ATP Document Indosat DWDM LBG-BTN Link Test

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 29

Indosat DWDM Project ZXONE 8000

Optical Transmission System

Network Integration Test Operation and Record

Link Name : LBG - BTN

Site Name : LBG

Customer : PT. Indosat

Provider : PT. ZTE Indonesia

a
Contents

T01 OTU: Actual Received Optical Power ............................................................................................................ 1


T01-01 Actual Received Optical Power ........................................................................................................... 1
Specifications of the TST4 (Optical Transponder Unit)................................................................................... 3
Specifications of the L4L×1 (OTN Line Board) .............................................................................................. 5
Specifications of the L4L×2 (OTN Line Board) .............................................................................................. 6
Specifications of the C2K×12 (OTN Tributary Board) .................................................................................... 7
T02 Main Optical Path: Output Optical Power of Each Channel at the MPI-S Point.............. 8
T02-01 Output Optical Power of Each Channel at the MPI-S Point ................................................................ 8
T03 Main Optical Path: Input Optical Power of Each Channel at the MPI-R Point .............. 10
T03-01 Input Optical Power of Each Channel at the MPI-R Point ................................................................ 10
T4 System Margin Test ........................................................................................................ 13
T4-01 Segment 7 dB Margin Test .................................................................................................................. 13
T4-02 Link Margin Test ................................................................................................................................. 16
T5 Transmission Performance Test ...................................................................................... 19
T5-01 OSNR measurement ............................................................................................................................ 19
T5-02 RFC-2544 TEST ................................................................................................................................. 22
T5-03 7x24-Hour BER-T Services ............................................................................................................. 24

b
T01 OTU: Actual Received Optical Power
T01-01 Actual Received Optical Power
Objective To verify that the actual received optical power on the WDM side and client side of
the OTU meets the optical power requirements of the engineering design.
Test Networking None
Diagram

Preset Conditions 1. The network must be working normally.


2. Lasers on the OTU must be enabled.
Test Procedures 1. Query the optical power at the input port LR of the OTU by using the U31. The
displayed value is the actual received optical power on the client side of the OTU.
2. Query the optical power at the input port CR of the OTU by using the U31. The
displayed value is the actual received optical power on the WDM side of the OTU.
Expected Results The actual received optical power meets the optical power requirements of the
engineering design refer to Technical Specification.
Result □OK □NOK □NA
Test Description Test instrument: none
Requiring on-site operation: none
Estimated man-hour: 10 minutes
Risk: low

Technical Specifications
Test NO Test content Expected result
T01-01 Actual Received Optical Power

TST4 line side -15(EOL)~0dBm

-10.3(PIN)~2.9(4*25G)
TST4 Client side -8.8(PIN)~
3.5dBm(10*10G)

L4L×1 line side -15~0dBm

L4L×2 line side -15~1dBm

C2K×12 Client side(I64.1) -11~-1dBm

1
Test Record
Equipment Reference
No. Slot Port Result Remarks
Name

□OK □NOK □NA Refer to Survey

□OK □NOK □NA Refer to Survey


□OK □NOK □NA Refer to Survey
□OK □NOK □NA Refer to Survey
□OK □NOK □NA Refer to Survey
□OK □NOK □NA Refer to Survey
□OK □NOK □NA Refer to Survey
□OK □NOK □NA Refer to Survey
□OK □NOK □NA Refer to Survey
□OK □NOK □NA Refer to Survey
□OK □NOK □NA Refer to Survey
□OK □NOK □NA Refer to Survey
□OK □NOK □NA Refer to Survey
□OK □NOK □NA Refer to Survey
□OK □NOK □NA Refer to Survey
□OK □NOK □NA Refer to Survey
□OK □NOK □NA Refer to Survey
□OK □NOK □NA Refer to Survey
□OK □NOK □NA Refer to Survey
□OK □NOK □NA Refer to Survey
□OK □NOK □NA Refer to Survey
□OK □NOK □NA Refer to Survey
□OK □NOK □NA Refer to Survey
□OK □NOK □NA Refer to Survey

Requirements:Refer Technical Specifications

Signature of Person

Indosat PT. ZTE Indonesia

2
Specifications of the TST4 (Optical Transponder Unit)
Specifications of optical module at the line side

Specifications of optical module at the Client side

3
4
Specifications of the L4L×1 (OTN Line Board)
Specifications of optical module at the line side

5
Specifications of the L4L×2 (OTN Line Board)
Specifications of optical module at the line side

6
Specifications of the C2K×12 (OTN Tributary Board)
Specifications of optical module at the Client side

7
T02 Main Optical Path: Output Optical Power of
Each Channel at the MPI-S Point
T02-01 Output Optical Power of Each Channel at the MPI-S
Point
Objective To verify that the specification at each point of the main optical path meets the
engineering requirements.
Test Networking Configuration diagram for testing main optical path function
Diagram

Preset Conditions The network must be commissioned and must be working normally.
Test Procedures 1. Connect an EOPM4 board port at the MPI-S point.
2. Open EOPM4 board menu on U31 NE explorer, then select related port
connected to MPI-S point.
3. Query EOPM4 board port, and then read the output optical power of each
channel.
Expected Results Item Specification
The average output optical power of each channel at the Refer to technical
MPI-S point (dBm) spesification
The preceding specifications vary with the system configuration.
Result □OK □NOK □NA
Test Description Test instrument: none
Requiring on-site operation: yes
Estimated man-hour: 30 minutes
Risk: low

8
Test Record Output optical power of each channel at point MPI-S Point
Test Subitem Output optical power of each channel at point MPI-S

Subrack Slot Board Channel Output Conclusion Reference


name NO. Type standard optical power
frequency(T (dBm))
Hz)

□OK □NOK □NA Refer to Technical


Specification

□OK □NOK □NA Refer to Technical


Specification

□OK □NOK □NA Refer to Technical


Specification

□OK □NOK □NA Refer to Technical


Specification

□OK □NOK □NA Refer to Technical


Specification

□OK □NOK □NA Refer to Technical


Specification

□OK □NOK □NA Refer to Technical


Specification

□OK □NOK □NA Refer to Technical


Specification

□OK □NOK □NA Refer to Technical


Specification
Index requirements:

Item Specification
The average output optical power of each channel at the MPI-S Refer to Technical
point (dBm) Specifications

Signature of Person

Indosat PT. ZTE Indonesia

9
T03 Main Optical Path: Input Optical Power of Each
Channel at the MPI-R Point
T03-01 Input Optical Power of Each Channel at the MPI-R
Point
Objective To verify that the specification at each point of the main optical path meets the
engineering requirements.
Test Networking Configuration diagram for testing main optical path function
Diagram

Preset Conditions The network must be commissioned and must be working normally.

Test Procedures 1. Connect an EOPM4 board port at the MPI-R point.


2. Open EOPM4 board menu on U31 NE explorer, then select related port
connected to MPI-R point.
3. Query EOPM4 board port, and then read the output optical power of each
channel.
Expected Results Item Specification
The average input optical power of each channel at the Refer to technical
MPI-R point (dBm) spesification
The preceding specifications vary with the system configuration.
Result □OK □NOK □NA
Test Description Test instrument: none
Requiring on-site operation: yes
Estimated man-hour: 30 minutes
Risk: low

10
Test Record Input optical power of each channel at point MPI-R
Test Subitem Input optical power of each channel at point MPI-R

Subrack Slot Board Channel Input optical Conclusion Reference


name NO. Type standard power (dBm)
frequency(TH
z)

□OK □NOK □NA Refer to Technical


Specification

□OK □NOK □NA Refer to Technical


Specification

□OK □NOK □NA Refer to Technical


Specification

□OK □NOK □NA Refer to Technical


Specification

□OK □NOK □NA Refer to Technical


Specification

□OK □NOK □NA Refer to Technical


Specification

□OK □NOK □NA Refer to Technical


Specification

□OK □NOK □NA Refer to Technical


Specification

□OK □NOK □NA Refer to Technical


Specification
Index requirements:

Item Specification
The average input optical power of each channel at the MPI-S Refer to Technical
point (dBm) Specifications

Signature of Person

Indosat PT. ZTE Indonesia

11
Technical Specification for OA

12
T4 System Margin Test
T4-01 Segment 7 dB Margin Test
Objective To verify that the specification at each segment meets the engineering requirements.
Test Networking
MPI-S
Diagram C2Kx12/TS4
ETOU10G W
MPI-R
C2Kx12/TS4
ETOU10G
SDH S W
OBA OLA OLA
OPA S
/OTN U
Analyze B U
OPA OLA OLA OBA B
r ① ② ③
ETOU10G C2Kx12/TS4
ETOU10G
C2Kx12/TS4 MPI-S
MPI-R

STEP1: STEP2: STEP3:


VOA add 7dB VOA add 7dB VOA add 7dB
margin margin margin

Preset Conditions The network must be commissioned and must be working normally.
Test Procedures 1. Establish the testing configuration according to the above diagram without the
Adjustable Optical attenuator (VOA).
2. Running BER Tester and make sure the BER Test is running normally.
3. To perform margin test:
STEP 1: At the point ① adjust the Adjustable Optical attenuator (VOA) to
make the input power of the optical amplifying unit to be tested within its
permissible input range until the BER Tester shows error, Then check and save
the attenuator result of VOA. Remove the VOA.
STEP 2: At the point ② adjust the Adjustable Optical attenuator (VOA) to
make the input power of the optical amplifying unit to be tested within its
permissible input range until the BER Tester shows error, Then check and save
the attenuator result of VOA. Remove the VOA.
STEP 2: At the point ③ adjust the Adjustable Optical attenuator (VOA) to
make the input power of the optical amplifying unit to be tested within its
permissible input range until the BER Tester shows error, Then check and save
the attenuator result of VOA. Remove the VOA.
Marks:
1)In the RAMAN system the OVA should add after the DRA board and before
the OPA board, just as the follows:
OPA DRA

MPI-R
STEP1:
VOA add 7dB
margin

13
2)The optical fiber must meet the RAMAN system requirement.
Expected Results Segment margin expected result per section is 7dB.
If some segment fiber loss is much bigger than design value, the segment margin need
recalculate.
Result □OK □NOK □NA
Test Description Test instrument: optical spectrum analyzer, BER Tester, VOA
Requiring on-site operation: yes
Estimated man-hour: 60 min
Risk: low

14
Test Record- Segment 7 Db System Margin Test
Test Sub item Segment 7 Db Margin Test

Node Segment Test


ID Result Conclusion Remarks
(Site A-Site B)

□OK □NOK □NA

□OK □NOK □NA

□OK □NOK □NA

□OK □NOK □NA

□OK □NOK □NA

□OK □NOK □NA

□OK □NOK □NA

□OK □NOK □NA

□OK □NOK □NA

□OK □NOK □NA

□OK □NOK □NA

Signature of Person

Indosat PT. ZTE Indonesia

15
T4-02 Link Margin Test
Objective To verify that the specification at each segment meets the engineering requirements.
Test Networking
MPI-S
Diagram C2Kx12/TS4
ETOU10G W
MPI-R
C2Kx12/TS4
ETOU10G
SDH S W
OBA OLA OLA
OPA S
/OTN U
Analyze B U
OPA OLA OLA OBA B
r ① ② ③
ETOU10G C2Kx12/TS4
ETOU10G
C2Kx12/TS4 MPI-S
MPI-R

STEP1: STEP2: STEP3:


VOA add xdB VOA add xdB VOA add xdB
margin margin margin

Preset Conditions The network must be commissioned and must be working normally.
Test Procedures 1. Establish the testing configuration according to the above diagram without the
Adjustable Optical attenuator (VOA).
2. Running BER Tester and make sure the BER Test is running normally.
3. To perform margin test:
STEP 1: At the point ① adjust the Adjustable Optical attenuator (VOA) to
make the input power of the optical amplifying unit to be tested within its
permissible input range until the BER Tester shows error, Then check and save
the attenuator result of VOA. Keep the VOA value.
STEP 2: At the point ② adjust the Adjustable Optical attenuator (VOA) to
make the input power of the optical amplifying unit to be tested within its
permissible input range until the BER Tester shows error, Then check and save
the attenuator result of VOA. Keep the VOA value.
STEP 2: At the point ③ adjust the Adjustable Optical attenuator (VOA) to
make the input power of the optical amplifying unit to be tested within its
permissible input range until the BER Tester shows error, Then check and save
the attenuator result of VOA. Keep the VOA value.
Marks:
1)In the RAMAN system the OVA should add after the DRA board and before
the OPA board, just as the follows:
OPA DRA

MPI-R
STEP1:
VOA add 7dB
margin

2)The optical fiber must meet the RAMAN system requirement.

16
Expected Results Link margin expected result per section refer to <Technical Specification - Segment
margin and OSNR Measurement for Link>.

Result □OK □NOK □NA


Test Description Test instrument: optical spectrum analyzer, BER Tester, VOA
Requiring on-site operation: yes
Estimated man-hour: 120 min
Risk: low

17
Test Record- Link Margin Test
Test Sub item Link Margin Test

Node Link Test


ID Result Conclusion Remarks
(Site A-Site B-Site C)

□OK □NOK □NA

□OK □NOK □NA

□OK □NOK □NA

□OK □NOK □NA

□OK □NOK □NA

□OK □NOK □NA

□OK □NOK □NA

□OK □NOK □NA

□OK □NOK □NA

□OK □NOK □NA

□OK □NOK □NA

Signature of Person

Indosat PT. ZTE Indonesia

18
T5 Transmission Performance Test
T5-01 OSNR measurement
Objective To measure the output OSNR of each channel at the MPI-R point

Test ROADM/OTM Site OLA Site ROADM/OTM Site

Networking Mi Di
Diagram TS4 TST4
W W
S MPI-R S
OLA

OLA

OA
... ...
U U
B B Dj
Mj L4Lx1
L4Lx1 EOPM4

Preset The network must be commissioned and must be working normally.


Conditions

Test 1. Connect an EOPM4 to the MPI-R point


Procedures 2. Record the optical power of each channel
3. Record OSNR of each channel
4. Record Margin OSNR of each channel when do the system Margin test
5. Recover the patch cord connection
6. Compare with the Expected Results
Expected The actual OSNR requirements refer to < Technical Specification - Segment margin and
Results OSNR Measurement for Link >

Result □OK □NOK □NA


Test Test instrument: EOPM4
Description Requiring on-site operation: yes
Estimated man-hour: 100 minutes
Risk: low

19
Test Record- OSNR Measurement for Services
Test Sub Item OSNR Measurement

N Link Card OSNR Margin Conclusion Remark


O Type Result OSNR

□OK □NOK □NA

□OK □NOK □NA

□OK □NOK □NA

□OK □NOK □NA

□OK □NOK □NA

□OK □NOK □NA

□OK □NOK □NA

□OK □NOK □NA

□OK □NOK □NA

□OK □NOK □NA

□OK □NOK □NA

Signature of Person

Indosat PT. ZTE Indonesia

20
Technical Specification - Segment Margin and OSNR Measurement
for Link

21
T5-02 RFC-2544 TEST
Objective To verify the service link RFC-2544 ability.
Test Configuration diagram for testing RFC-2544
Networking
Diagram

IP
analyzer

Preset Set up the test network according to the previous figure (an open system is illustrated).
Conditions Add an FOA at the receive end of the client side of every OTU board, to ensure that
the client-side receive optical power is within the range specified in the engineering
design.
Test 1. At the local OTM station, connect the signals output from the IP analyzer to the Rx
Procedures port on the OTUn board of the system to be tested. At the opposite OTM station,
perform a loopback at the optical interfaces on the client side of the corresponding
OTUn board. Then, connect the Tx port on the OTUn board at the local OTM station
to the Rx port of the IP analyzer.(Note: The loopback operation should be performed
on the opposite ODF. The IP analyzer should be connected to the local ODF.)
2. Test the packet loss, delay, throughput MTU result
3. Obtain the test results from the analyzer.
Expected 1.Packets loss 0%.
Results 2.The result of delay/latency is Pass on the tester.
3.Throughput MTU (9600 Byte) is Pass on the tester.
Result □OK □NOK □NA
Test Requiring on-site operation: yes
Description Estimated man-hour: 60 minutes
Risk: medium

22
Test Record- RFC2544 Test
Test Sub item RFC 2544 Test

NO Tested Service Test Result Conclusion Reference

□OK □NOK □NA Refer to Technical


Specification

□OK □NOK □NA Refer to Technical


Specification

□OK □NOK □NA Refer to Technical


Specification

□OK □NOK □NA Refer to Technical


Specification

□OK □NOK □NA Refer to Technical


Specification

□OK □NOK □NA Refer to Technical


Specification

□OK □NOK □NA Refer to Technical


Specification

□OK □NOK □NA Refer to Technical


Specification

□OK □NOK □NA Refer to Technical


Specification

□OK □NOK □NA Refer to Technical


Specification

□OK □NOK □NA Refer to Technical


Specification

1.Packets loss 0%.


2.The result of delay/latency is Pass on the tester.
3.Throughput MTU is Pass on the tester.

Signature of Person

Indosat PT. ZTE Indonesia

23
T.1 7 x 24 - Hours BER-T Services
Objective To verify the connectivity and stability of the services.
Test Configuration diagram for testing network BER
Networking
Diagram

SDH
analyzer

Preset Set up the test network according to the previous figure (an open system is illustrated).
Conditions Add an FOA at the receive end of the client side of every OTU board, to ensure that
the client-side receive optical power is within the range specified in the engineering
design.
Test 1. At the local OTM station, connect the signals output from the BER-T analyzer to
Procedures the Rx port on the OTUn board of the system to be tested. At the opposite OTM
station, perform a loopback at the optical interfaces on the client side of the
corresponding OTUn board. Then, connect the Tx port on the OTUn board at the local
OTM station to the Rx port of the BER-T analyzer.(Note: The loopback operation
should be performed on the opposite ODF. The BER-T analyzer should be connected
to the local ODF.)
2. Test the BER and alarms in the system for consecutive 24 hours.
3. Obtain the test results from the analyzer.
Expected No bit error or abnormal alarm is detected during the test.
Results

Result □OK □NOK □NA


Test Requiring on-site operation: yes
Description Estimated man-hour: 24 hours
Risk: medium

24
T.1 Test Record- 7 x 24 Hours BER-T Services
Test Sub item 7 x 24-Hour Network BER-T Services

Node Tested Slot/Interface Test Conclusion Reference


ID Tested Service Result

□OK □NOK □NA Refer to Technical


LBG 0-5-11 C2Kx12 Port 2 Specification
PASS
BTN 0-5-10 C2Kx12 Port 2

□OK □NOK □NA Refer to Technical


Specification

□OK □NOK □NA Refer to Technical


Specification

□OK □NOK □NA Refer to Technical


Specification

□OK □NOK □NA Refer to Technical


Specification

□OK □NOK □NA Refer to Technical


Specification

□OK □NOK □NA Refer to Technical


Specification

□OK □NOK □NA Refer to Technical


Specification

□OK □NOK □NA Refer to Technical


Specification

□OK □NOK □NA Refer to Technical


Specification
Technical specifications:
There should not be any bit errors occurred during the 7x24-hour network BER test of SDH services.

Signature of Person

Indosat PT. ZTE Indonesia

25
CERTIFICATE
OF
ACCEPTANCE TEST
It is agreed that, on , the acceptance test of _
network for (Contract No. ) bought by PT
Indosat has been successfully held by both the Indosat’s expert and
ZTE’s engineer.

It also had been proved by all parties that ZTE’s _


equipments can fully satisfy the need of PT Indosat under the
contract and can be rightly put into full service.

Signature for Approval

PT. Indosat PT. ZTE Indonesia

26