CHECKLIST GENSET KRISBOW

MAINTENANCE TIME TABLE


NO CHECK ITEMS DAILY 50H 250H / 3M 500H / 6M 750H / 9 M 1000H / 12 M NEEDED
1 Check the fuel level , lubricant level and water lever
2 Check fuel filter
3 Check lubricant driving output bearing (PTO)
4 Check air filter clean indicator
5 Check PTO and the bearing of clucth axes
6 Check fire extinguisher
7 Check start-up storage battery
8 Change oil and oil filter
9 Check V-shape belt tension
10 Check PTO and clucth connection
11 Adjust valve gap
12 Check the connection of PTO and clucth aces lever
13 Clean cranking box exhaust pipe
14 Check intake pipe and connection
15 Change fuel filter
16 Analyze cooling water content
17 Check/repair intake system
18 Check cooling system
19 Generator adjustment
20 Check the rev of diesel and adjust if necessary
21 Regulate motor valve gap
22 Check fuel system
23 Check turbine pressure enhancer
24 Check crankshaft shock absorber
25 Clean cooling system, change thermostat
26 Check cooling system pressure
27 Check air filter and change if necessary

1 The maintenance period of the diesel generator is calculated by working hours and calendar, whichever is sooner

According to the actual operation, the diesel hgenerator can be checked and repaired at advance. The maintenance period and maintenance contents are
2
adjusted depending on the usage, performance of machine and the capability of fuel and lubricant.

3 The standby diesel generator is required to keep promt start-up and good operation, so make regular repair and exam with the following trial running.

Run for 5 -10 minutes with adequate loading every


Exam :
week
Trial running of machine
Run for 15 - 20 minutes with adequate loading every Start-up bube pressure, exhaust
month color, shake etc

4 The meaning of the above table

▲ exam and repair, clean adjust

change

contact the manufacturer of supplier if customer cannot repair

heavy repair, dismantle of new machine or the machine sealed for a long time, and the necessary examination after the initial 50 hour's operation