TECHNICAL EDUCATION and SKILLS DEVELOPMENT AUTHORITY

Region IV-A CALABARZON


COLLEGE OF SCIENCES, TECHNOLOGY AND COMMUNICATIONS INC.
Sariaya, Quezon

SESSION PLAN

Sector
Qualification Title Electrical Installation and Maintenance NCII
PERFORM ROUGHING-IN ACTIVITIES, WIRING AND CABLING WORKS FOR
Unit of Competency SINGLE-PHASE DISTRIBUTION,POWER, LIGHTING AND AUXILIARY
SYSTEMS
PERFORM ROUGHING-IN ACTIVITIES, WIRING AND CABLING WORKS FOR
Module Title SINGLE-PHASE DISTRIBUTION,POWER, LIGHTING AND AUXILIARY
SYSTEMS
Learning Outcomes:
1. 1.1 Install electrical metallic /nonmetallic (PVC conduit).
Introduction
This module covers the knowledge, skills and proper attitude in laying-out, electrical metallic conduits for distribution,power lighting
and auxiliary systems.. It deals with laying-out of metallic conduits, wireways and cable trays, telephone terminal cabinets and cable
bridge.
A. LEARNING ACITIVITIES
LO 1: INSTALL ELECTRICAL METALLIC/ NON-METALLIC (PVC CONDUIT)
Learning
Methods Presentation Practice Feedback Resources Time
Content

Session Plan for ELECTRICAL INSTALLATION Date Developed: Document No.


AND MAINTENANCE NC II APRIL 25, 2019
Developed by: Issued by:
Page 1 of 3
Module Title: Performing Roughing-In,
Wiring and Cabling Works for Single- SYRA LYN R. LAGRAZON CSTC MAIN- SARIAYA
Phase Distribution, Power, Lighting and
Auxiliary Systems
Task Sheet 1.1-1 Information
Perform the Sheets
Read
following task to
Information Job Sheet
develop skills in
CONTENTS: sheet No. 1.1-1 TR-EIM NCII
Theories and bending metallic
PEC provisions conduit. PEC Book
on electrical Principles.
CBLM
metallic conduits Tools,Equipment
Written test or Answer Key Textbooks
Bending and Materials
examination Self- Check 1.1- 1.1-1 Pliers
electrical Tasks (Steps) &
Direct observation 1 Compare the Screw Driver
metallic conduit Key points
and questioning Answer the answers with IMC
Procedures in Demonstration following the answer key
installing (able to impart You can ask EMT 16 hrs.
questions.
electrical knowledge and the Compare RSC
metallic conduit skills) assistance of Performance Hack nut
Safety Practical Lab/ your trainer Criteria Bushing
procedures in Exercises to show you Checklist No. Entrance cap
installing and explain 1.1-1 for yor Metal strap
electrical further the Perform Job progress Hack saw
metallic conduits topic you Sheet No. 1.1-1 Pipe Bender
can’t Prepare in
Pipe Reamer
understand. installing electrical
Pipe Cutter
metallic conduits
Spirit level

Session Plan for ELECTRICAL INSTALLATION Date Developed: Document No.


AND MAINTENANCE NC II APRIL 25, 2019
Developed by: Issued by:
Page 2 of 3
Module Title: Performing Roughing-In,
Wiring and Cabling Works for Single- SYRA LYN R. LAGRAZON CSTC MAIN- SARIAYA
Phase Distribution, Power, Lighting and
Auxiliary Systems
B. ASSESSMENT PLAN
The assessment is done through Lecture/Discussion, Demonstration and Written tests.

C. TEACHER’S SELF-REFLECTION ON THE SESSION

Prepared by: Noted by:


JOSHUA MARIE J. ABRIZA JAIL BERT E. TABERNILLA

Date: February, 2020 Date:

Session Plan for ELECTRICAL INSTALLATION Date Developed: Document No.


AND MAINTENANCE NC II APRIL 25, 2019
Developed by: Issued by:
Page 3 of 3
Module Title: Performing Roughing-In,
Wiring and Cabling Works for Single- SYRA LYN R. LAGRAZON CSTC MAIN- SARIAYA
Phase Distribution, Power, Lighting and
Auxiliary Systems