SATUAN HARGA 2019 T. IV Acc 1.25 ACC
SATUAN HARGA 2019 T. IV Acc 1.25 ACC
NO JENIS/TYPE PAGAR TEBAL Jl. Raya Sukomanunggal Jaya A6, Satelit Square
Telp. 0317325885-0317317975 HP.
Melintang Panjang 08123005040 - 08155004242 email m3 Harga/m3
abadimetaluatama@gmail.com
1 Pagar BRC FP120 T4.25 4,25 mm 120 cm 240 cm Rp 127,400 0.288 Rp 1,440,000
2 Pagar BRC FP120 T4.75 4,75 mm 120 cm 240 cm Rp 156,900 0.288 Rp 1,440,000
3 Pagar BRC FP120 T5.0 5,0 mm 120 cm 240 cm Rp 166,300 0.288 Rp 1,440,000
4 Pagar BRC FP120 T5.1 5,1 mm 120 cm 240 cm Rp 177,700 0.288 Rp 1,440,000
5 Pagar BRC FP120 T5.5 5,5 mm 120 cm 240 cm Rp 200,100 0.288 Rp 1,440,000
6 Pagar BRC FP120 T5.6 5,6 mm 120 cm 240 cm Rp 207,900 0.288 Rp 1,440,000
7 Pagar BRC FP120 T6.0 6,0 mm 120 cm 240 cm Rp 237,100 0.288 Rp 1,440,000
8 Pagar BRC FP120 T6.7 6,7 mm 150 cm 240 cm Rp 294,200 0.360 Rp 1,440,000
9 Pagar BRC FP120 T7.0 7,0 mm 120 cm 240 cm Rp 320,600 0.288 Rp 1,440,000
10 Pagar BRC FP120 T7.5 7,5 mm 120 cm 240 cm Rp 367,200 0.288 Rp 1,440,000
11 Pagar BRC FP120 T8.0 8,0 mm 120 cm 240 cm Rp 417,000 0.288 Rp 1,440,000
1 Pagar BRC FP 150 T5.7 5,7 mm 150 cm 240 cm Rp 256,200 0.360 Rp 1,440,000
2 Pagar BRC FP 150 T6.0 6,0 mm 150 cm 240 cm Rp 283,300 0.360 Rp 1,440,000
3 Pagar BRC FP 150 T6.7 6,7 mm 150 cm 240 cm Rp 352,000 0.360 Rp 1,440,000
4 Pagar BRC FP 150 T7.0 7,0 mm 150 cm 240 cm Rp 383,800 0.360 Rp 1,440,000
5 Pagar BRC FP 150 T7.5 7,5 mm 150 cm 240 cm Rp 439,700 0.360 Rp 1,440,000
6 Pagar BRC FP 150 T8.0 8,0 mm 150 cm 240 cm Rp 499,400 0.360 Rp 1,440,000
1 Pagar BRC FP175 T5.7 5,7 mm 175 cm 240 cm Rp 284,300 0.420 Rp 1,440,000
2 Pagar BRC FP175 T6.0 6,0 mm 175 cm 240 cm Rp 314,100 0.420 Rp 1,440,000
3 Pagar BRC FP175 T6.7 6,7 mm 175 cm 240 cm Rp 390,200 0.420 Rp 1,440,000
4 Pagar BRC FP175 T7.0 7,0 mm 175 cm 240 cm Rp 425,300 0.420 Rp 1,440,000
5 Pagar BRC FP175 T7.5 7,5 mm 175 cm 240 cm Rp 487,200 0.420 Rp 1,440,000
6 Pagar BRC FP175 T8.0 8,0 mm 175 cm 240 cm Rp 553,400 0.420 Rp 1,440,000
1 Pagar BRC FP190 T5.7 5,7 mm 190 cm 240 cm Rp 300,300 0.456 Rp 1,440,000
2 Pagar BRC FP190 T6.0 6,0 mm 190 cm 240 cm Rp 332,000 0.456 Rp 1,440,000
3 Pagar BRC FP190 T6.7 6,7 mm 190 cm 240 cm Rp 412,300 0.456 Rp 1,440,000
4 Pagar BRC FP190 T7.0 7,0 mm 190 cm 240 cm Rp 449,400 0.456 Rp 1,440,000
5 Pagar BRC FP190 T7.5 7,5 mm 190 cm 240 cm Rp 515,000 0.456 Rp 1,440,000
6 Pagar BRC FP190 T8.0 8,0 mm 190 cm 240 cm Rp 585,100 0.456 Rp 1,440,000
1 Pagar BRC FP240 T7.0 7,0 mm 240 cm 240 cm Rp 524,600 0.456 Rp 1,440,000
2 Pagar BRC FP240 T7.5 7,5 mm 240 cm 240 cm Rp 601,200 0.456 Rp 1,440,000
3 Pagar BRC FP240 T8.0 8,0 mm 240 cm 240 cm Rp 682,800 0.456 Rp 1,440,000
HD (Galvanis HotDip)
1 P60 HD dia.1,5" 0.6 0.0381 0.01905 Rp 108,900.00 0.0007 Rp 1,440,000.00
1 P60 HD dia.2,0" 0.6 0.0508 0.0254 Rp 118,600.00 0.0049 Rp 1,440,000.00
2 P90 HD dia.1,5" 0.9 0.0381 0.01905 Rp 127,100.00 0.0010 Rp 1,440,000.00
2 P90 HD dia.2.0" 0.9 0.0508 0.0254 Rp 147,700.00 0.0073 Rp 1,440,000.00
3 P120 HD dia.1.5" 1.2 0.0381 0.01905 Rp 147,700.00 0.0055 Rp 1,440,000.00
3 P120 HD dia.2.0" 1.2 0.0508 0.0254 Rp 170,700.00 0.0097 Rp 1,440,000.00
4 P150 HD dia.1,5" 1.5 0.0381 0.01905 Rp 168,200.00 0.0068 Rp 1,440,000.00
4 P150 HD dia.2.0" 1.5 0.0508 0.0254 Rp 198,500.00 0.0122 Rp 1,440,000.00
5 P175 HD dia.1.5" 1.75 0.0381 0.01905 Rp 187,600.00 0.0080 Rp 1,440,000.00
5 P175 HD dia.2.0" 1.75 0.0508 0.0254 Rp 232,400.00 0.0142 Rp 1,440,000.00
6 P190 HD dia.1,5" 1.9 0.0381 0.01905 Rp 198,500.00 0.0087 Rp 1,440,000.00
6 P190 HD dia.2.0" 1.9 0.0508 0.0254 Rp 244,500.00 0.0154 Rp 1,440,000.00
7 P240 HD dia.1.5" 2.4 0.0381 0.01905 Rp 227,500.00 0.0109 Rp 1,440,000.00
7 P240 HD dia.2.0" 2.4 0.0508 0.0254 Rp 265,000.00 0.0194 Rp 1,440,000.00
1" 2.54 1 "
1.5 3.81 1.5"
0.0381
2 5.08 2 "
0.0508
Demak Surabaya)
HARGA
Ongkos Kirim port to door
+transport dan pikul
Rp 656,640 Rp 1,181,240.00
Rp 656,640 Rp 1,257,840.00
Rp 656,640 Rp 1,339,440.00
Rp 984.54 Rp 96,584.54
Rp 4,618.83 Rp 103,918.83 20" 2.464 KG/M' 27.104 11.00
Rp 1,476.81 Rp 106,776.81
Rp 6,928.24 Rp 118,328.24 7/8 22" 2.984 KG/M' 32.824 11.00
Rp 7,876.32 Rp 120,476.32
Rp 9,237.66 Rp 135,137.66 7/8 22" 2.984 KG/M' 32.824 11.00
Rp 9,845.40 Rp 134,545.40
Rp 11,547.07 Rp 159,247.07 7/8 22" 2.984 KG/M' 32.824 11.00
Rp 11,486.30 Rp 142,186.30
Rp 13,471.59 Rp 188,971.59 7/8 22" 2.984 KG/M' 32.824 11.00
Rp 12,470.84 Rp 157,670.84
Rp 14,626.29 Rp 199,826.29 7/8 22" 2.984 KG/M' 32.824 11.00
Rp 15,752.64 Rp 176,752.64
Rp 18,475.32 Rp 212,075.32 7/8 22" 2.984 KG/M' 32.824 11.00
Rp 984.54 Rp 109,884.54
Rp 7,001.17 Rp 125,601.17 20" 2.464 KG/M' 27.104 11.00
Rp 1,476.81 Rp 128,576.81
Rp 10,501.76 Rp 158,201.76 7/8 22" 2.984 KG/M' 32.824 11.00
Rp 7,876.32 Rp 155,576.32
Rp 14,002.35 Rp 184,702.35 7/8 22" 2.984 KG/M' 32.824 11.00
Rp 9,845.40 Rp 178,045.40
Rp 17,502.93 Rp 216,002.93 7/8 22" 2.984 KG/M' 32.824 11.00
Rp 11,486.30 Rp 199,086.30
Rp 20,420.09 Rp 252,820.09 7/8 22" 2.984 KG/M' 32.824 11.00
Rp 12,470.84 Rp 210,970.84 1
Rp 22,170.38 Rp 266,670.38 7/8 22" 2.984 KG/M' 32.824 11
Rp 15,752.64 Rp 243,252.64
Rp 28,004.69 Rp 293,004.69 7/8 22" 2.984 KG/M' 32.824 11
11 24000 9828.00983 9828.00983
11 24000 9828.00983 9828.00983
11 24000 9828.00983 9828.00983
11 24000 9828.00983 9828.00983
11 24000 9828.00983 9828.00983
11 24000 9828.00983 9828.00983
11 24000 9828.00983 9828.00983
11 24000 9828.00983 9828.00983
11 24000 9828.00983 9828.00983
11 24000 9828.00983 9828.00983
34,035.59
-
-
-
-
-
4,862.23
-
-
23.93
### 6,641.09
### 6,641.09
0
PERHITUNGAN BESI BETON
254,750
9.00
-
110,000
125,000
307,500
DAFTAR HARGA SATUAN BAHAN DAN UPAH
TAHUN 2019
A. Harga Satuan Bahan
FINISHING
1 Amplas lbr
2 Cat besi kg
3 Cat dasar kg
4 Cat emco kg
5 Cat menie besi kg
6 Cat menie kayu kg
7 Cat tembok Decolith kg
8 Cat tembok Dulux kg
9 Cat tembok Emco kg
10 Cat tembok Paragon kg
11 Cat tembok Toyopaint kg
12 Cat tembok Vinilex kg
13 Cat tembok Vinippaint kg
14 Dempul ltr
15 Kuas bh
16 Mild zak
17 Minyak cat ltr
18 Plamir kayu kg
19 Plamir tembok kg
20 Politur ultra ltr
21 Politur vernis ltr
22 Thiner A Bonanza ltr
23 Thiner B Spesial ltr
PENUTUP ATAP
24 Alang-alang panjang 2,4 meter lbr
25 Alluminium foil m2
26 Asbes Bubungan lbr
27 Asbes Gelombang 1,80 m x 0,80 m x 5 mm lbr
28 Asbes Gelombang 2,4 m x 1,05 m x 4 mm lbr
29 Asbes Rata 2 m x 1 m x 4 mm lbr
28 Atap metal Toratora 1 x 4 Extra m2
29 Atap metal Toratora 1 x 4 Premium m2
30 Atap metal Toratora 2 x 4 Extra m2
31 Atap metal Toratora 2 x 4 Premium m2
32 Atap metal Toratora 3 x 4 Extra m2
33 Atap metal Toratora 3 x 4 Premium m2
34 Atap metal Toratora 4 x 4 Extra m2
35 Atap metal Toratora 4 x 4 Premium m2
36 Bentala paras bh
37 Bentala tanah liat bh
38 Besi profil WF kg
39 Besi strip kg
40 Bubungan Biasa bj
41 Bubungan Karang Pilang (glazur) isi 3,5/m bj
42 Bubungan Karang Pilang isi 3,5/m bj
43 Bubungan Ngalayur isi 3,5/m bj
44 Bubungan Plentong bj
45 Bubungan Utama isi 3,5/m bj
46 Genteng Kanmuri (glazur) isi 14/m2 bj
47 Genteng Kodok Karang Pilang (Bambe) isi 20/m2 bj
48 Genteng Kodok Karang Pilang (Bisma) isi 20/m2 bj
49 Genteng Kodok Karang Pilang (Good Year) isi 20/m2 bj
50 Genteng Morando Abadi isi 18/m2 bj
51 Genteng Morando Jatiwangi isi 18/m2 bj
52 Genteng Morando Ngalayur isi 20/m2 bj
53 Genteng Plentong bj
54 Genteng plentong dicat bj
55 Genteng Plentong Jatiwangi isi 24/m2 bj
56 Ijuk kg
57 Ikut celedu paras bh
58 Ikut celedu tanah liat bh
59 Murda paras bh
PENGGANTUNG
69 Engsel kupu-kupu ps
70 Engsel nylon ps
71 Espagnoleth set
72 Grendel biasa bh
73 Grendel hararo bh
74 Kaca 3 mm bening m2
75 Kaca 5 mm bening m2
76 Kaca 6 mm bening m2
77 Kaca 8 mm bening m2
78 Kaca 10 mm bening m2
79 Kaca 12 mm bening m2
80 Kaca Es/Kapur 3 mm m2
81 Kaca Es/Kapur 5 mm m2
82 Kaca nako daun
83 Kaca nako teralis bening m2
84 Kaca ryben 3 mm m2
85 Kaca ryben 5 mm m2
86 Kait angin biasa bh
87 Kunci pintu TOP bh
88 Kunci pintu Union bh
89 Kunci pintu Vanesa bh
90 Kunci pintu Yale bh
91 Kunci pintu YURI bh
92 Kunci slot bh
93 Kunci tanam 2 slag bh
KERAMIK
IKAD
140 Ikad (Keramik) Kw. I 10 x 20 cm m2
141 Ikad (Keramik) Kw. I 20 x 20 cm m2
142 Ikad (Keramik) Kw. I 20 x 30 cm m2
143 Ikad (Keramik) Kw. I 30 x 30 cm m2
144 Ikad (Keramik) Kw. I 40 x 40 cm m2
145 Ikad (Keramik) Kw. II 10 x 20 cm m2
146 Ikad (Keramik) Kw. II 20 x 20 cm m2
147 Ikad (Keramik) Kw. II 20 x 30 cm m2
148 Ikad (Keramik) Kw. II 30 x 30 cm m2
149 Ikad (Keramik) Kw. II 40 x 40 cm m2
INESA
150 Keramik 30 x 30 Kelas I (Onyx Phyrus Ruby Jade, P) m2
151 Keramik 30 x 30 Kelas I (Onyx Phyrus Ruby Jade, UP) m2
152 Keramik 30 x 30 Kelas I (Pearl Ghita Cat Eye, P) m2
153 Keramik 30 x 30 Kelas I (Pearl Ghita Cat Eye, UP) m2
154 Keramik 30 x 30 Kelas I (Sand Wheat Spruce Clay Charcoal, R) m2
155 Keramik 40 x 40 Kelas I (Corypha Roystonea Raphia, P) m2
156 Keramik 40 x 40 Kelas I (Onyx Phyrus Ruby Jade, P) m2
157 Keramik 40 x 40 Kelas I (Onyx Phyrus Ruby Jade, UP) m2
158 Keramik 40 x 40 Kelas I (Pearl Ghita Cat Eye, P) m2
159 Keramik 40 x 40 Kelas I (Pearl Ghita Cat Eye, UP) m2
160 Keramik 60 x 60 Kelas I (Corypha Roystonea Raphia, P) m2
ESSENZA
161 Keramik 30 x 30 Kelas I (Black Orchid, Coral Bell, P) m2
162 Keramik 30 x 30 Kelas I (Black Orchid, Coral Bell, UP) m2
163 Keramik 30 x 30 Kelas I (Pepper Grey Price Rubert Silver star, P) m2
164 Keramik 30 x 30 Kelas I (Pepper Grey Price Rubert Silver star, UP) m2
165 Keramik 40 x 40 Kelas I (Pepper Grey Price Rubert Silver star, P) m2
166 Keramik 40 x 40 Kelas I (Pepper Grey Price Rubert Silver star, UP) m2
167 Keramik 60 x 60 Kelas I (Pepper Grey Price Rubert Silver star, P) m2
168 Keramik Kelas I Domus m2
169 Keramik Kelas I Granity Imperiali m2
170 Keramik Kelas I Lavagna m2
171 Keramik Kelas I Mountain Peak m2
GARUDA
172 Keramik 20 x 20 kelas I Emboss Dasar Muda m2
173 Keramik 20 x 20 kelas I Emboss Dasar Tua m2
174 Keramik 20 x 20 kelas I Tesia m2
175 Keramik 20 x 20 kelas II Emboss Dasar Muda m2
176 Keramik 20 x 20 kelas II Emboss Dasar Tua m2
177 Keramik 20 x 20 kelas II Tesia m2
178 Keramik 20 x 25 kelas I Motif Dasar Medium m2
179 Keramik 20 x 25 kelas I Motif Dasar Muda m2
180 Keramik 20 x 25 kelas I Nuri Dark m2
181 Keramik 20 x 25 kelas I Polos m2
182 Keramik 30 x 30 kelas I Granity m2
183 Keramik 30 x 30 kelas I Motif Embose m2
184 Keramik 30 x 30 kelas II Granity m2
185 Keramik 30 x 30 kelas II Motif Embose m2
186 Keramik 40 x 40 kelas I Motif Dasar Muda m2
187 Keramik 40 x 40 kelas I Motif Dasar Muda m2
ASIA
193 Keramik 10 x 20 kelas I warna muda m2
194 Keramik 20 x 20 kelas I warna muda m2
195 Keramik 20 x 20 kelas I warna tua m2
196 Keramik 20 x 25 kelas I warna tua m2
197 Keramik 20 x 30 kelas I warna muda m2
198 Keramik 30 x 30 kelas I warna muda m2
199 Keramik 30 x 30 kelas I warna tua m2
200 Keramik 40 x 40 kelas I warna muda m2
201 Keramik 10 x 20 kelas II m2
202 Keramik 20 x 20 kelas II m2
203 Keramik 20 x 30 kelas II m2
204 Keramik 30 x 30 kelas II m2
205 Keramik 40 x 40 kelas II m2
MULIA
206 Keramik 10 x 20 cm kelas I m2
207 Keramik 20 x 20 cm kelas I m2
208 Keramik 20 x 30 cm kelas I m2
209 Keramik 30 x 30 cm kelas I m2
210 Keramik 40 x 40 cm kelas I m2
211 Keramik 10 x 20 cm kelas II m2
212 Keramik 20 x 20 cm kelas II m2
213 Keramik 20 x 30 cm kelas II m2
214 Keramik 30 x 30 cm kelas II m2
215 Keramik 40 x 40 cm kelas II m2
SANITAIR
201 Bak mandi fibre glass 70x70x66 cm bh
202 Bak mandi keramik bh
203 Floor Drain " TOTO TypeTx 1 Bv 1 " Square Flange " bh
204 Floor drain plastik bh
205 Floor drain stainless bh
206 Kloset duduk INA bh
207 Kloset duduk Amerika Standar bh
208 Kloset duduk " TOTO Type AVANTE CW 821 PJ / SW 821JP COMPLIT bh
209 Kloset duduk " TOTO Type AVANTE CW 821J"/ SW 821JP COMPLIT bh
210 Kloset duduk " TOTO Type AVANTE CW 823 J bh
211 Kloset duduk " TOTO Type CW 660J bh
212 Kloset duduk " TOTO Type CW 660J / SW 660J COMPLIT bh
213 Kloset duduk " TOTO Type CW 660J / SW 660J COMPLIT WARNA bh
214 Kloset duduk " TOTO Type CW 660J WARNA COMPLIT bh
215 Kloset duduk " TOTO Type CW 661JT1 BODI COMPLIT bh
216 Kloset duduk " TOTO Type CW 661JT1" / SW 661JP COMPLIT bh
217 Kloset duduk " TOTO Type CW 661JT1" / SW 784JP COMPLIT bh
218 Kloset jongkok " TOTO Type CE 6 COMPLIT bh
219 Kloset jongkok " TOTO Type CE 7 COMPLIT bh
220 Kloset porselin jongkok Kia (standar) bh
221 Kloset porselin jongkok Ina (standar) bh
222 Kran biasa bh
223 Kran SunEi bh
224 Kran TOTO T 205 LCSC bh
225 Kran TOTO T 205 MC bh
226 Kran TOTO T 23 B13 bh
227 Kran TOTO T 23 B13V7N bh
228 Kran TOTO T 26 - 13 bh
229 Kran TOTO TX 109 LH bh
230 Penyekat Urinoir " TOTO " Type A 100 " bh
231 Shower Spray " TOTO Tx 403SPIV ( Pastel Ivory ) bh
232 Soap holder " TOTO " Type S 6 N " bh
233 Seal tape bh
234 Urinoir " TOTO U 57 M bh
235 Urinoir " TOTO U 57 M BODI bh
236 Urinoir " TOTO UW 447 JT 1 " bh
237 Urinoir " TOTO UW 447 JT 1 BODI bh
PAKU
244 Paku 10 cm kg
245 Paku kalsiboard kg
246 Paku list SQ kg
247 Paku pancing 60 x 230 kg
248 Paku reng/usuk SQ kg
249 Paku seng kg
250 Paku seng import bj
251 Paku skrup 1/2" kg
252 Paku skrup 2" kg
253 Paku skrup 3.5" kg
254 Paku sumbat 1/2" kg
PIPA
281 Pipa Galvanis 1/2" m1
282 Pipa Galvanis 3/4" m1
283 Pipa Galvanis 1 1/4" m1
284 Pipa Galvanis 1 1/2" m1
285 Pipa Galvanis 1" m1
286 Pipa Galvanis 1,5 BSA m1
287 Pipa Galvanis 2" m1
288 Pipa Galvanis 3" m1
289 Pipa Maspion AW 1 ljr
290 Pipa Maspion AW 1/2 ljr
291 Pipa Maspion AW 10 ljr
292 Pipa Maspion AW 1-1/2 ljr
293 Pipa Maspion AW 1-1/4 ljr
294 Pipa Maspion AW 12 ljr
295 Pipa Maspion AW 14 ljr
296 Pipa Maspion AW 16 ljr
297 Pipa Maspion AW 2 ljr
298 Pipa Maspion AW 2-1/2 ljr
299 Pipa Maspion AW 3 ljr
300 Pipa Maspion AW 3/4 ljr
301 Pipa Maspion AW 4 ljr
302 Pipa Maspion AW 5 ljr
SEMEN
327 Semen Bosowa 50 kg zak
328 Semen Gresik 40 kg zak
329 Semen Gresik 50 kg zak
330 Semen Tiga Roga 50 kg zak
331 Semen Tonasa 50 kg zak
332 Semen warna/semen grouting kg
BAHAN LISTRIK
356 Saklar (Broco) bh
357 Stop Kontak bh
358 Fitting bh
359 Steker bh
360 Coaxial cable 5C - 75 ohm commscof m1
361 Kabel NYM 3 x 2.5 mm ex. Supreme m1
362 Kabel NYM 4 mm m1
363 Kabel telephone m1
364 Lampu pijar 10 Watt (Philip) bh
365 Lampu pijar 15 Watt (Philip) bh
366 Lampu pijar 25 Watt (Philip) bh
367 Lampu TL 10 Watt (10 Watt) bh
BUIS BETON
376 Buis beton 10 x 75 bh
377 Buis beton 15 x 75 bh
378 Buis beton 20 x 75 bh
379 Buis beton 25 x 75 bh
380 Buis beton 30 x 75 bh
381 Buis beton 50 x 75 bh
PAVING
382 Paving 10 x 20 cm tebal 6 cm K225 m2
383 Paving 10 x 20 cm tebal 6 cm K300 m2
384 Paving 10 x 20 cm tebal 6 cm standard m2
385 Paving 10 x 20 cm tebal 8 cm K225 m2
386 Paving 10 x 20 cm tebal 8 cm K300 m2
387 Paving 10 x 20 cm tebal 8 cm standard m2
388 Paving Tiga Berlian tebal 6 cm K225 m2
389 Paving Tiga Berlian tebal 8 cm K225 m2
390 Kanstein Bulat 15x20x50 cm K225 m1
391 Kanstein Jumbo 15x30x50 cm K225 m1
392 Kanstein Super 17x25x60 cm K225 m1
393 Grass Block m2
394 Koral sikat zak
LAIN-LAIN
395 Dugul batu hitam 50 x 50 x 200 unit
396 Dugul batu hitam 60 x 70 x 250 unit
397 Dugul batu hitam 70 x 70 x 250 unit
398 Padmasari batu hitam 50 x 50 x 200 unit
399 Padmasari batu hitam 70 x 70 x 250 unit
400 Padmasari batu hitam 65 x 75 x 225 unit
2 Aspal Finisher
Spesifikasi 10 Ton
Merk Marini
Tahun Pembelian
Harga Pembelian 950,000,000.00
Kondisi Baik
Harga Sewa 544,082.36
3 Asphal Sprayer
Spesifikasi 850 L
Merk Yanmar
Tahun Pembelian 2012
Harga Pembelian 324,600,000.00
Kondisi Baik
Harga Sewa 127,806.25/ Jam
4 Bulldozer 100-150 HP
Spesifikasi 155 HP
Merk
Tahun Pembelian
Harga Pembelian 2,055,000,000.00
Kondisi Baik
Harga Sewa 858,170.47/ Jam
9 Dump Truk
Spesifikasi 10 T
Merk
Tahun Pembelian
Harga Pembelian 500,000,000.00
Kondisi Baik
Harga Sewa #VALUE!
12 Generator Set
Spesifikasi 135 kva
Merk cummins
Tahun Pembelian
Harga Pembelian 324,000,000.00
Kondisi BAIK
Harga Sewa 524,910.67/ jam
21 Stone Chrusher
Spesifikasi 50 T
Merk
Tahun Pembelian
Harga Pembelian 1,500,000,000
Kondisi Baik
Harga Sewa 898,952.59
24 Pedestrian Roller
Spesifikasi 835 T
Merk
Tahun Pembelian
Harga Pembelian 150,000,000.00
Kondisi Baik
Harga Sewa 98,602
25 Tamper
Spesifikasi 121 T
Merk
Tahun Pembelian
Harga Pembelian 25,000,000.00
Kondisi Baik
Harga Sewa 61,480.59
26 Jack hammer
Spesifikasi
Merk
Tahun Pembelian
Harga Pembelian 100,000,000.00
Kondisi Baik
Harga Sewa 57,595.89
27 Fulvi Mixer
Spesifikasi
Merk
Tahun Pembelian
Harga Pembelian 900,000,000.00
Kondisi Baik
Harga Sewa 1,489,331.35
28 Concrete Pump
Spesifikasi 8 m3
Merk
Tahun Pembelian
Harga Pembelian 112,500,000.00
Kondisi Baik
Harga Sewa 290,189.50
29 Trailer 20 TON
Spesifikasi 20 T
Merk
Tahun Pembelian
Harga Pembelian 750,000,000.00
Kondisi Baik
32 Welding Set
Spesifikasi 250 amp
Merk
Tahun Pembelian
Harga Pembelian 17,000,000.00
Kondisi Baik
Harga Sewa 131,554.28
35 Trailer 15 Ton
Spesifikasi 15 T
Merk
Tahun Pembelian
Harga Pembelian 450,000,000.00
Kondisi Baik
Harga Sewa 617,219.83
37 Cold Milling
Spesifikasi 1000 m
Merk
Tahun Pembelian
Harga Pembelian 4,945,000,000.00
Kondisi Baik
Harga Sewa 1,757,915.17
38 Cold Recycler
Spesifikasi 2.2 m
Merk
Tahun Pembelian
Harga Pembelian 19,500,000,000.00
Kondisi Baik
Harga Sewa 6,556,126.47
39 Hot Recycler
Spesifikasi 3.0 m
Merk
Tahun Pembelian
Harga Pembelian 29,250,000,000.00
Kondisi Baik
44 Concrete Breaker
Spesifikasi 20 m3
Merk
Tahun Pembelian
Harga Pembelian 900,000,000.00
Kondisi Baik
Harga Sewa 941,141.55
45 Asphalt Tanker
Spesifikasi 4000 liter
Merk
Tahun Pembelian
Harga Pembelian 500,000,000.00
Kondisi Baik
Harga Sewa 628,136.66
46 Cement Tanker
Spesifikasi 4000 liter
Merk
Tahun Pembelian
Harga Pembelian 500,000,000.00
Kondisi Baik
Harga Sewa 580,136.66
48 Vibrating Ramer
Spesifikasi 80 kg
Merk
Tahun Pembelian
Harga Pembelian 20,000,000.00
Kondisi Baik
Harga Sewa 57,438.47
49 Truk Mixer
Spesifikasi 5 m3
Merk
Tahun Pembelian
Harga Pembelian 750,000,000.00
Kondisi Baik
Harga Sewa 713,769.15
52 Blending Equipment
Spesifikasi 30 T
Merk
Tahun Pembelian
Harga Pembelian 500,000,000.00
Kondisi Baik
Harga Sewa 856,156.95
Sekretaris, Ketua,
Mengetahui,
Kepala Dinas PU, Penataan Ruang, Perumahan Rakyat
dan Kawasan Permukiman
Kabupaten Fakfak ,
Catatan :
Harga - harga hanya sebagai pedoman / pendukung
dalam perhitungan konstruksi ( tidak mengikat ).
UMP PROV. PAPUA BARAT 2019 2,934,500.00
SEKTOR PERTAMBANGAN MINYAK DAN GAS BUMI 4,000,000.00
SEKTOR PERTAMBANGAN KECUALI
SEKTOR KEHUTANAN, PERKEBUNAN, DAN GALIAN C 2,937,300.00
PERIKANAN 2,934,500.00
SEKTOR JASA KONSTRUKSI 3,002,000.00
Undang -undang no. 13 tahun 2003 tentang "ketenagakerjaan"
Jika dalam 1 hari bekerja selama 8 jam (5 hari kerja/ senin s/d jumat) maka dalam 1 bulan bekerja selama 21 hari
Jika dalam 1 hari bekerja selama 7 jam (6 hari kerja/ senin s/d sabtu) maka dalam 1 bulan bekerja selama 25 hari
RIZAL MINGGELE, ST
NIP. 19820701 200909 1 001 LIZA NEIRASARI, ST
NIP. 19751016 200111 2 001
Mengetahui,
Kepala Dinas PU, Penataan Ruang,
Perumahan Rakyat dan Kawasan Permukiman
Kabupaten Fakfak ,
ESSENZA
1 Keramik 30 x 30 Kelas I (Black Orchid, Coral Bell, P) m2 -
2 Keramik 30 x 30 Kelas I (Black Orchid, Coral Bell, UP) m2 -
3 Keramik 30 x 30 Kelas I (Pepper Grey Price Rubert Silver star, P) m2 -
4 Keramik 30 x 30 Kelas I (Pepper Grey Price Rubert Silver star, UP) m2 -
5 Keramik 40 x 40 Kelas I (Pepper Grey Price Rubert Silver star, P) m2 -
6 Keramik 40 x 40 Kelas I (Pepper Grey Price Rubert Silver star, UP) m2 93,000.00 124,548.20 133,889.32 137,003.02 143,230.43 137,003.02 137,003.02 137,003.02 143,230.43 146,344.14
7 Keramik 60 x 60 Kelas I (Pepper Grey Price Rubert Silver star, P) m2 -
8 Keramik Kelas I Domus m2 -
9 Keramik Kelas I Granity Imperiali m2 -
10 Keramik Kelas I Lavagna m2 -
11 Keramik Kelas I Mountain Peak m2 -
GARUDA - - - - - - - -
1 Keramik 20 x 20 kelas I Emboss Dasar Muda m2 - - - - - - - - -
2 Keramik 20 x 20 kelas I Emboss Dasar Tua m2 - - - - - - - - -
3 Keramik 20 x 20 kelas I Tesia m2 - - - - - - - - -
4 Keramik 20 x 20 kelas II Emboss Dasar Muda m2 - - - - - - - - -
5 Keramik 20 x 20 kelas II Emboss Dasar Tua m2 - - - - - - - - -
6 Keramik 20 x 20 kelas II Tesia m2 - - - - - - - - -
7 Keramik 20 x 25 kelas I Motif Dasar Medium m2 - - - - - - - - -
8 Keramik 20 x 25 kelas I Motif Dasar Muda m2 - - - - - - - - -
9 Keramik 20 x 25 kelas I Nuri Dark m2 - - - - - - - - -
10 Keramik 20 x 25 kelas I Polos m2 - - - - - - - - -
11 Keramik 30 x 30 kelas I Granity m2 - - - - - - - - -
12 Keramik 30 x 30 kelas I Motif Embose m2 - - - - - - - - -
13 Keramik 30 x 30 kelas II Granity m2 - - - - - - - - -
14 Keramik 30 x 30 kelas II Motif Embose m2 - - - - - - - - -
15 Keramik 40 x 40 kelas I Motif Dasar Muda m2 - - - - - - - - -
16 Keramik 40 x 40 kelas I Motif Dasar Muda m2 - - - - - - - - - -
17 Keramik 40 x 40 kelas I Motif Embose m2 - - - - - - - - - -
18 Keramik 40 x 40 kelas I Motif Granity Tua m2 - - - - - - - - - -
19 Keramik 40 x 40 kelas I Motif Medium Color m2 - - - - - - - - - -
20 Keramik 40 x 40 kelas I Motif Spesial Color m2 - - - - - - - - - -
21 Keramik 50 x 50 kelas I m2 - - - - - - - - - -
22 Granito 60 x 60 polos m2 350,000.00 446,569.20 480,061.89 491,226.12 513,554.58 491,226.12 491,226.12 491,226.12 513,554.58 524,718.81
22 Granito 60 x 60 warna m2 500,000.00 634,519.20 682,108.14 697,971.12 729,697.08 697,971.12 697,971.12 697,971.12 729,697.08 745,560.06
-
ASIA - - - - - - - - -
1 Keramik 10 x 10 kelas I warna muda m2 - - - - - - - - - -
2 Keramik 10 x 20 kelas I warna muda m2 -
3 Keramik 20 x 20 kelas I warna muda m2 - - - - - - - - - -
4 Keramik 20 x 20 kelas I warna tua m2 68,000.00 93,223.20 100,214.94 102,545.52 107,206.68 102,545.52 102,545.52 102,545.52 107,206.68 109,537.26
5 Keramik 20 x 25 kelas I warna tua m2 75,000.00 101,994.20 109,643.77 112,193.62 117,293.33 112,193.62 112,193.62 112,193.62 117,293.33 119,843.19
6 Keramik 20 x 30 kelas I warna muda m2 - - - - - - - - - -
7 Keramik 30 x 30 kelas I warna muda m2 54,000.00 75,681.20 81,357.29 83,249.32 87,033.38 83,249.32 83,249.32 83,249.32 87,033.38 88,925.41
8 Keramik 30 x 30 kelas I warna tua m2 65,000.00 89,464.20
9 Keramik 40 x 40 kelas I warna muda m2 76,000.00 103,247.20 110,990.74 113,571.92 118,734.28 113,571.92 113,571.92 113,571.92 118,734.28 121,315.46
10 Keramik 40 x 40 warna platinum m2 80,000.00 108,259.20 116,378.64 119,085.12 124,498.08 119,085.12 119,085.12 119,085.12 124,498.08 127,204.56
11 Keramik 10 x 20 kelas II m2 - - - - - - - - -
12 Keramik 20 x 20 kelas II m2 -
13 Keramik 20 x 30 kelas II m2 - - - - - - - - -
14 Keramik 30 x 30 kelas II m2 - - - - - - - - -
15 Keramik 40 x 40 kelas II m2 85,000.00 114,524.20 123,113.52 125,976.62 131,702.83 125,976.62 125,976.62 125,976.62 131,702.83 134,565.94
- - - - - - - - -
MULIA - - - - - - - - -
1 Keramik 10 x 20 cm kelas I m2 - - - - - - - - - -
2 Keramik 20 x 20 cm kelas I m2 85,000.00 114,524.20 123,113.52 125,976.62 131,702.83 125,976.62 125,976.62 125,976.62 131,702.83 134,565.94
3 Keramik 20 x 30 cm kelas I m2 - - - - - - - - - -
4 Keramik 30 x 30 cm kelas I m2 - - - - - - - - -
5 Keramik 40 x 40 cm kelas I m2 85,000.00 114,524.20 123,113.52 125,976.62 131,702.83 125,976.62 125,976.62 125,976.62 131,702.83 134,565.94
6 Keramik 10 x 20 cm kelas II m2 - - - - - - - - - -
7 Keramik 20 x 20 cm kelas II m2 - - - - - - - - - -
8 Keramik 20 x 30 cm kelas II m2 - - - - - - - - - -
9 Keramik 30 x 30 cm kelas II m2 - - - - - - - - - -
10 Keramik 40 x 40 cm kelas II m2 - - - - - - - - - -
- - - - - - - - -
PICASSO - - - - - - - - -
1 Ikad Keramik KW 1 20 x 20 cm m2 90,000.00 120,789.20 129,848.39 132,868.12 138,907.58 132,868.12 132,868.12 132,868.12 138,907.58 141,927.31
2 Ikad Keramik KW 1 20 x 25 cm m2 88,000.00 118,283.20 127,154.44 130,111.52 136,025.68 130,111.52 130,111.52 130,111.52 136,025.68 138,982.76
3 Ikad Keramik KW 1 30 x 30 cm m2 120,000.00 158,379.20 170,257.64 174,217.12 182,136.08 174,217.12 174,217.12 174,217.12 182,136.08 186,095.56
4 Ikad Keramik KW 1 40 x 40 cm m2 95,000.00 127,054.20 136,583.27 139,759.62 146,112.33 139,759.62 139,759.62 139,759.62 146,112.33 149,288.69
- - - - - - - - -
SANITAIR - - - - - - - - -
1 Bak mandi fibre glass 70x70x66 cm biasa bh 550,000.00 769,342.00 827,042.65 846,276.20 884,743.30 846,276.20 846,276.20 846,276.20 884,743.30 903,976.85
2 Bak mandi fibre glass 70x70x66 cm sudut bh 435,000.00 625,247.00 672,140.53 687,771.70 719,034.05 687,771.70 687,771.70 687,771.70 719,034.05 734,665.23
3 Bak mandi keramik 50x50 bh - - - - - - - - -
4 Floor Drain " TOTO TypeTx 1 Bv 1 " Square Flange " bh - - - - - - - - -
5 Floor drain plastik bh 35,000.00 45,358.60 48,760.50 49,894.46 52,162.39 49,894.46 49,894.46 49,894.46 52,162.39 53,296.36
6 Floor drain stainless bh 70,000.00 89,213.60 95,904.62 98,134.96 102,595.64 98,134.96 98,134.96 98,134.96 102,595.64 104,825.98
7 Floor drain plastik onda bh 35,000.00 45,358.60 48,760.50 49,894.46 52,162.39 49,894.46 49,894.46 49,894.46 52,162.39 53,296.36
8 Kloset duduk DATA komplit bh - - - - - - - - - -
9 Kloset duduk INA Komplit bh 2,650,000.00 3,400,642.00 3,655,690.15 3,740,706.20 3,910,738.30 3,740,706.20 3,740,706.20 3,740,706.20 3,910,738.30 3,995,754.35
10 Kloset duduk INA standard bh 1,100,000.00 1,458,492.00 1,567,878.90 1,604,341.20 1,677,265.80 1,604,341.20 1,604,341.20 1,604,341.20 1,677,265.80 1,713,728.10
11 Kloset duduk Amerika Standar bh 2,850,000.00 3,651,242.00 3,925,085.15 4,016,366.20 4,198,928.30 4,016,366.20 4,016,366.20 4,016,366.20 4,198,928.30 4,290,209.35
12 Kloset duduk " TOTO Type CW 421J WITH ECO WASHER bh 3,790,000.00 4,829,062.00 5,191,241.65 5,311,968.20 5,553,421.30 5,311,968.20 5,311,968.20 5,311,968.20 5,553,421.30 5,674,147.85
16 Kloset duduk " TOTO Type CW 660J / SW 660J COMPLIT bh 3,500,000.00 4,465,692.00 4,800,618.90 4,912,261.20 5,135,545.80 4,912,261.20 4,912,261.20 4,912,261.20 5,135,545.80 5,247,188.10
18 Kloset duduk LOLO warna COMPLIT bh 1,800,000.00 2,335,592.00 2,510,761.40 2,569,151.20 2,685,930.80 2,569,151.20 2,569,151.20 2,569,151.20 2,685,930.80 2,744,320.60
17 Kloset jongkok " TOTO Type CE 9 Complete Push valve FSD bh 3,588,000.00 4,575,956.00 4,919,152.70 5,033,551.60 5,262,349.40 5,033,551.60 5,033,551.60 5,033,551.60 5,262,349.40 5,376,748.30
18 Kloset jongkok " TOTO bh 395,000.00 575,127.00 618,261.53 632,639.70 661,396.05 632,639.70 632,639.70 632,639.70 661,396.05 675,774.23
19 Kloset porselin jongkok Kia (standar) bh 170,000.00 293,202.00 315,192.15 322,522.20 337,182.30 322,522.20 322,522.20 322,522.20 337,182.30 344,512.35
20 Kloset porselin jongkok VITO (standar) bh 195,000.00 324,527.00 348,866.53 356,979.70 373,206.05 356,979.70 356,979.70 356,979.70 373,206.05 381,319.23
21 Kloset porselin jongkok Ina (standar) bh 450,000.00 644,042.00 692,345.15 708,446.20 740,648.30 708,446.20 708,446.20 708,446.20 740,648.30 756,749.35
22 Kloset porselin jongkok America (standar) bh -
23 Kloset porselin jongkok DUTY bh 225,000.00 362,117.00 389,275.78 398,328.70 416,434.55 398,328.70 398,328.70 398,328.70 416,434.55 425,487.48
24 Kloset porselin jongkok DATA bh - - - - - - - - - -
25 Kloset porselin jongkok ROSI bh - -
26 Kloset porselin jongkok CHELSEA bh 185,000.00 311,997.00 376,601.68 343,196.70 358,796.55 343,196.70 343,196.70 343,196.70 358,796.55 366,596.48
27 Kran air 3/4 biasa dari besi bh 50,000.00 64,153.60 68,965.12 70,568.96 73,776.64 70,568.96 70,568.96 70,568.96 73,776.64 75,380.48
28 Kran air 3/4 biasa dari plastik bh 25,000.00 32,828.60 35,290.75 36,111.46 37,752.89 36,111.46 36,111.46 36,111.46 37,752.89 38,573.61
29 Kran air 1/2 biasa dari besi bh 40,000.00 51,623.60 55,495.37 56,785.96 59,367.14 56,785.96 56,785.96 56,785.96 59,367.14 60,657.73
30 Kran SunEi bh - - - - - - - - -
LAIN-LAIN - - - - - - - -
1 Dugul batu hitam 50 x 50 x 200 unit -
2 Dugul batu hitam 60 x 70 x 250 unit -
3 Dugul batu hitam 70 x 70 x 250 unit -
4 Padmasari batu hitam 50 x 50 x 200 unit -
5 Padmasari batu hitam 70 x 70 x 250 unit -
6 Padmasari batu hitam 65 x 75 x 225 unit -
7 Karpet plastik m2 35,000.00 46,862.20 50,376.87 51,548.42 53,891.53 51,548.42 51,548.42 51,548.42 53,891.53 55,063.09
8 Talang PVC P= 4M', L=4" bentuk bulat buah 100,000.00 128,307.20 137,930.24 141,137.92 147,553.28 141,137.92 141,137.92 141,137.92 147,553.28 150,760.96
9 Talang PVC P= 4M', L=4" bentuk kotak buah 160,000.00 203,487.20 218,748.74 223,835.92 234,010.28 223,835.92 223,835.92 223,835.92 234,010.28 239,097.46
10 Talang PVC P= 4M', L=8" bentuk kotak buah 250,000.00 316,257.20 339,976.49 347,882.92 363,695.78 347,882.92 347,882.92 347,882.92 363,695.78 371,602.21
11 Talang PVC P= 4M', L=6" bentuk bulat buah 120,000.00 153,367.20 164,869.74 168,703.92 176,372.28 168,703.92 168,703.92 168,703.92 176,372.28 180,206.46
12 Talang PVC P= 4M', L=40" bentuk bulat buah - -
13 Talang PVC P= 4M', L=140 mm" bentuk kotak buah 120,000.00 155,372.00 167,024.90 170,909.20 178,677.80 170,909.20 170,909.20 170,909.20 178,677.80 182,562.10
14 Talang PVC P= 4M', L: 8' buah 115,000.00 149,107.00 160,290.03 164,017.70 171,473.05 164,017.70 164,017.70 164,017.70 171,473.05 175,200.73
Sekretaris, Ketua,
Mengetahui,
Kepala Dinas PU, Penataan Ruang, Perumahan Rakyat
dan Kawasan Permukiman
Kabupaten Fakfak ,
ESSENZA
1 Keramik 30 x 30 Kelas I (Black Orchid, Coral Bell, P) m2 - Err:522
2 Keramik 30 x 30 Kelas I (Black Orchid, Coral Bell, UP) m2 - Err:522
3 Keramik 30 x 30 Kelas I (Pepper Grey Price Rubert Silver star, P) m2 - Err:522
4 Keramik 30 x 30 Kelas I (Pepper Grey Price Rubert Silver star, UP) m2 - Err:522
5 Keramik 40 x 40 Kelas I (Pepper Grey Price Rubert Silver star, P) m2 - Err:522
6 Keramik 40 x 40 Kelas I (Pepper Grey Price Rubert Silver star, UP) m2 93,000.00 124,548.20 124,548.20 126,416.42 126,416.42 127,661.91 129,530.13 137,003.02 129,530.13 137,003.02 132,021.09
7 Keramik 60 x 60 Kelas I (Pepper Grey Price Rubert Silver star, P) m2 - Err:522
8 Keramik Kelas I Domus m2 - Err:522
9 Keramik Kelas I Granity Imperiali m2 - Err:522
10 Keramik Kelas I Lavagna m2 - Err:522
11 Keramik Kelas I Mountain Peak m2 - Err:522
GARUDA - - - - - - - -
1 Keramik 20 x 20 kelas I Emboss Dasar Muda m2 - - - - - - - - -
2 Keramik 20 x 20 kelas I Emboss Dasar Tua m2 - - - - - - - - -
3 Keramik 20 x 20 kelas I Tesia m2 - - - - - - - - -
4 Keramik 20 x 20 kelas II Emboss Dasar Muda m2 - - - - - - - - -
5 Keramik 20 x 20 kelas II Emboss Dasar Tua m2 - - - - - - - - -
6 Keramik 20 x 20 kelas II Tesia m2 - - - - - - - - -
7 Keramik 20 x 25 kelas I Motif Dasar Medium m2 - - - - - - - - -
8 Keramik 20 x 25 kelas I Motif Dasar Muda m2 - - - - - - - - -
9 Keramik 20 x 25 kelas I Nuri Dark m2 - - - - - - - - -
10 Keramik 20 x 25 kelas I Polos m2 - - - - - - - - -
11 Keramik 30 x 30 kelas I Granity m2 - - - - - - - - -
12 Keramik 30 x 30 kelas I Motif Embose m2 - - - - - - - - -
13 Keramik 30 x 30 kelas II Granity m2 - - - - - - - - -
14 Keramik 30 x 30 kelas II Motif Embose m2 - - - - - - - - -
15 Keramik 40 x 40 kelas I Motif Dasar Muda m2 - - - - - - - - -
16 Keramik 40 x 40 kelas I Motif Dasar Muda m2 - - - - - - - - - -
17 Keramik 40 x 40 kelas I Motif Embose m2 - - - - - - - - - -
18 Keramik 40 x 40 kelas I Motif Granity Tua m2 - - - - - - - - - -
19 Keramik 40 x 40 kelas I Motif Medium Color m2 - - - - - - - - - -
20 Keramik 40 x 40 kelas I Motif Spesial Color m2 - - - - - - - - - -
21 Keramik 50 x 50 kelas I m2 - - - - - - - - - -
18 Kloset duduk LOLO warna COMPLIT bh 1,800,000.00 2,335,592.00 2,335,592.00 2,370,625.88 2,370,625.88 2,393,981.80 2,429,015.68 2,569,151.20 2,429,015.68 2,569,151.20 2,475,727.52
17 Kloset jongkok " TOTO Type CE 9 Complete Push valve FSD bh 3,588,000.00 4,575,956.00 4,575,956.00 4,644,595.34 4,644,595.34 4,690,354.90 4,758,994.24 5,033,551.60 4,758,994.24 5,033,551.60 4,850,513.36
18 Kloset jongkok " TOTO bh 395,000.00 575,127.00 575,127.00 583,753.91 583,753.91 589,505.18 598,132.08 632,639.70 598,132.08 632,639.70 609,634.62
19 Kloset porselin jongkok Kia (standar) bh 170,000.00 293,202.00 293,202.00 297,600.03 297,600.03 300,532.05 304,930.08 322,522.20 304,930.08 322,522.20 310,794.12
20 Kloset porselin jongkok VITO (standar) bh 195,000.00 324,527.00 324,527.00 329,394.91 329,394.91 332,640.18 337,508.08 356,979.70 337,508.08 356,979.70 343,998.62
21 Kloset porselin jongkok Ina (standar) bh 450,000.00 644,042.00 644,042.00 653,702.63 653,702.63 660,143.05 669,803.68 708,446.20 669,803.68 708,446.20 682,684.52
22 Kloset porselin jongkok America (standar) bh -
23 Kloset porselin jongkok DUTY bh 225,000.00 362,117.00 362,117.00 367,548.76 367,548.76 371,169.93 376,601.68 398,328.70 376,601.68 398,328.70 383,844.02
24 Kloset porselin jongkok DATA bh - - - - - - - - - - -
25 Kloset porselin jongkok ROSI bh - -
26 Kloset porselin jongkok CHELSEA bh 185,000.00 311,997.00 311,997.00 316,676.96 316,676.96 319,796.93 324,476.88 343,196.70 324,476.88 343,196.70 371,169.93
27 Kran air 3/4 biasa dari besi bh 50,000.00 64,153.60 64,153.60 65,115.90 65,115.90 65,757.44 66,719.74 70,568.96 66,719.74 70,568.96 68,002.82
28 Kran air 3/4 biasa dari plastik bh 25,000.00 32,828.60 32,828.60 33,321.03 33,321.03 33,649.32 34,141.74 36,111.46 34,141.74 36,111.46 34,798.32
29 Kran air 1/2 biasa dari besi bh 40,000.00 51,623.60 51,623.60 52,397.95 52,397.95 52,914.19 53,688.54 56,785.96 53,688.54 56,785.96 54,721.02
30 Kran SunEi bh - - - - - - - - - -
LAIN-LAIN - - - - - - - -
1 Dugul batu hitam 50 x 50 x 200 unit - Err:522
2 Dugul batu hitam 60 x 70 x 250 unit - Err:522
3 Dugul batu hitam 70 x 70 x 250 unit - Err:522
4 Padmasari batu hitam 50 x 50 x 200 unit - Err:522
5 Padmasari batu hitam 70 x 70 x 250 unit - Err:522
6 Padmasari batu hitam 65 x 75 x 225 unit - Err:522
7 Karpet plastik m2 35,000.00 46,862.20 46,862.20 47,565.13 47,565.13 48,033.76 48,736.69 51,548.42 48,736.69 51,548.42 49,673.93
8 Talang PVC P= 4M', L=4" bentuk bulat buah 100,000.00 128,307.20 128,307.20 130,231.81 130,231.81 131,514.88 133,439.49 141,137.92 133,439.49 141,137.92 136,005.63
9 Talang PVC P= 4M', L=4" bentuk kotak buah 160,000.00 203,487.20 203,487.20 206,539.51 206,539.51 208,574.38 211,626.69 223,835.92 211,626.69 223,835.92 215,696.43
10 Talang PVC P= 4M', L=8" bentuk kotak buah 250,000.00 316,257.20 316,257.20 321,001.06 321,001.06 324,163.63 328,907.49 347,882.92 328,907.49 347,882.92 335,232.63
11 Talang PVC P= 4M', L=6" bentuk bulat buah 120,000.00 153,367.20 153,367.20 155,667.71 155,667.71 157,201.38 159,501.89 168,703.92 159,501.89 168,703.92 162,569.23
12 Talang PVC P= 4M', L=40" bentuk bulat buah - -
13 Talang PVC P= 4M', L=140 mm" bentuk kotak buah 120,000.00 155,372.00 155,372.00 157,702.58 157,702.58 159,256.30 161,586.88 170,909.20 161,586.88 170,909.20 164,694.32
14 Talang PVC P= 4M', L: 8' buah 115,000.00 149,107.00 149,107.00 151,343.61 151,343.61 152,834.68 155,071.28 164,017.70 155,071.28 164,017.70 158,053.42
Sekretaris, Ketua,
Mengetahui,
Kepala Dinas PU, Penataan Ruang, Perumahan Rakyat
dan Kawasan Permukiman
Kabupaten Fakfak ,
9 1 M3 URUGAN KEMBALI
Mengurug Kembali 1 m3 galian dihitung dari 1/3 kali dari indeks pekerjaan galian
11 1 M3 URUGAN PASIR
1.2000 m3 Pasir Urug 1,165,290.00 1,398,348.00
0.3000 oh Pekerja 120,080.00 36,024.00
0.0100 oh Mandor 166,310.80 1,663.11
Total : 37,687.11 1,398,348.00 1,436,035.11
14 1 M2 PLESTERAN CIPRAT 1 PC : 2 PS
4.3200 kg Semen Portland 3,677.56 15,887.04
0.0060 m3 Pasir Pasang 1,165,290.00 6,991.74
0.3000 oh Pekerja 120,080.00 36,024.00
0.1000 oh Tukang Batu 148,899.20 14,889.92
0.0100 oh Kepala Tukang 160,907.20 1,609.07
0.0150 oh Mandor 166,310.80 2,494.66
Total : 55,017.65 22,878.78 77,896.43
18 1 M2 PEKERJAAN ACIAN
3.2500 zak Semen Portland 50 Kg 3,677.56 11,952.05
0.2000 oh Pekerja 120,080.00 24,016.00
0.1000 oh Tukang Labur/Cat 154,903.20 15,490.32
0.0100 oh Kepala Tukang 160,907.20 1,609.07
0.0100 oh Mandor 166,310.80 1,663.11
Total : 42,778.50 11,952.05 54,730.55
VI PEKERJAAN KAYU (SNI 3434 : 2008)
1 MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN JENDELA
KAYU KELAS I (KAYU BESI)
1.1000 m3 Balok Kayu Besi 5,774,540.00 6,351,994.00
1.2500 Kg Paku 10 Cm 45,358.60 56,698.25
1.0000 Kg Lem Kayu 82,948.60 82,948.60
7.0000 oh Pekerja 120,080.00 840,560.00
21.0000 oh Tukang Kayu 154,903.20 3,252,967.20
2.1000 oh Kepala Tukang 160,907.20 337,905.12
0.3500 oh Mandor 166,310.80 58,208.78
Total : 4,489,641.10 6,491,640.85 10,981,281.95
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
2 1 M3 MEMBUAT BETON 1 PC : 2 PS : 4 KR
232.0000 kg Semen Portland 3,677.56 853,192.76
0.5200 m3 Pasir Beton 1,165,290.00 605,950.80
0.7800 m3 Koral Beton 2,756,600.00 2,150,148.00
1.6500 oh Pekerja 120,080.00 198,132.00
0.2500 oh Tukang Batu 148,899.20 37,224.80
0.0250 oh Kepala Tukang 160,907.20 4,022.68
0.0800 oh Mandor 166,310.80 13,304.86
Total : 252,684.34 3,609,291.56 3,861,975.90
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
3 1 M3 MEMBUAT BETON 1 PC : 2 PS : 3 KR
280.0000 kg Semen Portland 3,677.56 1,029,715.40
0.4500 m3 Pasir Beton 1,165,290.00 524,380.50
0.9000 m3 Koral Beton 2,756,600.00 2,480,940.00
1.6500 oh Pekerja 120,080.00 198,132.00
0.2500 oh Tukang Batu 148,899.20 37,224.80
0.0250 oh Kepala Tukang 160,907.20 4,022.68
0.0800 oh Mandor 166,310.80 13,304.86
Total : 252,684.34 4,035,035.90 4,287,720.24
25 1 M2 PENGECATAN KANSTEIN
0.2840 kg Cat 90,717.20 25,763.68
0.0710 kg Thiner 63,151.20 4,483.74
0.0300 oh Tukang Cat 154,903.20 4,647.10
0.0030 oh Kep. Tukang 160,907.20 482.72
0.1500 oh Pekerja 120,080.00 18,012.00
0.0150 oh Mandor 166,310.80 2,494.66
Total : 25,636.48 30,247.42 55,883.90
1 1 TITIK INSTALASI STOP KONTAK, LAMPU, EXHAUST FAN DAN CEILING FAN
8.0000 m1 Kabel NYM 3 x 2.5 mm ex. Supreme 30,322.60 242,580.80
3.0000 bt Pipa Clipsal 20 mm hitam 51,623.60 154,870.80
2.0000 bh Tee dos clipsal 20 mm hitam 14,033.60 28,067.20
15.0000 bj Klem clipsal 20 mm hitam 7,768.60 116,529.00
3.0000 bj Sock clipsal 20 mm hitam 5,262.60 15,787.80
1.0000 bj Inbow dos plastik clipsal E 157 P 14,033.60 14,033.60
1.0000 ttk Biaya pasang 50,000.00 50,000.00
Total : 50,000.00 571,869.20 621,869.20
2 1 TITIK INSTALASI AC
10.0000 m1 Kabel NYM 3 x 2.5 mm ex. Supreme 30,322.60 303,226.00
3.0000 bt Pipa Clipsal 20 mm hitam 51,623.60 154,870.80
1.0000 bh Tee dos clipsal 20 mm hitam 14,033.60 14,033.60
15.0000 bj Klem clipsal 20 mm hitam 7,768.60 116,529.00
4.0000 bj Sock clipsal 20 mm hitam 5,262.60 21,050.40
1.0000 bj Inbow dos plastik clipsal E 157 P 14,033.60 14,033.60
1.0000 m1 Pipa flexible clipsal 20 mm hitam 51,623.60 51,623.60
1.0000 ttk Biaya pasang 50,000.00 50,000.00 50,000.00
Total : 50,000.00 725,367.00 775,367.00
Mengetahui,
Kepala Dinas Pekerjaan Umum
Kabupaten Fakfak ,
594,662.80
92,543.84
3,032,320.03
1,545,404.13
1,507,624.54
20,323.54
1,672,185.80
199,405.99
75,271.70
497,153.44
855,954.86
806,061.62
94,217.77
115,555.99
137,226.82
125,401.95
190,098.65
151,579.99
6,835.55
41,289.51
-
68,355.54
1,436,035.11
202,442.26
1,199,467.77
426,212.34
34,177.77
2,496,455.51
2,393,816.02
2,322,488.99
2,272,425.38
2,203,610.62
5,552,137.91
3,134,112.87
1,539,987.87
HARGA
3
3,310,288.15
3,284,308.14
3,263,102.36
3,257,592.61
3,267,291.46
1,642,516.34
1,628,003.72
1,620,945.01
1,616,582.44
1,616,242.12
1,610,714.26
622,912.39
588,901.70
2,669,821.91
76,817.22
138,928.60
124,172.27
118,665.49
114,182.05
112,629.14
110,970.06
109,770.19
166,284.08
158,941.70
152,575.36
150,893.23
148,292.71
93,255.16
77,896.43
43,227.02
20,810.03
100,566.33
54,730.55
HARGA
3
10,981,281.95
7,897,270.65
357,145.14
357,145.14
878,749.20
899,098.19
996,287.76
958,318.64
873,972.64
777,302.15
873,972.64
977,945.35
9,366,716.23
11,675,888.94
5,454,166.19
98,615.88
110,343.96
582,535.46
141,025.33
141,419.07
104,466.55
103,178.11
194,311.94
406,710.48
395,592.99
481,006.66
75,478.04
HARGA
3
4,058,584.13
3,861,975.90
4,287,720.24
209,324.71
254,166.34
254,166.34
491,720.86
501,494.26
634,061.66
549,609.46
458,127.93
152,891.46
8,753,609.94
10,102,852.99
14,843,759.50
12,115,396.35
11,423,909.69
10,999,712.68
11,511,250.05
140,500.14
201,953.60
29,602.12
29,602.12
149,273.13
101,178.00
303,936.85
71,079.17
98,077.67
313,994.41
113,732.95
92,922.13
44,507.35
155,823.92
83,643.78
313,489.40
43,107.30
258,113.40
86,598.30
101,434.90
HARGA
3
4,191,504.28
1,289,159.56
4,784,822.23
1,397,190.19
1,631,179.48
154,740.28
423,559.09
51,588.51
51,260.85
169,734.36
83,636.19
41,866.34
213,346.29
185,188.93
326,931.63
27,583.34
18,383.35
60,411.94
82,125.29
295,513.87
358,349.24
402,736.66
59,743.25
417,906.97
64,820.92
70,472.66
68,006.05
63,359.15
46,080.85
47,788.80
49,556.08
85,099.87
HARGA
3
389,965.46
223,727.46
208,281.73
208,281.73
212,143.16
399,119.73
399,119.73
402,981.16
377,847.45
105,445.25
105,445.25
105,445.25
105,445.25
105,445.25
105,445.25
308,932.45
105,445.25
105,445.25
105,445.25
105,445.25
105,445.25
1,234,052.71
406,433.60
278,414.06
499,807.71
454,807.71
55,883.90
621,869.20
775,367.00
711,584.00
744,162.00
R A B
PEMBANGUNAN RUMAH T.70
Lokasi : Kampung Homorkokma Distrik Kramamongga
REKAPITULASI
Harga Satuan
No Uraian pekerjaan Sat Volume
(Rp)
I. Pekerjaan Pendahuluan
1 Pengukuran/pas.bouwplak M' 49.00 92,543.84
2 Papan nama proyek Bh 1.00 1,000,000.00
3 Pembersihan lokasi M2 100.00 20,323.54
4 Barak Kerja M2 12.00 1,672,185.80
V. Pekerjaan Atap
1 Atap seng gelombang Bjls 0,30 M2 126.50 113,732.95
2 Bubungan seng plat Bjls 0,30 M' 16.00 44,507.35
1 2 3 4 5
VII. Pekerjaan Instalasi
1 Pasang lampu TL 40 Watt Bh 6.00 689,781.80
2 Pasang lampu pijar 25 Watt Bh 3.00 686,022.80
3 Zekering kast 1 group otomatis Bh 1.00 642,167.80
4 Pasang saklar tunggal Bh 5.00 621,869.20
5 Pasang saklar ganda Bh 2.00 621,869.20
6 Pasang stop kontak Bh 6.00 621,869.20
7 Penyambungan listrik Ls 1.00 2,500,000.00
8 Instalasi air Ls 1.00 2,000,000.00
9 Dokumentasi (0%,50%,100%) Ls 1.00 1,000,000.00
REKAPITULASI
Jumlah Harga
(Rp)
4,534,648.06
1,000,000.00
2,032,354.00
20,066,229.60
27,633,231.66
4,091,865.48
454,651.72
13,297,825.01
5,600,536.92
23,444,879.13
13,397,894.47
91,740,126.20
35,849,973.84
22,352,831.64
31,491,410.27
31,656,956.25
-
27,951,241.10
1,631,179.48
1,289,159.56
228,478.19
9,469,302.09
267,058,553.08
9,351,568.48
8,480,777.44
9,883,153.76
8,242,710.28
6,217,749.46
15,384,452.81
4,617,174.76
11,031,667.68
3,557,851.63
8,304,179.94
1,642,948.18
287,711.42
431,567.13
683,314.63
2,391,601.19
5,797,176.00
96,305,604.80
14,387,218.43
712,117.61
15,099,336.03
4,341,115.64
6,911,850.11
17,485,225.72
28,738,191.46
4,138,690.80
2,058,068.40
642,167.80
3,109,346.00
1,243,738.40
3,731,215.20
2,500,000.00
2,000,000.00
1,000,000.00
20,423,226.60
27,633,231.66
23,444,879.13
267,058,553.08
96,305,604.80
15,099,336.03
28,738,191.46
20,423,226.60
478,703,022.77
478,703,000.00
6,838,614.29
44.04
275.80
37.6
6.8
4.42 275.80
6.15
5.7
2.15
3.15
5
70.97 4.435625
0.9
10.08
RAB
PEMBANGUNAN PASAR EKS KIOS LAMA THUMBURUNI
KONSTRUKSI BETON TULANG BERLANTAI
LOKASI : FAKFAK KOTA
Harga Satuan Jumlah Harga
No URAIAN KEGIATAN Sat Volume
(Rp) (Rp)
1 2 3 4 5 6
I. PEKERJAAN PENDAHULUAN
1 Dokumentasi 0%,50%,100% LS 1.00 1,000,000.00 1,000,000.00
2 Pasang bouwplank M' 128.00 92,543.84 11,845,611.26
3 Papan nama proyek Bh 1.00 1,000,000.00 1,000,000.00
4 Barak Kerja M2 12.00 1,672,185.80 20,066,229.60
33,911,840.86
II. PEKERJAAN TANAH
1 Galian pondasi berbatu M3 150.21 125,401.95 18,836,626.25
2 Urugan tanah kembali M3 50.07 41,800.65 2,092,958.47
3 Timbunan tanah bawah lantai M3 123.20 426,212.34 52,509,360.29
4 Urugan pasir M3 15.40 1,436,035.11 22,114,940.66
95,553,885.67
III. Pekerjaan Pasangan
1 Pasang pondasi batu belah 1:4 M3 98.80 2,393,816.02 236,509,022.28
2 Pasang talud batu belah 1:4 M3 24.00 2,393,816.02 57,451,584.36
3 Pasang batu saluran 1:4 M3 9.00 2,393,816.02 21,544,344.14
4 Cor lantai kerja t=10 cm M3 6.22 4,058,584.13 25,244,393.31
5 Pasang poer beton tulang 1:2:3 (1x1x0.4) M3 14.40 8,753,609.94 126,051,983.17
6 Sloof beton tulang 1:2:3, 20/30 (arah X) M3 4.44 10,102,852.99 44,856,667.28
7 Sloof beton tulang 1:2:3, 20/30 (arah Y) M3 5.33 10,102,852.99 53,848,206.44
8 Sloof beton tulang 1:2:3,15/20 (arah X) M3 1.03 10,102,852.99 10,405,938.58
9 Sloof beton tulang 1:2:3,15/20 (arah Y) M3 2.28 10,102,852.99 23,034,504.82
10 Kolom beton tulang 1:2:3, 30/30 ( X,Y) M3 28.84 14,843,759.50 428,094,023.96
11 Kolom beton tulang 1:2:3, 20/20 (Teras Lt 1) M3 3.60 14,843,759.50 53,437,534.20
12 Kolom beton tulang 1:2:3, 20/20 (Teras Lt 2) M3 1.70 14,843,759.50 25,234,391.15
13 Balok beton tulang 1:2:3, 25/35 (Arah X)LT 2 M3 4.63 12,115,396.35 56,094,285.10
14 Balok beton tulang 1:2:3, 25/35 (Arah Y)LT 2 M3 5.55 12,115,396.35 67,240,449.74
15 Balok beton tulang 1:2:3, 15/25 (Arah X)LT 2 M3 0.84 12,115,396.35 10,176,932.93
16 Balok beton tulang 1:2:3, 15/25 (Arah Y)LT 2 M3 2.05 12,115,396.35 24,836,562.52
17 Ringbalk plat atap beton tulang 1:2:3, 15/20 (Arah X) M3 0.44 12,115,396.35 5,330,774.39
18 Ringbalk plat atap beton tulang 1:2:3, 15/20 (Arah Y) M3 0.66 12,115,396.35 7,996,161.59
19 Cor lantai beton tulang 1:2:3, T=10CM (LT 2) M3 47.16 11,423,909.69 538,751,581.11
20 Kolom praktis beton tulang 1:2:3, 10/10 (LT 2) M3 1.60 14,843,759.50 23,750,015.20
21 Cor plat atap beton tulang 1:2:3, T=9 cm M3 8.03 11,423,909.69 91,733,994.83
22 Listplankbeton plat atap t=10 cm M3 2.40 11,423,909.69 27,417,383.26
23 Kuda -kuda beton tulang 10/10 M3 1.12 11,423,909.69 12,794,778.86
24 Talang beton T= 10CM ( depan dan belakang) M3 6.00 11,423,909.69 68,543,458.16
25 Canopi beton atap (depan + belakang) t= 10 cm M3 1.73 11,423,909.69 19,763,363.77
26 Canopi ventilasi depan t= 10 cm M3 2.10 11,423,909.69 23,990,210.35
27 Canopi jendela t 5 mm M3 0.79 11,423,909.69 9,024,888.66
28 Kolom pagar beton bertulang 15/15 M3 0.41 14,843,759.50 6,085,941.39
29 Sloofpagar beton bertulang 15/20 M3 0.55 10,102,852.99 5,556,569.14
30 Coor lantai tumbuk 1:3:6, t=7 cm M3 30.80 4,058,584.13 125,004,391.33
31 Keramik lantai 30/30 M2 778.00 358,349.24 278,795,712.54
32 Pasang kaca blok M2 10.00 2,669,821.91 26,698,219.09
33 Pas batu cetak 1:4 LT1 M3 35.57 1,620,945.01 57,657,013.88
34 Pas batu cetak 1:4 LT2 M3 38.46 1,620,945.01 62,341,544.95
35 Plester dinding 1:4 M2 2,000.64 114,182.05 228,437,182.91
36 Plester dinding 1:2 M2 225.64 124,172.27 28,018,231.53
37 Acian dinding M2 2,226.28 54,730.55 121,845,537.20
3,033,597,778.12
1 2 3 4 5 6
IV. Pekerjaan KAYU/ALUMINIUM/PAGAR
1 Kusen Kayu besi 5/10 M3 1.07 10,981,281.95 11,706,046.56
2 Kusen kayu besi 5/10 M3 0.42 10,981,281.95 4,612,138.42
3 Gording kayu matoa 5/10 M3 2.00 5,454,166.19 10,908,332.38
4 Kasau 5/5 M3 0.80 5,454,166.19 4,363,332.95
5 Reng 2/3 M3 0.67 5,454,166.19 3,654,291.35
6 Plafond tripleks 3 mm M2 840.00 141,025.33 118,461,273.84
7 Jendela kaca riben M2 46.30 899,098.19 41,628,246.26
8 Jendela panil kaca riben (1,2x0,7) M2 16.80 899,098.19 15,104,849.62
9 Pintu toko (lipat dan besi) M2 175.00 1,100,000.00 192,500,000.00
10 Pagar BRC t= 1,2 m' Panil 26.00 526,518.95 13,689,492.79
11 Tiang BRC Bh 27.00 151,272.49 4,084,357.23
420,712,361.39
V. Pekerjaan Atap
1 Atap multiroof M2 344.00 183,976.56 63,287,938.02
2 Bubungan multiroof M' 40.00 419,755.73 16,790,229.18
80,078,167.20
VI. Pekerjaan Pengecatan
1 Sigmatex dinding baru 3x M2 2,226.28 63,359.15 141,055,217.28
2 Cat plafond M2 840.00 70,472.66 59,197,031.46
200,252,248.74
VII Pekerjaan Instalasi
1 Penyambungan listrik 900 watt Pkt 20.00 1,000,000.00 20,000,000.00
2 Pipa air hujan 3" M' 139.20 169,734.36 23,627,022.35
3 Pasang lampu XL 8 Watt Ttk 80.00 689,781.80 55,182,544.00
4 Pas. Saklar ganda Ttk 40.00 621,869.20 24,874,768.00
5 Pas. Stop kontak Ttk 40.00 621,869.20 24,874,768.00
6 Pas. Sekring kast Group 20.00 642,167.80 12,843,356.00
161,402,458.35
REKAPITULASI
I PEKERJAAN PENDAHULUAN Rp. 33,911,840.86
II PEKERJAAN TANAH Rp. 95,553,885.67
III Pekerjaan Pasangan Rp. 3,033,597,778.12
IV Pekerjaan KAYU/ALUMINIUM/PAGAR Rp. 420,712,361.39
V Pekerjaan Atap Rp. 80,078,167.20
VI Pekerjaan Pengecatan Rp. 200,252,248.74
VII Pekerjaan Instalasi Rp. 161,402,458.35
JUMLAH Rp 4,025,508,740.34
DIBULATKAN Rp 4,025,508,000.00
Untuk Tahun Anggaran 2019 Triwulan ke - IV, Dinas Pekerjaan Umum menetapkan harga satuan
per meter persegi untuk pembangunan gedung dan rumah dinas sebagai berikut:
I Harga material didapat dari beberapa toko material di Fakfak, ditambahkan dengan
biaya pikul, biaya transport, dan keuntungan/overhead ( 15% )
II Upah tenaga berdasarkan UMP Prop. Papua Barat Sektor Konstruksi = Rp.3.002.000,- per bulan.
dan hasil survey/wawancara bersama pekerja di lokasi proyek.
III Analisa harga satuan pekerjaan menggunakan analisa SNI, kecuali untuk yang tidak ada dalam
SNI masih mengacu pada BOW
IV Analisa/asumsi bangunan sebagai berikut
- Pondasi tinggi rata2 1,00 m s/d 1.50 m
- Timbunan menggunakan tanah+batu
- Galian tanah berbatu
- Rangka bangunan dengan kayu besi dan beton bertulang
- Lantai beton tumbuk
Sekretaris, Ketua,
LIZA NEIRASARI, ST
NIP. 19751016 200111 2 001
RIZAL MINGGELE, ST
9 1 M3 URUGAN KEMBALI
Mengurug Kembali 1 m3 galian dihitung dari 1/3 kali dari indeks pekerjaan galian
11 1 M3 URUGAN PASIR
1.2000 m3 Pasir Urug - -
0.3000 oh Pekerja 120,080.00 36,024.00
Total : 36,024.00 - 36,024.00
1
1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 2 PS
140.0000 bh Bata Merah 5 x 11 x 22 cm - -
43.5000 kg Semen Portland 1,875.00 81,562.50
0.0800 m3 Pasir Pasang 650,000.00 52,000.00
0.6000 oh Pekerja 120,080.00 72,048.00
0.2000 oh Tukang Batu 148,899.20 29,779.84
101,827.84 133,562.50 235,390.34
14 1 M2 PLESTERAN CIPRAT 1 PC : 2 PS
4.3200 kg Semen Portland 1,875.00 8,100.00
0.0060 m3 Pasir Pasang 650,000.00 3,900.00
0.3000 oh Pekerja 120,080.00 36,024.00
0.1000 oh Tukang Batu 148,899.20 14,889.92
Total : 50,913.92 12,000.00 62,913.92
17
1 M2 FINISHING SIAR PASANGAN BATU KALI ADUKAN 1PC : 2 PS
6.3400 kg Semen Portland 1,875.00 11,887.50
0.0120 m3 Pasir Pasang 650,000.00 7,800.00
0.3000 oh Pekerja 120,080.00 36,024.00
0.1500 oh Tukang Batu 148,899.20 22,334.88
Total : 58,358.88 19,687.50 78,046.38
18 1 M2 PEKERJAAN ACIAN
3.2500 zak Semen Portland 50 Kg 1,875.00 6,093.75
0.2000 oh Pekerja 120,080.00 24,016.00
0.1000 oh Tukang Labur/Cat 154,903.20 15,490.32
Total : 15,490.32 6,093.75 21,584.07
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
VI PEKERJAAN KAYU (SNI 3434 : 2008)
2 1 M3 MEMBUAT BETON 1 PC : 2 PS : 4 KR
232.0000 kg Semen Portland 1,875.00 435,000.00
0.5200 m3 Pasir Beton - -
0.7800 m3 Koral Beton #REF! #REF!
1.6500 oh Pekerja 120,080.00 198,132.00
0.2500 oh Tukang Batu 148,899.20 37,224.80
Total : 235,356.80 #REF! #REF!
3 1 M3 MEMBUAT BETON 1 PC : 2 PS : 3 KR
280.0000 kg Semen Portland 1,875.00 525,000.00
0.4500 m3 Pasir Beton - -
0.9000 m3 Koral Beton #REF! #REF!
1.6500 oh Pekerja 120,080.00 198,132.00
0.2500 oh Tukang Batu 148,899.20 37,224.80
Total : 235,356.80 #REF! #REF!
25 1 M2 PENGECATAN KANSTEIN
0.2840 kg Cat 70,000.00 19,880.00
0.0710 kg Thiner 48,000.00 3,408.00
0.0300 oh Tukang Cat 154,903.20 4,647.10
0.1500 oh Pekerja 120,080.00 18,012.00
Total : 22,659.10 23,288.00 45,947.10
HARGA HARGA HARGA HARGA
NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
1 1 TITIK INSTALASI STOP KONTAK, LAMPU, EXHAUST FAN DAN CEILING FAN
8.0000 m1 Kabel NYM 3 x 2.5 mm ex. Supreme 18,000.00 144,000.00
3.0000 bt Pipa Clipsal 20 mm hitam 40,000.00 120,000.00
2.0000 bh Tee dos clipsal 20 mm hitam 10,000.00 20,000.00
15.0000 bj Klem clipsal 20 mm hitam 5,000.00 75,000.00
3.0000 bj Sock clipsal 20 mm hitam 3,000.00 9,000.00
1.0000 bj Inbow dos plastik clipsal E 157 P 10,000.00 10,000.00
1.0000 ttk Biaya pasang 25,000.00 25,000.00
Total : 25,000.00 378,000.00 403,000.00
2 1 TITIK INSTALASI AC
10.0000 m1 Kabel NYM 3 x 2.5 mm ex. Supreme 58,000.00 580,000.00
3.0000 bt Pipa Clipsal 20 mm hitam 40,000.00 120,000.00
1.0000 bh Tee dos clipsal 20 mm hitam 10,000.00 10,000.00
15.0000 bj Klem clipsal 20 mm hitam 5,000.00 75,000.00
4.0000 bj Sock clipsal 20 mm hitam 3,000.00 12,000.00
1.0000 bj Inbow dos plastik clipsal E 157 P 10,000.00 10,000.00
1.0000 m1 Pipa flexible clipsal 20 mm hitam 40,000.00 40,000.00
1.0000 ttk Biaya pasang 25,000.00 25,000.00 25,000.00
Total : 25,000.00 872,000.00 897,000.00
Mengetahui
Kepala Dinas Cipta Karya
Kabupaten Badung
BATU
Batu Candi
1 20x20x2 m2 78,000.00
2 15x30x2 m2 78,000.00
3 20x30x2 m2 78,000.00
4 20x40x2 m2 80,000.00
5 30x30x2 m2 80,000.00
6 40x40x2 m2 105,000.00
7 30x60x2 m2 115,000.00
8 20x40x3 m2 135,000.00
9 30x30x3 m2 135,000.00
10 30x30x5 m2 165,000.00
11 40x40x5 m2 185,000.00
Palimanan putih
1 20x20x2 m2 65,000.00
2 20x30x2 m2 67,000.00
3 20x40x2 m2 68,000.00
4 20x40x3 m2 110,000.00
5 30x30x3 m2 110,000.00
Palimanan Cirebon
1 15x30x2 m2 72,000.00
2 20x30x2 m2 73,000.00
3 20x40x2 m2 75,000.00
4 30x30x2 m2 80,000.00
PARAS
Paras Kerobokan
1 20x40x3 Bj 6,000.00
2 20x40x5 Bj 8,000.00
Paras Kelating
1 20x40x3 Bj 6,000.00
2 20x40x5 Bj 8,000.00
3 Badung Selatan - Indah Jaya Jl. Bay Pass Nusa Dua No. 69
- Dewa Brata Jl. Raya Kuta
- Mekar Abadi Bangunan Jl. Bay Pass Nusa Dua
DAFTAR HARGA SATUAN UPAH
TAHUN 2016
HARGA
NO NAMA BARANG SPESIFIKASI SATUAN
(Rp.)
1 2 3 4 5
Catatan :
Sekretaris, Ketua,
Mengetahui,
Plh. Kepala Dinas Pekerjaan Umum
Kabupaten Fakfak ,
ANTHON UBRA, SE
NIP. 19580726 197807 1 001
DAFTAR HARGA SATUAN BAHAN BANGUNAN
TAHUN 2009
37,705,300
5400
Compatibility Report for SATUAN HARGA FEBRUARI 2019 acc -
LZ.xls
Run on 4/25/2019 11:52
Some cells or styles in this workbook contain formatting that is not 335
supported by the selected file format. These formats will be converted
to the closest format available.
Excel 97-2003
Excel 97-2003
Excel 97-2003
Excel 97-2003
Excel 97-2003