Client : Praneeth Projects Project : Construction of Antiliya Villas

SUBJECT : STROM WATER MANAGEMENT (POST DEVELOPMENT)


DESIGN DETAILS CONSIDERED

a) Total Run-off : Roof Top

Considering 60 min of rainfall


Volume of Rain Water Available for Harvesting is 80% - Cum
(After first flush of water about 20% is lost in transition) - m3/sec

b) Total Run-off : Lawn, Garden Area

Volume of Rain Water Available is 60% - Cum


(Losses due to runoff, evaporation, absorption, and evaptranspiration is 40%) - m3/sec

c) Total Run-off : Hard Scape & Driveway

Volume of Rain Water Available is 70% - Cum


(Losses due to runoff, evaporation, absorption, is 30%) - m3/sec

Total Runoff from Garden Area , Hardscape, Driveway


TOTAL RAIN FALL OF (A+B+C) - Cum

Storm Water Calculations 1 of 1 MEP Consultants : Dheeraj Sai Consultants