Professional Documents
Culture Documents
Ahs Plester MU
Ahs Plester MU
Bahan
Semen MU 10.340 Kg 2,460.00 25,436.40
Alat bantu 1.000 ls 1,400.00 1,400.00
Jumlah (1) 26,836.40
Tenaga
Pekerja 0.3150 OH 85,000.00 26,775.00
Tukang 0.1500 OH 110,000.00 16,500.00
Kepala Tukang 0.0150 OH 120,000.00 1,800.00
Mandor 0.0150 OH 150,000.00 2,250.00
Jumlah (2) 47,325.00
Jumlah (1) + (2) 74,161.40
fee kontraktor 10% 81,577.54
Total dibulatkan 81,500.00