CONCRETE - MATERIALS
CEMENT
ASTM C 150 Type 1 cement shall be used and testing conforming to ASTM C 114
Tri calcium aluminate shall be used not exceeding 10 perc by weight and magnesium oxide shall not be
4 perc weight more of the cement weight
Silica fume to be used along with cement as mineral admixture - 6 perc by weight of soil
Test certificate with chemical mineralogical and physical test shall be submitted for client approval
Client approved source shall be used and to be procured from only supplier
ADMIXTURE
Admixtures shall be used confirming compliance to ASTM C494
Silica fume confirming to ASTM 1240 to be used as admixture which are carried out by powder form to
the batching plant
Further it shall comply to chemical requirements as
silica dioxide - 85 perc
loss of ignition 6
moisture as 3 perc
WATER
Water be used for all concreting purpose and this standard of water shall be used for all purposes such
as concreted production and placement, aggregate washing, wetting and insulation of Formwork,
curing etc.
Free from oil, grease acids and deleterious material
shall conform ASTM C 1602 – Non potable
Ph value must be 7 to 9
Chemical limitations of water:
ASTM 512: acid chloride: prestressed concrete: 500mg / L AND RCC: 1000mg / L
Acid sulphate: ASTM 516: 1000mg /L
AGGREGATES
Aggregates must confirm the requirements of ASTM C 33, Specification for aggregates for concrete
Source of the aggregate shall be approved from client and continuous investigation must be done to
check the quality of aggregate so that good aggregate is being used through the project
Test certificates must submit for the engineer approval with following information:
Gradation curves and sieve analysis
…Aggregate type
…location of quarry
…
Fine aggregate shall be sweet sand, Size below 5 mm
Beach sand shall not be used
Coarse aggregate shall be below 20 mm and crushed stone
Testing of aggregates
Physical testing like organic matter clay lumps et for every 1000m3 of concrete
Chemical testing like loss of magnesium sulphate soundness test etc.: 3 months
Mechanical testing for 6 months
Very Imp: See table type of tests for aggregates – QCS 2002
B51-S01
SABIC
CONCRETE - MATERIALS
Reinforcement
General rebar – deformed billet steel – ASTM A 615, grade 60, specified yield strength – 414 M pa
Welded steel wire mesh – ASTM A 185 for plain fabric & ASTM A 497 for deformed fabric
Tie wire – ASTM A 82 not below 16 gauges
Tests of bending, elongation and bending for every 200 tons of steel procured for site for each
diameter in accordance with ASTM A 370
Epoxy steel -Fusion bonded Epoxy coated steel bars – ASTM A 775 + thickness of epoxy coating
shall be minimum 150 to 330 microns
Steel free from rust, deleterious amounts of salts & coatings
Curing Materials
Hessian cloth – AASTO M 182, weigh – 0.29 kg / m2
Impervious sheeting – polyethylene as per ASTM C 171
MAXIMUM WATER-
MINIMUM CEMENTITIOUS CEMENTITIOUS
MATERIALS CONTENTS (kg/m3) MATERIALS RATIO
7 DAY 28 DAY (2)
(BY WT.)
TYPE OF COMPRESSIVE COMPRESSIVE
CONCRETE STRENGTH STRENGTH
MPa MPa PORTLAND SILICA PC
CEMENT FUME +
(PC) (SF) SF
3. Aggregate gradation
Course and fine aggregates shall be mixed in order to reduce the quantity of sand (4.75mm) and water
20 100
9.5 40-65
4.75 30-50
0.60 22-38
0.30 10-20
7. Durability of concrete
Following tests to be found durability of concrete
By weight of dry cement
Type of tests Standard (inclusive of silica fume) in
%
8. Slump
Std – C 143
Concrete with high slump to be rejected
Acceptable slump ranges
Type of structure slump
Slabs and pavements 100-125mm
Structural concrete 125-175mm
10. Admixture
Superplasticizers (high range water reducing admixtures) confirming Std c 494 and c 1107 to be used to improve
workability and impermeability of concrete
Use of super…..is as per ACI 212.4R and manufacturers recommendations
Below 2 perc b weight of cement
B501 – S01
SABIC - Cast in place concrete
Execution
Batching
Batching of materials shall be by weight
Weighing machine shall be calibrated properly and documentation should be furnished by contractor to
demonstrate that accuracy is maintained throughout in accordance with ACI 304R
Contractor shall establish procedure to determine the moisture content in aggregates daily and any
changes shall be recorded
Moisture content of aggregate to be utilized in adjusting the weight of aggregate and water quantity added
to mix
Mixing
Concrete shall be produced in a central batching and mixing plant which conforms to ACI 304R and
ASTM C 94
Mixing and addition of water in trucks are not allowed
Continuous operator to be hired at batching plant
For important pour: back plan to be produced in case of plant failure and to be submitted for approval
When powdered silica fume is added to concrete mixing, time will be 50 perc greater than time without
silica fume
If it is in a slurry form, then extra time is not required
TESTING LABORATORY
The testing laboratory shall be accredited by SASO or other authorized organizations. It shall meet the
requirement of ASTM C 1077 and shall have a quality system in accordance with ISO 17025.
Contractor shall employ an Independent Testing Laboratory approved by SABIC to perform all testing of
materials used in the concrete mixes and concrete samples in accordance with applicable standards
Independent Testing Laboratory shall furnish all equipment, facilities, and labor required for field
sampling, curing, transporting test samples, field/laboratory tests, recording of test results, and preparing
necessary reports.
B501 – S01
SABIC - Cast in place concrete
Execution
Unsatisfactory Concrete
If any test results fail to the quantity of concrete represented by the results shall be removed and replaced
with concrete meeting the requirement of this standard at no additional cost to SABIC.
Additionally, an investigation shall be performed by contractor to identify the root cause of noncompliance
and specify corrective measures.
Records
1. Concrete Placement Record
Date of Placement:
Delivery tickets
1 Weather conform 12
to approved Yes/No
design mix?
Temperature / humidity
a. Ambient Numbers of delivery
2 b. Concrete (at time of 13
tickets attached
placement
c. Relative humidity
Were cylinders taken
3 Rate of placement 1428-days
for 7- and Yes/No
test?
4 Curing method
Breakdown of
5 Type of equipment used 15 and other
placement
remarks, if
applicable
Quantity of concrete
6
placed (volume of pour)
7 Type of finish
8 Start time
Note:
1. Water should not be added at site.
B501 – S01
SABIC - Cast in place concrete
Execution
Subgrade preparation
Line and grade
Formwork
Reinforcement
Embedded (civil items)
Embedded (mechanical
items)
Embedded (electrical items)
Water stop
Block-outs/openings
(civil, mechanical and
electrical)
Preparation of
construction joint
Water proofing/vapor barrier
Cleanliness and access
Verification of rates of
placement (m 3/h)
Provision for hot weather
concreting
Contractor’s Hold point released
Signature/Date/Time
SABIC Engineer’s Name Signature/Date
B501 – S01
SABIC - Cast in place concrete
Execution
B501 – S01
SABIC - Cast in place concrete
Execution
Concrete cover
SABIC may check the cover and verify it, if it is less than in size or either way not matching with
standards than cover with concrete meeting the standards to be replaced
Salt Content
Covered in design mix
Placement
STD ACI 301 and 304
Prior to placement make ensure all SABIC Inspection is finished
Movement of formworks and rebar to be checked and controlled while placement of concrete
Temperature of concrete and climatic conditions, concreting not to proceed during sandstorm
Max height & depth of pour are 1m and 60cm
Compaction
Std ACI 309 Consolidation of concrete
Full compaction of the concrete is achieved through the entire depth of layer, it shall be thoroughly
worked around formworks and rebars properly
Power driven poker type vibrator
Immersion type vibrator
Placed vertically in successive intervals to have good compaction, good bonding in preceding layers
Over vibration causing segregation or leakage through formwork avoided
Standby equipment for vibration and compaction to be arranged
Vibration not to be used in a way so that it will damage formwork, displace rebar and segregate the
mix
B501 – S01
SABIC - Cast in place concrete
Execution
B501 – S01
SABIC - Cast in place concrete
Execution
CURING
See Royal standards + QCS 2002 + PDO
PROTECTION OF CONCRETE
See separate SABIC Procedure
Concrete shall be central mixed in a batching plant in accordance with ASTM C 94 and this
standard. The relative proportions of fine and coarse aggregates, workability and strength of the
mixes shall be determined by production equipment trial mixes.
Once the aggregate proportions have been accepted by SABIC, they shall not be changed
without SABIC approval.
All test on the trial mixes, including 28 days compressive strength test, shall be completed and
approved by SABIC prior to concrete pouring.
Acceptance of trial mix will be made by SABIC when proportions, slump, workability,
consistency, impermeability, water/cementitious materials ratio and all other requirements of this
standard have been met, and when the strength test results for each of the specified concrete
strengths also match
Six (6) separate test mixes shall be prepared for each proposed mix design, and six (6) test
cylinders shall be made from each test mix, giving a total of 36 cylinders for each proposed mix
design.
The test cylinders shall be made and cured in accordance with ASTM C 192 and tested in
accordance with ASTM C 39. Additionally, enough samples shall be prepared for the other tests
required by this standard.
Eighteen (18) concrete cylinders shall be tested for compressive strength at 7 days and 28 days
(total 36). The mean strengths and standard deviations shall be established for each test.