INSTRUMENT AIR
2"-0370-AI-04801-G1E1A
8861 M6-0370-00048
ATM
KC E
NOTE 3 06328
A A
HS
0006
I M
P/R
S
KV
06328
0370-FAC-0006
B B
0370-DCB-0004
FINAL MOLY DRYER
0370-DRE-0001
DIRECT CONNECTION (CHUTE)
8050 M6-0370-00022
0370-STP-0386
as confidential. This document is confided to the recipient only for this information and
orientation. It may be neither be copied, reproduced or read by any other third party
nor used for any other purpose than designated whitout previous written consent of
The entire content of this document is property of BECHTEL, and must be treated
C
BECHTEL. All copies or extracts to be treated in the same manner.
0370-BNS-0002
I M M
E
0370-VBB-0001 & 0007
para su informacion y orientacion. No puede ser copiado, reproducido, leido por terceros
0370-VBB-0001
tratado confidencialmente. Este documento es confiado a quien lo recibe solamente
ni usado para otro proposito que el indicado sin la aprobacion escrita de BECHTEL.
2 x 1.6 kW (A)
DRYER DISCHARGE CHUTE.
s.s
0370-FAC-0039
Todas las copias o extractos deben ser tratados en igual forma.
0370-CVB-0023 0370-DCB-0004
MOLY LOADOUT SLAT CONVEYOR DUST COLLECTOR FOR MOLY
BAGS FILLING PLANT
44 m² area MOLY NOTE 2
MOLY MOLY
1 0370-ZMA-0001 BAGS TO MOLY
1 STORAGE AREA
PANEL CONTROL M
0370-ZMA-0001 0370-BNS-0002
DISPENSER AND WEIGHING SYSTEM MOLY CONCENTRATE
15 tph Cap. LOADOUT BIN WI WT WE 0370-CVB-0023
(with load cells and table 20 Tonnes M M SLOP
06327 06327 06327 1.4 % E
F
vibrator). c.s., construction E
s.s lined. WQI
IA
06327
BECHTEL CHILE
POR POR
SB TM TM VL XSTRATA FECHA
CLIENTE
0 28 Mar 13 ISSUED FOR CONSTRUCTION CHEQUEO
T.MATHI
SUPV.
E T.MATHI 21-MAR-13 MOLY PLANT
GN
POR DISC.
C 05 Jun 12 ISSUED FOR HAZOP SB BS PKM VL
MOLY CONCENTRATE LOADOUT
F25635-D.dgn - Tamaño 34"x22"
ING. PROYECTO.
S I V.LOOTHRA
ING. PROYECTO V.LOOTHRA 28-MAR-13
B 10 Jan 12 ISSUED FOR APPROVAL SB BS PKM VL MOLY CONCENTRATE STORAGE AND LOADOUT M5-0370-01010 GTE. INGENIERIA GTE. INGENIERIA P&ID
28-MAR-13
A 17 Jun 11 ISSUED FOR REVIEW SM TM PKM VL MOLY PLANT OVERALL PREOCESS FLOW DIAGRAM M5-0370-01001 PLANO BECHTEL N° PLANO CLIENTE N° REV.
1
Job No. 25635
Rev.
N°
FECHA REVISION POR CHEQ. SUPV.
ING.
PROY.
CLIENTE PLANOS REFERENCIA NUMERO NOTAS 25635-220-M6-0370-00021 1
C Copyright Bechtel Corporation 2013. All rights reserved. Contains confidential information proprietary to Bechtel not to be disclosed to third parties without Bechtel's prior written permission. C Se prohibe la reproduccion parcial o total de este documento sin la expresa autorizacion de Bechtel Corporation.
FECHA: 8/28/2013 HORA: 12:08:13 PM USUARIO: SBANDA
1 2 3 4 5 6 7 8 ARCHIVO: