85 EA E 78035 - 00 Control Room
85 EA E 78035 - 00 Control Room
_____
00 Issue for Purchase Order N° 527572 dated 07 July 2010 P. Poto A. Mazza R. Scoglio 01/02/2011
0A Issued for material requisition C. Giani A. Mazza R. Scoglio 15/03/2010
Rev. Description Prepared Checked Approved Date
Cod. modulo : MDT.GG.QUA.0004 Fg. 01/Rev. 3.96 Cod.file: spcep_r.dot File dati: 032083-85-ea-e-78035_00.doc
This document is the property of Saipem who will safeguard its right according to the civil and penal provision of law.
AFAM – RIVERS STATE GOVERNMENT
OPEN CYCLE POWER PLANT Job Number UNIT
032083 85
PROJECT SPECIFICATION FOR PACKAGED
SPC.N. 85-EA-E-78035
CONTROL, SWITCHGEAR AND
INSTRUMENTATION ROOM Sh. 2 of 31 Rev. 00
INDEX
1 GENERAL 4
1.1 SCOPO 4
1.2 TERMS AND DEFINITIONS 4
3 REFERENCE DOCUMENTS 6
3.1 ELECTRICAL DOCUMENTS 6
3.2 INSTRUMENTATION DOCUMENTS 6
3.3 GENERAL DOCUMENTS 6
3.4 DOCUMENT PRIORITY 7
_____
4 PLANT AND SITE CHARACTERISTICS 8
4.1 PLANT DESCRIPTION 8
4.2 SITE AND ENVIRONMENT CHARACTERISTICS 8
4.3 UTILITIES AND AUXILIARY SUPPLIES 9
5 SCOPE OF SUPPLY 10
5.1 GENERAL 10
5.2 EQUIPMENT, COMPONENTS, MATERIALS AND
SERVICES 10
5.3 Acceptance and routine test at workshop 12
5.4 BATTERY LIMITS 12
_______________________________
Cod. modulo : MDT.GG.QUA.0005 Fg. 01/Rev. 3.96 Cod.file: spcep_r.dot File dati: 032083-85-ea-e-78035_00.doc
This document is the property of Saipem who will safeguard its right according to the civil and penal provision of law.
AFAM – RIVERS STATE GOVERNMENT
OPEN CYCLE POWER PLANT Job Number UNIT
032083 85
PROJECT SPECIFICATION FOR PACKAGED
SPC.N. 85-EA-E-78035
CONTROL, SWITCHGEAR AND
INSTRUMENTATION ROOM Sh. 3 of 31 Rev. 00
9 SCHEMATIC DIAGRAMS 31
9.1 Simplified general single line diagram 31
_____
_______________________________
Cod. modulo : MDT.GG.QUA.0005 Fg. 01/Rev. 3.96 Cod.file: spcep_r.dot File dati: 032083-85-ea-e-78035_00.doc
This document is the property of Saipem who will safeguard its right according to the civil and penal provision of law.
AFAM – RIVERS STATE GOVERNMENT
OPEN CYCLE POWER PLANT Job Number UNIT
032083 85
PROJECT SPECIFICATION FOR PACKAGED
SPC.N. 85-EA-E-78035
CONTROL, SWITCHGEAR AND
INSTRUMENTATION ROOM Sh. 4 of 31 Rev. 00
1 GENERAL
1.1 SCOPO
It defines technical requirements for design, manufacture, assembly and acceptance testing in
the Supplier's workshops as well as the supply, custom clearance, delivery, unloading,
erection, adjusting, painting, identification, commissioning and acceptance testing of
prefabricated building in container equipped as control, switchgear and instrumentation room
complete in every respect and suitable for satisfactory operation.
1.2.1 Terms
1.2.2 Definitions
Project data sheet: Saipem or Supplier document containing all the detailed data of
each transformer used in a specific project.
It contains:
- extent of Saipem involvement;
- certificates required;
_______________________________
Cod. modulo : MDT.GG.QUA.0005 Fg. 01/Rev. 3.96 Cod.file: spcep_r.dot File dati: 032083-85-ea-e-78035_00.doc
This document is the property of Saipem who will safeguard its right according to the civil and penal provision of law.
AFAM – RIVERS STATE GOVERNMENT
OPEN CYCLE POWER PLANT Job Number UNIT
032083 85
PROJECT SPECIFICATION FOR PACKAGED
SPC.N. 85-EA-E-78035
CONTROL, SWITCHGEAR AND
INSTRUMENTATION ROOM Sh. 5 of 31 Rev. 00
Shall and should: in the project specification the word “shall” is to be considered as
“mandatory requirement”; the word “should” is to be considered as “recommended to
comply with the requirement”.
For the terms of this specification and not defined hereunder, reference shall be made
to the definitions contained in IEC Codes.
Design conditions: are the external factors which may influence the life and the
operation of the transformer. They include:
_____
2 LAW, CODES, STANDARD AND REGULATIONS
2.1 LAW
Whole supply shall be completely complied with National laws and regulations. The
latest issue of the codes and standard mentioned in the reference documents
paragraph shall be considered.
For components and/or auxiliary equipment shall be followed any applicable IEC code
and recommendation.
Any other codes recognised in the country of origin of equipment might be
considered, provided that they comply with the above Codes or ensure equivalent
quality.
Edition in force at the purchase order date shall be considered.
_______________________________
Cod. modulo : MDT.GG.QUA.0005 Fg. 01/Rev. 3.96 Cod.file: spcep_r.dot File dati: 032083-85-ea-e-78035_00.doc
This document is the property of Saipem who will safeguard its right according to the civil and penal provision of law.
AFAM – RIVERS STATE GOVERNMENT
OPEN CYCLE POWER PLANT Job Number UNIT
032083 85
PROJECT SPECIFICATION FOR PACKAGED
SPC.N. 85-EA-E-78035
CONTROL, SWITCHGEAR AND
INSTRUMENTATION ROOM Sh. 6 of 31 Rev. 00
3 REFERENCE DOCUMENTS
The supply shall be designed, manufactured and tested according to
general/common requirements, if not emendated or implemented in this specification.
During the offer and order stage, other documents shall be supplied from Saipem and
the Supplier shall fulfil the requirements specified without extra charge.
3.1 ELECTRICAL DOCUMENTS
- 00-EA-E-78003 Simplified single line diagram
- 00-EA-E-78030 Project specification for L.V. switchgears
- 00-EA-E-78031 Project specification for direct current system
- 00-EA-E-78032 Project specification for static A.C. uninterruptible power
system
- 00-EA-E-78079 Inspection data sheet for L.V. switchgears
- 00-EA-E-78080 Inspection data sheet for auxiliary service panel L.V.
/L.V. transformer
- 00-EA-E-78081 Inspection data sheet for direct current system
_____
- 00-EA-E-78082 Inspection data sheet for static A.C. uninterruptible
power system
- 00-EA-E-78133 Data sheet for PMCC
- 00-EA-E-78140 Data sheet for Auxiliary service panel and relevant L.V.
/L.V. transformer
- 00-EA-E-78141 Data sheet for Direct Current System
- 00-EA-E-78142 Data sheet for static A.C. uninterruptible power system
- 00-EA-E-78143 Data sheet for DC system batteries
- 00-EA-E-78144 Data sheet for UPS batteries
- 00-EA-E-78438 L.V. switchgears - ASP one line diagram
- SPC.EL.BLD.0070 DESIGN AND ERECTION OF ELECTRICAL SYSTEMS
IN BUILDINGS
3.2 INSTRUMENTATION DOCUMENTS
- 00-HA-E-77000 Technical Specification for Control and Safety systems
3.3 GENERAL DOCUMENTS
- 00-GB-A-62030 PLOT PLAN
- 00-ZA-E-85005 Loss prevention and Environmental Design Philosophy
- 00-ZA-E-85010 Fire and Gas Detection Design Criteria
- 00-ZA-E-85135 Active Fire Protection Design Basis
_______________________________
Cod. modulo : MDT.GG.QUA.0005 Fg. 01/Rev. 3.96 Cod.file: spcep_r.dot File dati: 032083-85-ea-e-78035_00.doc
This document is the property of Saipem who will safeguard its right according to the civil and penal provision of law.
AFAM – RIVERS STATE GOVERNMENT
OPEN CYCLE POWER PLANT Job Number UNIT
032083 85
PROJECT SPECIFICATION FOR PACKAGED
SPC.N. 85-EA-E-78035
CONTROL, SWITCHGEAR AND
INSTRUMENTATION ROOM Sh. 7 of 31 Rev. 00
Any discrepancy between the present specification and the above listed documents shall be
duly notified to CONTRACTOR.
If no deviation and exception list is issued it is understood that the equipment will be
designed in fully compliance with Project requirements.
It is emphasized that the above specifications provide minimum technical requirements and
does not relieve VENDOR from his responsibility concerning proper design, reliability and safe
operation of the supplied equipment.
Compliance with these specifications shall not relieve the VENDOR of the responsibility to
supply Systems and Equipment of correct design, materials, workmanship and performance
suited to meet the specified service conditions and regulations
It is also stressed that Control and Safety systems shall be fully integrated and all auxiliary
equipment shall be supplied as a turnkey system, i.e. VENDOR shall include in the supply
anything is required to deliver a fully working system.
Requirements determined from system studies carried out during the detail engineering stage
and Vendor data for the various interface packages shall be incorporated into the final
specification.
The VENDOR shall co-ordinate with Package Vendors in order to get all necessary
information for the configuration of the serial interfaces.
_______________________________
Cod. modulo : MDT.GG.QUA.0005 Fg. 01/Rev. 3.96 Cod.file: spcep_r.dot File dati: 032083-85-ea-e-78035_00.doc
This document is the property of Saipem who will safeguard its right according to the civil and penal provision of law.
AFAM – RIVERS STATE GOVERNMENT
OPEN CYCLE POWER PLANT Job Number UNIT
032083 85
PROJECT SPECIFICATION FOR PACKAGED
SPC.N. 85-EA-E-78035
CONTROL, SWITCHGEAR AND
INSTRUMENTATION ROOM Sh. 8 of 31 Rev. 00
- Earthquake NA NA
_______________________________
Cod. modulo : MDT.GG.QUA.0005 Fg. 01/Rev. 3.96 Cod.file: spcep_r.dot File dati: 032083-85-ea-e-78035_00.doc
This document is the property of Saipem who will safeguard its right according to the civil and penal provision of law.
AFAM – RIVERS STATE GOVERNMENT
OPEN CYCLE POWER PLANT Job Number UNIT
032083 85
PROJECT SPECIFICATION FOR PACKAGED
SPC.N. 85-EA-E-78035
CONTROL, SWITCHGEAR AND
INSTRUMENTATION ROOM Sh. 9 of 31 Rev. 00
musk.
The Manufacturer shall submit its tropicalization procedure to demonstrate
compliance with the above requirements by near of test results on components or
with a guarantee certificate.
4.3 UTILITIES AND AUXILIARY SUPPLIES
Water to supply Sanitary and dressing room. Detail interface will be defined during
the engineering phase without any extra cost.
_____
_______________________________
Cod. modulo : MDT.GG.QUA.0005 Fg. 01/Rev. 3.96 Cod.file: spcep_r.dot File dati: 032083-85-ea-e-78035_00.doc
This document is the property of Saipem who will safeguard its right according to the civil and penal provision of law.
AFAM – RIVERS STATE GOVERNMENT
OPEN CYCLE POWER PLANT Job Number UNIT
032083 85
PROJECT SPECIFICATION FOR PACKAGED
SPC.N. 85-EA-E-78035
CONTROL, SWITCHGEAR AND
INSTRUMENTATION ROOM Sh. 10 of 31 Rev. 00
5 SCOPE OF SUPPLY
5.1 GENERAL
In the present chapter are listed the elements that shall be included in the scope of
supply for the Supplier.
All services, equipment and material not specifically mentioned in the scope of supply
but necessary for safe and functional operability of plant during operations shall be
provided.
The list shall be intended as indicative and not exhaustive. All material and services
concerning the scope of supply shall be complete of anything is needed to obtain the
characteristics, performance and requirements prescribed in chapters 5,7,8 with the
only exclusions explicitly indicated in chapter 6, not other exclusions shall be
accepted.
Deviations or clarifications from the present specification and/or enclosed documents
shall be indicated in a dedicated chapter of the Supplier proposal with precise
reference at the relevant paragraphs.
Saipem shall not consider the deviations or clarifications not listed in the chapter.
5.1.1 Responsibility
_____ The engineering and design, the documentation manufacturing, factory test, site test,
commissioning and start up activities and the information required for the installation
of the equipments on site with relevant and materials included in the scope of supply
as per this specification, shall fall within the exclusive and specific responsibility of the
Supplier, who shall comply with this specifications, reference codes, standards, other
reference and/or attached documents and the current good engineering practice.
Supplier shall guarantee that his supplied equipments accessories and materials are
in compliance with the project documentation, they will be new and of highest quality
standard for material and workmanship.
The Supplier shall test the supplied materials and equipment at his factory in
accordance with the requirements stated in the codes and in the project
documentation.
5.1.2 Coordination
Supplier shall coordinate, expedite and solve any problem that could arise with his
sub-Suppliers; furthermore, Supplier shall be responsible for ensuring that all relevant
information and document are forwarded to his sub-suppliers.
Supplier shall provide and it is also responsible for all the necessary data and
information required for the electrical, mechanical and civil interface.
Cod. modulo : MDT.GG.QUA.0005 Fg. 01/Rev. 3.96 Cod.file: spcep_r.dot File dati: 032083-85-ea-e-78035_00.doc
This document is the property of Saipem who will safeguard its right according to the civil and penal provision of law.
AFAM – RIVERS STATE GOVERNMENT
OPEN CYCLE POWER PLANT Job Number UNIT
032083 85
PROJECT SPECIFICATION FOR PACKAGED
SPC.N. 85-EA-E-78035
CONTROL, SWITCHGEAR AND
INSTRUMENTATION ROOM Sh. 11 of 31 Rev. 00
Each single room or container shall be supplied complete of its auxiliary as:
Electrical plan, lighting power and grounding system,
HVAC and pressurization system,
fire detection & protection system,
internal cabling and wiring connection;
anchor bolts and plates for all equipment and structures supplied;
_____
The whole supply shall be considered on the basis of ex-works delivered package,
with the only exclusions listed at chapter 6.
Anyway, Delay in the erection activities are not accepted due to lack of spare parts during
commissioning stage.
_______________________________
Cod. modulo : MDT.GG.QUA.0005 Fg. 01/Rev. 3.96 Cod.file: spcep_r.dot File dati: 032083-85-ea-e-78035_00.doc
This document is the property of Saipem who will safeguard its right according to the civil and penal provision of law.
AFAM – RIVERS STATE GOVERNMENT
OPEN CYCLE POWER PLANT Job Number UNIT
032083 85
PROJECT SPECIFICATION FOR PACKAGED
SPC.N. 85-EA-E-78035
CONTROL, SWITCHGEAR AND
INSTRUMENTATION ROOM Sh. 12 of 31 Rev. 00
_______________________________
Cod. modulo : MDT.GG.QUA.0005 Fg. 01/Rev. 3.96 Cod.file: spcep_r.dot File dati: 032083-85-ea-e-78035_00.doc
This document is the property of Saipem who will safeguard its right according to the civil and penal provision of law.
AFAM – RIVERS STATE GOVERNMENT
OPEN CYCLE POWER PLANT Job Number UNIT
032083 85
PROJECT SPECIFICATION FOR PACKAGED
SPC.N. 85-EA-E-78035
CONTROL, SWITCHGEAR AND
INSTRUMENTATION ROOM Sh. 13 of 31 Rev. 00
6.2 SERVICES
Transport
_____
_______________________________
Cod. modulo : MDT.GG.QUA.0005 Fg. 01/Rev. 3.96 Cod.file: spcep_r.dot File dati: 032083-85-ea-e-78035_00.doc
This document is the property of Saipem who will safeguard its right according to the civil and penal provision of law.
AFAM – RIVERS STATE GOVERNMENT
OPEN CYCLE POWER PLANT Job Number UNIT
032083 85
PROJECT SPECIFICATION FOR PACKAGED
SPC.N. 85-EA-E-78035
CONTROL, SWITCHGEAR AND
INSTRUMENTATION ROOM Sh. 14 of 31 Rev. 00
7.1.2 BODY
The main structure will be composed by:
frame: constituted by cold rolled steel profiles in Fe 275J0, jointed to the eight (8)
corners with MIG pulsating arc welding;
external surfaces (walls/roof): made with folded sheets in CARBON STEEL,
thickness 2 mm continuous welded along the frame;
external surface (base): completed with steel sheet CARBON STEEL,
thickness 2 mm welded to the base frame
Cod. modulo : MDT.GG.QUA.0005 Fg. 01/Rev. 3.96 Cod.file: spcep_r.dot File dati: 032083-85-ea-e-78035_00.doc
This document is the property of Saipem who will safeguard its right according to the civil and penal provision of law.
AFAM – RIVERS STATE GOVERNMENT
OPEN CYCLE POWER PLANT Job Number UNIT
032083 85
PROJECT SPECIFICATION FOR PACKAGED
SPC.N. 85-EA-E-78035
CONTROL, SWITCHGEAR AND
INSTRUMENTATION ROOM Sh. 15 of 31 Rev. 00
This type of floor covering involves the use of tiles of acid-proof or chemical-proof
stoneware suitable for floors or walls.
2) Vinyl tile floor coverings for Electrical Sub Station
For vinyl tile floor coverings, the following checks must be carried out before tiling
begins:
the tiles are checked to ensure that they are of the correct size, shape and
squareness;
the tiles are checked to ensure that they comply in terms of shape, colour and
surface texture with the approved sample.
Once tiling has been completed, checks need to be carried out to ensure that the
vinyl floor coverings are free of any defects that could alter their properties or
appearance, such as surface imperfections, stains, cuts, splits, blisters or broken
edges
_______________________________
Cod. modulo : MDT.GG.QUA.0005 Fg. 01/Rev. 3.96 Cod.file: spcep_r.dot File dati: 032083-85-ea-e-78035_00.doc
This document is the property of Saipem who will safeguard its right according to the civil and penal provision of law.
AFAM – RIVERS STATE GOVERNMENT
OPEN CYCLE POWER PLANT Job Number UNIT
032083 85
PROJECT SPECIFICATION FOR PACKAGED
SPC.N. 85-EA-E-78035
CONTROL, SWITCHGEAR AND
INSTRUMENTATION ROOM Sh. 16 of 31 Rev. 00
Cod. modulo : MDT.GG.QUA.0005 Fg. 01/Rev. 3.96 Cod.file: spcep_r.dot File dati: 032083-85-ea-e-78035_00.doc
This document is the property of Saipem who will safeguard its right according to the civil and penal provision of law.
AFAM – RIVERS STATE GOVERNMENT
OPEN CYCLE POWER PLANT Job Number UNIT
032083 85
PROJECT SPECIFICATION FOR PACKAGED
SPC.N. 85-EA-E-78035
CONTROL, SWITCHGEAR AND
INSTRUMENTATION ROOM Sh. 17 of 31 Rev. 00
_______________________________
Cod. modulo : MDT.GG.QUA.0005 Fg. 01/Rev. 3.96 Cod.file: spcep_r.dot File dati: 032083-85-ea-e-78035_00.doc
This document is the property of Saipem who will safeguard its right according to the civil and penal provision of law.
AFAM – RIVERS STATE GOVERNMENT
OPEN CYCLE POWER PLANT Job Number UNIT
032083 85
PROJECT SPECIFICATION FOR PACKAGED
SPC.N. 85-EA-E-78035
CONTROL, SWITCHGEAR AND
INSTRUMENTATION ROOM Sh. 18 of 31 Rev. 00
The HVAC System shall be designed to maintain a positive pressure in the rooms with
exception to the Battery Room (see chapter 7.1.13)
Each main equipments for HVAC System shall be redounded (2units x 100% -
duty/stand by). Switch-over of the redounded equipment is done weekly or in case of
failure of one unit by a dedicated switch over panel.
HVAC System shall be interlocked with the Fire & Gas system so that it can be shut
down, if required, in the event of a fire/gas alarm being initiated in the zone which the
system serves
Cod. modulo : MDT.GG.QUA.0005 Fg. 01/Rev. 3.96 Cod.file: spcep_r.dot File dati: 032083-85-ea-e-78035_00.doc
This document is the property of Saipem who will safeguard its right according to the civil and penal provision of law.
AFAM – RIVERS STATE GOVERNMENT
OPEN CYCLE POWER PLANT Job Number UNIT
032083 85
PROJECT SPECIFICATION FOR PACKAGED
SPC.N. 85-EA-E-78035
CONTROL, SWITCHGEAR AND
INSTRUMENTATION ROOM Sh. 19 of 31 Rev. 00
sound attenuators;
electrical duct heaters;
ductwork and accessories including the insulation:
grilles, diffusers, transit grilles, disc valves, air intake dampers and sand-trap
louvers;
fire and/or fire/smoke dampers where applicable;
electrical System related to HVAC equipment;
DDC Control System to control the HVAC System
All HVAC external equipments shall be designed and provided suitable for outdoor
installation.
For the outdoor conditions, Supplier shall refer to the followings values:
a) Absolute minimum temperature 16°C
b) Absolute maximum temperature 41°C
c) Design Temperature
_____
- Dry Bulb 34 °C
- Wet Bulb 28 °C
The Inert gas exhaust fans shall be provide in the false floor for the followings rooms:
- Switchgear Room
- Control Room
- Instrumentation Room
_______________________________
Cod. modulo : MDT.GG.QUA.0005 Fg. 01/Rev. 3.96 Cod.file: spcep_r.dot File dati: 032083-85-ea-e-78035_00.doc
This document is the property of Saipem who will safeguard its right according to the civil and penal provision of law.
AFAM – RIVERS STATE GOVERNMENT
OPEN CYCLE POWER PLANT Job Number UNIT
032083 85
PROJECT SPECIFICATION FOR PACKAGED
SPC.N. 85-EA-E-78035
CONTROL, SWITCHGEAR AND
INSTRUMENTATION ROOM Sh. 20 of 31 Rev. 00
Inert Gas exhaust fans will be used for gas cleaning purpose after fire. One duty and
one stand by axial fan shall be installed at roof level for Inert gas exhaust.
For Switchgear Room, HVAC System shall be designed in accordance with the values
of Heat Dissipation described in the Electrical documentation provided by Supplier.
For instrumentation and control Room, the following heat dissipation values shall be
considered:
Heat
Building dissipation
Control Room 5 kW
Instrumentation Room 3 kW
The latest editions of the following Codes and Standards shall be applied as a
minimum in the definition of design criteria for F&G System:
Cod. modulo : MDT.GG.QUA.0005 Fg. 01/Rev. 3.96 Cod.file: spcep_r.dot File dati: 032083-85-ea-e-78035_00.doc
This document is the property of Saipem who will safeguard its right according to the civil and penal provision of law.
AFAM – RIVERS STATE GOVERNMENT
OPEN CYCLE POWER PLANT Job Number UNIT
032083 85
PROJECT SPECIFICATION FOR PACKAGED
SPC.N. 85-EA-E-78035
CONTROL, SWITCHGEAR AND
INSTRUMENTATION ROOM Sh. 21 of 31 Rev. 00
The LFAP, including detection devices (flame, smoke, heats detectors etc.) as well as
alarm devices (horn and sirens) and fire extinguishing system, shall be provided,
installed and wired within the shelter in order to protect people and equipment.
_____ The supply shall include a battery back up system providing a sufficient capacity to
operate the fire alarm system under quiescent load (system operating in a non alarm
condition) for a minimum of 24 hours and, at the end of that period, shall be capable of
operating all alarm notification appliances used for evacuation or to direct aid to the
location of an emergency for 5 minutes.
The LFAP shall include, but not limited to, the following inputs
and outputs
Cod. modulo : MDT.GG.QUA.0005 Fg. 01/Rev. 3.96 Cod.file: spcep_r.dot File dati: 032083-85-ea-e-78035_00.doc
This document is the property of Saipem who will safeguard its right according to the civil and penal provision of law.
AFAM – RIVERS STATE GOVERNMENT
OPEN CYCLE POWER PLANT Job Number UNIT
032083 85
PROJECT SPECIFICATION FOR PACKAGED
SPC.N. 85-EA-E-78035
CONTROL, SWITCHGEAR AND
INSTRUMENTATION ROOM Sh. 22 of 31 Rev. 00
All I/O cards, circuits and the external wiring to detectors or other field devices, having
safety related functions, shall always be monitored and automatically alarmed when a
failure occurs. These audible and visual alarms shall easily be distinguished from other
types of alarms.
The process plant Fire and Gas Detection System shall be provided with sufficient and
reliable detectors to ensure personnel warning and allow immediate response to
minimize damage from any emergency situation.
All detectors and alarm devices suitable for outdoor location in plant areas, shall be
certified for use in hazardous areas (EEx-d) and waterproof to IP 65 as a minimum.
F&G detectors and alarm devices inside buildings shall be suitable for safe area.
Fixed clean agent total flooding system shall be provided to protect the following
enclosures:
Cable basement (cable void) below the Control Room floating floor;
Cable basement (cable void) below the Instrumentation Room floating floor;
_______________________________
Cod. modulo : MDT.GG.QUA.0005 Fg. 01/Rev. 3.96 Cod.file: spcep_r.dot File dati: 032083-85-ea-e-78035_00.doc
This document is the property of Saipem who will safeguard its right according to the civil and penal provision of law.
AFAM – RIVERS STATE GOVERNMENT
OPEN CYCLE POWER PLANT Job Number UNIT
032083 85
PROJECT SPECIFICATION FOR PACKAGED
SPC.N. 85-EA-E-78035
CONTROL, SWITCHGEAR AND
INSTRUMENTATION ROOM Sh. 23 of 31 Rev. 00
Cable basement (cable void) below the Switch Gear / Battery Room floating
floor;
System Design
The system shall be designed to meet the requirements of NFPA 2001 (where
applicable) and the selected extinguishing gas shall be FM-200 (HFC 227 ea).
The system shall include (as minimum) the following main equipment and control
device UL listed and/or FM approved (where applicable):
Main FM-200 cylinders complete with quick discharge valve, siphon, magnetic
liquid level indicator, discharge hose, wall mounting bracket, etc.
Primary control kit with 24 Vdc solenoid actuator, c/w low pressure switch.
Slave kit, c/w low pressure switch.
Manifold with non-return valves.
Discharge pressure switch for system release.
_____
Cylinders cabinet.
FM-200 discharge nozzles.
FM-200 hot dipped galvanised pipe, manifold, fittings, hook up material,
designed and fabricated according to NFPA 2001 necessary for connection
from main/reserve cylinder and remote discharge nozzles (pipe will be supplied
in commercial length bars, fittings and supports will be supplied loose).
Detection System.
_______________________________
Cod. modulo : MDT.GG.QUA.0005 Fg. 01/Rev. 3.96 Cod.file: spcep_r.dot File dati: 032083-85-ea-e-78035_00.doc
This document is the property of Saipem who will safeguard its right according to the civil and penal provision of law.
AFAM – RIVERS STATE GOVERNMENT
OPEN CYCLE POWER PLANT Job Number UNIT
032083 85
PROJECT SPECIFICATION FOR PACKAGED
SPC.N. 85-EA-E-78035
CONTROL, SWITCHGEAR AND
INSTRUMENTATION ROOM Sh. 24 of 31 Rev. 00
Fire Extinguishers:
Means of emergency escape in the event of fire, gas leak or other dangerous
_____ occurrence, shall be provided from the prefabricated building in container equipped as
control, switchgear and instrumentation room.
There should be at least two escape routes from every location within the facility
where concentration of personnel can be present. These routes shall be kept
unobstructed from equipment or other fixed items and should be in different
directions so that personnel can always retreat from the danger. The length of
escape routes should be kept to a minimum and emergency exits from the facility
should lead to safe assembly areas. Dead ends, i.e. areas with only one exit, should
be avoided.
The contents of any room in which persons are employed shall be so arranged or
disposed that there is a free passage-way for all persons employed in the room to a
means of escape in case of fire.
All doors affording a means of exit from a factory for the persons therein shall,
except in the case of sliding doors, open outwards .
Every hoistway or liftway inside a building shallbe completely enclosed with fire-
resisting materials, and all means of access to the hoist or lift shall be fitted with
doors of fire-resisting materials; provided that any such hoistway or liftway shall be
enclosed at the top only by some material easily broken by fire or be provided with a
vent at the top .
Every window, door or exit affording means of escape in case of fire or giving
access thereto, other than the means of exit in ordinary use, shall be distinctively
and conspicuously marked by a notice printed in red letters of an suitable size; all
such notices shall be in such form . and in English and in such Nigerian languages,
as an inspector may direct .
_______________________________
Cod. modulo : MDT.GG.QUA.0005 Fg. 01/Rev. 3.96 Cod.file: spcep_r.dot File dati: 032083-85-ea-e-78035_00.doc
This document is the property of Saipem who will safeguard its right according to the civil and penal provision of law.
AFAM – RIVERS STATE GOVERNMENT
OPEN CYCLE POWER PLANT Job Number UNIT
032083 85
PROJECT SPECIFICATION FOR PACKAGED
SPC.N. 85-EA-E-78035
CONTROL, SWITCHGEAR AND
INSTRUMENTATION ROOM Sh. 25 of 31 Rev. 00
In general the following equipment shall be installed inside the switchgear room:
_____
ONE POWER MOTOR CONTROL CENTER (00-PMCC );
ONE AUSILIARY SERVICE PANEL (00-ASP );
ONE DIRECT CURRENT PANEL (00-DCP );
ONE STATIC A.C. UPS (00-UPS );
Furthermore, supplier shall furnish and install inside the switchgear container an
interface panel dedicated to interconnect equipment included in gas turbine package
with those included in air insulated substation scope o supply.
Standard dimension for this panel shall be 600mm width 600 large same height of
motor control centre. Interface panel shall be equipped with terminals on DIN guide.
The terminals of auxiliary wiring shall be made in compliance with IEC 60947-7 and
suitable for the type and the material of the selected conductors.
Insulating material of terminals shall be high-density plastic material. All terminals
shall be able for connecting two wires of section 4 mm² on each side. On both sides
of guide DIN and relevant terminals shall be foreseen earthed metallic grilles or
channels.
Mechanical and electrical installation of switchgears shall be realized at workshop
and shall be suitable for transport to the site.
All interconnecting cables necessary to connect the above switchgears and Interface
instrumentation panel, wire terminals shall be included in scope of work and installed
at workshop. Cables shall be XLPE insulated not armoured. Interconnecting cables
shall be laid under the floating floor level in cable trays.
All interconnecting cables coming from field to switchgears, XLPE armoured type are
not included in vendor’s scope of work; for these interconnecting cables an suitable
cable ladders network shall be foreseen under the floor of containers.
_______________________________
Cod. modulo : MDT.GG.QUA.0005 Fg. 01/Rev. 3.96 Cod.file: spcep_r.dot File dati: 032083-85-ea-e-78035_00.doc
This document is the property of Saipem who will safeguard its right according to the civil and penal provision of law.
AFAM – RIVERS STATE GOVERNMENT
OPEN CYCLE POWER PLANT Job Number UNIT
032083 85
PROJECT SPECIFICATION FOR PACKAGED
SPC.N. 85-EA-E-78035
CONTROL, SWITCHGEAR AND
INSTRUMENTATION ROOM Sh. 26 of 31 Rev. 00
These cable ladders and their supporting brackets shall be included in scope of
supply and sent jointly to the main supply for installation on site.
Batteries’ data are described in the relevant technical specification listed at paragraph
3.1.
The following battery banks shall be installed inside the battery room:
ONE BATTERIES BANK FOR DIRECT CURRENT SYSTEM (00-BT-01 );
ONE BATTERIES BANK FOR UPS (00-BT-02 );
ONE BATTERIES BANK FOR UPS (00-BT-03 );
Mechanical and electrical installation of battery banks shall be realized at workshop.
_____ Interconnecting cables necessary to connect the battery banks to their respective
switchgears, wire terminals and cable ladders shall be included in scope of work and
sent jointly to the main supply for installation on site. For this scope an suitable cable
ladders network shall be foreseen under the floor of containers.
Eye Washes shall be provided as follows:
Type: Eye Wash units connected to the potable water network.
General Description: Manual activation by hand.
Design Standard: ANSI-Z358.1 “Standard for Emergency eyewash and
Shower Equipment”.
In general the following equipment shall be installed inside the Instrumentation room:
Control system cabinets (preliminary dimension WxDxH )
o PCS 1600 x 800 x 2100 mm
o ESD 1600 x 800 x 2100 mm
o Server 600 x 600 x 1400 mm
_______________________________
Cod. modulo : MDT.GG.QUA.0005 Fg. 01/Rev. 3.96 Cod.file: spcep_r.dot File dati: 032083-85-ea-e-78035_00.doc
This document is the property of Saipem who will safeguard its right according to the civil and penal provision of law.
AFAM – RIVERS STATE GOVERNMENT
OPEN CYCLE POWER PLANT Job Number UNIT
032083 85
PROJECT SPECIFICATION FOR PACKAGED
SPC.N. 85-EA-E-78035
CONTROL, SWITCHGEAR AND
INSTRUMENTATION ROOM Sh. 27 of 31 Rev. 00
Final dimension of the above equipments will be communicate during the engineering
phase.
Mechanical and electrical installation at supplier workshop of the instrumentation
panels/equipments provide by others shall be included in scope of work and shall be
suitable for transport to the site.
All interconnecting cables necessary to connect the above instrumentation panels
and switchgears, wire terminals shall be included in scope of work and installed at
workshop. Cables shall be XLPE insulated not armoured. Interconnecting cables shall
be laid under the floating floor level in cable trays.
All interconnecting cables coming from field, XLPE armoured type are not included in
vendor’s scope of work; for these interconnecting cables an suitable cable ladders
network shall be foreseen under the floor of containers.
These cable ladders and their supporting brackets shall be included in scope of
supply and sent jointly to the main supply for installation on site.
Supplier shall furnish and install inside the Interface instrumentation panel
_____ dedicated to interconnect on one side the switchgears located in switchgear
room and on other side the instrumentation panels.
All interconnecting cables coming from field to the Interface instrumentation panel,
XLPE armoured type are not included in vendor’s scope of work; for these
interconnecting cables an suitable cable ladders network shall be foreseen under the
floor of containers.
For all interconnecting cables, electrical and instrumentation, coming from other
rooms and from the field an suitable cable ladders network shall be foreseen under
the floor of containers.
Integrated Test (IFAT)
The Control system vendor will participate at the Integrated Test that will be held at
packaged control, switchgear and instrumentation room supplier premises further to
the systems installation within the shelters.
The Test shall consist in systems power up, verification of its own functionality and
interconnection test between all the systems installed within the shelters as Control
system, F&G system, MCC’s etc.
All test and communication test between the above mentioned equipment shall be
carried out at supplier workshop free of charge
7.5 CONTROL ROOM
Control room shall be obtained inside one container or part of it. The following
equipments shall be supplied free issue and installed by vendor inside the control
room:
No. 2 Operator Workstation (OWS) each equipped with no. 2 monitors 21” tft
No. 1 off Engineering Workstation (EWS) equipped with no. 1 monitor 21” tft
_______________________________
Cod. modulo : MDT.GG.QUA.0005 Fg. 01/Rev. 3.96 Cod.file: spcep_r.dot File dati: 032083-85-ea-e-78035_00.doc
This document is the property of Saipem who will safeguard its right according to the civil and penal provision of law.
AFAM – RIVERS STATE GOVERNMENT
OPEN CYCLE POWER PLANT Job Number UNIT
032083 85
PROJECT SPECIFICATION FOR PACKAGED
SPC.N. 85-EA-E-78035
CONTROL, SWITCHGEAR AND
INSTRUMENTATION ROOM Sh. 28 of 31 Rev. 00
Cod. modulo : MDT.GG.QUA.0005 Fg. 01/Rev. 3.96 Cod.file: spcep_r.dot File dati: 032083-85-ea-e-78035_00.doc
This document is the property of Saipem who will safeguard its right according to the civil and penal provision of law.
AFAM – RIVERS STATE GOVERNMENT
OPEN CYCLE POWER PLANT Job Number UNIT
032083 85
PROJECT SPECIFICATION FOR PACKAGED
SPC.N. 85-EA-E-78035
CONTROL, SWITCHGEAR AND
INSTRUMENTATION ROOM Sh. 29 of 31 Rev. 00
- no. 3 ABS wash basin holding up to no. 2 trays, no. 4 faucets hot/cold water type
- no. 2 ceramic showers
WATER HEATER
- no. 1 electric water heater with a 200 litres capacity
8.1 GENERAL
On the prefabricated building in container equipped as control, switchgear and
instrumentation room and on their auxiliaries shall be carried out the test listed in the
relevant inspection data sheet and in general, as minimum requirement, the factory
routine test.
For all factory tests the Supplier shall be fully responsible for all test execution
activities.
The site tests shall be carried out under supervision and responsibility of the Supplier
The Supplier, who is fully responsible for the supply, may perform additional tests in
_____ accordance with his quality control plan.
The Supplier shall be fully responsible for inspections and tests on subsupplier’s
materials.
The tests shall be carried out according to the methods indicated in the applicable
codes.
For all tests, the results and the tolerances shall be in accordance with the applicable
codes in force at the purchase order date.
The test certificate relevant to the main equipment shall be part of the Supplier project
documentation.
For the auxiliary equipment the rated data shown on the technical booklets will be
accepted.
Saipem reserves the right to send his own inspectors to witness the factory tests to
ensure that bus ducts are in accordance with the project specification, standards and
any other document referred to in the purchase order.
The presence of Saipem's inspectors shall not relieve the Supplier of his
responsibilities.
If the tests on a part or the whole bus duct assembly are not successful and/or bus
duct characteristics are not in accordance with the project documents, Saipem may
reject the supply.
_______________________________
Cod. modulo : MDT.GG.QUA.0005 Fg. 01/Rev. 3.96 Cod.file: spcep_r.dot File dati: 032083-85-ea-e-78035_00.doc
This document is the property of Saipem who will safeguard its right according to the civil and penal provision of law.
AFAM – RIVERS STATE GOVERNMENT
OPEN CYCLE POWER PLANT Job Number UNIT
032083 85
PROJECT SPECIFICATION FOR PACKAGED
SPC.N. 85-EA-E-78035
CONTROL, SWITCHGEAR AND
INSTRUMENTATION ROOM Sh. 30 of 31 Rev. 00
_____
_______________________________
Cod. modulo : MDT.GG.QUA.0005 Fg. 01/Rev. 3.96 Cod.file: spcep_r.dot File dati: 032083-85-ea-e-78035_00.doc
This document is the property of Saipem who will safeguard its right according to the civil and penal provision of law.
AFAM – RIVERS STATE GOVERNMENT
OPEN CYCLE POWER PLANT Job Number UNIT
032083 85
PROJECT SPECIFICATION FOR PACKAGED
SPC.N. 85-EA-E-78035
CONTROL, SWITCHGEAR AND
INSTRUMENTATION ROOM Sh. 31 of 31 Rev. 00
9 SCHEMATIC DIAGRAMS
_____
_______________________________