Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 7

CURRICULUM VITAE

DEBASISH GHOSH
S/O—BENI MADHAB GHOSH (Govt.POST MASTER)
PS—BELONIA .VILL+PO—KRISHNANAGAR. DIST — SOUTH TRIPURA.
STATE — TRIPURA , PIN—799156 (INDIA)
Mob-- ® 0091-8415810795, 08974652132
E-Mail- debasishghosh_1984@yahoo.com
Career Objective - To pursure a challenging carrier with a significant role in a dynamic and
progressive organization contributing towards the growth of company and myself, using my
analytical, technical, skills and leadership qualities.
Position Applied –QC Multi Discipline Inspector.(Mechanical
inspector/Engineer)
TOTAL WORK EXPERIENCE 10 YEARS (Gulf-6 years India -4 years)
Career Profile-Summary
Duration
Name of organization Designation
From To
M/s DESEIN PVT
LTD,INDIA(power plant project) Mar 2014 Aug 2015 QC Welding & Painting inspector

M/s Madina Group of company QC Welding & Painting inspector


QATAR ,DOHA Dec 2013 Feb 2014
(DOLPHIN Offshore )
M/s GS ENGINEERING AND
QC supervisor
CONSTRUCTION(EPC)OMAN Jun 2010 Aug 2013
(power plant project) (Welding/painting/Piping/Equipment)
M/s RBG QATAR(RAS LAFFAN)
Piping INSPECTOR
(piping & tank/LNG Maintenance- Jan2010 May2010
shut down
Train-1,2,4,6,Akg-1 )
M/S AL-MUTAWA SAMYONG
3rd Party Inspector(ON CALL BASIS)
INSPECTION COMPANY, Dec 2007 Jan 2010
(welding/piping)
(AMSYCO)(SAUDI ARABIA)
M/s ESSAR CONSTRUCTION
PVT LTD (pipe line project) May 2005 Nov 2007 QC Inspector

PROJECT : AGTP combined cycle Extension Project 4x23+10% agartala


OWNER :NORTH EASTERN ELECTRIC POWER CORPORATION LTD
OWNER’S ENGINEER: DESEIN PVT LTD
CONTRACTOR : Thermax power Division
Position : Multi dicipline INSPECTOR (WELDING & PAINTING)OWNER’S ENGINEER
Duration : Mar- 2014 TO Aug -2015
Duties and Responsibilities: Review previous inspection history, job packs, drawings, specifications,
inspection plans and repair plans prior to inspection of equipment.
• Carry out inspection of equipment in accordance with the specified plans and inspection procedures.
Carry out pipeline inspection, pipe laying, support installation,welding,hydrotest.
• Assess equipment condition and report with repair recommendation based on code and procedural
requirements.
• Inspection of HRSG ,boiler and heat exchanger ,& installation as per the FQP.
• Preparation of WPS and WQT & carry out welding activities.
• Attend the mom and discuse progress report and daily activity as per plan
• Coordinate with the NDT coordinator and NDT technicians to get the NDT done and Cary out coating
inspection, coating contractor to get the coating done as per plan.
• carry out welding inspection and Review the NDT reports and findings and field verify as.
• Witness and certify the equipment pressure test, repairs and certify the equipment for its indented
operation, and Submit detailed inspection and repair reports.
•Report to HOD & QC Manager.
• Shall be capable of making decisions on repairs as per code requirements and handle NDT Techs working
under him and able to guide them during the inspection activities. • Managed inspection services for piping
under ASME B31.3, storage tanks under API-653 and vessels under API-510 and ASME code.
• Responsible for designing and construction of large, welded, field-erected low-pressure carbon steel
aboveground storage tanks (including flat-bottom tanks) with a single vertical axis of revolution under API
620 code,Coating and lining inspection in Storage tanks
. • Inspection of installation of Poly propylene (3LPP) Heat Shrink Sleeves of Canusa-CPS (GTS-PP-
Wrapid sleeve) on girth-welded joints of main oil transfer lines and CanusaTube on Gas injection pipelines.
• Inspection of the coating integrity by portable High voltage DC holiday detector (SPY-Model 790).
• Inspection of coating adhesion by peel strength test.
• Inspection of the encapsulation integrity of the Cathodic Protected area by portable High voltage DC
holiday detector (SPY-Model 790).
• Inspection of the coating integrity of mainline and field joint coating before lowering the pipelines to the
trench.
• Reviewing daily coating reports, Holiday detection report, Adhesion test report etc. Carryout various pipe
line project line inspection/testing/insulation coating/painting works.
•Inspecting & ensuring the proper way of abrasive and coating material storage & usage.
•Familiar with the methods & usage of testing instruments such as Testex surface profile gauge with testex tape, limpet
gauge, hypodermic needle gauge, WFT & DFT gauge= (comb gauge & banana gauge) and holiday detector etc.
Witnessing holiday testing and lowering of U/G pipeline.
•Review of client's specification, purchase orders, work procedures, inspection plans & implementing in the inspection
processes.
•Overhauled and re-commissioned 6 ton capacity fire tube boiler,Daily log entry for weather condition and calibration
of measuring devices.
•Assessing pre-blast and post blast condition of substrate prior to painting application.
•Ensuring surface preparation complies with visual standard and coating complies with the project specification.
Witness surface preparation, salt test, moisture content test, sealer-filler-subsequent coat applications for LPG
containment concrete tanks’.
•Verification of insulation materials such as Poly Isocynurate (PIR), Polyurethane foam (PUF), Foam glass, Glass
wool, Rock wool boards, Reinforcement cloth, Filament tape, Butyl rubber, Stainless steel bands, Clips, Rivets,
Cladding sheets, Primary & secondary
PROJECT –FMP-528 Hydraulic Tubing Replacement DOHA DOLPHIN 1 &2 OFFSHORE PROJECT
CLIENT: Dolphin Energy LTD
Company Name: MADINA GROUP OF COMPANY
Position : QC INSPECTOR (WELDING & PAINTING)
Duration Dec- 2013 TO Feb -2014
Duties and Responsibilities:Report to site QC Manager.
 Attend the meeting talk to client & customer solution the problem as per the requirement.
 Directly responsible for performing this activity. Prepare inspection reports, Perform visual and
dimensional inspection of materials before fit-up and welding.
 Carry out daily activity,and all welding & painting inspection activity as per the procedure.
 Package preparation and done the activity as per the FQP.
 Carryout daily activity status & planning to daily inspection update and completion.
 Responsible for stage wise painting / coating inspection.
 Check Surface preparation, DFT, as per the requirement.
 Follow the FQP as per the client requirement/specification.
 Perform NDT test as per the requirement.
Site : BARKA, OMAN (IWPP-3) POWER PLANT PROJECT
OWNER : AL SUWADI POWER COMPANY SAOC
OWNERS ENGINEER: TRACTEBEL ENGINEERING
CONTRACTOR: The consortium of SIEMENS & GS E&C
Position : QC SUPERVISOR (EPC CONTRACTOR)
Duration Jun 2010 TO Aug -2013
Duties and Responsibilities:Manage the service for the client achive excellences in prevention maintain
follow code, standard Quality Procedure.
 Report to site QA/QC Manager.
 Directly responsible for performing this activity.
 Shells generate suitable report forms/Quality records.
 Report to project manager at site and HOD QA/QC at registered office.
 Prepare inspection reports, NCR, technical queries, weekly QA/QC reports and monthly production and
repairing status.
 Inspect lines in accordance with P & ID & isometric drawing for mechanical clearance.
 Manpower management and review interim and final documentation,
Supervise the Quality Control functions/activities of a project or its parts, including quality control inspection
schedules and the collection of quality records. Review and approval of production work packs and punching
outstanding items Review and approval of production test packs and punching outstanding points
 Execute the specific inspections on materials, equipments and construction/installation activities on
site.
 Perform visual and dimensional inspection of materials before fit-up and welding.
 Check isometric drawing for correct revisions (AFC) and spool fabrication.
 Check consumables-type, condition, size (filler, gas, etc). Perform in-process inspection.
 Conducting Weld Audit periodically to ensure the quality of the welding activity, Maintaining records of
all welders and ensures their qualification continuity.
 Continuously monitoring the performance of the welders. Carrying out the welding inspection before,
during and after welding operation as per approved test plan, relevant Engineering drawing,
international standard and project specification.
 Material inspection for incoming materials & Review of material certificates to check compliance to
project specifications.
 Knowledge of Storage tank inspection (FUEL OIL/SERVICE WATER/BWRO TANK /RFWT/FWT/CRUD
OIL TANK INSPECTION VARIOUS ACTIVITY Follow the PROCEDURE of TANK CALIBRATION, Step
wise(ITP) inspector will carry out the inspection & experienced and well versed with the codes API-
653, Reviewed and revised thousands of vessel and tank designs and drawings.
 Modified tank inspection and maintenance & Tank-age inspections and environmental audits at all
project refineries.
 Recommend to alteration work on a tank involving cutting, burning, heating operation that changes the
physical dimensions/or configuration of a tank. Observe the corrosion rate, break over point and
atmospheric pressure while inspecting the Tank. Perform tank inspection, repairing alteration and
reconstruction depending on the situation.
 Responsible for tank erection activities.
 Check fit up ,and gap, verify filler wire/electrode ,wps as per the procedure or not.
 Checked the dimensions by drawing while assembling the roof plates.
 Performed vacuum testing and water filling testing.
 Carryout Hydrostatic Test, Pneumatic Test, Leak Test & Flushing.
 Hydro test package review, test pressure decision, as per the code, piping progress report weld status,
work status, check calibration certificate.
 Knowledge of combined cycle, piping line installation.
To witness NDT & PWHT after NDT inspection and Final documentation for the clients review.
 Knowledge of Heat Recovery Steam Generator (HRSG)WELDING/PIPING Works
 Control of welding process as per applicable WPS & PQR requirements. Have been experienced and
well versed with the codes like ASME Section-II, V.VIII.IX, ASME-B31.1/31.3, AWS-D1.1, API-1104, API-
620, API-650, API-510, ISO5817, API5L etc.
 Knowledge of underground pipe line HDPE Pipe lying & inspection.
 As a good experience of power plant project revised ITP/FQP.Quality Plan, ECC Procedure & Siemens
policy.
 72’’dia circulating water line installation(intake area)and feed water line 8 inch dia 16inch dia HP Line
and 24 inch dia Lp line and 18 inch dia ip line installation and carry out inspection as per the code and
standard and project specification.
 Future Pipes Industries is a part of manufacturing plants member of the Future Pipes Group
manufacturer of high performance, anti-corrosive Fiberglass pipe systems.
 Plan and supervise installation, testing and commissioning of (GRE, GRP, and GRV) pipes and fittings
and ensure that it has carried out as per standard procedure, Inspection Test Plan (ITP).Provide
training to personnel that will perform the installation
Ensure that appropriate instruction derived from the documents are given to the personnel who will
execute the job. Ensure that all safety precaution were given while executing the job.
 Receives all controlled documents such as isometric drawings, method statements, site quality plan and
inspection test plan
 Perform site inspection along with the client QC Inspector and report to the Head Department
Responsible for all GRE/GRP installation as per client specification and site quality plan
 INSPECTION OF GRP/GRE PIPE INSPECTION (ABOVE GROUND & UNDERGROUND),CHECK LAMINATION
OF PIPE , MATERIAL PROPERTIES TYPE OF RESIN,THICKNESS CALCULATION,CHECK FIBERGLASS
HANDLING THE MATERIALS ,AS PER CODE STANDARD, CHECK PIPE DEFLECTION AS PER CODE
APPLICABE OR NOT , HARDNESS TEST PROCEDURE FOLLOW UP THE PLAN .& HYDRO TEST ,& START
THE COMMISSIONING
 Prepare data book upon completion of jobs, Knowledge of Fire Fighting C02 System/Hydrant
System/FM200/Sprinkler System & Door fan test.
 Knowledge of HVAC Installation Procedure & Inspection.
 Different type of coating systems like Zinc silicates, Zinc rich epoxies, pure epoxies, Glass flake epoxies,
Glass flake Vinyl esters, Poly urethanes, 3 Layer Polypropylene (3LPP) heat shrink sleeves.
 Blasting and painting inspection in Piping, coating inspection in Pipelines and coating & lining inspections in
Storage tanks in Oil and gas new construction.
 Responsible for stage wise painting / coating inspection.
 Undertake QC painting / coating activities in the work place for daily basis.
 Monitor weather condition for surface preparation and painting / coating application.
 Hot dip galvanizing coating inspection in galvanizing plant.
 Execute Painting / coating inspection work as per company / project inspection test plan.
 To check and monitor all painting / coating related works and ensure all final products meet in
accordance with company procedure, client requirement and international codes.
 Responsible for incoming coating / painting material inspection and has to ensure whether these
materials suits to meets the requirements of project specifications.
 Prepare all necessary QA / QC painting / coating documents and handed over to clients review.
 Verify dft, wft as per project specification.
 Review of calibration status.
 To undertake test qualifications for spray painters, brush painter’s hydro blasters & abrasive blasters.
 Co-ordinate with the paint manufacturer technical representative on daily basis. Blasting, painting, fire
proofing, Thermal spray aluminum and insulation activities are strictly in compliance with project/
client requirements and paint manufacturer recommended procedure.
 Approved procedure is available prior to commencement of work.
 Ensure compliance of all personnel safety procedures and painting application practice.
 Equipments is in good condition and meet the specification requirements.
 All approved paint product and solvent provided with product technical data and material safety
data sheet (MSDS) .
 All materials and equipment that require protection from grit blast and paint over-spray mist are
suitably protected i.e. stainless steel, level gauges, compressor intakes.
 Paint inspections are performed with approved inspection tools and that the tools used in
accordance with the accepted inspection practices.
 Surface inspection of all lines for insulation as per isometric drawing.
 Check the paint report of all lines for insulation for assurance that the line is already hydro tested
and accepted by client before proceeding to insulation works.

Client–Ras Gas Qatar( site-Ras Laffan)


Contractor- Salam RBG Qatar
12’’ dia, 8’’dia, 16’’dia32’’1/2’’3/4’’1’’ pipe and tube replacement work (shut down)
Position-piping inspector
Duration-jan2010-may2010
Career Profile-AL-MUTAWA SAMYONG INSPECTION CO.(AMSYCO) 3RD PARTY
INSPECTION SERVICES
LOCATION – SAUDI ARABIA
PROJECT NAME –MARAFIQ/SAUDI KAYAN/NCP/VENDOR INSPECTION ON CALL BASIS
Duties and Responsibilities:Inspection carried out as per standards and code,
 Ensure that all job has been done as per client and drawing than proceed inspection activities.
 Inspection carryout on piping, Vessel pressure, valve fitting and vender supply equipment inspection.
(piping/welding/equipments)
 Verify daily welding production reports and ensure compliance to NDT requirements & Maintained
record of inspection and testing.
 Prepared inspection release report.Attending Daily/Weekly/Monthly meeting with client to clarify all
technical issued.
 All job activities proceed with full safety attention to prevent any job interruptions.
 Review of Inspection & Test Plan, Material verification, all stages of inspection, Dimensional inspection,
and Welding inspection.
 Inspection of raw material as per procurement order (P.O.) and reviewing of mill test certificate (MTC)
and related procurement documents for traceability and conformance to mechanical /Chemical
properties in accordance with applicable Codes & standard like ASTM, ASME, AWS, BS, AND API, etc.
 Fit-up Inspection Diamention Inspection of the fit-ups in the in-process stage with respect to visual,
dimensional and orientation compliance as per the approved drawings and specifications.
 Perform non destructive test or hardness test (if necessary) and analyze findings & raise report where
necessary.
 Perform initial inspection and raise report.
 Raise NCR (non conformance report) and submit to immediate supervisor.
 Interact with customers and attend to their needs and Files update all quality records in the
department.
 Review and approval of production test packs and punching outstanding points
 Execute the specific inspections on materials, equipments and construction/installation activities on
site.
 Perform functional checks and mechanical completion checks.
 Hydrostatic Test, Pneumatic Test, Leak Test & Flushing Inspection.
Level & Plumpness/Verticality Checks (able to take reading via auto-level & theodolite).
 Pump/Motor Alignment Inspection with having experience also on compressors & turbines.
 Knowledge of work with Marafiq IWPP power plant project /Saudi kayan/NCP Project.
 Inspection Test Plan according to Client’s requirements & etc…
 Provided me with the understanding and knowledge required in implementing project Quality.
 Responsible for assisting the site QC manager for implementation of approved Quality plan,
procedures inspection testing plans, ensuring the clients requirement at the job site.
 Prepare, review of inspection testing plan, check list, test packages as required by the client.
Ensure and liaise with Construction for adherence of the preventive and proactive calls at the job
site to avoid potential non Conformities. Quality Records are up to date everyday wise. Maintain
quality records and ensure those produced are collected and compiled into records. Preparation
document and submit to the client the QC Weekly Look ahead. Review of all QC inspectors reports.
Coordinate with third party Inspection agencies / Inspectors as required. RFI to review, issued to
the client and controlled & Supervise & monitor activities of all QC Inspectors.
CLIENT -M/s Hindustan Petroleum Co. Ltd
ESSAR CONSTRUCTION LTD (CONTRACTOR )
MUNDRA—DELHI PIPE LINE PROJECT 18”DIA, 164 km Spread –I
Duration: May2005-Feb2006
CLIENT: M/s GAIL
Owner’s Engineer-- Tractebel Engineering/GLI/S.G.S
CONTRACTOR: DQE-Essar Construction Limited Consortium
DAHEJ--- URAN PIPE LINE PROJECT 30” DIA 150 km
Duration: Mar2006-Nov2007
Duties and Responsibilities: carryout of pipe laying & piping inspection.
 Check fit up & welding(after,before,during) operation as per approved test plan, relevant engineering
drawing, international standard and project specification
 Knowledge of code api-1104. & pipe line project specification.
 Knowledge of pig test. Knowledge of stress check.
 Arranging (NDT) preventive maintenance progress upon schedule and responsible for the proper
inspection request. Verify that the NDT and tests have been carried out as per request review of QA/QC
part of final documentations.
 Preparation of the Test packs for Hydro testing & Punch and Maintain inspection documentations and
prepare inspection reports, correspondence and other written materials.
 Coordinate of radiographic work requirement for any particular task and verifying the interpretation of
radiographic films.
 Perform proper NDE method on finished weld on steel fabrication and piping, pipeline tie-in and
insulation, existing gas plant installation.
 Inspection of the fit up in the in-process stage with respect of visual, dimensional and orientation
compliance as per the approved drawings and specifications.
 Review of Inspection & Test Plan, Material verification, all stages of inspection, welding inspection.
 Carryout Material & Welding consumable inspection and follow Documentation of quality records as
per ISO Standards.
 Perform functional checks and Mechanical completion checks.
 Verify special process and the relevant workers qualifications. Coordinate in conducting Quality Audits,
finding the Non conformities and suggesting corrective action to resolve.
 Inspection Test Plan according to client’s requirements and as per procedure.
 Preparing the progress schedule and reports and Identify the material (pipes, flanges, fittings etc) as
per the material take off list and isometric drawings during the fabrication. Supervision of construction,
installation and erection of pipeline jobs.
 Review of contractor's WPS/PQRs prior to start of welding activities.
 Check edge preparation and fit-ups to verify that fit-up is within tolerance.
 Preliminary welding inspection activities (fit-up, root pass, intermediate, and hot pass, materials trace
ability, dimensional checking and orientations of piping components).
 Check and assure that all joints are exposed for examination during pressure test.
 Check vents are open when filling and draining lines.
 Confirm repairs re-testing and re-inspection accordance to specification.
 Over all co-ordination with piping QC team.
 Internal inspection of fit-up, welding of pipeline, joint check up of pipeline using P&ID and Isometric
Drawings.
 Taking joint measurement of work done along with the clients / contractors and preparation of
necessary certificate.
 Attending the Progress meeting with client and discussing about the work schedule.
 Maintaining the material stock require.
 Controlling the quality of the works as per given standard, drawings and Inspection and Test Plan.
 Ensure blinds are removed and correct gaskets are installed.
 Verify that Control Valves and other items that were removed for the tests are replaced.
 Review drawing and specification, responsible for material take-off, withdrawing, and controlling the
material, raising construction technical query whatever engineering problem. Making field
modification report whatever changes or revision on the drawing, Raising field inspection report
whatever problem on the line, make and submit daily progress report, push and motivate people to
attain productivity schedule, checking and distribute work activities.
 Study all isometric drawings approved for construction prior to distribution to different areas of work
for sub-contractors to undergo.
 Responsible for the fabrication and construction of pipes to its exact location I area as per ISO
drawing.
 Monitors the daily and weekly accomplishment of sub-contractors whether or not they have
performed ahead of schedule.
 Attends regular weekly meetings with superiors, owner and sub-contractors to whatsoever
discussions may arise involving safe.
Technical Skills & Expertise
Familiar with EPC, ASNT,API-510 ,AWS CWI,Tank ,ISO NACE,BGAS,QMS,Corrosion, ASTM, ASME
Section II, V, VIII, IX, ASME B 31.1, B31.3, API 5L, API 650/653/570-1104. Codes and standards.
Conversant with ISO_9001:2000 well versed with P & ID, Isometric Drawings, Knowledge of welding
symbols and geometry.
Educational Qualification
Passed SSLC from Board of TBSE with 45% marks in2000
Passed Pre-Degree in (HSC) from TBSE with 46% marks in2002
Passed Diploma in Mechanical Engineering (3 YEARS)
Passed AWS /CWI (CERTIFIED WELDING INSPECTOR) 09071411 in 2009-18(Renewal)
AMERICAN WELDING SOCIETY, USA
Passed BGAS CSWIP grade -2/3 FOR TWI UK certificate no -74760 issue-16 may-2013 upto-25-april-
2018(PAINTING INSPECTOR)
Passed OFFSHORE COURSE TBOSIET OPITO APPROVED, SAFETY TRAINING
CERTIFICATE NO-5146550102011410946 Exp-01/01/2018
Passed safety course QATAR INTERNATIONAL SAFETY CENTRE ISI, H2S, PTW, AGI, CSE, AGT, JSA
ASNT LEVEL-2 in RT 06-11-2011 to 05-11-2016 certificate no-AWN/II/RT/28
ASNT LEVEL-2 in UT 22-03-2012 to 21-03-2017 certificate no-AWN/II/UT/0206
ASNT LEVEL-2 in MPT 30-01-2013 to 29-01-2018 certificate no-AWN/II/MT/528A
ASNT LEVEL-2 in LPT 30-01-2013 to 29-01-2018 certificate no-AWN/II/LPT/210287-1
PASSED CERTIFICATION OF QUALITY CONTROL & MANAGEMENT
Govt Training Institute (Ministry of Labour & Employment)
PAINTING / COATING Application & Inspection Training ATTENDED in JOTUN PAINTS OMAN

Software Skills- Windows, Ms Office, Microsoft Word, Microsoft Excel.MS Power Point,internet
suffering,
Additional knowledge
Testing methods like Inter-granular corrosion test, Hardness test, Tensile test, Bend test, Charpy
Impact test, Magnetic Particle test, and Third Party Inspection methods.
 Entire piping inspection during site fabrication and shop fabrication.
 Piping line check punch list preparation witnessed hydro testing.
 Pipe support inspection and reinforced pad leak testing.
 Reviewing gauges calibration certificates prior to release for hydro test.
 Review work method statements and procedures.
 Inspection of hot and cold insulation for piping and equipments.
 Making as built drawing for the lines
Task Executed
 Inspecting material before erecting the line and initial stage of Welding.
 Preparation of weekly and monthly reports to client and senior Management.
 Handling the pre commissioning and flushing activities.
 Piping line check to confirm that the lines is completed as per ISO.
 Preparation, development and review of project quality plans.
 Review hydro test package to verify the completion of NDT requirements.
 Preparation of hydro test package as per ISO.
 Performing the box off operation before starting the commissioning activities.
 Verification of materials, materials receiving inspection prior to release for fabrication.
 Ensure project quality objectives are attained

Personal details
Name : Debasish Ghosh
Father’s name : Beni madhab Ghosh
Permanent Address : vill+po—south Krishna nagar
Ps—Belonia, District—south Tripura
Pin—799156 state—Tripura, India.
Date of Birth : 04/05/1984
Sex : Male
Religion & caste : Hindu
Nationality : Indian
Languages known : English, Hindi, and Bengali
Marital status : single
Hobbies : Playing Shuttle Badminton, Driving Vehicles
Alternate E-Mail :debasishghosh_1984@yahoo.com
Passport Details
Passport number : G3154609
Place of issue : Kolkata
Date of issue : 16/08/2007
Date of expiry : 15/08/2017
Declaration
I here by declare information is correct and true to the best of my knowledge.It I were places in
your esteemed concern.I will discharge my duties with at most sincerity and to your ful
satisfaction.

(DEBASISH GHOSH)

You might also like