MQ SP P 5022 PDF
MQ SP P 5022 PDF
This specification has been revised as indicated below and described in the revision record on the following
page. Please destroy all previous revisions.
Lead Engineer:
Engineering Manager:
Client Approval:
Record of Revisions
Table of Contents
1.0 GENERAL......................................................................................................................................................... 5
1.1 Summary .............................................................................................................................................5
A. Scope of Specification...................................................................................................................5
B. Work Not Included ........................................................................................................................5
C. Related Specifications ...................................................................................................................5
D. Terminology ..................................................................................................................................5
1.2 References ...........................................................................................................................................6
A. ASME (American Society of Mechanical Engineers) ...................................................................6
B. ASTM (American Society for Testing and Materials) Annual Book of Standards .......................6
C. Government Requirements ............................................................................................................6
1.3 Submittals............................................................................................................................................7
A. Manufacturer's and Shop Fabricator’s Existing Certification Procedures .....................................7
B. Manufacturer’s Test Reports (MTR) .............................................................................................7
C. Certificate of Material Compliance (CMC)...................................................................................7
D. Records to Owner..........................................................................................................................7
1.4 Quality Assurance...............................................................................................................................7
A. Seller/Subseller Procurement Procedures......................................................................................7
B. Audits ............................................................................................................................................7
C. Certification Documents Minimum Requirements........................................................................8
D. Review Control Log (Pipe Shop Fabricator and Field Subseller Requirement)............................9
E. Record File ....................................................................................................................................9
F. Receiving Control Log ..................................................................................................................9
4.0 ATTACHMENTS...........................................................................................................................................16
4.1 Attachment 01: Piping Material Certificate Of Compliance ......................................................16
Power and Water Utility Co. for Jubail and Yanbu (MARAFIQ) Master Specification MQ-SP-P-5022
Project Name: Date: 31 Mar 2011
Contract Number: Page 5 of 16
Revision 1
1.0 GENERAL
1.1 Summary
A. Scope of Specification
2. No deviation shall be made from this specification without written authorization from
Marafiq Piping Engineering.
2. The requirements of this specification are not intended to replace the ASME material
certification requirements of ASME Code Compliance.
C. Related Specifications
D. Terminology
2. CMC (Certificate of Material Compliance): This document shall certify that the material
meets the requirements of the material specifications required by the purchase order.
Equivalent to EN 10204 2.1 or 2.2 certification.
3. MTR (Manufacturer's Test Report): This document shall certify the chemical analysis
and mechanical properties of materials. Equivalent to EN 10204 3.1 B certification.
5. PMI (Positive Material Identification): The process in which materials that require
traceability and certification shall be identified, controlled, and documented.
6. Total Traceability: The use of unique, permanent identification marking of material such
as heat number, code number, or equivalent to trace a component back to original MTR
throughout manufacturing, fabrication, construction, and plant operation.
1.2 References
The publications listed below form part of this specification. Each publication forming part of this
specification shall be the latest revision and addendum in effect on the date this specification is issued
for construction unless noted otherwise. Except as modified by the requirements specified herein or the
details of the drawings, Work included in this specification shall conform to the applicable provisions
of these publications.
B. ASTM (American Society for Testing and Materials) Annual Book of Standards
ASTM A530, General Requirements for Specialized Carbon and Alloy Steel Pipe
ASTM A960, General Requirements for Wrought Steel Piping Fittings
ASTM A999, General Requirements for Alloy and Stainless Steel Pipe
D. Government Requirements
Where fabrication and design criteria in this specification are affected by Kingdom of Saudi
Arabia legislation, regulation, standard and codes, this specification shall be modified as
necessary to ensure compliance.
Power and Water Utility Co. for Jubail and Yanbu (MARAFIQ) Master Specification MQ-SP-P-5022
Project Name: Date: 31 Mar 2011
Contract Number: Page 7 of 16
Revision 1
1.3 Submittals
Alternate procedures, practices, and forms may be submitted for Marafiq Piping Engineering
review, provided they meet the basic requirements of this specification. The seller shall obtain
authorization before implementation.
The seller or manufacturer shall submit to Marafiq Piping Engineering or Shop Fabricator
(dependent upon purchaser) required MTR’s before time of shipment.
The seller or manufacturer shall submit to Marafiq Piping Engineering or Shop Fabricator
(dependent upon purchaser) required CMC’s before time of shipment.
D. Records to Owner
Engineering Contractor’s Piping Engineering will consolidate and submit all records concerning
certification and traceability to Marafiq at the conclusion of the project, for permanent
reference.
PMI certified piping components shall be furnished in accordance with this specification in
addition to Specifications MQ-SP-P-5011, MQ-SP-P-5012, MQ-SP-P-5013, MQ-SP-P-5014,
MQ-SP-P-5015, and MQ-SP-P-5016 (as applicable by type of component).
1. This specification shall be referenced in and attached to all RFQ’s (requests for
quotation) and PO’s (purchase orders) for Seller/Subseller supplied parts for materials
that require certification.
2. Materials requiring certification shall not be combined in the same purchase order with
materials not requiring certification.
3. Engineering Contractor’s Piping Engineering shall review all Contractor’s home office
originated RFQ and PO packages before issue, and shall be present at all bid qualification
meetings concerning materials requiring certification to this specification.
B. Audits
2. The audits are intended to determine quality, accuracy, effectiveness, continuity, need for
improvement, need for corrective action, and undesirable trends.
3. Results of the periodic audits and actions implemented will be documented and filed by
Engineering Contractor as necessary to monitor and maintain overall certification and
traceability requirements of this specification.
4. Engineering Contractor’s Piping Engineering will conduct a final audit (refer to Section
2.2B.4.) to ensure that certification and traceability documentation meets the
requirements of this specification. The final audit will also provide for determining the
necessary condition of the documentation and logistics for turning the entire records over
to the owner (refer to Section 1.3E.)
1. MTR
● Name of Supplier.
● Name of prime material manufacturer and plant location.
● Engineering Contractor’s PO number (or shop fabricator's PO number when
purchased by shop fabricator). Fabricator shall include Engineering Contractor’s
fabrication PO number for reference.
● PO item number and item code number.
● Quantity, size, heat number (or equivalent), and brief description of item(s).
Note: Quantity shall relate to all or a portion of purchased quantity, as applicable. Mill
run quantity is not acceptable.
● Material specification and grade, class, or type designation.
● Actual test results of chemical analysis and mechanical properties in accordance
with the material specifications.
● Shall be dated and clearly state the name of the organization submitting the
documents.
2. CMC
3. Nonconformances
Certifications are nonconforming and unacceptable when any of the following conditions
exist:
● Missing data.
● Incorrect data.
● Incomplete data.
● Illegible documents.
● Documents with pertinent data cut off in the course of copying.
D. Review Control Log (Pipe Shop Fabricator and Field Subseller Requirement)
A review control log shall be created, maintained, and indexed by PO number and PO item
number showing (by PO quantity units) the perpetual status of the following:
Certification required
Certification received
Certification in review
Certification accepted
Certification rejected
Certification not received
Pending Nonconformances
E. Record File
A file of certification documents together with copies of POs. The file shall be indexed in
sequence of the PO numbers. Copies of all correspondence and related documents pertinent to
any nonconformances shall be stamped and attached to the certifications and included in this
file.
2. The Receiving Control Log shall be indexed by purchase order number, and purchase
order item number showing (by purchase order quantity units) the status of the following:
● Certified materials required (purchase order item numbers and quantities will
suffice).
Power and Water Utility Co. for Jubail and Yanbu (MARAFIQ) Master Specification MQ-SP-P-5022
Project Name: Date: 31 Mar 2011
Contract Number: Page 10 of 16
Revision 1
2.0 PRODUCTS
2.1 Materials
Piping material components requiring PMI (positive material identification) in accordance with this
specification will be listed as follows:
A. Purchase Orders
1. The purchase order shall include type of certification and traceability of piping
components listed in the purchase order.
1. For total traceability, unique permanent identification marking of material such as heat
number, code number, or equivalent is required.
a. Marking requirements
Marking shall be accomplished by the use of low stress steel die stamps or electro-
etching. Electro-etching may be either the stylus or chemical method (chemicals
shall not contain chlorides, sulfur or halogen compounds). In any case,
identification shall be applied such that abrasions and oxidation encountered
during shipping, storing, handling, fabrication and installation will not obliterate
the identifying marks.
c. Manufacturer's Equivalent
b. Certifications that have been verified as complete and correct shall be stamped
"Accepted." The stamp shall also include the responsible company's name,
discipline, and date and shall be signed with reviewer's name.
3. In order to provide for a central control, Piping Shop Fabricator shall transmit a copy of
accepted and stamped certifications with a copy of fabricator's POs to Engineering
Contractor’s Piping Engineering for inclusion in home office certification file and review
Power and Water Utility Co. for Jubail and Yanbu (MARAFIQ) Master Specification MQ-SP-P-5022
Project Name: Date: 31 Mar 2011
Contract Number: Page 12 of 16
Revision 1
control log. Copies shall be transmitted at the time they are accepted. The fabricator's
review control log shall indicate the transmittals.
Shop Fabricator shall implement and maintain a material receiving control log of certified
materials throughout the performance of the contract. (Minimum content requirements
are listed in Section 1.4F.)
(1) Materials requiring MTRs shall be placed in a receiving hold area apart
from other materials in order to proceed with traceable continuity. This
separation shall be maintained throughout all receiving and dispensing
activities.
(2) The responsible receiving agent shall check for receipt of accepted
certification corresponding to materials received. Materials without such
certification shall remain in the initial receiving hold areas until the
necessary accepted certification is on hand.
c. Nonconforming Materials
This section applies only to materials requiring total traceability throughout fabrication.
d. Shop Piping Fabricator shall transmit, on the same day of shipment, copies of
certified drawing packets of each shop fabrication. The number of copies and
distribution will be stated in the fabrication PO.
3.0 EXECUTION
Perform the following procedures before shipping of the piping components that require PMI (positive
material identification).
A. Manufacturer's Requirements
a. MTRs shall be originated by the prime materials manufacturer and they shall be
traceable to both the purchase order and the material itself. The documents shall
report the actual results of test in accordance with the material specification
required by the purchase order. Minimum content requirements of documents are
listed in Section 1.4.C.2.
b. CMC shall be originated by the supplier and shall be traceable to the PO.
Minimum content requirements are listed in Section 1.4.C.1 and Attachment 01 of
this specification.
A. Field Requirements
2. Field Receiving
The responsible receiving agent shall implement and maintain a Material Receiving
Control Log of certified materials throughout the performance of the contract.
(Minimum content requirements are listed in Section 1.4F.)
Power and Water Utility Co. for Jubail and Yanbu (MARAFIQ) Master Specification MQ-SP-P-5022
Project Name: Date: 31 Mar 2011
Contract Number: Page 15 of 16
Revision 1
(1) Place materials requiring manufacturer's test reports in a receiving hold area
apart from all other materials in order to proceed with traceable continuity.
Maintain this separation throughout all receiving and dispensing activities.
(2) The responsible receiving agent shall check for receipt of accepted
certification corresponding to materials received. Materials without such
certification shall remain in the initial receiving hold areas until the
necessary accepted certification is on hand.
(3) The responsible receiving agent shall examine materials with accepted
certification on hand to verify that traceable marking fully meets the
requirements of this specification and matches the accepted certification.
Place acceptable materials in receiving release areas ready for field
fabrication or installation, as the case may be.
c. Nonconforming Materials
This section applies only to materials requiring total traceability throughout field fabrication and
installation.
d. Shop Fabricator shall transmit, on the same day of shipment, copies of certified
drawing packets for each shop fabrication. Subsequent field assembly and
installation activities shall include the implementation of a procedure for recording
and maintaining documented traceable continuity through the completion of final
field installation.
4.0 ATTACHMENTS
End of Specification
Power and Water Utility Co. for Jubail and Yanbu (MARAFIQ) Master Specification MQ-SP-P-5022
Project Name: Date: 31 Mar 2011
Contract Number: Attachment 01 - Page 1 of 1
Revision 1
PIPING MATERIAL
CERTIFICATE OF COMPLIANCE
________________________________ _______________________________
________________________________ _______________________________
________________________________ _______________________________
________________________________ _______________________________
________________________________ _______________________________
Fabricator PO No.:
______________________________
(7) _______________________________________________________________________________
_______________________________________________________________________________
_______________________________________________________________________________
_______________________________________________________________________________
We certify that the above listed materials meet the requirements of the applicable material specification required by the
referenced purchase order. We further certify that all applicable heat treatment, chemical analysis, and mechanical tests
(including impact tests when applicable) required by the materials specifications were performed, and the test results are true
and correct.