Download as pdf or txt
Download as pdf or txt
You are on page 1of 55

HEAD OFFICE 8F JW Tower, 2477 Nambusoonhwan-ro, Seocho-gu, Seoul, Korea 137-864

Tel. 82-2-2103-3030, 3036 Fax. 82-2-2103-3049


PLANTS 1,Gilchun-ri, Sangbuk-myun, Ulju-kun, Ulsan City, Korea 689-821
Tel. 82-52-262-3881 Fax. 82-52-264-3981
275-2 Daewho-dong, Daedeok-Gu, DaeJeon City, Korea 306-801
Tel. 82-42-605-8200 Fax. 82-42-622-9967
Home Page www.hyundaial.co.kr

Dia chi: Duong B2, Khu B, Khu Cong nghiep Pho Noi A, Huyen Van Lam
Tinh Hung Yen, Viet Nam
Tel: +84 321 396 7771-5 ; Fax: +84 321 396 7770 ; E-mail: jb222@gg-al.com

The best manufacturer in the field of


exterior cladding,
aluminum curtain walls and windows
Introduction
We, Hyundai aluminum Co., Ltd. are very proud of introducing our great deal of remarkable accomplishments

throughout worldwide which has been fully supported by the utmost technologies

in the field of aluminum curtain walls, window & door, Aluminum Forms and industrial products.

Since we established our business in 1978, we have faced a lot of challenges to meet our customer s

requirements and this has made us more promising company up to now.

Under the environment that only the best can survive in the keen competition, it has made us continually seek

out new technologies to further our product capabilities firmly based upon a strog, integral research mood

with regard to material technology

and manufacturing skills in order to ensure our competitive position and high-quality products.

As being capable of meeting any requirements from our customers with the total service system covering

design, production, fabrication, packing, delivery, installation and maintenance of designated products, we

have always produced best quality

products with the excellent reputation being accumulated which has given us a lot of opportunities to work

foremost builders.

With it in mind that the foundation of the philosophy to put the putsuit of technology on the first priority has

been sustained under ever changing environments, we can assure that we will give you full satisfaction and

continue to the successful

performance of business.
Contents
HANOI MANUFACTURING BASES 4 POSCO MANAGEMENT
HANOI PRODUCTION CAPACITY 6 INFORMATION CENTER(POINT GLAZING) 60
KOREA PLANT 8 JEIL SECURITY EXCHANGE BUILDING 61
PRODUCTION PROCESS 10 YOOHWA SECURITY EXCHANGE BUILDING 62
KOREA TRADE CENTER OFFICE BUILDING 63
SWIMMING POOL,
PERFORMANCES RAMADA RENAISSANCE HOTEL
VIETNAM PROJECT ENTRANCE, WOMAN’S MISSION CENTER 64
SPLENDORA NEW CITY PROJECT 12
INTERNATIONAL BROADCASTING CENTER
DETECH TOWER 13
BOTANICAL GARDEN 65
LANCASTER COMPLEX 14

Brief History
HILLSTATE COMPLEX PROJECT 15
USA PROJECT
HABICO TOWER
BRINDERSON TOWER 66
KEANGNAM HANOI LANDMARK TOWER 16
DIRECTOR’S GUILD 67
MIPEC TOWER 17
TWO UNION SQUARE 68
550 SOUTH HOPE STEET 69
1978 Established as a division of Hyundai Engineering & KOREA PROJECT CHICAGO TITLE
Construction Co., Ltd. In Hyundai Group (Architectural NORTHEAST ASIA TRADE TOWER 19 CHRYSLER CORPORATE HEADQUARTERS 70
Materials Division) HALLYM UNIVERSITY 1420 FIFTH AVENUE
DONGTAN MEDICAL CENTER 20 ALCOA WORLD HEADQUARTERS 71
1980Set up the technical cooperation with ALCAN in MBC's NEW BUILDINGS IN TWO UNION SQUARE 72
Canada and started the production of anodizing. SANGAM-DONG 21
DAEHAN LIFE INSURANCE CO.,LTD CHINA PROJECT
1982 Set up the technical cooperation with AWA in U.S.A HEAD OFFICE BUILDING 22
WORLD PLAZA 73
PARC 1 23
and completed the installation of automatic paint line. WORLD FINANCE TOWER 74
SUNGWOO OSTAR 27
JINGYIN MANSION BUILDING
PENTAPORT 25
1987 Established Hyundai Aluminum Industry Co., Ltd. as KING HIP BUILDING 75
SONDO GLOBAL UNIVERSTY CAMPUS 26 SOUTH PACIFIC HOTEL 76
a subsidiary of Hyundai Business Group.
D-CUBECITY MALL 27 PUDONG GOVERNMENT OFFICE CENTER 77
SONDO HILLSTATE 28
1988 Awarded Flour polymer Extrusion Coating applicator
BUSAN NATIONAL UNIVERSITY
INDUSTRIAL COMMERCIAL BANK 78
Certificate by PPG industries. POS PLAZA 79
CHILDREN’S HOSPITAL 29
MACAU TOWER & ENTERTAINMENT 80
SONDO GLOBAL R&D CENTER 30
1989 Equipped Extrusion Press _(3,600 tons) NHN VENTURE TOWER 31
MASAN I’PARK 32
EGYPT PROJECT
1992 - Equipped Extrusion Press _(1,800 tons) FOUR SEASONS HOTEL 81
SEOUl LOTTE HOTEL(RENOVATION) 33
- Operated the Vertical anodizing shop THE# CENTRAL STAR 34
- Equipped CNC fabrication shop NAMCHEON SAMICK
JAPAN PROJECT
RECONSTRUCTION APARTMENT 35 NIHON TELEPHONE & TELEGRAPH
1995 Awarded ISO 9001 certificate for design, JUNG-DONG WE'VE THE STATE 36 HEAD-QUARTERS BUILDING 82
Development, production, installation & servicing for BUSAN POSEIDON II 37
aluminum extrusion bars & assembled windows, BUSAN POSEIDON I 38 SPAIN PROJECT
curtain wall systems. DAEGU WE’VE THE ZENITH 39 INDOCENTRO
MAPO LOTTE CASTLE 40 FOMENTO M-30 83
1998 Merged into Korea Industrial Development Co., Ltd. BEOMIL-DONG MAJESTOWER
as a Division of Hyundai Aluminum. SINJENG-DONG WE’VE THE ZENITH 41 ARGENTINA PROJECT
LOTTE DEPARTMENT STORE / BOUCHARD PLAZA 84
RENOVATION 42
2002 Established Hyundai Aluminum industry Co., Ltd.
BUNDANG CHA-MEDICAL CENTER 43
as an independent company from Korea Industrial HONGKONG PROJECT
LOTTE CASTLE IVY 44
Development Co., Ltd. GOVERNMENT OFFICE BUILDING PHASE II
YONGSAN PRIVATE STATION 45
KOWLOON PARK SPORTS COMPLEX 85
SEOCHO ACROVISTA 46
2004 Merged into Doosan Industrial Development Co., Ltd.
HYUNDAI BENECITY 47
TAIWAN PROJECT
GALWOL-DONG OFFICETEL 48
2005 Established Hyundai Aluminum Co., Ltd. as a JUNGJA-DONG, DOOSAN WE'VE PAVILION 49
TAIKAY BUILDING 86
subsidiary of Dongyang Gangchul Co., Ltd. FUBON BANKING CENTER 87
HEADQUARTERS OF HYUNDAI MARINE
& FIRE INSURANCE CO., LTD 50 TAISHIN BANK TOWER 88
2006 Established Hyundai Aluminum VINA in Vietnam MOK-DONG HYPERION 51
BEXCO CONVENTION CENTER 52 PHILIPPINES PROJECT
ICEC LAND CORPORATION HEADQUARTERS 89
2008 Equipped & Operated full production line STAR TOWER 53
(Dies, Billet Casting, Extrusion, CNC Fabrication, Painting DAE-RIM ACROVILL 54
& Assembly) BUNDANG PANTEON BUILDING 55 AUSTRALIA PROJECT
CHONG-RO BUILDING 56 120 COLLINS STREET 90
2010 Awarded TCVN 5838-5842:1994 (ISO6362/1-5:1986-1991) BUSAN LOTTE HOTEL 57
EULGI-RO REDEVELOPMENT BUILDING AL-FORM SYSTEM 92
KOREA HEAVY INDUSTRIAL CO., LTD. 58 PERFORMANCES RECORD 104
2011 Opened Hyundai Aluminum VINA - Hanoi Office
POSCO MANAGEMENT
INFORMATION CENTER(UNITZED) 59
Hanoi Manufacturing Bases

PLANT

Location : hanoi Vietnam


Casting 36,000 ton/year
Extrusion 18,000 ton/year
Fabrication 3,600 ton/year
Assembly 2,400 ton/year
Painting 7,200 ton/year
OFFICE DORMITORY Anodizing 7,200 ton/year

4 5
Hanoi PRODUCTION CAPACITY
II. PRODUCTION PROCESS

Extrusion Line

Manufacture Line Melting Furnace

Paint Line Homogenizing Furnace Die-Making Manufacture Line Manufacture Line

6 7
Location : Korea (Daejeon & Eonyang)
KOREA PLANT Die Making 7,000 ton/year
As a manufacturer of Aluminum products, we have built significant performances in many locations both at home and abroad. As our
Melting 36,000 ton/year
plants are situated in the vicinity of Ulsan industrial complex where most of the Hyundai group plants are located, we have benefited Extrusion 8,000 Ton Press up to 17” Diameter 84,000 ton/year
from valuable technical know-how and on-site experience from those group companies.Moreover, we have integrated production 4,350 Ton Press up to 13” Diameter
facilities which rang from melting extrusion, fabrication, painting & anodizing to assembling our products. Whatever your requirements, 2,750 Ton Press up to 8” Diameter
Anodizing Clear (Natural) Anodizing 36,000 ton/year
we can give successful performance and satisfaction, to our customers.
Bronze color Anodizing (Various Color Range)
Black Color Anodizing
High Performance Fluorocarbon Coating (Kynar 500) 30,000 ton/year
Organic Coating Other organic coating
Fabrication 9,600 ton/year
Assembly 7,200 ton/year

Daejeon Plant # 1 Daejeon Plant # 2

Eonyang Plant

Daejeon Plant # 3 Daejeon Plant # 5 / Plant # 6

8 9
PRODUCTION PROCESS
Hyundai Aluminum is proud of perfect production system consisting of the most advanced
facilities which allows effective production of products.

1. DESIGN 2.DIE MARKING 3.MELTING 4.EXTRUSION


PERFORMANCES
VIETNAM PROJECT
KOREA PROJECT
U.S.A PROJECT
CHINA PROJECT
EGYPT PROJECT
JAPAN PROJECT
SPAIN PROJECT
ARGENTINA PROJECT
5. ANODIZING 6.COATING 7.FABRICATION & ASSEMBLING 8.PACKING HONG KONG PROJECT
TAIWAN PROJECT
PHILIPPINES PROJECT

GLAZING WORK PROCESS AUSTRALIA PROJECT

SECTION CAULKING WORK(SEALANT) NORTON TAPE WORK GLASS WORK

JAMB SEALING WORK TRANSOM SEALING WORK SEALING WORK OF HEAD PART

10
SPLENDORA NEW CITY PROJECT
ARCHITECT Dowool
CONTRACTOR Posco E&C
BUILDING STORIES 28 Stories X 2Units
CONSTRUCTION PERIOD April.2011~December.2011
SYSTEM AL. Punched Window

PERFORMANCES VIETNAM PROJECT DETECH TOWER


ARCHITECT
CONTRACTOR
Nguoi Phap
Detech
VIETNAM PROJECT BUILDING STORIES 19 Stories
CONSTRUCTION PERIOD June.2011~Jan.2012
SYSTEM AL. Punched Window & Stick C/wall

12 13
HILLSTATE COMPLEX PROJECT
ARCHITECT HyunJong
CONTRACTOR Hyundai E&C
BUILDING STORIES 35 Stories x 5Units
CONSTRUCTION PERIOD June.2012~March.2013
SYSTEM PVC Punched Window &
Al. Stick System

VIETNAM PROJECT

LANCASTER COMPLEX
ARCHITECT Archipel
PERFORMANCES CONTRACTOR Minh Khang Ltd.Co.
VIETNAM PROJECT BUILDING STORIES 29 Stories
CONSTRUCTION PERIOD June.2012~December.2012
SYSTEM AL. Punched Window &
Stick C/wall

14 15
PERFORMANCES
HABICO TOWER, HANOI, VIETNAM
ARCHITECT
CONTRACTOR
DOUL INTERNATIONAL LTD.
DOOSAN HEAVY INDUSTRIES
VIETNAM PROJECT KEANGNAM HANOI LANDMARK TOWER, HANOI, VIETNAM
ARCHITECT
CONTRACTOR
HEERIM ARCHITECTS & PLANNERS
KEANGNAM
VIETNAM PROJECT & CONSTRUCTION CO., LTD. ENTERPRISES CO., LTD.
BUILDING STORIES 48 STORY (USD 16,940,000) BUILDING STORIES 48 STORY X 2 BUILDINGS,
CONSTRUCTION PERIOD SEP. 2009 - JUL. 2012 70 STOREY X 1 BUILDING
SYSTEM UNITIZED SYSTEM CONSTRUCTION PERIOD FEB. 2008.11 - AUG. 2010
SYSTEM UNITIZED SYSTEM
16 17
MIPEC TOWER, HANOI, VIETNAM NORTHEAST ASIA TRADE TOWER, SONDO, KOREA
PERFORMANCES
VIETNAM & KOREA
ARCHITECT
CONTRACTOR
FINENCO
COTEBA
KOREA PROJECT ARCHITECT
CONTRACTOR
K.P.F
DAEWOO CONSTRUCTION
BUILDING STORIES 28 STORIES BUILDING STORIES 68 STORIES
PROJECT CONSTRUCTION PERIOD DEC. 2010 - MAY. 2011 CONSTRUCTION PERIOD AUG. 2007 - SEP. 2010
SYSTEM PUNCHED WINDOW WALL SYSTEM SYSTEM UNITIZED SYSTEM

18 19
KOREA PROJECT

HALLYM UNIVERSITY DONGTAN MEDICAL CENTER


ARCHITECT GUGAN ARCHITECTS GROUP, LTD.
CONTRACTOR HYUNDAI ENGINEERING &
CONSTRUCTION
BUILDING STORIE 19 STORIES
CONSTRUCTION PERIOD MAR. 2011 ~ SEP. 2012
SYSTEM AL. Punched Window & Stick C/wall

MBC's NEW BUILDINGS IN SANGAM-DONG


ARCHITECT HEERIM ARCHITECTS & PLANNERS
CONTRACTOR HYUNDAI DEVELOPMENT COMPANY
BUILDING STORIES 14 STORIES x 4 BUILDINGS
CONSTRUCTION PERIOD NOV. 2011 ~ OCT. 2013
SYSTEM AL. Punched Window & Stick C/wall
PERFORMANCES
KOREA PROJECT

20 21
KOREA PROJECT

PARC 1(TOWER2), YEOIDO, SEOUL, KOREA PARC 1(HOTEL), YEOIDO, SEOUL, KOREA
DAEHAN LIFE INSURANCE CO.,LTD
ARCHITECT ROGERS STRICK HARBOUR ARCHITECT ROGERS STRICK HARBOUR
PERFORMANCES HEAD OFFICE BUILDING, SEOUL, KOREA
ARCHITECT C.M. PARK & CO., LTD
+ PARTNER HARBOUR + PARTNER HARBOUR
CONTRACTOR SAMSUNG C&T CORPORATION CONTRACTOR SAMSUNG C&T CORPORATION
KOREA PROJECT CONTRACTOR SHIN DONG-A CONSTRUCTION
&ENGINEERING CO.,LTD
BUILDING STORIES 54 STORIES BUILDING STORIES 33 STORIES
CONSTRUCTION PERIOD MAY. 2010 - JAN. 2012 CONSTRUCTION PERIOD OCT. 2010 - JUN. 2012
BUILDING STORIES 63 STORIES
SYSTEM UNITIZED SYSTEM SYSTEM UNITIZED SYSTEM
CONSTRUCTION PERIOD FEB. 1983 - NOV. 1984
SYSTEM UNITIZED SYSTEM
22 23
SUNGWOO OSTAR, YANGPYUNG, KOREA
PERFORMANCES ARCHITECT
CONTRACTOR
HANKI ARCHITECTS & ENGINEERS
SUNGWOO CONSTRUCTION
KOREA PROJECT PENTAPORT, ASAN, KOREA
CONTRACTOR
BUILDING STORIES
SK Engineering & Construction Co.,Ltd.
66 STORIES
KOREA PROJECT BUILDING STORIES
CONSTRUCTION PERIOD
38 STORIES
JUL. 2010 - DEC. 2011
CONSTRUCTION PERIOD
SYSTEM
MAR. 2009 – OCT. 2011
UNITIZED SYSTEM
SYSTEM PUNCHED WINDOW WALL SYSTEM

24 25
SONDO GLOBAL UNIVERSTY CAMPUS , SONDO, KOREA

PERFORMANCES
ARCHITECT
CONTRACTOR
MOOYOUNG ARCHITECTS & ENGINEERS
HYUNDAI CONSTRUCTION
KOREA PROJECT D-CUBECITY MALL, SINDORIM, KOREA
ARCHITECT
CONTRACTOR
SAMOO ARCHITECTS & ENGINEERS
DAESUNG CONSTRUCTION
BUILDING STORIES 6 STORIES BUILDING STORIES 16 STORIES
KOREA PROJECT CONSTRUCTION PERIOD APRIL. 2010 - OCT. 2011 CONSTRUCTION PERIOD MAC. 2010 - JUN. 2011
SYSTEM STICK SYSTEM SYSTEM STICK SYSTEM

26 27
PERFORMANCES
SONDO HILLSTATE, SONDO, KOREA
ARCHITECT
CONTRACTOR
E. METRO
HYUNDAI CONSTRUCTION
KOREA PROJECT BUSAN NATIONAL UNIVERSITY CHILDREN’S HOSPITAL, YANGSAN, KOREA
CONTRACTOR
BUILDING STORIES
DAEWOO CONSTRUCTION
12 STORIES
BUILDING STORIES 20 STORIES CONSTRUCTION PERIOD APR. 2007 - DEC. 2010
KOREA PROJECT CONSTRUCTION PERIOD JUL. 2009 - JAN. 2011 SYSTEM PUNCHED WINDOW WALL SYSTEM
SYSTEM PUNCHED WINDOW WALL SYSTEM

28 29
SONDO GLOBAL R&D CENTER , INCHEON, KOREA NHN VENTURE TOWER, BUNDANG, KOREA
PERFORMANCES CONTRACTOR
BUILDING STORIES
POSCO E&C
10 STORIES
KOREA PROJECT ARCHITECT
CONTRACTOR
SAMOO ARCHITECTS & ENGINEERS
HYUNDAI ENGINEERING &
KOREA PROJECT CONSTRUCTION PERIOD
SYSTEM
MAY. 2009 – MAY. 2010
UNITIZED, STICK, STEEL CURTAIN WALL SYSTEM BUILDING STORIES
CONSTRUCTION CO., LTD.
29 STORIES
CONSTRUCTION PERIOD MAR. 2007 – DEC. 2009.
SYSTEM UNITIZED SYSTEM

30 31
MASAN I’PARK, MASAN, KOREA

PERFORMANCES
ARCHITECT
BUILDING STORIES
HYUNDAI INDUSTRIAL DEVELOPMENT CO., LTD.
36 STORIES
KOREA PROJECT LOTTE HOTEL(RENOVATION), SEOUL, KOREA
CONTRACTOR
BUILDING STORIES
LOTTE CONSTRUCTION CO., LTD.
38 STORIES
CONSTRUCTION PERIOD MAY. 2008 - DEC. 2009 CONSTRUCTION PERIOD MAR. 2007 – SEP. 2009
KOREA PROJECT SYSTEM PUNCHED WINDOW WALL SYSTEM SYSTEM PUNCHED WINDOW STICK SYSTEM

32 33
THE# CENTRALSTAR, BUSAN, KOREA NAMCHEON SAMICK RECONSTRUCTION APARTMENT, BUSAN, KOREA
PERFORMANCES CONTRACTOR
BUILDING STORIES
POSCO E&C
48 STORIES
KOREA PROJECT CONTRACTOR
BUILDING STORIES
KOLON ENGINEERING & CONSTRUCTION CO., LTD.
28 STORIES
KOREA PROJECT CONSTRUCTION PERIOD
SYSTEM
JUN. 2008 - MAY. 2011
UNITIZED SYSTEM
CONSTRUCTION PERIOD
SYSTEM
JUN. 2007 - FEB. 2009
PUNCHED WINDOW WALL SYSTEM

34 35
PERFORMANCES
JUNG-DONG WE'VE THE STATE, GYUNGGI-DO, KOREA
ARCHITECT
CONTRACTOR
SHILIM ARCHITECTS
DOOSAN INDUSTRIAL DEVELOPMENT CO., LTD.
KOREA PROJECT BUSAN POSEIDON II, BUSAN, KOREA
ARCHITECT
CONTRACTOR
KUN-WON ARCHITECT & ASSOCIATES
DOOSAN INDUSTRIAL DEVELOPMENT CO., LTD.
KOREA PROJECT BUILDING STORIES APT:17 STORIES X 6UNITS, BUILDING STORIES 47 STORIES X 5UNITS
OFFICETEL:37 STORIES X 4UNITS CONSTRUCTION PERIOD Aug. 2005 – Dec, 2006
CONSTRUCTION PERIOD DEC. 2006 - MAY 2007 SYSTEM PUNCHED WINDOW WALL SYSTEM
SYSTEM PUNCHED WINDOW WALL SYSTEM

36 37
BUSAN POSEIDON I, BUSAN, KOREA DAEGU WE’VE THE ZENITH, DAEGU, KOREA
PERFORMANCES ARCHITECT
CONTRACTOR
KUN-WON ARCHITECT & ASSOCIATES
DOOSAN INDUSTRIAL DEVELOPMENT CO., LTD.
KOREA PROJECT ARCHITECT
CONTRACTOR DOOSAN INDUSTRIAL DEVELOPMENT CO., LTD.
KOREA PROJECT BUILDING STORIES 46 STORIES / 48 STORIES
CONSTRUCTION PERIOD May. 2005 – Dec, 2006
BUILDING STORIES 47 STORIES
CONSTRUCTION PERIOD OCT.2007 ~ MAR.2010
SYSTEM STICK CURTAIN WALL SYSTEM SYSTEM STICK CURTAIN WALL SYSTEM

38 39
BEOMIL-DONG MAJESTOWER , BUSAN, KOREA
ARCHITECT GAJUN ARCHITECTS
CONTRACTOR CHINHUNG CONSTRUCTION CO., LTD
BUILDING STORIES 40 STORIES
CONSTRUCTION PERIOD OCT.2007 ~ NOV.2010
SYSTEM STICK CURTAIN WALL SYSTEM

KOREA PROJECT

SINJENG-DONG WE’VE THE ZENITH, ULSAN, KOREA


ARCHITECT NOW ARCHITECTS
MAPO LOTTE CASTLE, SEOUL, KOREA CONTRACTOR DOOSAN INDUSTRIAL
PERFORMANCES CONTRACTOR
BUILDING STORIES
LOTTE CONSTRUCTION CO., LTD.
42 STORIES
DEVELOPMENT CO., LTD
BUILDING STORIES 48 STORIES
KOREA PROJECT CONSTRUCTION PERIOD NOV. 2006 – FEB. 2009 CONSTRUCTION PERIOD
SYSTEM UNITIZED SYSTEM SYSTEM STICK CURTAIN WALL SYSTEM

40 41
DESCRIPTION
This system is installed piece by piece. Usually the vertical mullions are
installed first, followed in turn by the horizontalrail members, the panels(if
any), and finally the glazing or window units. In designs accenting the
horizontal lines the process maybe altered to first install the horizontal rail
members.In either case, both the horizontal rails & vertical mullions are often
long sections designed to overlap or extend through attheir intersections.

ADVANTAGES
It offers its relatively low shipping & handling costs, because of minimum bulk,
and the fact that it does some degree of dimensional adjustment to site
structural conditions.

LOTTE DEPARTMENT STORE, SEOUL, KOREA


PERFORMANCES ARCHITECT
CONTRACTOR
YE ARCHITECTS & ASSOCIATES.
LOTTE ENGINEERING & CONSTRUCTION CO., LTD.
KOREA PROJECT BUNDANG CHA-MEDICAL CENTER, GYUNGGI-DO, KOREA
ARCHITECT
CONTRACTOR
KIM YOUNG JUN CITY ARCHITECTS
DOOSAN INDUSTRIAL DEVELOPMENT CO., LTD.
KOREA PROJECT BUILDING STORIES
CONSTRUCTION PERIOD
14 STORIES
SEP. 2004 - FEB. 2006
BUILDING STORIES 5 STORIES
CONSTRUCTION PERIOD DEC. 2005 - FEB. 2006
SYSTEM STICK SYSTEM SYSTEM STICK SYSTEM

42 43
LOTTE CASTLE IVY, YEOIDO, SEOUL, KOREA YONGSAN PRIVATE STATION, SEOUL, KOREA
PERFORMANCES ARCHITECT
CONTRACTOR
S&G GENERAL CONSTRUCTION OFFICE
DONG-A CONSTRUCTION &
KOREA PROJECT ARCHITECT
ASSOCIATES CO., LTD.
HAE-AHN ARCHITECTS &

KOREA PROJECT BUILDING STORIES


ENGINEERING CO.,LTD
30 + 20 STORIES
CONTRACTOR
DEVELOPMENT CO., LTD.
HYUNDAI INDUSTRIAL

CONSTRUCTION PERIOD JUN. 2003 - MAY. 2005 BUILDING STORIES 9 STORIES


SYSTEM UNITIZED SYSTEM CONSTRUCTION PERIOD MAY. 2004 - MAR. 2005
SYSTEM STICK SYSTEM, PANEL SYSTEM
44 45
HYUNDAI BENECITY, BUSAN, KOREA
PERFORMANCES
SEOCHO ACROVISTA, SEOUL, KOREA
ARCHITECT
CONTRACTOR
GUN-WON ARCHITECTS & ASSOCIATES.
DAELIM INDUSTRIAL COMPANY
KOREA PROJECT ARCHITECT IL-SHIN ARCHITECTS &
ASSOCIATES CO., LTD.
KOREA PROJECT BUILDING STORIES 37 STORIES CONTRACTOR HYUNDAI ENGINEERING &
CONSTRUCTION CO., LTD.
CONSTRUCTION PERIOD JUN. 2002 - NOV. 2004
SYSTEM UNITIZED SYSTEM BUILDING STORIES 38 STORIES 4 UNITS
CONSTRUCTION PERIOD OCT. 2003 - DEC. 2004
SYSTEM UNITIZED SYSTEM
46 47
GALWOL-DONG OFFICETEL, SEOUL, KOREA
PERFORMANCES ARCHITECT
CONTRACTOR
HAUD ARCHITECTS & ASSOCIATES.
BUKSAN CONSTRUCTION CO., LTD.
KOREA PROJECT JUNGJA-DONG, DOOSAN WE'VE PAVILION, GYUNGGI-DO, KOREA
ARCHITECT
CONTRACTOR
MINORU YAMASAKI ASSOCIATES KOREA
DOOSAN INDUSTRIAL DEVELOPMENT CO., LTD.
KOREA PROJECT BUILDING STORIES
CONSTRUCTION PERIOD
21 STORIES
APR. 2003 - AUG. 2004
BUILDING STORIES 27 STORIES
CONSTRUCTION PERIOD JAN. 2003 - MAR. 2004
SYSTEM STICK WALL SYSTEM SYSTEM PANEL SYSTEM

48 49
PERFORMANCES
HEADQUARTERS OF HYUNDAI MARINE & FIRE INSURANCE CO., LTD, SEOUL, KOREA
ARCHITECT JUNG LIM ARCHITECTS & ASSOCIATES CO., LTD.
KOREA PROJECT MOK-DONG HYPERION, SEOUL, KOREA
ARCHITECT
CONTRACTOR
YE CONSTRUCTION LTD.
HYUNDAI ENGINEERING & CONSTRUCTION CO., LTD.
CONTRACTOR HYUNDAI INDUSTRIAL DEVELOPMENT CO., LTD. BUILDING STORIES 69 STORIES
KOREA PROJECT BUILDING STORIES 20 STORIES CONSTRUCTION PERIOD OCT. 2001 - MAR. 2003
CONSTRUCTION PERIOD DEC. 2002 - OCT. 2003 SYSTEM PUNCHED WINDOW WALL SYSTEM
SYSTEM RENOVATION SYSTEM

50 51
BEXCO CONVENTION CENTER, BUSAN, KOREA
PERFORMANCES ARCHITECT
CONTRACTOR
MESA ARCHITECTS
HYUNDAI ENGINEERING & CONSTRUCTION CO., LTD.
KOREA PROJECT STAR TOWER, SEOUL, KOREA
ARCHITECT
CONTRACTOR
DONG SHIN ENGINEERING CO., LTD.
HYUNDAI INDUSTRIAL DEV. CO., LTD.
KOREA PROJECT BUILDING STORIES
CONSTRUCTION PERIOD
8 STORIES
FEB. 2000 - APRIL. 2001
BUILDING STORIES 45 STORIES
CONSTRUCTION PERIOD NOV. 1996 - APR. 2001
SYSTEM STICK SYSTEM SYSTEM UNITIZED SYSTEM

52 53
DAE-RIM ACROVILL, GYUNGGI-DO, KOREA BUNDANG PANTEON BUILDING, GYUNGGI-DO, KOREA
PERFORMANCES CONTRACTOR
BUILDING STORIES
DAE-RIM INDUSTRIAL CO., LTD.
46 STORIES
KOREA PROJECT ARCHITECT
CONTRACTOR
HAE-AHN ARCHITECT & ASSOCIATES
HYUNDAI INDUSTRIAL DEVELOPMENT CO., LTD.
KOREA PROJECT CONSTRUCTION PERIOD
SYSTEM
DEC. 1998 - DEC. 1999
UNITIZED SYSTEM
BUILDING STORIES
CONSTRUCTION PERIOD
27 STORIES
JUNE 1999 - DEC. 2000
SYSTEM PUNCHED WINDOW WALL SYSTEM

54 55
CHONG-RO BUILDING, SEOUL, KOREA
PERFORMANCES ARCHITECT
CONTRACTOR
SAMWOO ARCHITECT & ENGINEERING
SAMSUNG CORPORATION
KOREA PROJECT BUSAN LOTTE HOTEL, BUSAN, KOREA
ARCHITECT
CONTRACTOR
YE ARCHITECTS & ASSOCIATES
LOTTE ENGINEERING & CONSTRUCTION CO., LTD.
KOREA PROJECT BUILDING STORIES
CONSTRUCTION PERIOD
32 STORIES
APR. 1997 - JUN. 1998
BUILDING STORIES 53 STORIES
CONSTRUCTION PERIOD SEP. 1993 - AUG. 1997
SYSTEM STICK SYSTEM SYSTEM COLUMN CLADDING SYSTEM

56 57
PERFORMANCES
KOREA HEAVY INDUSTRIAL CO., LTD., SEOUL, KOREA
ARCHITECT
CONTRACTOR
KOHN PEDERSON FOX ASSOCIATES
DONG BU CONSTRUCTION CO., LTD.
KOREA PROJECT POSCO MANAGEMENT INFORMATION CENTER, SEOUL, KOREA
ARCHITECT
CONTRACTOR
S&G GENERAL CONSTRUCTION OFFICE
DONG-A CONSTRUCTION &
KOREA PROJECT BUILDING STORIES
CONSTRUCTION PERIOD
22 STORIES
OCT. 1996 - OCT. 1997
ENGINEERING CO.,LTD
BUILDING STORIES 30 + 20 STORIES
SYSTEM UNITIZED SYSTEM CONSTRUCTION PERIOD JUL. 1993 - FEB. 1995
SYSTEM UNITIZED SYSTEM

58 59
PERFORMANCES
POSCO MANAGEMENT INFORMATION CENTER, SEOUL, KOREA
ARCHITECT
CONTRACTOR
S&G GENERAL CONSTRUCTION OFFICE
DONG-A CONSTRUCTION
KOREA PROJECT JEIL SECURITY EXCHANGE BUILDING, SEOUL, KOREA
ARCHITECT
CONTRACTOR
ARCHITECTS & PLANNERS INC.
DUKSAN CIVIL ENGINEERING
KOREA PROJECT &ENGINEERING CO.,LTD CONSTRUCTION CO.,LTD
BUILDING STORIES 30 + 20 STORIES BUILDING STORIES 29 STORIES
CONSTRUCTION PERIOD JUL. 1993 - FEB. 1995 CONSTRUCTION PERIOD MAY. 1992 - DEC. 1993
SYSTEM POINT GLAZING SYSTEM SYSTEM UNITIZED SYSTEM

60 61
YOOHWA SECURITY EXCHANGE BUILDING, SEOUL, KOREA
PERFORMANCES ARCHITECT WOOIL GENERAL ARCHITECTURE
DESIGN OFFICE
KOREA PROJECT KOREA TRADE CENTER OFFICE BUILDING, SEOUL, KOREA
ARCHITECT
CONTRACTOR
NIKKEN SEKKI LTD.
KEUK DONG CONSTRUCTION
KOREA PROJECT CONTRACTOR SEDEA CONSTRUCTION CO., LTD.
CONSTRUCTION CO.,LTD
CO., LTD.
BUILDING STORIES 54 STORIES
BUILDING STORIES 20 STORIES CONSTRUCTION PERIOD JAN. 1987 - MAY. 1988
CONSTRUCTION PERIOD SEP. 1992 - OCT. 1993 SYSTEM STICK SYSTEM
SYSTEM STICK SYSTEM
62 63
SWIMMING POOL, RAMADA RENAISSANCE HOTEL, SEOUL, KOREA
ARCHITECT SAM BOO CONSTRUCTION CO., LTD.
CONTRACTOR SAM BOO CONSTRUCTION CO., LTD.
CONSTRUCTION PERIOD APR. 1987 - APR. 1988
SYSTEM SKYLIGHT SYSTEM
INTERNATIONAL BROADCASTING CENTER,
SEOUL, KOREA
ARCHITECT KIM JOONG-UP
DESIGN OFFICE
CONTRACTOR KBS (KOREA
BROADCASTING STATION)
CORPORATION
CONSTRUCTION PERIOD JAN. 1987 - DEC. 1989
PERFORMANCES SYSTEM SKYLIGHT SYSTEM
KOREA PROJECT

KOREA PROJECT
BOTANICAL GARDEN, CHEJU ISLAND, KOREA
ARCHITECT TOKYO LANDSCAPE
ARCHITECT
CONTRACTOR HYUNDAI ENGINEERING &
CONSTRUCTION CO., LTD.
BUILDING STORIES 1F (HEIGHT:40M)
CONSTRUCTION PERIOD JUN. 1987 - MAR. 1988
SYSTEM SKYLIGHT SYSTEM
ENTRANCE, WOMAN’S
MISSION CENTER,
SEOUL, KOREA
SYSTEM
SKYLIGHT SYSTEM

64 65
BRINDERSON TOWER, IRVINE, CA., U.S.A
PERFORMANCES ARCHITECT
CONTRACTOR
ALBERT C. MARTIN & ASSOCIATES
BRINDERSON CONSTRUCTION CO.,LTD
USA PROJECT DIRECTOR’S GUILD, HOLYWOOD, CA., U.S.A
ARCHITECT
CONTRACTOR
ROCHLIN & BARON
STOLTE CONSTRUCTION CO.,LTD
USA PROJECT BUILDING STORIES
CONSTRUCTION PERIOD
13 STORIES
SEP. 1986 - DEC. 1986
BUILDING STORIES 11 STORIES
CONSTRUCTION PERIOD NOV. 1987 - FEB. 1988
SYSTEM UNITIZED SYSTEM SYSTEM UNITIZED SYSTEM

66 67
TWO UNION SQUARE, SEATTLE, WA, U.S.A 550 SOUTH HOPE STEET, L.A., U.S.A
PERFORMANCES ARCHITECT
CONTRACTOR
NBBJ GROUP
TURNER CONSTRUCTION CO., LTD
USA PROJECT ARCHITECT
CONTRACTOR
KOHN PEDERSEN FOX ASSOCIATES PC.
KOLL CONSTRUCTION / OHBAYASHI AMERICA, J.V
USA PROJECT BUILDING STORIES
CONSTRUCTION PERIOD
56 STORIES
APR. 1988 - APR. 1989
BUILDING STORIES
CONSTRUCTION PERIOD
31 STORIES
SEP. 1989 - JUL. 1990
SYSTEM UNITIZED SYSTEM SYSTEM UNITIZED SYSTEM

68 69
USA PROJECT

1420 FIFTH AVENUE, SEATTLE, WA., U.S.A


ARCHITECT CALLISON PARTNERSHIP
CONTRACTOR SELLEN CONSTRUCTION CO., LTD.
BUILDING STORIES 44 STORIES
CONSTRUCTION PERIOD DEC. 1987 - JUL. 1988
SYSTEM UNITIZED SYSTEM

CHRYSLER CORPORATE HEADQUARTERS, MICHIGAN, U.S.A


ARCHITECT SMITH, HENCHMAN & GRYLLS
CONTRACTOR WALBRIDGE ALDINGER
BUILDING STORIES 27 STORIES
CONSTRUCTION PERIOD OCT. 1994 - JUN. 1995
SYSTEM UNITIZED SYSTEM

ALCOA WORLD HEADQUARTERS, PENNSYLVANIA, U.S.A


ARCHITECT THE DESIGN ALLIANCE AND
RUSLI ASSOCIATES
CONTRACTOR TURNER CONSTRUCTION
BUILDING STORIES 12 STORIES
CONSTRUCTION PERIOD MAR. 1997 - JUL. 1998
SYSTEM STICK SYSTEM

CHICAGO TITLE, CHICAGO, ILL., U.S.A


PERFORMANCES ARCHITECT
ASSOCIATES PC.
KOHN PEDERSON FOX

USA PROJECT CONTRACTOR


BUILDING STORIES
MORSE DIESEL
62 STORIES
CONSTRUCTION PERIOD JUN. 1990 - DEC. 1991
SYSTEM UNITIZED SYSTEM

70 71
TWO UNION SQUARE, SEATTLE, WA, U.S.A

PERFORMANCES
ARCHITECT
CONTRACTOR
NBBJ GROUP
TURNER CONSTRUCTION CO., LTD
CHINA PROJECT WORLD PLAZA, SHANGHAI, CHINA
ARCHITECT
CONTRACTOR
LONDON WILSON ARCHITECT
MING TAI REAL-ESTATE
BUILDING STORIES 56 STORIES DEVELOPMENT CO., LTD.
USA & CHINA PROJECT CONSTRUCTION PERIOD APR. 1988 - APR. 1989 BUILDING STORIES 38 STORIES
SYSTEM UNITIZED SYSTEM CONSTRUCTION PERIOD MAR. 1995 – MAR. 1996
SYSTEM UNITIZED SYSTEM

72 73
CHINA PROJECT
JINGYIN MANSION BUILDING, SHANGHAI, CHINA
ARCHITECT EAST CHINA DESIGN
INSTITUTION ARCHITECT
CONTRACTOR JINGYIN MANSION BUILDING
& DEV.CO., LTD.
BUILDING STORIES 39 STORIES
CONSTRUCTION PERIOD OCT. 1997 - NOV. 1998
SYSTEM UNITIZED SYSTEM

KING HIP BUILDING, SHEN ZHEN, CHINA


ARCHITECT HUASEN ARCHITECTRAL & ENGINEERING
DESIGNING CONSULTANTS LTD
WORLD FINANCE TOWER, SHANGHAI, CHINA CONTRACTOR HUA SI CONSTRUCTION CO., LTD.
PERFORMANCES ARCHITECT
CONTRACTOR
LEIGH & ORANGE
SHANGHAI NEW WORLD CONSTRUCTION
(GRAND DUKE METAL WORKS LTD)
BUILDING STORIES 59 STORIES
CHINA PROJECT DEVELOPMENT CO., LTD. CONSTRUCTION PERIOD MAR. 1995 - JUN. 1995
BUILDING STORIES 43 STORIES SYSTEM UNITIZED SYSTEM
CONSTRUCTION PERIOD OCT. 1995 - AUG. 1997
SYSTEM UNITIZED SYSTEM

74 75
PERFORMANCES
SOUTH PACIFIC HOTEL, SHANGHAI, CHINA
ARCHITECT FAST CHINA ARCHITECTURAL
DESIGN & RESEARCH INSTITUDE
CHINA PROJECT PUDONG GOVERNMENT OFFICE CENTER, SHANGHAI, CHINA
ARCHITECT
CONTRACTOR
FUJTA CORPORATION
SHANGHAI PUDONG NEW AREA
CHINA PROJECT CONTRACTOR MEINHARDT FAÇADE
TECHNOLOGY I I.K.LTD
ADMINISTRATION COMMISION
BUILDING STORIES 22 STORIES / 5 STORIES X 6
CONSTRUCTION PERIOD MAR. 1999 – MAY. 2002 CONSTRUCTION PERIOD MAY. 1997 – JUN. 1998
SYSTEM UNITIZED SYSTEM SYSTEM UNITIZED SYSTEM

76 77
INDUSTRIAL COMMERCIAL BANK, BEIJING, CHINA

PERFORMANCES
ARCHITECT
CONTRACTOR
BUILDING STORIES
SKIDMORE OWING & MERRILL
SINDUSTRIAL COMMERCIAL BANK
11 STORIES, 2UNITS
CHINA PROJECT POS PLAZA, SHANGHAI, CHINA
ARCHITECT
CONTRACTOR
PEI COBB FREED & PARTNERS
SHANGHAI POSEC ESTATE
CHINA PROJECT CONSTRUCTION PERIOD OCT. 1995 – AUG. 1997
DEVELOPMENT CO., LTD.
BUILDING STORIES 22 STORIES / 5 STORIES X 6
SYSTEM STICK SYSTEM
CONSTRUCTION PERIOD MAY. 1997 – JUN. 1998
SYSTEM UNITIZED SYSTEM

78 79
1

FOUR SEASONS HOTEL, EGYPT

PERFORMANCES
MACAU TOWER & ENTERTAINMENT,
ARCHITECT
CONTRACTOR
CCMBECA
MACAU, CHINA

STDM / HYUNDAI & CCEM J/V


EGYPT PROJECT ARCHITECT
CONTRACTOR
WZMH ARCHITECTS
NOVA PARK CAIRO, S.A.E.
BUILDING STORIES 29 STORIES
BUILDING STORIES 343M-TOWER & 8F UNIT-SYSTEM
CHINA & EGYPT PROJECT CONSTRUCTION PERIOD JAN. 2002-JUN. 2004
CONSTRUCTION PERIOD MAR. 1999 – DEC. 2002
SYSTEM PUNCHED WINDOW WALL SYSTEM
SYSTEM STICK SYSTEM

80 81
SPAIN PROJECT

INDOCENTRO, S.A, MADRID, SPAIN


ARCHITECT AUIA
CONTRACTOR FOMENTO DE OBRAS Y
CONSTRUCTIONES, S.A
BUILDING STORIES 15 STORIES
CONSTRUCTION PERIOD NOV. 1991 - FEB. 1993
SYSTEM UNITIZED SYSTEM

FOMENTO M-30, MADRID, SPAIN


NIHON TELEPHONE & TELEGRAPH HEAD-QUARTERS BUILDING, TOKYO, JAPAN ARCHITECT JOSE CARLOS DE GOYNECHE
ARCHITECT CESAR PELLCI YAMASHIDA CONTRACTOR FOMENTO DE OBRAS Y
PERFORMANCES CONTRACTOR TAISEI CONSTRUCTION CO., LTD (NIHON KENTETSU) CONSTRUCTIONES, S.A.
BUILDING STORIES 31 STORIES BUILDING STORIES 15 STORIES
JAPAN & SPAIN PROJECT
CONSTRUCTION PERIOD DEC. 1994 - APR. 1995 CONSTRUCTION PERIOD JUL. 1992 – OCT. 1992
SYSTEM UNITIZED SYSTEM SYSTEM UNITIZED SYSTEM

82 83
HONGKONG PROJECT

PERFORMANCES
ARGENTINA & HONGKONG PROJECT

GOVERNMENT OFFICE BUILDING PHASE II, HONG KONG


ARCHITECT ARCHITECTURAL SERVICES
DEPARTMENT
CONTRACTOR SHUNSING `
CONSTRUCTION CO., LTD.
BUILDING STORIES 48 STORIES
CONSTRUCTION PERIOD FEB. 1988 - JUL. 1989
SYSTEM STICK SYSTEM

KOWLOON PARK SPORTS COMPLEX, HONG KONG


ARCHITECT SIMON ASSOCIATES
CONTRACTOR SHUI-ON CONSTRUCTION CO.,LTD
BUILDING STORIES 3 STORIES(AREA:15,000M)
CONSTRUCTION PERIOD MAR. 1988 - JAN. 1989
SYSTEM TECH WALL SYSTEM
BOUCHARD PLAZA, BUENOS AIRES, ARGENTINA
ARCHITECT CESAR PELLI & ASSOCIATES PC&
ALVAREZ Y ASOCIADOS
CONTRACTOR ALTO PALERMO. S.A.
BUILDING STORIES 30 STORIES
CONSTRUCTION PERIOD SEP. 1995 - JUL. 1996
SYSTEM UNITIZED SYSTEM

84 85
FUBON BANKING CENTER, TAIPAI, TAIWAN
PERFORMANCES
TAIKAY BUILDING, TAIWAN
ARCHITECT
CONTRACTOR
DTI (DESIGN TEAM INCORPORATED)
CHIEF CONSTRUCTION CORP.
TAIWAN PROJECT ARCHITECT
MERRILL ARTECH
SKIDMORE, OWINGS &

TAIWAN PROJECT BUILDING STORIES A BLDG : 13 STORIES / CONTRACTOR


FU TSU CONST
SCHAL BOVIS, INC &
B BLDG : 17 STORIES
CONSTRUCTION PERIOD DEC. 1992 - AUG. 1993 BUILDING STORIES 27 STORIES
SYSTEM 2-SIDE STRUCTURAL GRAZING SYSTEM CONSTRUCTION PERIOD OCT. 1992 - DEC. 1993
SYSTEM UNITIZED SYSTEM

86 87
PHILIPPINES PROJECT
ICEC LAND CORPORATION HEADQUARTERS, MANILA,
PHILIPPINES
ARCHITECT KOHN PEDERSEN FOX
ASSOCIATES PC & RECIO &
CASAS ARCHITECTS
CONTRACTOR ICEC LAND CORPORATION
BUILDING STORIES 59 STORIES
CONSTRUCTION PERIOD NOV. 1996 - JUL. 1997
SYSTEM UNITIZED SYSTEM

TAISHIN BANK TOWER, TAIPEI, TAIWAN


PERFORMANCES ARCHITECT PCF, HAIGO SHEN
BUILDING STORIES 24 STORIES
TAIWAN & PHILIPPINES PROJECT CONSTRUCTION PERIOD AUG. 2003 - APR. 2004
SYSTEM UNITIZED SYSTEM

88 89
AL-FORM SYSTEM
I. AL-FORM Business
II. What is AL-FORM?
III. AL-FORM Features
IV. Expected Effects
V. AL-FORMWork Process
VI. AL-FORMWork Cycle
VII. Preliminaries /
Installation Example
VIII. STAIR-Mock-up Test
IX. Accessory

120 COLLINS STREET, MELBOURNE, AUSTRALIA


PERFORMANCES ARCHITECT
CONTRACTOR
DARRYL JACKSON
GROLLO CONSTRUCTION PTY. LTD.
AUSTRALIA PROJECT BUILDING STORIES 52 STORIES
CONSTRUCTION PERIOD NOV. 1988 - MAY. 1990
SYSTEM PUNCHED WINDOW WALL SYSTEM

90
I. Company Introduction / AL-FORM Business Objective PERFORMANCE

Shorten the lead Shorten the lead-time, High structural quality, work safety, time, High structural quality, work safety,
Easiness of work Easiness of work
Supply customer Supply customer’s satisfaction with total service system

Features

According to the site status, supply for total customized servic According to the site status, supply for total customized service system
covering design, manufacture and site supervision system covering design, manufacture and site supervision Guro nam kwang regencyvill 30F Daelim Pyungchon AcroTower 42F Yeongdeungpo SK VIEW 38/40F Youngsan Park Tower 40F
Total supply for Wall, Slab, Materials for stairs and Total supply for Wall, Slab, Materials for stairs and
Aluminum Aluminum-support, Tie, Assembly Pin etc. support, Tie, Assembly Pin etc.

Business Overview and Vision

Al Al-Form is the best choice in aspect of Price, Lead Form is the best choice in aspect of
POSCO STACITY 58F POSCO STACITY 58F Daewoo Yongsan Citypark 2005. 07~ Lotte/Hyundai Incheon
Price, Lead-time, time, Quality, Safety Quality, Safety Gawoldong FirstCity 2005.01~
Applied ALApplied AL-FORM System over 70% in High FORM System over 70% in High-rise Reinforcement rise Reinforcement
Concrete buildings and stipulated in specification in Korea. Concrete buildings and stipulated in specification in Korea.

Doosan Beomil-dong PoseidonII Sindorim Ssangyong Platinum Daewoo Daegu Trumpworld Bucheon Jung-dong We’ve
2005.03~ 2005.04~ Susung 2005.09~ the State 2005.09~

Namcheon-dong Kolon Incheon Hanhwa Ecometro 2007.09~ Doosan Haeundae We’ve The Zenith GS/ Songdo Xi 20BL 2008.12~
hanulche 2007.05~ 2008.10~

92 93
II. What’s AL-FORM? Example

- Aluminum Extrusion Material :


Example I Example II
Raw Materia Aluminum A6061-T6

- Cutting & Welding manufacture of


Fabrication Aluminum Extrusion Materials and Al. sheet

Coating - Enamel Coating

- Width 600/450/300 X Height 2325 X Thickness 66


Wall Panel - W600x2325 base on 29kg

Slab Panel - Width 600/450/300 X Length 1,200 X Thickness 66


- D600x1200 base on 13kg

Components Example III

Note
1. This Systemized Stairs of AL-FORM does not need other materials
2. All assembled type shorten the installation time and excellent quality

94 95
III. AL-FORM Features

AL-FORM Features II
- Shorten the Early stage of installation period by supervision at site and package by each installation part.
- In general, it takes 5-7days from the beginning of installation

AL-FORM Features III AL-FORM Features IV


- Minimized cracks by support Drop Head way - Easy installation without any filling-up equipment
- Possible to dismantle the Slab panel after one day and can be shorten the and shorten the lead-time by repetitive panels.
lead time.

AL-FORM Features I
-Customized design and manufacturing for every non-typical parts and complete installation as just site-assembly.

FORM Installation Floor Remained support Floor

96 97
IV. Expected effects VI. AL-FORM Work CYCLE

- Shorten the Early stage of installation period by supervision at site and package by each installation part.
Improvement of - In general, it takes 5-7days from the beginning of installation
High Quality Cost Saving work condition
• Good Flatness • Possibility of secure and • Possibility of secure and
• Minimal installation shorten absolute lead time shorten absolute lead time 1st Day - WALL FORM Removal, Delivery / G/F Delivery
error • Cost saving for defect • Cost saving for defect
• Protection of worker’s • cost saving for succession • cost saving for succession 2nd Day - Installation reinforcing bar in Wall
error progress progress
• Cost saving for waste • Cost saving for waste
management and site management and site 3rd Day - Installation work of Wall form / SLAB FORM removal
arrangement arrangement 7Day
• Possible to hire low cost • Possible to hire low cost CYCLE Of 4th Day - Installation work of Inside FORM & SLAB FORM
workers workers
General
Apartment
5th Day - Installation work of SLAB FORM / SLAB reinforcing bar delivery

- Assembly work of SLAB reinforcing bar


6th Day Electronic equipment installation
- Inspection before concrete casting

7th Day - Concrete casting work / Curing

V. AL-FORM Work Process

Review Manu- Delivery 1st Day - WALL FORM removal, Lifting / G/F Lifting
Estimation Contract Return
Dwgs facture products
2nd Day - Installation work of WALL FORM / SLAB FORM removal / Lifting
Before 3Month Before 2-1Month Input product
5Days
- Installation work of SLAB FORM /
CYCLE Of 3rd Day SLAB reinforcing bar lifting work Installation
• Review • Confirm Supply • Discuss Structure • Confirm site • Dispatch the site • Check the quantity
structural dwg. Scope dwg condition supervisor of damage and loss High-rise
• Proposal for • Confirm price • Confirm Structure • Submit Dwg, • Management • site supervision - Assembly work of slab reinforcing bar / Installation of Electronic
AL-FORM
• Summit
• Confirm Input
date
Dwg.
• Review Installation
Bill of Quantity. of errors Building 4th Day equipment / Inspection before concrete casting equipment
Estimation Dwg.
• Review • Secure Raw
supply scope Materials
• Review Price
5th Day - Concrete Casting work / Curing after casting

98 99
VII. Preliminaries / Installation Example VIII. STAIR- Mock-up Test

Wall Assembly SL Assembly Assembly of Stairs

Inside Elevation Deck Assembly Top of Deck

Wall Dismantlement Deck Dismantlement Carriage and Loading

Carriage and Loading The quality after installation

100 101
IX. Accessory

PERFORMANCES
STUB PIN WEDGE PIN AL-ONE TOUCH TIE RECORD

AL-SEPA TIE AL-PLAT TIE AL-BRACKET

AL-REGULATION BRACKET BEAM PIN BRACING BOLT

JACK BASE

102
OVERSEAS PERFORMANCES RECORD DOMESTIC PERFORMANCES RECORD
U.S.A China (Including Hong Kong, Taiwan, Macau) PROJECT NAME
1. Dae-Han Life Insurance Office Bldg, Seoul
PERIOD
Feb.1983-Nov.1984
PROJECT NAME
60. Nasan Suite III, Seoul
PERIOD
Mar.1997-Dec.1997
PROJECT NAME PERIOD PROJECT NAME PERIOD 2. Eulgi-ro Redeveloping Bldg. (PPC) Seoul Nov.1985-Jul.1987 61. Techno Mart, Seoul Jan.1997-Aug.1998
1. Koll Center, Bellevue, WA. Jan.1986-Jan.1987 5. Park Lane Square Bldg, Hong Kong May.1992-Feb.1993 3. Law Enforcement Head Office Feb.1986-Feb.1987 62. Hyundai Parkvill, Seoul Jul.1997-Dec.1999
2. 1420 5th Ave. Seattle Dec.1987-Jul.1988 6. Jaffe Road, Hong Kong May.1992-Oct.1992 4. Hanmoo Hotel Feb.1986-Mar.1987 63. Hyundai Marine Insurance Building Dae-ku Feb.1998-Oct.1999
3. 777 Tower L.A.C.A Apr.1989-Oct.1989 7. Peninsula Hotel, Hong Kong Oct.1992-Jul.1993 5. Lotte Hotel, Seoul Aug.1986-Jul.1987 64. Mokdong Grand Tower, Seoul Feb.1999-Feb.2001
4. Pioneer Place Portland Ore. Dec.1988-Jun.1989 8. East Point Center, Hong Kong Oct.1992-Jul.1993 6. Rivera Hotel. Seoul Jan.1987-Mar.1988 65. Bexco, Busan Nov.1999-Dec.2000
5. 550 South Hope Street Sep.1989-Feb.1990 9. Taicom Bldg, Taiwan Oct.1992-Dec.1993 7. Korea Trade Center Office Bldg, Seoul Apr.1987-Apr.1988 66. Gi-jang City Hall Feb.1999-Jan.2000
6. Chicago Title Chicago ILL Jun.1986-Dec.1987 10. Fubon Banking Center, Taiwan Oct.1992-Dec.1993 8. Ramada Renaissance Hotel, Seoul Jan.1987-May.1988 67. Hyundai Marine Insurance Building, Ul-san Mar.1999-Oct.2000
7. 3131 Eliot Seattle WA Jun.1986-Nov.1986 11. Tai Kai Bldg, Taiwan Dec.1992-Agu.1993 9. Intercontinental Hotel, Seoul Apr.1987-Mar.1989 68. District Public Prosecutor Office, Busan Oct.1999-May.2001
8. Brinderson Tower PH-1 Irvine Jun.1986-Oct.1986 12. Far East World Center, Taiwan Dec.1992-Sep.1993 10. Korea Broadcasting Station Bldg, Seoul Jan.1987-Mar.1988 69. Incheon International Airport Nov.1999-Dec.2000
9. Director’s Guild Hollywood, CA Nov.1987-Feb.1988 13. Chinan Hotel Oct.1994-Mar.1995 11. Botanical Garden, Che-ju Island Dec.1988-Dec.1991 70. Han Wha Building, Seoul Jan.2000-Mar.2001
10. Hutton Center, Santa CA Mar.1987-May.1987 14. World Plaza, Shanghai Mar.1995-Mar.1997 12. Korea Textile Center, Seoul Sep.1989-Jul.1990 71. Mokdong Hyperion I, Seoul Jul.2001-Apr.2003
11. Columbia Studio Plaza Burbank, CA Sep.1987-Dec.1989 15. King Hip Building, Shenzhen Mar.1995-Jun.1996 13. Kyung Ki Bank HQ Bldg, Incheon Dec.1989-Jul.1991 72. Seo-Cho Building, Seoul Mar.2002-Jul.2003
12. 34 W. Wacker Chicago, ILL Jun.1987-Mar.1988 16. International Trading Center, Shenzhen Mar.1995-Mar.1996 14. Marine Center, Busan Jul.1989-Jul. 1991 73. Hyun Marine Insurance H/Q Bldg, Seoul Dec.2002-Oct.2003
13. Jamboree Center Irvine CA Mar.1987-Mar.1988 17. World Finance Tower, Shanghai Oct.1995-Aug.1997 15. Samho HQ Office Bldg, Seoul Dec.1989-Jul.1991 (Renovation)
14. 865 Figueroa L.A. CA Feb.1989-Nov.1989 18. Industrial Commercial Bank of China, Oct.1995-Aug.1997 16. Saieiung Officetel, Seoul Oct.1989-dec.1990 74. Daewoo Marine Technical Center Oct.2002-May.2003
15. Two Union SQ. Seattle, WA Apr.1988-Apr.1989 Beijing 17. Pacific Security Office Bldg, Busan Oct.1989-Oct.1990 75. Chunho-dong Theme Building, Seoul Dec.2002-Dec.2003
16. 100F Wisconsin Sep.1988-Jan.1989 19. POS-PLAZA Pudong, Shanghai Apr.1997-Dec.1998 18. Che-ju Miwon Bldg, Cheju Island Oct.1989-Oct.1990 76. Dae-Rim Acrovista, Seoul Jun.2002-Nov.2004
17. Jamboree Center Irvine, CA May.1990-Aug.1990 20. Jingyin Mansion Build, Pudong May.1997-Jan.1998 19. Cosmos Officetel, Seoul Oct.1989-Mar.1991 77. Gwangjang-dong Officetel Jan.2003-Sep.2003
18. 600 Anton Bldg. L.A. CA Aug.1990-Nov.1990 21. Pudong Government Building, Pudong, May.1997-Jun.1998 20. Sando Bldg, Seoul Jan.1989-Aug.1990 78. Korea Cable Technical Lab, Gwangju Jan.2003-May.2004
19. Ladera Tower Condo Guam Nov.1992-Aug.1993 Shanghai 21. Yusung Hyundai Resortel, Seoul Nov.1989-Oct.1991 79. Busan BeneCity, Busan Aug.2003-Dec.2004
20. Chrysler H/Q Guam Oct.1995-Jun.1995 22. Macau Tower, Macau Mar.1999-Nov.1999 22. Nam Seoul Country, Seoul Jul.1989-Jun.1991 80. Yong-San Private Station Building II,Seoul Aug.2003-Apr.2004
21. First Hawaiian Center, Guam Oct.1994-Aug.1995 23. Hyundai Center (Beijing) Oct.1999-Jan.2000 23. Mukyo-dong Hyundai Bldg. Seoul Aug.1989-Dec.1990 81. Galwoldong Officetel Apr.2003-Aug.2004
22. American Store H/Q Salt Lake, Utah Dec.1995-Jul.1996 24. South Pacific Hotel, Shanghai Oct.1999-Feb.2000 24. Crystal Beach Office Tower, Busan Aug.1989-Dec.1990 82. Yeouido Lotte Castle IVY, Seoul Jun.2003-May.2005
23. Fox Studio Operation (NEB Bldg), LA May.1999-Nov.1999 25. Macau Entertainment, Macau Sep.1999-Dec.2000 25. Hyundai Marine Insurance Bldg. Busan Jan.1989-Aug.1990 83. Bundang Jungja-dong Pavilion, Gyunggi-do Jan.2003-Mar.2004
24. Alcoa World H/Q Pittsburgh, PA Apr.1997-Oct.1998 26. Beijing International Club May.2000-Sep.2001 26. Hyun-Seo Bldg., Seoul Dec.1989-Oct.1990 84. Yong-San Station Private Building III, Seoul Aug.2003-Apr.2004
25. Lucent Chicago Feb.1999-Oct.1999 27. Taishin Bank Tower, Taishin,Taiwan Aug.2003-May.2004 27. Hyundai Marine Insurance Bldg. Seoul Jan.1990-Jun.1991 85. Sunreung Acrotel, Seoul Jul.2003-Oct.2004
26. Yeba Buena Sanfrancisco Feb.1999-Dec.1999 28. Sung Dam Bldg. Seoul Jan.1990-Aug.1991 86. Mok-dong Netville, Seoul Jun.2003-Dec.2003
27. 110 Glendon Portland Jan.1999-Jun.1999 29. Asia Cement Office Bldg. Jan.1990-Feb.1991 87. KCC Park Towon Mar.2004-Aug.2004
28. Millennium Tower Portland Oct.1999-Feb.2000 In Others 30. Sungnam Daehan Ins. Bldg. Apr.1990-Jun.1991 88. Mok-dong HyperionII, Seoul May.2004-Jun.2004
29. 640 5th Avenue Mar.2002-Sep.2002 31. Samho Mulsan Officetel, Seoul Jan.1991-Jun.1991 89. Pyeongchon Venturedigm, Gyunggi-do Oct.2005-Mar.2006
PROJECT NAME PERIOD
30. Calpers H/Q, CA Mar.2003-Jan.2004 32. Hyundai High Lan officetel, Seoul Apr.1991-Jul. 1991 90. Beomil-dong Poseidon, Busan Oct.2005-Dec.2006
1. Bayshore Resort Pa, Condominium, Feb.1985-Jun.1986
31. 2000 Avenue of the stars Oct.2004-Mar.2005 33. Hanksan Officetel, Pohang Mar.1991-Oct.1991 91. Haeundae Poseidon, Busan Oct.2005-Dec.2006
Singapore
32. OHSU River Campus Nov.2004-May.2005 34. Dongrae Hotel, Busan Jul.1990-Mar.1991 92. Hangangno Complex Building, Seoul May.2005-Oct.2007
2. Brega New Town Complex Brega, Libya Mar.1988-Aug.1990
33. The Eliot Tower At 10th Feb.2005-Jun.2005 35. Ulsna Daehan Life insurance Bldg. Oct.1991-Mar.1992 93. Jung-dong We’ve The State, Gyunggi-do Nov.2005-Sep.2006
3. Asian Development Bank, Philippines Jul.1988-Jul.1990
34. At Water Tower, Portland Apr.2006-Jan.2007 36. Daehan Investment Trust Mar.1992-Dec.1993 95. Korea University Guro Hospital, Seoul Sep.2005-Jul.2007
4. Metrotown Eaton, Canada Oct.1988-Feb.1989
35. One Museum Park, Chicago Apr.2006-Apr.2007 37. Seoul Security Bldg. Seoul Nov.1992-Oct.1993 96. Best Western Hotel, Seoul Dec.2005-Mar.2007
5. Eaton Center, Canada Oct.1988-Feb.1989
36. San Jose Condominium, CA Jul.2006-Jan.2007 38. Jeil Security Bldg, Seoul May.1992-Dec.1993 97. Bundang Cha Hospital, Gyeonggi-do Dec.2005-Sep.2006
6. 120 Collins St. Australia Nov.1989-May.1990
37. UW Medical Center, WA Jul.2007-Jan.2007 39. Public Prosecutor’s Office Bldg. Jun.1993-Jun.1994 98. KD Villant II, Seoul Jan.2006-Dec.2006
7. Indocasa Bldg, Spain Nov.1991-Feb.1993
38. 555 Mission Street, CA Jan.2007-Jun.2007 40. Oil Development Center Aug.1993-Jun.1994 99. Haeundae Sentum City, Busan May.2006-Dec.2008
8. Fomento, Spain Jul.1992-Oct.1992
9. Proyecto Bouchard, Argentina Sep.1995-Jul.1996 41. POSCO Head Office Bldg. Jul.1993-Feb.1995 100. Busan Aqua Palace, Busan Apr.2006-Dec.2007
42. Busan Lotte Bldg., Busan Jan.1994-Dec.1996 101. Cheonho Brown Stone, Seoul May.2006-Jul.2007
In Japan 10. I.C.E.C. H/Q, Manila, Philippine
11. Hyundai Building, Russia
Nov.1996-Jul.1997
Feb.1996-May.1997 43. Dadong Bldg. Seoul Jan.1995-Aug.1996 102. Posco International Center, Busan Sep.2006-Dec.2006
PROJECT NAME PERIOD 12. 18 Stories, Qatar Oct.1995-Dec.1996 44. Dogokdong Character Bldg. Seoul Jul.1995-Apr.1996 103. Daehyeon 2 zone Reconstruction Apt, Seoul Sep.2006-Apr.2007
1. Holiday Inn Tower, Nagoya Jul.1989-Dec.1989 13. PBCOM Office Tower, Manila, Philippine Mar.1999-Mar.2000 45. Jamsil Sigma Bldg. Feb.1995-Mar.1996 104. Sangok Lotte Mart, Incheon Aug.2006-Apr.2007
2. NTT Shinjuku H/Q, Tokyo Dec.1993-Apr.1994 14. Four Seasons Hotel, Egypt Jan.2002- Sep.2004 46. Busan City Hall Bldg. Busan Mar.1995-Mar.1997 105. Mapo Lotte Castle, Seoul Nov.2006-Feb.2009
3. Tokyo Int,I Forum, Tokyo Sep.1994-Dec.1994 15. Sydney Hilton Hotel, Sydney, Australia Jul.2003-Apr.2004 47. Daerim Acrovill, Seoul Oct.1998-Dec.1999 106. Ulsan 2nd Provincial Office, Ulsan Apr.2007-Dec.2008
4. Kanakawa Office Bldg. Kana Oct.1994-Apr.1995 16. One Raffles Quay, Singapore Dec.2003-Dec.2005 48. Doosan Heavy Industrial Bldg. Oct.1995-Oct.1997 107. Anyang Doosan Venture Digm, Gyeonggi-do Jan.2007-Sep.2007
5. Atago, Tokyo Oct.1999-Oct.2000 17. Emirates Office Tower, Dubai, U.A.E Completed 49. Yeido Evangelical Center Mar.1996-Oct.1997 108. Dongcheon-dong Complex Center, Daegu Feb.2007-Aug.2007
18. Keangnam Hanoi Landmark Tower, Feb.2008-Aug.2010 50. Hansol Head Office Building Dec.1996-Oct.1997 109. Busan University Hospital,Yangsan Apr.2007-Nov.2008
Hanoi, Vietnam 51. Dongbu H/Q Bldg. Seoul Aug.1996-Oct.1997 110. The 2nd Busan University Hospital,Yangsan Jun.2008-Dec.2010
China (Including Hong Kong, Taiwan, Macau) 19. Habico Tower, Hanoi, Vietnam Sep.2009-Jul.2012 52. Government Bldg. Phrase3, Seoul Nov.1996-Dec.1997 111. Busan University Children’s Hospital, Jun.2007-Jul.2008
20. Mipec Tower, Hanoi, Vietnam Dec.2010-May2011 53. Professional Const. Bldg. Seoul Dec.1996-Aug.1997 Yangsan
PROJECT NAME PERIOD
21. SPLENDORA NEW CITY PROJECT April.2011~December.2011 54. Woosung Chrancter199 Nov.1996-Jul.1998 112. Dongnae Lotte Mart, Busan May.2007-Feb.2008
1. Kowloon Park Bldg, Hong Kong Jan.1988-Feb.1989
22. DETECH TOWER June.2011~Jan.2012 55. Private Seoul Pension Center May.1996-Feb.1998 113. Namcheon Samick Reconstruction Apt, Jun.2007-Feb.2009
2. Government Office Building Phase2, Feb.1988-Jul.1989
23. LANCASTER COMPLEX June.2012~December.2012 56. Korea Economic Newspaper Building Jun.1996-Oct.1997 Busan
Hong Kong
24. HILLSTATE COMPLEX PROJECT June.2012~March.2013 57. I -Tower Bldg., Seoul Nov.1996-Apr.2001 114. Sinjeong-dong We’ve The Zenith, Ulsan Jun.2007-Feb.2010
3. Government Office Building Phase3, Sep.1988-Jan.1989
58. Korea Broadcasting Office Building Jan.1997-Jan.1998 115. Sajik-dong We’ve The Zenith, Cheongju Jun.2007-Jul.2009
Hong Kong
59. Chongro Tower, Seoul Feb.1997-Mar.1999
4. Tai Shou Office Bldg, Taiwan Dec.1991-Mar.1992
104 105
DOMESTIC PERFORMANCES RECORD
PROJECT NAME PERIOD
116. Incheon National Airport Human Aug.2007-Jul.2008
Resources Development Center, Incheon
117. Northeast Asia Trade Tower, Incheon Dec.2007-Oct.2009
118. Hynix A-Project, Cheongju Aug.2007-Jun.2008
119. Masan I’Park, Masan May.2008-Dec.2009
120. Seomyeon The# Centralstar, Busan Jan.2008-May.2011
121. Sogong-dong Lotte Hotel Remodeling, Aug.2007-Sep.2009
Seoul
122. Cheongnyangni private railroad Jul.2008-Aug.2010
station buildings, Seoul
123. Adena Tower, Seoul Jul.2008-Feb.2009
124. NHN Venture Tower, Bundang Mar.2008-Jun.2009
125. Yongin Light Rail Transit, Gyeonggi-do Sep.2008-Jun.2009
126. Pentaport, Asan Mar.2009-Oct.2011
127. Posco Global R&D Center, Incheon May.2009-May.2010
128. Sondo Hillstate, Incheon Jul.2009-Jan.2011
129. Sindorim D-cubecity, Seoul Mar2010-Jun2011
130. Sondo Global University Campus, Incheon Apr2010-Aug2011
131. Yeouido Park1(Tower 2), Seoul May.2010-Jan2012
132. Yangpyung Sungwoo Ostar, Gyunggi-do Jul.2010-Dec.2011
133. Yeouido Park1 Hotel, Seoul Oct.2010-May.2012
134. HALLYM UNIVERSITY DONGTAN MAR. 2011 ~ SEP. 2012
MEDICAL CENTER
135. MBC's NEW BUILDINGS IN NOV. 2011 ~ OCT. 2013
SANGAM-DONG

106

You might also like