PIPELINE DATA
PIPE THK -ts (m)
UNIT LENGTH - La CONC THK -tconc PE COAT THK
SIZE (in) OD (m) tsi tsii (m) (m) -tpe (m)
CALCULATIONS
AREA (m2) WEIGHT (in air) BUOYANCY OF UNIT PIPE (Kg) PIPELINE
WEIGHT OF UNIT SPREAD
CASE STEEL - AS STEEL Ws PIPE (in air) MEDIUM BUOYANCY LENGTH (m)
tsi = 2.09E-02 2004.41 7318.27 SWAMP 6674.72 4642
tsii = 2.38E-02 2281.16 7595.02 CREEK 5477.65 208
SUBMERGED
PIPELINE
AVG. UNIT WGHT SPREAD WGHT
PE COAT - Ape PE COAT - Wpe OF PIPE (in air) SUBMERGED UNIT PIPE WGHT (Kg) (Kg)
tsi = 599.86 SWAMP 798.43 303794.82
tsii = 6.74E-03 151.35 622.54 CREEK 2272.24 38739.85
WGHT OF TOTAL
SUBMERGED
ABSORBED H2O PIPELINE
IN UNIT PIPE - AVG UNIT SUBMERGED WGHT OF SPREAD WGHT
CONC COAT - Aconc CONC COAT - Wconc (3%) LINE PIPE (Kg/m) KPxx - Kpxy (Kg)
tsi = SWAMP 65.44
tsii = 1.39E-01 5162.51 154.88 CREEK 186.25 342534.67
TOTAL REQUIRED BUOYANCY TO FLOAT PIPE SPREAD KP0.501 TO KP3.024 (MTon) === 342.535
IF CAPACITY OF UNIT POLY FLOAT (Kg) = 750
TOTAL NO. OF FLOATS REQUIRED (KP15.450 TO KP20.300)= 456.71 - approx. 450nos