Milestone Phase Review Decision Point
A Concept Refinement Initial Technical Review Pre- MS A
A Concept Refinement Alternative System Review Pre- MS A
B Technology Development System Requirements Review MS A
C System Design Integrated Baseline Review MS B
C System Design System Functional Review MS B
C System Design Preliminary Design Review MS B
C System Design Critical Design Review MS B
C System Demonstration Test Readiness Review MS B
C System Demonstration Flight Readiness Review MS B
C System Demonstration System Verification Review MS B
C System Demonstration Functional Configuration Audit MS B
C System Demonstration Production Readiness Review MS B
Post-C Production and Deployment Operational Test Readiness Review MS C
Post-C Production and Deployment Physical Configuration Audit MS C
Post-C Production and Deployment Full Rate Production Decision Review FRP DR
Post-C Operation and Support In-Service Review FRP DR and Later
Refined reliability needs stated as broad Reliability requirements stated in system level
measures of effectiveness with thresholds and operational terms. Evaluation of the stated
objectives if possible requirements includes verifying completeness.
Alternative
System Review
Reliability drivers and risks To demonstrate that reliability cost
identification for preferred Reliability drivers and risks have been
system design documented
Integrated
Baseline
Review
Contract reliability requirements documented
(Inherent Availability, Mean Time Between
User reliability requirements translated into
Failure, Mean Time Between Removal, Mean
contractual specifications
Time Between Calendar Failure) at stated
confidence
System specification completed including
System specifications documented
reliability requirements
Initial reliability requirements allocation complete Lower level reliability allocation documented
Reliability modeling and simulation initiated for Reliability model and simulation plan
system and lower levels as required documented
Assess progress identifying and mitigating Progress review including analysis outputs
failure modes based on engineering and physics (Failure Modes and Effects Analysis, Data
based methods, analysis of manufacturing Collection Analysis and Corrective Action
variation and workmanship errors, and analysis System/Failure Reporting and Corrective Action
of failure modes chargeable to operators and System, Fault Tree Analysis, manufacturing
maintainers studies, Human Systems Integration, etc.)
Physical
Configuration
Audit
Reliability Initial Operational Test and Evaluation Operational Testing report, reliability case, risk
Sufficient reliability demonstrated to performance reviewed versus requirements management
Reliability
enter full rate production
System Initial Operational Test Reliability risks identified, mitigation plans
and Evaluation performance Reliability risk mitigation plan
Full Rate and manufacturing processes
developed, assigned, and resourced
Production maturity sufficient to begin full- Maintenance Operational Testing results
rate production Operational Testing test report
System is maintainable within evaluated against requirements and models
Maintainability
program affordability requirements
Maintainability risks documented and deemed
Risk assessment includes maintainability issues
manageable within cost estimates
Ongoing in-service reliability monitoring
Documented reliability monitoring results
including trend analysis
Reliability Review of in-service reliability
In-Service Status check of measured
Obsolescence plan completed and implemented Obsolescence plan
Review performance in actual use
Ongoing in-service maintenance monitoring
Maintainability Review of in-service maintainability Documented maintenance monitoring results
including trend analysis