SCOPE OF WORK

Document No : FORM-ENG-001 Responsibility : Engineering


REV. 01 Date : February 26, 2016 Page : 1 of 1
No. : 1 of 1 Customer : PT.KPC Part Name : PIN OUTER 01

Date : October 18, 2018 Job No. : MR032601 Model/Unit : EH4500 or EH5000

SSC ID : SSC SA-3964 Quote No. : Part No. :


PLANNED PROCESS
Work Std. Time Date Finish Insp.
No. Process Description Ö
Center Hrs Start Finish Start Finish Sign Sign
10 Manufacture New Sleeve H.LATHE 3.0
20 Machining Profile Install Sleeve H.LATHE 2.0
30 Striping OD Pin Shaft Bearing Seat Ö H.LATHE 1.0
40 Striping OD Pin Shaft Hole Seat Ö H.LATHE 1.0
50 Weld Slot & Hole to Make Stopper (Tanggul) Ö GENWELD 0.5
60 Install Sleeve to Pin GENWELD 0.5
70 Weld Joint Sleeve to Pin GENWELD 1.0
75 Masking & Blasting Ö SPRAY 2.0
80 Metal Spray OD Pin Ö SPRAY 3.5
90 Machining Ex Weld Joint (Face Area) H.LATHE 1.0
100 Final Machining Ö H.LATHE 6.0
110 Cut Thread H.LATHE 0.5
120 Re-Tap All Thread Ö HD 1.0
130 Handressing & Cleaning Ö HD 1.0
140 Post Inspection Ö QC 0.5
150 Final Inspection Ö QC 0.5
160 Packing Ö HD 0.5

REMARKS

UN-PLANNED PROCESS / REWORK


Work Std. Time Date Finish Insp.
No. Process Description Ö
Center Hrs Start Finish Start Finish Sign Sign

Issued by: (Engineering) Reviewed by: (Engineering Spv.) Received by: (Production Spv.)

Date: Date: Date:


Prcs. No : 30-40
Process Definition : Striping



 
   
 

 
  

                       

Dimension Record (Critical Dim.) X: X' :


Inspection Requirement: Y: Y': Rev:00

Prcs. No : 50
Process Definition : Weld Buid up (SMAW Proses)

Dimension Record (Critical Dim.) X: X' :


Y: Y':
Inspection Requirement: Rev:00
Page 2 of 5
Prcs. No : 80
Process Definition : Metal Spray

 
9 7
6 6
    
.

 
.
5 2
             
                              
              

W AJ IB BLASTANG
Spray process can not be- PAREM ETER BLASTING
J ARAK TEM BAK : 102m m START SPRAY DIAMETER :
performed when the blasting-
process is over 8 hours AIR PRESSURE : 100 PSI FINISH SPRAY DIAMETER :
GRIT SIZE : 20- 25 G
VOLT :
PARAM ETER METAL SPRAY (BOND COAT) PARAM ETER M ETAL SPRAY (TOP COAT)
RPM TABLE : 73 RPM RPM TABLE : 73 RPM AMPERE :
PRE HEAT : 107°- 1 21 °C W IRE : HTW 50 AIR PRESURE :
W IRE : 75B (TAFA) VOLT : 32
VOLT : 30 AM PERE :1 50 PASSES QTY :
AM PERE : 150 J ARAK TEM BAK : 102 m m
TEMPERATURE (ON SPRAY) :
JARAK TEM BAK : 150 m m AIR PRESURE : 6- 6.5 BAR
AIR PRESURE : 6- 6.5 BAR SPRAY GUN ANGLE (DEG) : 60°- 90° TEMPERATURE (FINISH SPRAY) :
SPRAY GUN ANGLE (DEG) : 60°- 90° TEM PERATURE (ON SPRAY) : 50°C MAX

Dimension Record (Critical Dim.) X: X' :


Inspection Requirement: Y: Y': Rev:00

Prcs. No : 90-100
Process Definition : Machining Ex Weld & Ex Spray

        
          
       
      
      
   

   
  

      
    

   

    
      

Dimension Record (Critical Dim.)

Inspection Requirement: Rev:00


Page 3 of 5
SCOPE OF WORK
Document No : FORM-ENG-001 Responsibility : Engineering
REV. 01 Date : February 26, 2016 Page : 1 of 1
No. : 1 of 1 Customer : PT.KPC Part Name : PIN OUTER 02

Date : September 14, 2018 Job No. : MR032370 Model/Unit : EH4500 or EH5000

SSC ID : SSC SA-3807 Quote No. : '09156 Part No. :


PLANNED PROCESS
Work Std. Time Date Finish Insp.
No. Process Description Ö
Center Hrs Start Finish Start Finish Sign Sign
10 Manufacture New Sleeve H.LATHE 3.0
20 Machining Profile Install Sleeve H.LATHE 2.0
30 Striping OD Pin Shaft Bearing Seat Ö H.LATHE 1.0
40 Striping OD Pin Shaft Hole Seat Ö H.LATHE 1.0
50 Weld Slot & Hole to Make Stopper (Tanggul) Ö GENWELD 0.5
60 Install Sleeve to Pin GENWELD 0.5
70 Weld Joint Sleeve to Pin GENWELD 1.0
75 Masking & Blasting Ö SPRAY 2.0
80 Metal Spray OD Pin Ö SPRAY 3.5
90 Machining Ex Weld Joint (Face Area) H.LATHE 1.0
100 Final Machining Ö H.LATHE 6.0
110 Cut Thread H.LATHE 0.5
120 Re-Tap All Thread Ö HD 1.0
130 Handressing & Cleaning Ö HD 1.0
140 Post Inspection Ö QC 0.5
150 Final Inspection Ö QC 0.5
160 Packing Ö HD 0.5

REMARKS

UN-PLANNED PROCESS / REWORK


Work Std. Time Date Finish Insp.
No. Process Description Ö
Center Hrs Start Finish Start Finish Sign Sign

Issued by: (Engineering) Reviewed by: (Engineering Spv.) Received by: (Production Spv.)

Date: Date: Date:


SCOPE OF WORK
Document No : FORM-ENG-001 Responsibility : Engineering
REV. 01 Date : February 26, 2016 Page : 1 of 1
No. : 1 of 1 Customer : PT.KPC Part Name : PIN OUTER 03

Date : September 14, 2018 Job No. : MR032370 Model/Unit : EH4500 or EH5000

SSC ID : SSC SA-3807 Quote No. : '09156 Part No. :


PLANNED PROCESS
Work Std. Time Date Finish Insp.
No. Process Description Ö
Center Hrs Start Finish Start Finish Sign Sign
10 Manufacture New Sleeve H.LATHE 3.0
20 Machining Profile Install Sleeve H.LATHE 2.0
30 Striping OD Pin Shaft Bearing Seat Ö H.LATHE 1.0
40 Striping OD Pin Shaft Hole Seat Ö H.LATHE 1.0
50 Weld Slot & Hole to Make Stopper (Tanggul) Ö GENWELD 0.5
60 Install Sleeve to Pin GENWELD 0.5
70 Weld Joint Sleeve to Pin GENWELD 1.0
75 Masking & Blasting Ö SPRAY 2.0
80 Metal Spray OD Pin Ö SPRAY 3.5
90 Machining Ex Weld Joint (Face Area) H.LATHE 1.0
100 Final Machining Ö H.LATHE 6.0
110 Cut Thread H.LATHE 0.5
120 Re-Tap All Thread Ö HD 1.0
130 Handressing & Cleaning Ö HD 1.0
140 Post Inspection Ö QC 0.5
150 Final Inspection Ö QC 0.5
160 Packing Ö HD 0.5

REMARKS

UN-PLANNED PROCESS / REWORK


Work Std. Time Date Finish Insp.
No. Process Description Ö
Center Hrs Start Finish Start Finish Sign Sign

Issued by: (Engineering) Reviewed by: (Engineering Spv.) Received by: (Production Spv.)

Date: Date: Date: