2nd floor level slab completed and 3rd floor level slab is in progress.
Physical Status as on date 02/01/2020
Admin Block (G+3+4) Built up area 29814 Sqm.
29814 Sqm
BBBuiltip
(G+3+4)
RCC raft complete and column upto plinth level casting in progress. (80%).
CONSTRUCTION OF PERMANENT CAMPUS (PHASE I WORKS) OF
IIM RANCHI, JHARKHAND.
Green room slab casing complete and +6600mm level slab shuttering and reinforcement laying
work in progress.
CONSTRUCTION OF PERMANENT CAMPUS (PHASE I WORKS) OF
IIM RANCHI, JHARKHAND.
RCC and Brick work of ground floor completed and ground floor plaster and brick work 1st floor is in progress.
CONSTRUCTION OF PERMANENT CAMPUS (PHASE I WORKS) OF
IIM RANCHI, JHARKHAND.
Grade slab is in progress (60%) and 1st floor level slab shuttering is in progress.
CONSTRUCTION OF PERMANENT CAMPUS (PHASE I WORKS) OF
IIM RANCHI, JHARKHAND.
Plinth beam and grade slab completed and 1st floor level slab shuttering is in progress.
CONSTRUCTION OF PERMANENT CAMPUS (PHASE I WORKS) OF
IIM RANCHI, JHARKHAND.