NTPC VINDHYACHAL

Annexure – 8.1
REPORT ON MOCK DRILL FOR CRISIS
MANAGEMENT PLAN IN POWER SECTOR
In the month of May’2019

1. Name of Power Uti lity / Generati ng Stati on : NTPC VSTPS stage-I

2. Date / Time of Mock-drill : 01/10/2019 ( DG SET-4/6)

3. Locati on site of Mock-drill UCB , DG set room-2 stage-I

4. Observers : SCE ( Shift in charge engineer, Desk engineer , DG set operator)

5. Scenario of mock emergent situati on : DG set charging and equipment loading

6. Objecti ve : Mock Drill for emergency Preparedness


7. Chronological order of drives logged :
Date & Time Events Response Time
01-10-2019
10:45:30 Main DG SET-6 came in service 06 sec

10:46:12 EMCC sections charged from DG set 10 sec

10:46:50 SOP taken I/S 3 sec

10:46:55 AOP taken I/S 1 sec

10:47:08 Stator Water Pump taken I/S 3 sec

8.Observations on effectiveness of Mock Drill: No defects found.

9. Recommendations I Suggestions on the observations (S. No. 8)

Signature of Designated
Signature of
(Safety / Security Officer) (Head 0 & M of Plant)
Dated……………… Dated ............................................................................................................

(")