Professional Documents
Culture Documents
O.H.W.T As Built Drawings
O.H.W.T As Built Drawings
LIST OF DRAWINGS
NUMBERS OF TITLE OF
DRAWINGS DRAWINGS
1. GENERAL NOTES
2. TYP ELEVATION
3. FRONT ELEVATION
4. WALL & FOUNDATION PLAN
5. WALL REINF. PLAN
6. BOTT. SLAB REINF. PLAN
7. TOP SLAB REINF. PLAN
8. COLUMN DETAIL
GENERAL NOTES
1. ALL DIMENSIONS TO BE READ NOT TON BE MEASURED.
2. ALL STRUCTURAL DRAWINGS SHOULD BE READ IN CONJUCTION WITH ARCHITECTURAL DRAWS.
3. MINIMUM CLEAR DISTANCE BETWEEN THE LAYERED BARS SHALL BE ONE INCH OR DIAMETER OF BAR,
WHICHEVER IS GREATER.
4. ONE INCH DIAMETER SPACER BAR SHALL BE USED BETWEEN TWO ROWS OF STEEL BAR IN BEAMS.
5. LAP SPLICE FOR COLUMNS SHALL BE PROVIDED IN THE CENTER OF COLUMN AS FOR DETAIL GIVEN IN
THE DRAWING.
6. LAP SPLICE FOR BEAM SHALL BE PROVIDED AT APPROXIMATELY 41 OF THE SPAN LENGTH OF BEAM
AS PER DETAIL GIVEN IN THE DRAWING.
7. ALL LAPS ARE 60 TIMES db WITH STIRRUPS/ TIES SPACING 8". TIES / STIRRUPS IN BEAMS COLUMNS & LINTEL
8. ALL LAYOUT, CONFIGURATION, DIMENSION & LEVELS SHALL BE VERIFIED BEFORE PROCEEDING WITH THE WORK.
9. ALL REINFORCEMENT BARS SHALL BE HELD FIRMLY IN PLACE BEFORE PROCEEDING WITH THE WORK.
10. CEMENT FROM DIFFERENT SOURCES SHALL NOT BE MIXED FOR ALL STRUCTURES.
11. COARSE SAND FROM APPROVED QUARRIES / SOURCES SHALL BE USED.
12. WELL GRADED CRUSHED STONE FROM APPROVED QUARRIES / SOURCES SHALL BE 34" TO ALL RCC WORK.
DESIGN DATA
1. BASE DESIGN CODE FOR THE BUILDING ARE ACI318-08 SPECIFICATION, UBC 97.
2. THE STRUCTURAL DESIGN CONFORM TO THE REQUIREMENTS OF SEISMIC ZONE 2B ONLY.
3. THE CYLINDER COMPRESSIVE STRENGTH OF ALL CONCRETE SHOULD BE 3000 PSI AT 28 DAYS. APPROVAL STATUS
4. ALL MAIN & TRANSVERSE / STIRRUPS REINFORCEMENT ARE GRADE 60 DEFORMED BAR ASTM A615 WITH WEIGHT 3
5. FOR SOIL HAVING BERING CAPACITY LESS THAN 0.75 TSF, LOOSE STRATA, WATER LOGG etc. THESE DRAWINGS / DESIGN
IS NOT APPLICABLE & REDESIGNING OF THE STRUCTURE RECOMMENDED. REVISION
6. POSITION OF BARS IN BEAMS SHALL BE ADJUSTED KEEPING IN VIEW THE POSITION OF VERTICAL BARS OF THE COLUMNS.
7. BARS IN BEAMS SHALL BE JOGGLED IN VERTICAL PLANE FOR LAPS & SHALL BE STAGGER.
8. BARS IN COLUMNS SHALL BE JOGGLED FOR LAPS WITH STARTER BAR.
9. STIRRUPS SHALL BE PLACED IN SUCH A WAY THAT THEIR HOOKS SHALL BE STAGGERED AN LOCATED IN COMPRESSION FACE.
10. ADEQUATE SHORTING & SUPPORTS TO THE SIDES OF ALL EXCAVATION SHALL BE SUPPLIED & ERECTED WHERE REQUIRED TO
TO SAFE GUARD WORKMEN & PROTECT ANY ADJACENT STRUCTURE.
11. WHILE BACK FILLING OF EXCAVATION FOR FOOTINGS COMPACTION SHALL BE DONE IN LAYER .
PROJECT DESCRIPTION:
Date
REV.
DRAWING TITLE DRAWING NO#
APPROVAL STATUS
REVISION
NSL
PROJECT DESCRIPTION:
Date
REV.
APPROVAL STATUS
OUTLET PIPE
REVISION
PROJECT DESCRIPTION:
Yasir Iqbal
CHECKED BY
Engr.Zahid Khan
Date
REV.
10'-6" 4'
4'
10'-6" 3
APPROVAL STATUS
REVISION
PROJECT DESCRIPTION:
Date
REV.
FOR GENERAL NOTES REFER SH-01 WALL & FOUNDATION PLAN SH-04
NOTES
12'
#4@6"cc
#4@9"cc
12' #4@6"cc #4@6"cc
3
APPROVAL STATUS
REVISION
#4@9"cc
#4@6"cc
PROJECT DESCRIPTION:
Date
REV.
12'
#4@6" #4@6"
#4@6"
#4@6" REVISION
PROJECT DESCRIPTION:
Date
REV.
FOR GENERAL NOTES REFER SH-01 BOTT. SLAB REINF. PLAN SH-06
NOTES
12'
#4@6"
REVISION
#4@6"
PROJECT DESCRIPTION:
Date
REV.
FOR GENERAL NOTES REFER SH-01 TOP SLAB REINF. PLAN SH-07
NOTES
RCC
COLUMN
18"X18"
G.L
APPROVAL STATUS
1.5" COVER 0
#3@8"cc
8-#6 REVISION
#3@8"cc
#4@6"c/c
PROJECT DESCRIPTION:
#4@6"c/c
STRUCTURAL DRAWING CHECKED BY
Date
REV.