CONTRACTOR WORK IMPROVEMENT NOTICE CORRECTIVE ACTION PLAN

Ref. No. MUS-C1-HSE-CWIN-098

Location (Coordinates): Project Name: Site visit Date: Consultant HSE Rep:

Construction of Extending Sheikh Zayed Bin


Umm Lafina
Sultan Street Umm Lafina Island to Connect Al 01/03/2020 Mr. Ramod Kumar
Reem Island Contract - 1

Project Manager Name: Engr. Alaa Mouada Shouja Telephone No. 0508180225 Email address: alaa.shouja@GhantootGroup.ae

S/N Observation Corrective Actions Action By Target Date Remarks Status

Contractor has breached: Complying with the requirements of


1.The requirements of Approved Project HSE Contractor 3/4/2020 Approved Project HSE Management Closed
Management Plan 5.15 A Plan

Complying with the requirements of


2.Musanada HSE Requirments for Contractors Contractor 3/4/2020 Closed
Musanada HSE.
Site workers welfare facilities (Toilets, Rest
shelters & drinking water outlets) inspected;
1 all HSE shortfalls identified and reported
(Refer attached welfare HSE Inspection
report.
Provided Walk ways Drinking water,
3.OSHAD SF CoP 8.0 General Workplace
Contractor 3/4/2020 Rest Rooms, Washing & Toilet Closed
amenities
facilities.

4.OSHAD SF CoP 9.0 Workplace Wellness Contractor 3/4/2020 Closed

Training on Heat Stress , providing of


5.OSHAD SF CoP 11.0 Safety in Heat Contractor 3/4/2020 Air conditions to start before Closed
summer.

6.OSHAD SF CoP 53.0 OSH Management


Contractor 3/4/2020 Closed
During Construction work

Prepared By:
Approved By:

Eng. Salam khan Eng. Alaa Mouada Shouja

HSE MANAGER Project Manager

54470-00SIT-GE-SIT-HSE-CAR-0016-00
Construction of Extending Sheikh Z
Island to Connect Al

HSE Improvement Noties Corrective Action Close

Observation Photos

Observation 01
Observation 02

Observation 03
Observation 04
Observation 05

Observation 06
Observation 07

Observation 08
Observation 09

Observation 10
Observation 11

Observation 12
ng Sheikh Zayed Bin Sultan Street Umm Lafina
nnect Al Reem Island Contract 1

ction Close out Pictures (MUS-C1-HSE-CWIN-090)

Closed Out Photos

Observation 01
Observation 02

Observation 03
Observation 04
Observation 05

Observation 06
Observation 07

Observation 08
Observation 09

Observation 10
Observation 11

Observation 12
Prepared
By: Approved By:
Eng.
Eng. Alaa Mouada Shouja
Salam
Project Manager
Mouada Shouja
anager