PROJECT: CONSTRUCTION OF BATINAH EXPRESSWAY-PKG 4 FROM (KM 136+500 TO KM 187+043)

TEMPORARY MODIFICATIONS OF ROUND ABOUTS ALONG WITH HIGHWAY


BASF/FOSROC/HENKYL - GROUT_REPAIR MATERIAL APPROVAL LOG AS ON 10.11.2015
Previous Name of
Sl No. Present Name of Material Material Manufacturer Purpose Approval Details REMARKS

Grouting between
1 MasterFlow 928 Masterflow 928 T BASF single cell box culvert C.1.40.33/SO/15L333 AAN

Consultant Mentioned Micro LTO proposed through


2 MasterFlow 980 Masterflow 980 T BASF Microconcrete in CPCD concrete on drawings CPCD works letter

Bridge Bearing
3 MasterSeal 915 Masterflow 410 plus BASF Grouting C.1.40.33/SO/15L576 AAN

4 Polygrout NS _ Henkel Polybit Tie rod Hole Filling C.1.40.33/SO/14L215 AAN

5 Conbextra GP _ FOSROC Tie rod Hole Filling C.1.40.33/SO/14L256 AAN

Repair of cracks and Verbal instructions by


6 MasterEmacco S466 Emaco S66 T BASF blowholes IC 14 Bridge works consultant RE

7 Emaco S422 Emaco S22 NB BASF Tie Rod Hole Filling C.1.40.33/SO/14L008 Rejected

8 Masteroc FLC 100 Meyco Flowcable BASF Girder Grouting LTO/BEW4/PAR/439 Parsons Approved only

9 Emaco S423 _ BASF Tie Rod Hole Filling C.1.40.33/SO/14L008 Rejected

10 MasterKure 181 MASTERKURE 181 BASF Curing Compound LTO/BEW4/PARSONS/360 Parsons Approved only