Muhammad Raheel Minhas-Leadman

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

URRICULUM

ITAE

Muhammad Raheel Minhas

S/O Ch. Talib Hussain


Address:Fateh Pur Road Chah Chanan Wala ALIPUR
Cell NO: +92345-3801280
OBJECTIVE
To get the chance in your esteemed organization to build my career and utilize my
professional expertise to fulfill the organizational requirement.

PERSONAL INFORMATION
Date of Birth: 10-01-1987

NIC #: 32301-6178722-1

Passport # AG0747221

Domicile: Ali Pur (Punjab)

Religion: Islam

Marital status: Single

Nationality: Pakistani

Health: Good

Email: raheelminhas786@gmail.com

minhasraheel@yahoo.com

QUALIFICATION
Degree Subjects Board/University
B.Tech Electrical PIMSAT UNIVERSITY LAHORE
D.A.E Electrical P.B.T.E Lahore
Matriculation Science B.I.S.E D.G Khan

Experience
Shahid Mehboob Engineers and Contractors (SMEC)
Site Engineer Electrical
Job Period (10 Apr 2018 To till …)
Pc (Pearl Continental) Hotel Meer Pur AJK
Working at pc hotel with Hashoo group
Internal external wiring,Coduting,Cable tray installation, Public address, Fire
alarm,cctv,cable pulling and termination.
Lt panel installation and termination.

 SINSINA Corner Company kingdom of Saudi Arabia.


 Site Engineer Electrical
 Job Period (24 Apr 2016 to 03 May 2017)
Working at Arasco/Mefsco Dora Dora project Al-Kharj.
Electrical and Instrumentation.
Instalation, testing and commissioning of HT & LT Switchgear, power and control
Distribution System.Earthing and lightening
protectionsystem&powergeneration.Responsible for all aspects of underground work
including, cable pulling, installing instruments & threaded, installing trucking tray, ladder
rack, confine space entry, power and lighting. Terminating and installing gladding SWA
SCREEN.
Diagnose malfunctioning system, equipment and electrical parts, via using test
equipment to identify.
Transformers and other components within designated schedule.
All work done as per BOQ.

USAID Power Distribution Program Multan.


IMR Audit Consultant
Job Period (01 Feb 2014 To 13 Aug 2015)
Ensure reliability of 11/132 KV Transmission Lines and to avoid damages by supervising
the patrolling teams efficiently to ensure maximum patrolling coverage of the
transmission lines & ensure availability of supervision at critical sites.
Provide on-site training to the DISCO staff for successful operations of HHU
devices;
Work with Task manager to monitor daily activities at Subdivision where
MEPCO has started IMR/HHU
Enforce discrepancy management and help to gain all internal approvals for
withdrawing material for subdivision
Monitoring the material utilization at subdivision,
Coordinate USAID Power Distribution Program coordinate to support
IMR/HHU Implementation management trainee
 INCOTEL ENGENEERING SERVICES PVT LAHORE
 ELECTRICAL ENGINEER
 Job Period (01 Feb 2013 To28 Jan 2014)CCBPL LAHORE
Installation And Maintenance Power Panels,Db’s and Motors.
Preventive and maintenance of 2200Kva Generator.
Installation and maintenance of sogo light.
Wiring a single phase & 3phase system.
General maintenance of frequency converter.
Repairing of 3 phase motor in STAR & DELTA.

 SINSINA Corner Company kingdom of Saudi Arabia.


 ASSISTANT ENGINEER
 Job Period (03 March 2012 to 13 July 2012)
SINSINA Corner Company kingdom of Saudi Arabia. Sub-Contractor
BEMCO Arabian Company.
Working at (QCCPP2) Qurrayah Combined Cycle Power Plant.
All types of HT, LT and control cables termination as per
demand .DC&AC
High voltage motor’s termination. Turbine valve Gen set exciter and CT’S
Termination.
Excitation, step up and step down transformer control cables
Terminations MV&LV cables laying as per demand .jb installation.
All types of power panel’s maintenance.
Permit Receiver License Holder from BEMCO Arabian Company.

 Toyota Sargodha Motors

Job Period (05 Jan 2010 to 20th December 2011)

Two Years’ Experience as Associate Engineer at Toyota Sargodha Motors.

 Repair and maintenance the power panels and jb’s.

 Arden Engineering & Automation Pvt. Ltd. Lahore.

Job Period (1st May 2008 to 30th April 2009)


 One Year Experience as Engineering & Services Staff at Working at

TELENOR MSC Faisalabad. LV cables termination.

 Installation the LT&HT panels and termination.

 Single phase and three phase wiring.

 Repair and Maintenance LV Panels

 Cable Tray Installation


Professional Skills:
Professional Computer Course
* MS Office
* Windows XP
* MS Word

Hobbies & Interest


o Playing Cricket & Badminton

o Watching Movies

o Traveling

o Trouble Shooting

Reference

 will be provided on demand

You might also like