Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

n1

n1 DESIGN IMPLEMENTATION
La Marina - Club Hipico
/////////////////////////////////
IMPLEMENTATION N1 IMPRESSIONS
Current situation

Av Salesianos - Clotario Blest La Marina - Club Hipico Clotario Blest commercial boulevard Clotario Blest community gardens Av Departamental

EAST BORDER AREA INTERSCALE PHASING MODEL IMPACT SANTIAGO SOUTHWEST REGION
Removed or displaced trees REMOVED OR Strategy Projects SanƟago Metropolitan Region
DISPLACED TREES Slow traffic paths
Plaza Elefante Blanco

.parque aguada east


For the restructuring of As the need for new education-
the street profile and the al facilities in the municipality
realization of the new 2008 of Pedro Aguirre Cerda is quite
built structures, it is nec- 100 km/h
high, the highschool on the plot
2009

.a. jarlan north


essary to remvove some of the White Elephant is one of

30 km/h
/h
30 km
trees. These can either the first projects to be developed
2010

.parque aguada west


be relocated, if they are within the strategy for the Santi-
of good quality, or they ago Southwest Region, and spe-
2011

.metroline departamental
can be disposed of. If

50 km/h
cifically within the East Border

/h
50 k
m/h

km
possible, relocation is fa- area. The highschool is situated

30
30 k
2012

.connecƟon portal bicentenario


m/h
vorable. on the neighbourhood node of
Club Hipico and La Marina and
m/h

50 k 2013
30 k

initially only influences the high-


m/h
m/h
50 k

2014 school plot itself, through the ad-


dition of new functionality to the

/h
30 k

km
m/h
public space network.

/h
2015
30

.metroline maipu
km
30

h
30

km/
km
/h

Public Facilities

100
80 2016 1,25 km
km
/h
As the highschool is developed,
2017 its influence spreads to other
NEW BUILT
30
km/
h neighbourhood scale projects
New build structures involving mainly the regenera-
STRUCTURES 2018

To provide a continuity
path not marked

METROPOLITAN 2019 METROPOLITAN tion of the street profiles of Club


Hipico and La Marina. As the two

.train turntable museum / playground


in the street profile that
path marked on road main streets that serve the White
ensures a feel for the 80 k
m/h
narrow separation from road
2020 Elephant plot, it is important that
neighbourhood scale of strong separation from road
these streets match their role
the street, the unused 2021 in the network. The two streets
open spaces along La NATIONAL AND METROPOLITAN NATIONAL DIRECTOR PLAN mentionned also serve the pub-
Street profiles 2022 lic facilities corridor along Club
Marina are redefined as GOVERNMENT Hipico and the sportspark along
housing plots. The hous-
ing typology should be 2023 La Marina, both in strong relation
corresponding with the Large Urban Projects to the highschool plot, as they
Bicentennial program
current housing along 2024 Transantiago require similar street layouts
MOP
La Marina street. Metro and attract a public with simi-
MINVU
2025 Metropolitan Highways lar mobility characteristics. The
Metropolitan and Municipality Roads White Elephant, together with
2026 the public facilities corridor and

.club hipico - o’higgins


the sports facilities, becomes a
2027 neighbourhood hub, suited for
slow traffic and larger and small-
2028 er groups of people.

2029 Educational Corridor


New road structure NEW ROAD STRUCTURE 1,25 km As the neighbourhood educa-
2030 tional hub develops, it connects
The existing road paving to the educational corridor to the
is used where possible. north and south. This corridor,
La Marina is narrowed consisting of Via Alhué and Via
due to its characteris- Carelmapu together with Club
tics of being a neigh- Strategy Projects PPP Hipico, houses the majority of
bourhood street. This the schools and school-support-
narrowing is executed ing facilities such as sports, in
through the use of one the PAC municipality, making it
half of the street for an important neighbourhood fa-
slow traffic and leaving 2008
cilities axis in the public space
the other half available
neighbourhood road

network. By developing La Ma-


2009
.school elefante blanco

for a two-way street. rina, which is part of this corri-


municipality road

metropolitan road
dor, a connection is made to the
2010 .infra a. jarlan
.clotario blest

border of La Victoria and, con-


Characteristical corridors tinually, to the main street of La
2011 .av salesianos Victoria, making the educational
2012 corridor accessible to this neigh-
.a. jarlan south bourhood.
2013
Connecting Neighbourhoods
2014 From the integration into the ed-
.playground elefante blanco

ucational corridor and the acces-


PROPOSED

MUNICIPAL MUNICIPAL
Proposed pedestrian zone sibility to one of the main neigh-
PEDESTRIAN ZONE 2015
bourhoods of this thesis’ design
2016 research (La Victoria), large
As the White Elepah-
.connecƟons aguada

1,25 km
connectivity corridors appear
ant plot is redefined
2017 towards the metropolitan scale
as a highschool area,
public space network, that influ-
it becomes part of an
2018 ences the Santiago Southwest
existing strip of pub- MUNICIPALITY MASTER PLAN Region. Club Hipico, the vertical
lic facilities along Club
2019 axis of the educational corridor,
Hipico. The highschool
connects to Parque Aguada,
links the schools and
2020 completing the public facilities-,
.plaza matadero

the public facilities (rep- Pedro Aguirre Cerda Landuses


sports- and green spaces-strip
resented by a church Lo Espejo Building Normatives
2021 running north-south. Via Carel-
on the south side of La Estación Central Educational Facilities
mapu, the horizontal axis of the
Marina) and triggers the Cerillos Neighbourhood streets
2022 educational corridor, connects to
development of an edu- San Miguel Public Space
the Autopista, allowing accessi-
cational corridor. This
2023 bility by car from the metropolitan
link between schools
highway-network, and to Portal
and church is strength- public space corridor

2024 Bicentenario, again completing


ened by a pedestrian
the green spaces, but also in-
public facilities corridor

zone that emphasizes


2025 troducing this new development
commercial corridor

on the slow character of infrastructural corridor


to a vast and expanding school
this node.
2026 district, integrating neighbour-
Slow traffic paths SLOW TRAFFIC PATHS Green along roads hoods. On a municipal scale,
2027 the connection to La Victoria is
Because of the charac- strengthened through the devel-
ter of this node, which 2028 opment of Clotario Blest and the
emphasizes on slow connection it makes to 30 Octu-
modes of traffic, gather-
2029 bre and the feria libre, both com-
ing of pedestrians and mercial streets within the neigh-
1,25 km
an attraction of large 2030 bourhood of La Victoria, relating
groups of people, it is to the local commerce on the
2031 municipal boulevard following
important to facilitate
accessibility for these Clotario Blest towards Parque
2032 Aguada.
slow modes of traffic.
Like the square does
for pedestrians, other Metropolitan Scale
slow traffic modes like As the educational corridor de-
bicycle and scooter are Strategy Projects Private Entrepreneurs (Community) velops a relation to Portal Bicen-
served through develop- tenario, its reach also expands
ment of separate lanes. towards the Cerrillos munici-
pality, beyond the Bicentennial
building site. An new east west
2008 connection is established, that
includes both the metroplitan
2009 as the municipal and the neigh-
bourhood scale, by connecting
Rerouting buslines REROUTING BUSLINES
the Bicentenary projects to the
LOCAL LOCAL
2010
.proĮle c. hipico

.slow traĸc faciliƟes school district

educational corridor, while cross-


Club Hipico serves
2011 ing some municipal continuing
.proĮle la marina

many buslines, but the


roads. As the new railway cross-
row of trees on one side of the road
11

busstops are not situ-


6 3

2012 ings on the west border of La Vic-


3

row of trees on both sides of the road


H1

ated to serve the public


H0

toria are developed, La Marina


09

H1
green from park or sports facilities

2 H facilities on this educa-


2 H

06 2013 expands its influence through


.proĮle 2 de abril

tional corridor. There- COMMUNITIES LOCAL STRATEGIES


H1

30 Octubre to Avenida Maipú.


fore a rerouting of some Public transport 2014 The metropolitan public space
buslines is proposed,
1,25 km network is now within the reach
where some of the lo-
2015 of the neighbourhood node we
.commerce jarlan gardens
1

cal busses are guided


31

Neighbourhood Associations Local Commerce started from and new orienta-


3

along the highschool


H1

Community Participation 2016 Community Programs tions are created through the
.proĮle 1 de Mayo

plot to turn at Manu-


9
H0

development of the Matadero


ela Errázuriz and then 2017 square and the entrance of Por-
.proĮle tres oriente

continue their original


tal Bicentenario. By making con-
route. 2018 nections to Parque Aguada, this
green corridors functions as a
2019 bridge towards Parque O’Higgins.

2020 Relational Network


With the Parque Aguada function-
2021 ing as a bridge, more and better
New placed trees NEW PLACED TREES connections are made towards
2022 the north, including the Parque
Trees are one of the O’Higgins - Club Hipico centrality
elements with which 2023 and towards the Estación Cen-
a street profile can be tral. The Matadero square and
defined as having cer- 2024 the Train Turntable museum /
tain functions and with playground start functioning as
which orientation can 2025 pivots between Portal Bicentena-
be given. At this node, rio. Parque Aguada, the central
2026
trees are placed along station, Lo Valledor market and
the housing blocks and new/changed busroute
Pedro Aguirre Cerda’s neighbour-
2027
the large highschool existing busroute
hoods. The networks on different
square is defined by new metroline
scales interact through inter-
2028
larger distinctive trees, metrostop
1,25 km scale connections and through
SCALE 1:20000 communal use of spaces.
irregularly placed. busstop

2029

TRAFFIC SYSTEM FINANCIAL SCHEME National Government National Government


Chile Chile

Proposed urban scheme Roads and signs Educational facility Street


Ministry of Education

Subsidy MOP
Subsidy (public works)

MINVU
BUS

National Infra (housing)


Municipality Municipality Municipality Municipality Municipality
Municipality
BUS

Interregional
(PAC) Housing
BUS

Roads
BUS

Strategy Technical Budget Inhabitants/ Pedestrian


PPP

Support Community Local Infra Path

Labour
NGO Tech. Support Inhabitants/
PPP

Community

PUBLIC SPACE / STREET IMPROVEMENT


Labour

SCALE 1:500 SCHOOL


SCALE 1:1250

Sanne van den Heuvel 1140914


DSD UA SANTIAGO - GRADUATION PROJECT

You might also like