 11 28272.5 - Shopping Complex Factory & Fully Builtup Area
4 4 HBR 1st Stgae, 3rd Block 8P 361.10 KEB Public Office KPTCL Public Office
5 5 HBR 1st Stgae, 3rd Block 8P 907.83 Anand Co-Op. Bank Bank Vacant
6 6 HBR 1st Stgae, 3rd Block 8P 1120.00 HPC Company Ltd Petrol Bunk Petrol Bunk
7 7 HBR 1st Stgae, 3rd Block 8P1 1353.00 The Mysore Paper Mills Ltd Office Vacant
Add. Director General Direcotorate Office Building
8 8 HBR 1st Stgae, 3rd Block 8P2 2100.00 Revenue Intelligency Vacant
9 9 HBR 1st Stgae, 3rd Block 8P3 274.75 Anatha Shishi Nivasa Shishu Palana Kendra Vacant
8P4 &
10 10 HBR 1st Stgae, 3rd Block 8P5 999.85 M/s. Beris Welfare Assciation Social & Cultural Kendra Vacant
Jagadguru Renukacharya Vidyalaya English Medium Primary School English Medium Primary School &
11 11 HBR 1st Stgae, 3rd Block 3P 5975.25
Society & Play Ground Play Ground
12 12 HBR 1st Stgae, 3rd Block 7 11250.00 KPTCL KPTCL KPTCL
13 13 HBR 1st Stgae, 3rd Block 12 65653.00 - BDA Housing Masque & Fully Built Up Area
14 14 HBR 1st Stgae, 3rd Block 14 3105.00 - Burril Ground Burril Ground
15 15 HBR 1st Stgae, 5th Block CA 377.00 BESCOM (O & M) O & M Unit O & M Unit Office
Ground Level Reservier and BWSSB
16 16 HBR 1st Stgae, 5th Block CA 4322.25 BWSSB Pump House
H.B.R. 2nd STAGE
17 1 HBR 2nd Stage 11 6142.5 BMTC BMTC BMTC
18 2 HBR 2nd Stage 2 642 Education Department School School
19 3 HBR 2nd Stage 1 653 Education Department School School
20 4 HBR 2nd Stage CA- 3367 Sri Gururaghavendra Temple Social and Cultural Social and Cultural
Sanjeevappa Sakamma
21 5 HBR 2nd Stage CA-1A 714.35 School School
Charitable Trust

R.T. NAGAR
22 1 R.T. Nagar 1st Block CA-5 5975.25 Taralabalu Jagadguru Bruhan Matha Social and Cultural Social and Cultural
23 2 R.T. Nagar 1st Block CA-4P ESI Hospita ESI Hospital ESI Hospital
24 3 R.T. Nagar 2nd Block CA- 2079.65 Florance Public School Florance Public School Florance Public School
25 4 R.T. Nagar 1st Block CA-4/1 1272.84 Al Ameer Welfare Association Masque & Arebic School Masque & Arebic School
26 5 R.T. Nagar 2nd Block CA-2/4 Vinayaka Temple Trust Vinayaka Temple Vinayaka Temple
27 6 R.T. Nagar 2nd Block CA-5 77.65 KMF KMF Milk Center KMF Milk Center
C.A. DETAILS - BDA LAYOUT
Main Sub C.A. Site
Name of the Layout Area in Sq.M Name of the Allottee Purpose Present Status
Sl No Sl. No. No
28 7 R.T. Nagar 1st Block CA-3 77.65 KMF KMF Milk Center KMF Milk Center
29 8 R.T. Nagar 2nd Block CA-7 77.65 KMF KMF Milk Center KMF Milk Center
30 9 R.T. Nagar 2nd Block CA-4 77.65 KMF KMF Milk Center KMF Milk Center

VASANTH NAGAR
31 1 Vasanth Nagar 139 AEE, Building Division BBMP Office BBMP Office
32 2 Vasanth Nagar CA- Rajput Sabha Hostel Hostel
33 3 Vasanth Nagar 13 11258.5 Lakshmi Venkateshwara Temple Temple Temple
34 4 Vasanth Nagar 46 1391 Kunchitigara Sangha Hostel Hostel
35 5 Vasanth Nagar CA- 7469 Mount Carmel College College & Play Ground College & Play Ground

PILLANNA GARDEN
36 1 Pillanna Garden CA 799.79 P&T Post Office Post Office
37 2 Pillanna Garden CA 7428 BS Sridhar LPG Gas Distributors LPG Gas Distributors
38 3 Pillanna Garden CA-1 812.89 BESCOM BESCOM O & M BESCOM O & M
39 4 Pillanna Garden CA BMTC Vacant
40 5 Pillanna Garden CA HOPCOMS Hopcoms Hopcoms
41 6 Pillanna Garden CA-4 794.5 Vinitha Education Society School School

MATADAHALLI EXTENSION
42 1 Mathadahalli CA BSNL BSNL Exchange BSNL Exchange
43 2 Mathadahalli CA 9430 Childrens Welfare Association Childrens Welfare Association Childrens Welfare Association
44 3 Mathadahalli CA 81.93 KMF KMF KMF

EAST OF NGEF LAYOUT


45 1 East of NGEF Layout 7P2 1450.57 Mother Diary Dairy Products Dairy Products
46 2 East of NGEF Layout 7 P1A 3826.97 A.H.Memorial School Education Education
47 3 East of NGEF Layout 7 P1B 4000.1 New Horizon School Education Education
48 4 East of NGEF Layout 7 P3 870.99 Karnataka Ayurvedic Society Medicine Medicine
49 5 East of NGEF Layout 8 P1 826 Anjal Trust Social & Cultural Social & Cultural
50 6 East of NGEF Layout 8 P2 815.81 Kasturi Nagar Welfare Association Social & Cultural Social & Cultural
51 7 East of NGEF Layout 8 P3 1000 Crest Care Social & Cultural Social & Cultural
52 8 East of NGEF Layout 8 P4 2622.4 BWSSB BWSSB BWSSB
53 9 East of NGEF Layout 8 P5 996.62 BPC Ltd., Petrol Bunk Petrol Bunk
54 10 East of NGEF Layout 8 P6 2253.63 Nightingale Medical Trust Geriartic Institute Research Centre Geriartic Institute Research Centre
55 11 East of NGEF Layout 9 3016 Udaya Vidya Kendra Education Education
56 12 East of NGEF Layout 10 463.1 BBMP IPP Dispnesary Dispnesary
C.A. DETAILS - BDA LAYOUT
Main Sub C.A. Site
Name of the Layout Area in Sq.M Name of the Allottee Purpose Present Status
Sl No Sl. No. No
57 13 East of NGEF Layout 11 1965 Karnataka Punjabi Association Social & Cultural Social & Cultural
Proposed for R.T.O & Southern
East of NGEF Layout 15 2256 Part alloted to R.T.O Part alloted to R.T.O
58 14 Railway
59 15 East of NGEF Layout 16 2949.75 Sainik Welfare Co-operative Centre Community Centre Community Centre
60 16 East of NGEF Layout 17 852.75 Madyama Community Centre Social & Cultural Social & Cultural
61 17 East of NGEF Layout 18 2700 BWSSB BWSSB BWSSB
62 18 East of NGEF Layout 19 1769 BPC Ltd., Gas Godown Gas Godown
63 19 East of NGEF Layout 22 421 Vishwakarma Association Social & Cultural Social & Cultural

HRBR LAYOUT
64 1 HRBR 1st Block 1 343.42 Indian Institute of Music Music School Shakthi Ganapathy Temple
65 2 HRBR 1st Block 5 6969 BWSSB Water Supply Water Supply
66 3 HRBR 1st Block 6 6514.2 KEB Power Supply Power Supply
Tombs
HRBR 1st Block 10 1822.8 Modaliar Trust Park
67 4 Vinayaka Temple
68 5 HRBR 1st Block 12 5018.19 BDA Ward Office BDA Ward Office BDA Ward Office
69 6 HRBR 1st Block 14 3672 Fire Force Fire Force Fire Force
70 7 HRBR 1st Block 16 991.06 Police Department Police Station Not constructed
71 8 HRBR 1st Block 15 990 Postal Dept. Post Office
72 9 HRBR 1st Block 17 13323.25 BMTC Bus Terminal
73 10 HRBR 1st Block 19 1896.24 Yadava Sanga Yadava Sanga Building under Construction
74 11 HRBR 1st Block 4 2714.87 Barry Association - Mini Forest
75 12 HRBR 2nd Block 2 1954.12 CMR Trust School School
76 13 HRBR 2nd Block 4 966.04 Police Station Police Station Police Station
77 14 HRBR 2nd Block 5 1471.37 KPTCL KPTCL Office KPTCL Office
78 15 HRBR 2nd Block 6 2528 Dpt. Of Libraries Library Bldg. under construction
79 16 HRBR 2nd Block 7 8342.13 HRBR Cosmopolitan Club Social & Cultural Activities Social & Cultural Activities
80 17 HRBR 2nd Block 10 5688.29 Revana Siddeshwara Trust School School
81 18 HRBR 2nd Block 11 6124.5 KSRTC Bus Terminal Bus Terminal Bus Terminal
82 19 HRBR 2nd Block 14 5827.6 BWSSB Treatment Plant Fencing by Forest Dept
83 20 HRBR 3rd Block 1 4159.79 BWSSB GLR GLR
84 21 HRBR 3rd Block 2 2196.35 BPCL Petrol Bunk Petrol Bunk
85 22 HRBR 3rd Block 3P1 72 KMF Milk Booth Milk Booth
86 23 HRBR 3rd Block 3P2 75.2 BBMP Ward Office Ward Office

87 1 OMBR 8 602.26 social & Education centre (South india ) church Social & Education centre
C.A. DETAILS - BDA LAYOUT
Main Sub C.A. Site
Name of the Layout Area in Sq.M Name of the Allottee Purpose Present Status
Sl No Sl. No. No

8 2 OMBR 9 750.3 Petrol bunk H P C L Petrol bunk Petrol bunk

89 3 OMBR 5 7015.42 Education (C M R)Education Building Education

Vacant (out of 717.82 Sq.M


608.00 Sq. M has been utilised
for
90 4 OMBR 13 109.82 Petrol Bunk Petrol Bunk
formation of service road at
Ramamurthy Nagar Grade
separator)
91 5 OMBR 3(p) 72 K M F Milk vending center Milk vending center K M F Milk vending center
92 6 OMBR 3(p) 33.33 HOPCOMS Vegetable vending center HOPCOMS
93 7 OMBR 3(p) 2169.6 Education Trust constructed compound Education
94 8 OMBR 6 23652.22 Gov't Building Wireless dept. Gov't Building
95 9 OMBR 7 11732.68 Gov't Building Telecom Dept. Gov't Building
96 10 OMBR 2 23012.27 Gov't Building BWSSB Tanks & Quarters Gov't Building
G.Byappanahalli Slum
97 1 G.Byappanahalli Slum - 83.61 Association Church
98 2 G.Byappanahalli Slum - 83.61 Association Maramma Temple
99 3 G.Byappanahalli Slum - 111.48 Karnataka board of Wakf School
100 4 G.Byappanahalli Slum - 83.61 Karnataka board of Wakf Mosque
LINGARAJAPURA
101 1 Lingarajapura 6 School for Physical Handicapped School School
102 2 Lingarajapura 3 1200.00 East Bangalore Church of Christ Church Church
Women's & Childrens
103 3 Lingarajapura 5 3560.00 School School
Kshemabhivrudhi School
104 4 Lingarajapura C.A. 1680.00 Ebanajor full Gospel Church of India Church Church

R.M.V. II Stage
105 1 R.M.V. II Stage 1st Block 1 2695.30 - School Vacant
106 2 2 4253.00 - Park Park
107 3 2nd Block 1 1947.00 - Park Park
108 4 2 3939.00 - Burrial Ground Burrial Ground
109 5 3 1859.00 Allotted to Gas agency Gas Agency -
110 6 3rd Block 1 a) 3135.00 KEB KEB Existing Building
C.A. DETAILS - BDA LAYOUT
Main Sub C.A. Site
Name of the Layout Area in Sq.M Name of the Allottee Purpose Present Status
Sl No Sl. No. No
b) 299.00 Hopcoms Hopcoms Provided chain link fencing
111 7 2 5455.00 Park - MS grill fencing
Existing Temple Building under
112 8 3 936.50 Park Temple
litigation O.S.No. 6156/95
113 9 4 2783.00 Park Park Chain link fencing
114 10 Sy. No. 20 1 3276.00 C.A (H.T. Line) Park -
Sy. No. 36/4.5 of
115
11 Geddadahalli 1 637.87 C.A. Petrol Bunk Existing Bunk
116 12 2 109.25 C.A. Vacant Vacant
Sy. No. 71/3 of
117
13 Nagashettihalli 1 675.00 C.A. Temple Existing Temple

Executive Engineer