Title: SOP- PRODUCT DEVELOPMENT Doc. No: SOP-EG-01 REV No: 00 Date: 25.07.2018
Control Point
Document / Format (POKA YOKE)
Sr. No. Action Responsibility Timeline
Reference
Control PY Warning PY
Design With in 2 days from
1 Issue of Sample number
Engineer receipt of sample
QP-WI-01
Design With in 7days from
2 Dismantling of Sample assembly & Creation of BOM
Engineer receipt of sample
With in 15 days from
3 Check product feasibility according to Machinery, Capacity & resources available CFT QP-WI-03
receipt of sample
With in 20 days from
4 Costing of product & sent offer to marketing including all expenses & profit HOD
receipt of sample
Design Engineer/
14 Assembly & Testing of developed product As per development plan
assembly
Design
15 Sample Submission As per development plan QP-WI-04
Engineer
PROJECT DESCRIPTION
COMPONENT
1. FAILURE HISTORY
2. PARAMETERS REVIEWED
7. RUST PREVENTIVE
8. SAMPLE APPROVAL
9. PROCESS REVIEW
10. ASSEMBLY TOOLING
12. OTHERS
Design Engineer Design Mgr. V.D. HOD (Engineering)
Document: QP-WI-05
REVISION: 0
Ref. No: DR/
Date:
10
11
12
13
14
15
16
17
18
Prepared By
EMMFORCE INC
Doc. No: SOP-EG- REV No: 00 Date: 25.07.2018
Control Point
Document / Format (POKA YOKE)
Responsibility Timeline
Reference
Control PY
Design
Engineer
Design
Engineer
HOD
Reviewed By Approved By
e: 25.07.2018
rol Point
(POKA YOKE)
Warning PY
ved By