BOQ
Description of work Drawing Calculation Quantity Remark
ITEM
b
b3
`
Potongan H - H
b1 = 0.20 m t1 = 0.30 m
b2 = 1.08 m L1 = 4.80 m
b3 = 1.27 m
b4 = 3.48 m
b5 = 3.72 m
b6 = 1.08 m
b7 = 1.27 m
h1 = 1.05 m
Broken back transtition h2 = 1.22 m
h3 = 1.05 m
h4 = 1.22 m
Two side section
Area = ((h1+h2)/2)xb1+((b2+b3)/2xt1+((b4+b5)/2xt1+((b6+b7)/2xt1+((h3+h4)/2xb1
= 0.23 + 0.35 + 1.08 + 0.35 + 0.23
= 2.24 x 2.00 (two side)
= 4.48 m2 4.48 m2 Type A1
Potongan D - D Floor
Area = h2 x L22 x 2
= 0.30 x 6.00 x 2
= 3.60 m2
Filet
Area = b5 x L22 x 2
= 0.21 x 6.00 x 2
= 2.55 m2
Wall
Area = (4 h1 + 2h2 ) x L22
= 8.96 x 6.00
= 53.76 m2
Protector siphon
L = 33.5 m
b = 3.12 m lubang box = 2 nos
h = 1.66 m Jumlah fillet = Lubang box x 4
b1 = 1.26 m = 8 nos
h1 = 1.26 m
Fillet = 0.00 m
area = ( b x h) - (( b1 x h1 ) x nos)
= 2.00 m2
Fillet = (0.5 x Fillet2) x Nos
= 0.00 m2
Arah Memanjang
( 2 h x L) + ( 4 h1 x L) + ( 2 b1 x L) 364.5 m2 Type A2
BOQ
Description of work Drawing Calculation Quantity Remark
ITEM
C-2.1 Form work type - A1 Culvert siphon
(without heavy support, L = 32.0 m
less than or = 1 m) n = 2 nos
R1 = 0.50 m
C-2.2 Form work type - A2 R2 = 0.63 m
(with rather heavy
supporting, 1m < h <= Keliling culvert
5m)
Keliling = (2 x 3.14 x R2 ) + ( 2 x 3.14 x R1 )
= 3.96 + 3.14
= 7.10 m
Area = keliling x L x n
Culvert siphon = 7.10 x 32.00 x 2
= 454.17 m2 454.17 m2 Type A1
b1 = 0.20 m
b2 = 0.30 m
b3 = 3.47 m
b4 = 0.15 m
b5 = 0.21 m
h1 = 1.99 m
h2 = 0.30 m
h3 = 0.15 m
Floor
Potongan I - I Area = h2 x L22 x 2
= 0.30 x 3.00 x 2
= 1.80 m2
Filet
Area = b5 x L22 x 2
= 0.21 x 3.00 x 2
= 1.27 m2
Wall
Area = (4 h1 + 2h2 ) x L22
= 8.56 x 3.00
= 25.68 m2
BOQ
Description of work Drawing Calculation Quantity Remark
ITEM
b2 = 2.18 m
b3 = 2.34 m
b4 = 0.20 m
Potongan L - L b5 = 0.00 m
d = 0.60 m
BOQ
Description of work Drawing Calculation Quantity Remark
ITEM
Flum flushing
Floor
Area = h2 x L22 x 2
= 0.20 x 5.20 x 2
= 2.08 m2
Filet
Area = b5 x L22 x 2
= 0.21 x 5.20 x 2
= 2.21 m2
Wall
Area = (4 h1 + 2h2 ) x L22
= 5.20 x 5.20
= 27.04 m2
Protector siphon
L = 9.0 m
b = 1.40 m lubang box = 1 nos
h = 1.40 m Jumlah fillet = Lubang box x 4
b1 = 1.00 m = 4 nos
h1 = 1.20 m
Fillet = 0.15 m
area = ( b x h) - (( b1 x h1 ) x nos)
= 0.76 m2
Fillet = (0.5 x Fillet2) x Nos
= 0.05 m2
Culvert flushing
Total Area x 2 ( kanan kiri)
Total Area = 1.61 m2 1.610 m2 Type A2
Arah Memanjang
( 2 h x L) + ( 4 h1 x L) + ( 2 b1 x L) 86.4 m2 Type A2
BOQ
Description of work Drawing Calculation Quantity Remark
ITEM
Flum flushing
Floor
Area = h2 x L22 x 2
= 0.20 x 4.06 x 2
= 1.62 m2
Filet
Area = b5 x L22 x 2
= 0.21 x 4.06 x 2
= 1.72 m2
Wall
Area = (4 h1 + 2h2 ) x L22
= 2.80 x 4.06
= 11.37 m2