MACHINE ROOMLESS

COUNTERWEIGTH SIDE-DROP COUNTERWEIGHT BACK-DROP

DETAIL [A] DETAIL [B] DETAIL [A]&[C] DETAIL [B]

DETAIL [C] DETAIL [D] DETAIL [D] DETAIL [E]


VIEW A VIEW B VIEW C VIEW D

CAR PLAN VIEW CAR CEILING VIEW

MCOP

CAR OPERATING PANEL

LANDING OPERATING PANEL

G
MACHINE ROOMLESS SHAFT VERTICAL SECTION
COUNTERWEIGHT SIDE-DROP

SHAFT VERTICAL SECTION


OVERHEAD DETAIL
PIT DETAIL

DETAIL [H]
SOFFIT
DETAIL [L] OVERHEAD HEIGHT ???
F.F.L.

Technical requirements
1. The shaft in this drawing is concrete construction, the concrete wall should be firm, the compressive strength should not be less
than 24 MPa, if the shaft is brick construction, one ring beam for each two stops, and make a single ring beam on the side of the
wall 2400mm from the ground to install landing doors.
2. To furnish a properly framed and constructed legal hoistway with a tolerance of 25.4mm (or 1 inch) including all emergency
exit doors in the blind portion of the hoistway and where necessary its extension above the roof. The hoistway shall be stripped to
minimize the accumulation and circulation of dust. (By Others)
3. To furnish a lift pit of proper legal depth below the lowest landing with suitable drains, waterproofing and electrical outlet.
Tie-down beams (if required). (By Others)
4. More concrete technical requirements for elevator construction refer to EN81 Safety rules for the construction and installation of
lifts, or consult to our company.
5. This drawing is suitable for the MRL passenger lift with rated capacity 1025kg, traction ratio 2:1.
MACHINE ROOMLESS SHAFT VERTICAL SECTION
COUNTERWEIGHT BACK-DROP

SHAFT LIGHTING INTERVAL DISTANCE 6000


GUIDE RAIL BRACKET INTERVAL DISTANCE 2000

SHAFT VERTICAL SECTION


??? ??? ???

OVERHEAD DETAIL
PIT DETAIL

DETAIL [H]
SOFFIT
OVERHEAD HEIGHT ???
DETAIL [L]
F.F.L.

Technical requirements
1. The shaft in this drawing is concrete construction, the concrete wall should be firm, the compressive strength should not be less
than 24 MPa, if the shaft is brick construction, one ring beam for each two stops, and make a single ring beam on the side of the
wall 2400mm from the ground to install landing doors.
2. To furnish a properly framed and constructed legal hoistway with a tolerance of 25.4mm (or 1 inch) including all emergency
exit doors in the blind portion of the hoistway and where necessary its extension above the roof. The hoistway shall be stripped to
minimize the accumulation and circulation of dust. (By Others)
3. To furnish a lift pit of proper legal depth below the lowest landing with suitable drains, waterproofing and electrical outlet.
Tie-down beams (if required). (By Others)
4. More concrete technical requirements for elevator construction refer to EN81 Safety rules for the construction and installation of
lifts, or consult to our company.
5. This drawing is suitable for the MRL passenger lift with rated capacity 1025kg, traction ratio 2:1.