For 40 years,
we’ve been putting
C02 in its place.
HALLIBURTON
You have CO2
challenges
safety
CO2 Storage Framework
Phase 2: Operation
In the operation phase, detailed planning, This is a short sheet
surface work, well drilling, casing and
cementing are followed by CO2 injection–
which could vary from a few years to decades.
Phase 3: Closure
This phase employs monitoring, verification
and accounting to control risks after CO2
injection ceases. At this point, all systems
are constantly monitored to ensure equipment
is functioning properly.
Phase 4: Post Closure
Closure data determine if a site no longer
requires monitoring—or needs additional
monitoring and/or remediation.
security
The industry’s leading CO2
technology
Technologies and Services
for CO2 Storage
expertise
Profiling service was then deployed to
document how the carbon dioxide affects
the aquifer.
commitment to the environment and to our customers’ • CorrosaCem NP cement – A non-Portland cement
need for engineered cementing systems has led to the and nonfoamed system that constitutes the most
development of systems that have properties that could resistant slurry systems available to the market
be expected to better endure the impact of corrosive when the desire is to eliminate carbonation and
downhole environments that are prone to changes even not just minimize the effects. Elimination of the
as the well ages and reservoir-characteristics change. Portland cement component of these systems allows
Halliburton’s corrosion-resistant engineered-cement for maximum protection in all CO2 environments.
systems are tailored to specific operator requirements Foamed versions of these systems are available as
– reservoir type, reservoir properties, temperatures, CorrosaSeal cement.
pressure, and the injected gas composition are some of
the factors to consider when selecting the ideal sealant.
Project Consulting
Challenge planning. FEL methodology aligns an operator’s
technical and business goals to create a more
How can I expand my team to ensure I have the skills
comprehensive development plan. By integrating
and experience I need to complete my project?
professionals from multiple surface and subsurface
Solution disciplines and equipping them with the industry’s
latest technology, the FEL approach increases project
With over 1,500 consultants—supported by over 5,000
definition and lowers risk to positively impact ROI.
engineers and scientists–Halliburton can provide
Halliburton’s FEL approach contains three critical
expertise and analysis in site selection, seismic data
elements: a well-defined uncertainty and optimization
analysis for determining safe CO2 storage, reservoir
framework, the industry’s best technologies for
modeling and simulations, risk analysis, design injection
integrated asset modeling, and the creation of
plans and more.
multidisciplinary teams that generate unique
Highlighted Technologies and Services project insights.
• How do I accelerate the injection rate and/or • For a cased and cemented hole application,
increase reservoir capacity for CO2 injection? CobraMax® Fracturing Service is the best process
because the proppant can be pumped down the
• How do I maximize recovery from my CO2
annulus area between casing and tubing, reducing the
enhanced oil recovery (EOR) project?
overall treating pressure and allowing for placement
Solution of high conductivity fracs for optimum CO2 injection.
Project Management
Challenges Regulatory requirements
Our Project Management teams strive to proactively
• How can I minimize non-productive time (NPT)
meet regulatory requirements, integrate Health, Safety
and lost time incidents (LTI)?
and Environment (HSE) core values into all business
• How will I manage and measure all of the resources activities and mitigate risks to enable safe, on-time and
working on the project? on-budget operations.
Solution
Solution
• Does my drilling and completion plan minimize within each formation. Our unique StrataSteer® 3D
cost and maximize injectivity? Geosteering Service employs proprietary software and
• How do I ensure I comply with local regulations innovative downhole tools to place wells in the
on the use of CO2 resistant construction materials? optimal formation.
• Who can I trust to help refine and execute my
• Course corrections can be made while drilling with
drilling and completion plan during construction
Halliburton’s rotary steerable systems (such as the
and operation?
Geo-Pilot® system), to place the well in the right
Solution location for CO2 injection in to the reservoir.
• This technology suite can also be tied directly to real- • Multilateral systems with complex insertion
time measurement-while-drilling (MWD) and architecture for increased CO2 injection rates
logging-while-drilling (LWD) data feeds, supporting and storage capacity.
accurate/real-time well path positioning, engineering
• CO2 resistant expandable liner hangers are available
analysis and updating of the earth model.
in chrome alloys. They provide the following benefits
• Efficient and cost effective sequestration begins in CO2 wells:
with optimal placement of the injection wells. · Ability to deploy liners to depth.
Halliburton’s LWD sensors provide the sub-surface · Gas tight seal at top of liner.
team with a detailed view of the position of the bit
· PermSeal® sealant treatments can seal CO2 Laboratory testing results demonstrate the superior penetration
formations and leak pathways in nano perm zones. capabilities and performance of the H2 Zero™ system.
· PermTrol™ sealant treatments seal or restrict flow
deep into formations that have leaks.
· WaterWeb® service treatments reduce the relative
permeability of leaking formations to restrict flow
of leaking fluids.
· CorrosaCem™ Cement Systems are CO2 resistant
cements used when cement squeezes and plugs are
best for sealing.
· In the event that there is a leak in a confining
zone far away from existing wells, a lateral must be
drilled from a nearby well to intersect the leak TEST 1 was run with a typical chromium-based polymer
and then cement or chemical sealants can be system. Penetration was about 0.5-feet and regained
injected to seal the leak. permeability about 0.28%.
H07082 09/2009