Professional Documents
Culture Documents
E458 CON CI IPR BAC 003 A Method - Statement - Demolation - Works - Concrete - Platforms
E458 CON CI IPR BAC 003 A Method - Statement - Demolation - Works - Concrete - Platforms
Bacau Depots
METHOD STATEMENT FOR
DEMOLITION WORKS
CONCRETE PLATFORMS
06/08/2012
Depots Revamp CON-IPR-BAC-CI-003-A
Method Statement for Demolition Works Concrete Platforms
REVISION
Page 1
Depots Revamp CON-IPR-BAC-CI-003-A
Method Statement for Demolition Works Concrete Platforms
1. SCOPE 1. SCOP
This procedure contains the conditions that Prezenta procedura contine conditiile ce
must be observed and required activities for trebuiesc respectate si activitatile necesare
demolition concrete platforms. demolarii platformelor betonate.
Page 2
Depots Revamp CON-IPR-BAC-CI-003-A
Method Statement for Demolition Works Concrete Platforms
4.DEFINITIONS 4. DEFINITII
Page 3
Depots Revamp CON-IPR-BAC-CI-003-A
Method Statement for Demolition Works Concrete Platforms
Page 4
Depots Revamp CON-IPR-BAC-CI-003-A
Method Statement for Demolition Works Concrete Platforms
there are objects that can be damaged and to zonelor in care se afla obiecte ce pot fi
protect them: manholes, drain inlets, pipes, deteriorate si protejarea acestora: camine
construction. vizitare, guri scurgere, conducte, constructii
8. RESPONSIBILITIES 8. RESPONSABILITATI
1. The Site manager is responsible to 1. Seful de santier are responsabilitate de
check the works so that they might be a verifica lucrarile astfel incit sa fie
performed in compliance with the executate in conformitate cu prezenta
current procedure; procedura;
2. Personnel involved in the works shall 2. Personalul implicat in aceste lucrari
hold a valid certificate for the work they trebuie sa detina un certificat valid
are undertaking; pentru lucrarile pe care le efectueaza.
3. HSE Responsible will check and admit 3. Responsabilul SSM va verifica si va
to work only the machines that meet the admite la lucru numai utilajele care
technical requirements of the works to corespund din punct de vedere tehnic
be performed; lucrarilor ce se vor executa;
4. Environmental Protection Responsible 4. Responsabilui cu problemele de
is liable to observe the regulations in protectia mediului are responsabilitatea
Page 5
Depots Revamp CON-IPR-BAC-CI-003-A
Method Statement for Demolition Works Concrete Platforms
Page 6