Contoh Perhitungan Slope Deflection
3 EI 10 EI 2 EI
A B C D
6 m’ 2 m’
6 m’ 12 m’ 6 m’ 1,5 m’
Momen Primer
1
q. 2,4 t/m’ MFAB = - . 2,4 . 62 = - 7,2 tm.
A B 12
1
MFAB MFBA MFBA = + . 2,4 . 62 = + 7,2 tm.
12
6 m’
8t
1 8 .6 . 62
q. 1,6 t/m’ MFBC = - . 1,6 . 122 - = - 31,2 tm.
B C 12 122
1 8 .6 . 62
MFBC MFCB MFCB = + . 1,6 . 122 + = + 31,2 tm.
12 122
12 m’
7,2 t
7,2. 4 2 . 2
MFCD = - = - 6,4 tm.
C D 62
7,2. 22 . 4
MFBC MFCB MFDC = + = + 3,2 tm.
62
6 m’
2,4 t
D
MD MD = - 2,4 . 1,5 = - 3,6 tm
1,5 m’
2(3 EI )
MAB = MFAB + (B) = - 7,2 + EI B.
6
2(3 EI )
MBA = MFBA + (2 B) = + 7,2 + 2EI B.
6
2(10 EI )
MBC = MFBC + (2 B + C) = - 31,2 + 3,333EI B + 1,667EI C.
12
2(10 EI )
MCB = MFCB + (2 C + B) = + 31,2 + 3,333EI C + 1,667EI B.
12
2(2 EI )
MCD = MFCD + (2 C + D) = - 6,4 + 1,333EI C + 0,667EI D.
6
2(2 EI )
MDC = MFDC + (2 D + C) = + 3,2 + 1,333EI D + 0,667EI C.
6
Substitusi Persamaan.
5,333EI B + 1,667EI C = + 24
1,667EI B + 4,667EI C + 0,667EI D = - 24,8
0,667EI C + 1,333EI D = + 0,4
1.66
5.333 B + 7 C + 0 = 24
4.66 0.66 -
1.667 B + 6 C + 7 D = 24.8
0.66 1.33
+ 7 C + 3 D = 0.4
1.66 = 0.31
7 3
5.33 4.14 0.66 -
3 5 C + 7 D = 32.3
0.66 1.33
7 C + 3 D = 0.4
0 = 0
5.33 1.22 5.59
3 6 D = 8
4.56
D = 7
0.66 0.16 -
7 = 1 C = 8.53
4.14 7.16
5 B = 6
EI B = + 7,166
EI C = - 8,528
EI D = + 4,567