Professional Documents
Culture Documents
1 - Project HSE Plan - IMC-1 Project
1 - Project HSE Plan - IMC-1 Project
1 - Project HSE Plan - IMC-1 Project
Karachi, Pakistan
PROJECT
HSE
PLAN
IMC-01 PROJECT
WASTE WATER TREATMENT CONSTRUCTION PROJECT
Indus Motor Company Limited
Originator
HSE Compliance Officer 31-08-2018
(GASCO)
Reviewed By M. Khalid
01-09-2018
(GASCO) HSE Manager
Approved By Ameer Muhammad
01-09-2018
(Gasco) Project Manager
Approved By
(IMC)
Approved By
(IMC)
Approved By
(IMC)
TABLE OF CONTENTS
1. INTRODUCTION...........................................................................7
1.1. PURPOSE......................................................................................................................7
1.2. SITE INTRODUCTION & ADDRESS..........................................................................7
1.3. SCOP OF WORK...........................................................................................................8
2. OVERVIEW..................................................................................9
2.1. CORE VALUES............................................................................................................9
2.2. KEY ELEMENTS........................................................................................................10
3. MANAGEMENT LEADERSHIP AND COMMITMENT.......................11
3.1. COMPANY POLICIES................................................................................................12
3.2. HEALTH, SAFETY & ENVIRONMENT POLICY....................................................13
3.3. NO SMOKING POLICY.............................................................................................14
3.4. SUBSTANCE ABUSE POLICY..................................................................................15
3.1. HSEQ CERTIFICATION.............................................................................................16
3.2. HSE ORGANOGRAM................................................................................................20
3.3. ROLES & RESPONSIBILITIES..................................................................................21
3.3.1. MANAGER PROJECTS.............................................................................................................21
3.3.2. SITE MANAGER.......................................................................................................................21
3.3.3. HSE MANAGER........................................................................................................................23
3.3.4. HSE ENGINEER/ SUPERVISOR..............................................................................................24
3.4. STATUTORY & LEGAL REQUIREMENTS.............................................................25
3.5. PROJECT OBJECTIVES.............................................................................................26
3.6. HSE TARGETS...........................................................................................................27
4. HSE MANAGEMENT SYSTEM......................................................28
4.1. HSE PERFORMANCE MONITORING......................................................................29
4.2. HAZARD IDENTIFICATION, RISK ASSESSMENT AND CONTROL...................30
4.3. ENVIRONMENTAL PROTECTION POLICY AND PROCEDURES....................32
4.4. STATISTICS AND KPI’S..........................................................................................33
4.4.1. KEY PERFORMANCE INDICATORS......................................................................................33
4.5. HSE INDUCTION.......................................................................................................33
5.6 HSE TRAININGS / AWARENESS SESSIONS..........................................................34
4.7. AUDITS AND INSPECTIONS...................................................................................36
4.7.1. RECTIFICATION CRITERIA....................................................................................................36
4.7.2. SITE HSE AUDIT......................................................................................................................36
Page 2 of 95
4.7.3. HEAD OFFICE SITE AUDIT & INSPECTION.........................................................................37
4.8. HAZARD REPORTING..............................................................................................37
4.9. INCIDENT/ACCIDENT REPORTING.......................................................................38
4.10. AWARDS AND INCENTIVE SCHEME....................................................................39
4.11. HSE COMMUNICATIONS & MEETINGS................................................................39
4.11.1. SAFETY INSPECTIONS / AUDITS..........................................................................................39
4.11.2. SAFETY AWARENESS / MEETING........................................................................................39
4.11.3. DAILY TOOL BOX MEETING.................................................................................................40
4.11.4. SITE SPECIFIC HSE EXECUTION.........................................................................................41
4.12. PERMIT TO WORK SYSTEM...................................................................................42
4.13. EMERGENCY RESPONSE........................................................................................42
4.13.1. EMERGENCY RESPONSE PROTOCOL..................................................................................43
43
4.13.2. EMERGENCY CONTACT NUMBERS...................................................................................44
4.13.3. LIST OF APPROVED HOSPITAL & MEDICAL EMERGENCY HELP CENTRES...............45
5. OCCUPATIONAL SAFETY............................................................46
5.1. PERSONNEL CONDUCT...........................................................................................46
5.2. NO SMOKING POLICY.............................................................................................46
5.3. SAFE TOOLS AND EQUIPMENT.............................................................................47
5.4. HOUSE-KEEPING......................................................................................................47
5.5. PERMIT TO WORK....................................................................................................47
5.6. PERSONAL PROTECTIVE EQUIPMENT.................................................................47
5.6.1. HEAD PROTECTION................................................................................................................48
5.6.2. EYE AND FACE PROTECTION...............................................................................................48
5.6.3. FOOT PROTECTION.................................................................................................................49
5.6.4. FALL PROTECTION.................................................................................................................49
5.6.9. USE OF LADDERS....................................................................................................................49
5.6.10. CARE OF FALL PROTECTION EQUIPMENT........................................................................50
5.6.11. HAND PROTECTION................................................................................................................50
5.6.12. RESPIRATORY PROTECTION................................................................................................51
5.6.13. HEARING PROTECTION.........................................................................................................51
5.7. LIFTING EQUIPMENT...............................................................................................51
5.7.1. LIFTING EQUIPMENT CERTIFICATION...............................................................................51
5.7.2. COMPETENCE & CERTIFICATION OF LIFTING EQUIPMENT PERSONNEL..................51
5.7.3. SAFE WORKING LOADS.........................................................................................................52
5.7.4. GENERAL REQUIREMENTS FOR LIFTING EQUIPMENT..................................................52
5.7.5. LIFTING EQUIPMENT SPECIFIC RISKS................................................................................53
5.8. HAND TOOLS............................................................................................................54
Page 3 of 95
5.9. PORTABLE POWER TOOLS.....................................................................................55
5.9.1. ELECTRICAL POWER TOOLS................................................................................................55
5.9.2. PNEUMATIC POWERED HAND TOOLS................................................................................55
5.10. SCAFFOLDING AND MEANS OF ACCESS AND ESCAPE...................................57
5.11. HAZARDOUS GASES AND LIQUIDS......................................................................58
5.11.1. HYDOGEN SULPHIDE.............................................................................................................58
5.11.2. CARBON DIOXIDE AND NITROGEN....................................................................................58
5.11.3. LIQUID NITROGEN..................................................................................................................59
5.12. GAS CYLINDERS.......................................................................................................60
5.12.1. CYLINDER IDENTIFICATION AND USAGE.........................................................................60
5.12.2. STORAGE OF CYLINDERS.....................................................................................................60
5.12.3. STACKING OF CYLINDERS....................................................................................................60
5.12.4. HANDLING AND MOVEMENT OF CYLINDERS..................................................................61
5.12.5. CYLINDER FITTINGS..............................................................................................................61
5.12.6. GAS WELDING/CUTTING EQUIPMENT...............................................................................62
5.13. RADIOACTIVE SUBSTANCES.................................................................................63
5.13.1. STORAGE..................................................................................................................................63
5.13.2. TRANSPORT OF RADIOACTIVE SUBSTANCES..................................................................64
5.13.3. GENERAL HANDLING AND PERSONAL PROTECTION GUIDELINES............................66
5.14. ROAD SAFETY...........................................................................................................68
5.14.1. SEAT BELTS..............................................................................................................................68
5.14.2. DRIVER TRAINING AND QUALIFICATION.........................................................................69
5.14.3. COMMUNICATION DEVICES.................................................................................................69
5.15. JOURNEY MANAGEMENT......................................................................................70
5.15.1. DRIVING UNDER THE INFLUENCE OF ALCOHOL, DRUGS, NARCOTICS OR
MEDICATIONS.......................................................................................................................................71
5.15.2. DRIVER FITNESS AND ALERTNESS.....................................................................................71
5.16. CONFINED SPACE ENTRY......................................................................................72
5.16.1. MINIMUM REQUIREMENTS FOR ENTERING CONFINED SPACES.................................73
5.17. ELECTRICAL SAFETY..............................................................................................75
5.17.1. PERSONNEL..............................................................................................................................75
5.18. HOT WORK................................................................................................................75
5.18.1. SAFE WELDING AREA............................................................................................................76
5.18.2. HOT WORK PERMIT................................................................................................................76
5.18.3. INSPECTION AND TESTING...................................................................................................76
5.18.4. HOT WORK PRECAUTIONS...................................................................................................77
5.19. MATERIALS HANDLING AND STORAGE.............................................................78
5.19.1. LIFTING OF LOADS BY PERSONNEL...................................................................................78
5.19.2. MATERIAL STORAGE.............................................................................................................78
Page 4 of 95
5.20. OFFICE SAFETY........................................................................................................80
5.21. SAFETY OF VISITORS TO WORKSITES................................................................81
5.21.1. HSE INDUCTION......................................................................................................................81
5.21.2. PERSONAL PROTECTIVE EQUIPMENT..............................................................................81
7. ENVIRONMENT..........................................................................91
7.1. ENVIRONMENT POLICY..........................................................................................91
7.2. WASTE MANAGEMENT...........................................................................................91
7.3. HOUSEKEEPING........................................................................................................91
ABBREVIATION & TERMINOLOGY:...............................................................................92
ANNEXURES:.......................................................................................................................95
Page 5 of 95
CHANGE LOG
Rev. Pages
No. Date Change Description Modified
Page 6 of 95
1. INTRODUCTION
1.1. PURPOSE
This HSE Plan shall outline how GASCO shall comply with relevant
Acts, Regulations, Code of Practices, Standards, and client
requirements.
Page 7 of 95
Elevation: 26′ (8 m)
Maximum Air Temperature: 28°C (in winter)
Minimum Air Temperature: 12°C (in winter)
Relative Humidity: 49%
Avg Daily Wind Speed: 18 km/h
Coordinates: 24.7857° N, 67.3422° E
Page 8 of 95
2. OVERVIEW
Relationships
We’ll work in
partnership with our
Our business depends on healthy relationships
clients, the
with customers,
regulators and our business partners and suppliers.
employees to Within this standard
deliver Social
our HSE Responsibility the main extension of
this core value is in the
objectives.
Being socially responsible is integral area of environmental
to what we do. We aim to make care, where we define
our obligations and
a positive difference to the communities aspirations to reducing
where we operate and seek ways to resource consumption
assist them. waste and any negative
Within this s impacts of what we
standard we set out
do.
the framework to People
protect the health of People are our business. We are professional, high
everyone that we work with
and to sustain our operations performing team players focused on delivering and
free of incidents and injuries. drawing on our global expertise.
An essential aspect of this behavior
and assuring
training and competence is Innovation We’ll use both our
appropriate to the risks Innovation gives us competitive advantage. traditional continuous
encountered. improvement
Financial Responsibility techniques as well as
embracing innovation,
We expect to receive fair
HSE excellence is a to delivery our HSE
reward for our business performance. We are objectives.
sign of successful
cost aware and carefully manage our own
business. We won’t
compromise and
HSE our customers’ costs.
excellence for
Integrity
financial gain.
Page 9 of 95
We are proud of our reputation, built over many years, which
depends on us doing the right thing.
Page 10 of 95
3. MANAGEMENT LEADERSHIP AND COMMITMENT
Page 11 of 95
3.1. COMPANY POLICIES
GASCO has instituted a set of Policy Statements, which are signed &
pledged by the Managing Director. These policies establish the
company‘s commitment to a Healthy and Safe working environment for
all its personnel and those of its sub-contractors/service providers, as
well as the stewardship of the environment in which it works.
The primary object of this plan is to formalize the basis upon which,
Page 12 of 95
3.2. HEALTH, SAFETY & ENVIRONMENT POLICY
Page 13 of 95
3.3. NO SMOKING POLICY
Page 14 of 95
3.4. SUBSTANCE ABUSE POLICY
Page 15 of 95
1.1. HSEQ CERTIFICATION
The Health, Safety & Environment Program has been prepared to assess
each employee in satisfying its morale, contractual and legal accident
prevention responsibilities, in such a manner that a safe, efficient
operation is assured.
Page 16 of 95
Page 17 of 95
Page 18 of 95
Page 19 of 95
3.5. HSE ORGANOGRAM
GASCO MANAGEMENT
BOARD
PROJECT MONITORING TEAM
HSE MANAGER
Page 20 of 95
3.6. ROLES & RESPONSIBILITIES
Page 21 of 95
Shall be responsible for Safety Induction of all Site personnel under
his control to ensure they are adequately briefed as to HSE
requirements and the hazards in the workplace, prior to
commencement of site work.
Shall ensure that all HSE incidents are properly reported and
investigated with the object of preventing recurrences and
confirming correct remedial action has been taken; and HSE
performance reported monthly.
Shall implement HSEQ Inspections / Audits across the site. Monitor
and report on HSEQ Performance and enforce good Housekeeping
and safe working practices.
Shall establish and chair regular site HSE review meetings,
attended by representatives of all departments.
Shall ensure Method Statements & Risk Assessments are produced
and submitted in a timely manner, reviewed for adequacy & in
place prior to commencement of any site work activities.
Shall ensure that appropriate maintenance and inspection of
services, equipment and plant is carried out at correct intervals, in
accordance with relevant standards, and records kept.
Shall ensure that activities are managed and coordinated so as to
avoid HSE risks, pre-start up meetings organized etc.
Shall ensure all Hazardous Substances are properly controlled and
an inventory (with appropriate data sheets) is compiled and
maintained and readily available.
Shall regularly test the Emergency Response procedures and
amend as and when necessary.
Shall ensure Welfare arrangements are of an adequate standard
and maintained
Shall appoint a responsible person to take responsibility for the
above during periods of absence
Shall ensure this Plan is reviewed and updated as and when
necessary.
Shall ensure appropriate Waste Management procedures (duty of
care etc.) are implemented and followed.
Shall ensure all appropriate signage is displayed.
Page 22 of 95
3.6.3. HSE MANAGER
Page 24 of 95
Promulgation Enforcing
Instrument Scope and Applicability
Date Authority
Medical appliances:
Accidents reporting
Sindh Mining
The Mines Act Work / rest cycles / Hours of work Extra
Feb-23 Concession
1923 wages for over time:
authority
- Child Labor
- Register of employees
Page 25 of 95
Director General
The Petroleum Petroleum
Dec-89
Rules 1937 Concessions
(DGPC)
Director General
Petroleum
Petroleum
(Production) Rules Aug-49
Concessions
1949 - Section 19A
(DGPC)
The Forest Act
Mar-50
1927
Sindh Wild life
Protection Rules, Apr-72 Provincial EPA
1972
Electricity Rules
Dec-78
1937
Page 26 of 95
To operate incident and injury free.
Ensure the environment is not adversely affected by our
operations.
Foster a quality culture of “Do it once and do it well”.
To respect the community.
To provide our client with great experience.
Zero fatality
Zero security incident
Zero fire incident
Zero LTI (Lost Time Injury)
Zero Near miss incident
100% Hazard Identification Returns
Zero road transport accident (RTA)
Zero transport accident
100% Driving Protocols.
100% tracking of waste generated and disposed on site.
ERO Epidemics
Page 27 of 95
Documents Description
Policy Policies set the overall guidelines and directions of GASCO’s
approach to HSE.
Health Safety & Defines HSE administration and management framework for
Environmental Plan GASCO. This includes responsibilities, risk assessments, trainings
(This Plan) and inductions, general site rules and protocols, risk controls, audit
and management review.
Site Environmental Describes the environmental controls to be implemented and
Management Plan measured for a geographical work area, processes or discipline.
Leading Leading
Plan Actual Plan Actual
Indicators Indicators
Page 28 of 95
Premob activities 100% Exposure Hours 0
Adequate control
100% Fatalities 0
for key hazards
Mobilization
100% Lost Time Injuries 0
activities
Total recordable
HSE Trainings 100% 0
Cases
Management Field High Risk
100% 0
Inspections Incidents
HSE Audits /
100% Unsafe acts 0
Inspections
Item Responsi
Action Target
Description bility
Key Hazard / Risk
Working at 1/2 day training for supervisors on GASCO
Page 29 of 95
working at height Guideline and
Height Procedure
Item Responsib
Action Target
Description ility
Site
Obtain and confirm all required permits GASCO
Preparation
Build site office GASCO
Housekeeping GASCO
Page 30 of 95
Work
Conduct Risk Assessment Session GASCO
Execution
Obtain permit to work (PTW) GASCO
Develop daily task plans GASCO
Perform JSA for site activities GASCO
Held planned HSE meetings GASCO
Execute planned drills GASCO
Implement audit plan GASCO
Inventories waste generated and
GASCO
segregation.
Page 31 of 95
To make fire or produce heat, use of rubber tyre or similar material
is prohibited at site.
Barriers and coverings are used to control dust and fumes from
spreading.
Page 32 of 95
4.5. HSE INDUCTION
All the senior and junior officers and the Service providers will be
given induction once they entered the work site. Our induction
outlines include, but not limited to,
Training of all Staff is mandatory time to time that covers all areas
related to their scope of work. On each Management of Change
Trainings must be ensured by Project Engineer. Sub-contractors
will be encouraged to participate in the training programs.
Page 34 of 95
5.7. AUDITS AND INSPECTIONS
The findings (if any) are dealt depending upon the severity of the
findings. If the findings are of severe nature then the equipment/
vehicle is stopped from normal operation and is marked as out of
order until the highlighted error is rectified by the mechanic. After
rectification the corrective action is re-checked/verified by
mechanic/relevant person along with HSE Engineer/ Supervisor
and then it is allowed to be used/put back into service.
Page 36 of 95
4.7. INCIDENT/ACCIDENT REPORTING
GASCO will submit the basic safety information to the appropriate IMC
Representative not later than the fifth day of the month following the
month under review, by email.
HSE Engineer will investigate the major and moderate incidents; prepare
incident / accident and hazard investigation report by following the
“Incident and Accident Investigation Report” and forward to Site
Manager and GASCO Head Office.
Page 37 of 95
(Annexure 04_ Incident Reporting Form)
Workers are awarded with a certificate every month for safe work
practices from each department and given an incentive for their good
services. Assessment will be based on HSE compliances, hardworking
and punctuality.
Safest Worker
Safest Driver (LTV/HTV)
Safest Operator (EME)
Site Manager
HSE Engineer
QA/QC Incharge
Admin Incharge
Prior to Works, all equipment will be inspected safe for operation and
must meet all GASCO / IMC safety specifications and regulations.
Subsequent inspections will be made to ensure that proper actions have
been taken to rectify earlier identified unsafe situations and that
equipment is in working order.
Frequency:
GASCO will conduct Tool Box Meeting at the work place in the morning
before start of the work about the nature of job to be done. What are
the safety aspects to be observed and whom to contact in case of
emergency. Toolbox meeting will be conducted by authorized Safety
Supervisor/Officer.
Reporting:
Page 39 of 95
Any personal injury to any IMC or GASCO Personnel,
its agents or Subcontractors
Any injury to any third party
A near miss incident.
A full detailed report via telex or fax sent to Company within twenty-four
hour (24) hours and an Accident or Incident Report filled out by
GASCO’s HSE Manager immediately.
The GASCO’s Site Specific Health and Safety Execution Plan include, but
is not limited to the following safety elements as applicable to the work:
Page 40 of 95
4.10. PERMIT TO WORK SYSTEM
GASCO will comply with the IMC Permit System to ensure the highest
level of personal safety in hazardous work areas of Project in live Plant.
GASCO will also comply with the Permit to Work System to ensure the
highest level of personal safety in hazardous work areas of Project at
Work locations. All record will kept under HSE department for audit
purpose.
As all the work is to be carried out in the plant area therefore work
permit procedure compliance shall be adhered throughout working at
IMC plant site. Contractor workforce and supervisor should get
themselves aware of the IMC work permit procedure.
IMC safety depart will assess the workforce and supervisor for their
understanding of IMC work permit procedure, only after clearing this
assessment contractor can deploy its staff in the area for any working
at IMC plant site.
HSE Engineer will ensure that the IMC Emergency Response Plan
(Document # HSE-Safety-ERP-III-01) shall be understood and
implemented at site and site personnel are aware of this plan. HSE
Engineer will arrange the emergency drills at site to ensure that all
employees are aware to the Emergency Response plan and to
evacuate the area.
Page 41 of 95
4.11.1. EMERGENCY RESPONSE PROTOCOL
4.11.2.
E
M
E
R
G
E
N
C
Y
Page 42 of 95
CONTACT NUMBERS
IMC:
GASCO:
Administrator 0301-8296443
Logistics 0301-8296443
Page 43 of 95
4.11.3. LIST OF APPROVED HOSPITAL & MEDICAL EMERGENCY
HELP CENTRES
Eidhi Ambulance:
115 / 021-32310066
Page 44 of 95
5. OCCUPATIONAL SAFETY
HSE, as always, will be given special attention and will remain the focal
point for all the activities to be planned & executed. GASCO HSE Team in
individual capacities as well as along with IMC FHSEA will work tirelessly
and closely for achieving safer working practices at work place.
Page 45 of 95
GASCO, at its own expense, provide adequate tools and equipment that
are safe enough to use, that are of the approved type, and that are up to
the amount that is required for the execution of the contract works or
services. GASCO will maintain these tools and equipment in a
professional manner as dictated by legal and industry standards. In
addition, GASCO will keep up-to-date records of all the said tools and
equipment.
5.4. HOUSE-KEEPING
GASCO supplies its personnel assigned to the work site with adequate
personal protective equipment including clothing, which will be
maintained in good, condition or replaced as required. These must be
worn on all relevant occasions as dictated by the hazards of the job at
hand, and as indicated by notices, instructions and good practices.
Loose or floppy clothing is prohibited around rotating or moving
equipment. Rings, neck chains or loose jewelry shall be removed while
engaging in manual labour.
Page 47 of 95
5.6.3. FOOT PROTECTION
Both hands will be kept free for climbing, descending and performing
Page 48 of 95
work on a ladder. No carrying of hand tools, grease guns, etc. while
climbing on ladder. Articles, which are too large to be carried in a
pocket or on a belt, shall be lifted and lowered by a hand line. The
employee should not rush and should only take one step at a time.
Only one person at a time shall be on the ladder.
Portable ladders shall have anti-slip safety feet and be secured at the
top before work begins in order to prevent the ladder from shifting. A
second employee should hold the ladder until the climber can secure it
at the top. In addition, portable ladders should be set at the correct
angle before use. Where possible, angle of 70 degrees or 0.3 meters (1
foot) out at bottom for every 1.2 meters (4 feet) of ladder height to
ensure stability.
Full body harnesses and lanyards to be kept clean and never laid down
in mud, water, dirt, etc. All fall protection equipment to be placed in a
proper storage area when not in use. Only approved cleaning products
for full body harnesses and lanyards to be used in order not to diminish
the rated capacity of the device.
Page 49 of 95
5.6.6. RESPIRATORY PROTECTION
All lifting equipment and all parts and working gear thereof, both fixed
and mobile will be of good construction, sound material and free from
defects and will be maintained and operated to comply with GASCO
standards.
Page 51 of 95
Due Date
Brief Date of Due Date
Equi of next
Descriptio Proof Date of of next
p. ID SWL Proof
n of Load Inspection Inspectio
No. Test Load
Equipment n
Test
When ‘Lifting Appliance’ has undergone repairs that affect the load
bearing parts or replacement of parts or components that affect
the structural integrity, the ‘Lifting Appliance’ shall be re-inspected
and certified by Approved Certifying Authority.
(Annexure 05_ Procedure for Lifting Activity)
(Annexure 06_ Lifting Plan)
Page 52 of 95
The following rules will apply to the use of hand tools by personnel
working for,
The job will be well planned in advance and the appropriate
personal protective equipment worn before commencement.
Each hand tool will be inspected to ensure that it is in good
condition before use and will be kept it in good condition
throughout its usage on GASCO operations.
Unsafe tools will not be used for work on GASCO contracts. Unsafe
tools include wrenches with cracked or worn jaws; screwdrivers
with broken tips, or split or broken handles; hammers with
chipped, mushroomed or loose heads and broken or split handles;
mushroomed heads on chisels; dull saws; and extension cords or
electrical tools with improper or broken plugs, improper or
removed grounding systems, or split insulation.
Workers will be trained on the selection of the right tools for each
job and the correct usage of the tools.
Only trained and authorized personnel will be allowed to use
power tools.
Tools will be stored in a proper storage area, and carried to and
from the work site in a toolbox, cabinet, or other appropriate tool
holder or pouch.
Tools will not be carried up or down ladders by hand. Appropriate
pouches shall be used. Where pouches are not available, tools will
be lifted and lowered by hand lines.
Tools will not be thrown from one level to another neither will they
be thrown from one location to another on the same level.
Tools will not be kept lying on the floor, on the scaffold, in
walkways or cluttering workbenches.
Spark proof tools will be inspected regularly to ensure that there
are no steel splinters.
Power tools shall be inspected, tested and used, in accordance
with the manufacturer’s instructions.
Page 54 of 95
Pneumatic tools must not be used for any purpose other than that
for which they were designed. Non-standard attachments and
accessories shall not be used.
The compressed air supply must be regulated to the correct
pressure, adequately filtered, dried, and where necessary,
lubricated.
The means of disconnection from the air supply must be easily
accessible. Prior to performing any repair, adjustments or cleaning
on pneumatic tools the air supply will be isolated, lines and tools
de-pressurized and tools disconnected.
Safety goggles and breathing masks will be worn where grit or
dust may be produced or disturbed. Ear protectors will be worn
where the work generates high noise levels in excess of 85 dB.
Under no circumstances will compressed air be directed at any
part of a person’s body
Precautions must be taken to prevent clothing, hair, rags, etc.
from becoming entangled with any moving parts of pneumatic
tools.
Maintenance of pneumatically operated tools must be carried out
at regular intervals by competent persons. Tools must not be
modified or the labels and descriptions defaced or removed.
Where guards are required they will be securely fitted and
correctly adjusted.
Where sparking or heat is generated by the use of pneumatic
tools, an approved coolant will be used
Only patented pneumatic hose, couplings and fittings of the
correct rating will be used when using pneumatic tools. Where
applicable, whiplash protectors will be used at hose quick release
union type connections and split pins on the couplings
Compressed air driven tools will be fitted with governors to ensure
correct speed control.
Page 55 of 95
5.10. SCAFFOLDING AND MEANS OF ACCESS AND ESCAPE
Page 56 of 95
5.11. HAZARDOUS GASES AND LIQUIDS
Page 57 of 95
Both CO2 and N2 are heavier than air and tend to accumulate in
low-lying areas. Extended overexposure to CO 2 and N2 blocks the
intake of oxygen stimulates breathing and increases the heart
rate. This can result in discomfort, nausea, and ultimately
unconsciousness and death.
Page 59 of 95
5.12.3. STACKING OF CYLINDERS
Page 61 of 95
5.13. RADIOACTIVE SUBSTANCES
5.13.1. STORAGE
Page 64 of 95
warning sign on the outside. The transport container
would be properly strapped to prevent movement or
loss.
A) Personal Protection
Page 65 of 95
No persons with open wounds are allowed to be involved in an
operation with radioactive scale contaminated equipment.
Any person involved in the operation will be checked to
decontaminate himself prior to returning to the accommodation
e.g. by showering/hosing with water with particular attention
being paid to the boots and gloves. Sites of potential
contamination will be monitored to confirm the effect of this
decontamination procedure.
B) Dose Limitation
Page 66 of 95
Suitable warning notices for display at barriers will have the
wording "RADIATION - DO NOT ENTER"- in Urdu and English. The
notices will also include the radiation symbol
Specialized service provider will provide evidence of training in
safe handling and use of sources for all personnel involved in the
work.
Specialized service provider will provide a copy of their Radiation
Management System detailing amongst others procedures for
the safe handling, storage, transport and contingency plans.
Fixed devices containing sealed radioactive sources, will be leak
tested once in every 12 months and if contamination above 200
Becquerels is detected, the device must be cordoned off and the
Ministry of Environment informed immediately.
Personnel regularly employed on work involving exposure to
ionizing radiation (Classified worker) will be medically examined
at the commencement of employment and yearly thereafter as
per Islamic Republic of Pakistan health regulations.
Page 67 of 95
Where there are more than two seats in a row, seatbelts must be
fitted for center seat passengers.
In vehicles equipped with sleeper berths, if the berth is to be
used while the vehicle is in motion, approved restraint will be
provided and used at all times the vehicle is in motion.
Where it is impossible to implement the above seatbelts
requirements for buses or coaches, the minimum requirements
are that seatbelts are fitted for the driver (3- point); and front
seats with open space in front (such as a seat adjacent to a
doorway). These seats should not be occupied unless seat belts
are fitted.
Vehicles, which are not capable of more than 10 km/h, may be
exempted.
Personal vehicles used on GASCO business will be consistent with
the above specifications.
Page 68 of 95
Drivers will neither initiate nor answer a mobile phone call while
driving a vehicle; this includes text messaging and the use of
hands-free devices.
This also applies to radios used for two-way
communication including communication with base stations.
The driver will safely leave the road and bring the vehicle to a
complete and safe stop before initiating or answering a call.
The exception to this is for the use of two-way radios as part of
convoy management or for use during emergency situations.
Radios used in these circumstances would be kept to a minimum
necessary to communicate and control the hazards and risks of
the journey being undertaken.
Page 70 of 95
and alert. In particular:
Page 71 of 95
5.16. CONFINED SPACE ENTRY
Process vessels, tanks, bins, stacks, large pipes, pits, and vaults.
Any enclosure where the presence of air contaminants may be
harmful to a worker and prevent his ability to escape unaided.
Confined space entry is defined as the act of physically entering
a confined space. Entry covers not only complete body entry, but
also when only the head is inserted for a quick visual inspection.
Page 72 of 95
In addition to the location-specific procedures, the following
minimum requirements shall apply for entry into confined
spaces:
Confined space entry certificate and other appropriate work
permits such as hot- work or cold work as per client protocols.
The air in a confined space shall be tested prior to a person
entering the space for oxygen (O2) content; Lower Explosive
Limit (LEL); and hydrogen sulfide (H2S) in that order with an
approved and calibrated device by a person trained and certified
to use the device.
Danger levels are as follows
Page 73 of 95
In completely enclosed spaces, such as tanks, a continuous
atmospheric monitor will be worn by the person entering the
space.
NO ENTRY: Under no circumstances will entry be permitted
when:
Workers will carry out all work in GASCO relating to electricity in a safe
manner in accordance with the relevant GASCO procedures and
international standards such as the BS 7671 Requirements for
Electrical Installations (IEE Wiring Regulations).
The GASCO procedures will include but not limited to the following:
5.17.1. PERSONNEL
Page 74 of 95
Only Competent Electrical Persons will be permitted to perform
work on electrical equipment or systems. This includes all work
on electrical equipment and installations, and all testing and
faultfinding.
GASCO will ensure that records are maintained for all Competent
Electrical Persons employed whether directly or indirectly.
GASCO personnel records will include the record of electrical
training and qualifications including copies of relevant
certificates.
Hot work will be carried out, if require, under IMC PTW system.
As all the work is to be carried out in the plant area therefore work
permit procedure compliance shall be adhered throughout working at
IMC plant site. Contractor workforce and supervisor should get
themselves aware of the IMC work permit procedure. IMC safety depart
will assess the workforce and supervisor for their understanding of IMC
work permit procedure, only after clearing this assessment contractor
can deploy its staff in the area for any working at IMC plant site.
Page 75 of 95
If hot work needs to be performed outside of the SWA, possibility
will be explored with customer, of shutting-in producing wells,
certain process vessels or other operations. In addition, all
movable fire hazards in the vicinity will be removed to a safe
distance or guards used to confine the heat, sparks and slag and
to protect the immovable fire hazards.
A Hot Work Permit will be obtained prior to carrying out any hot
work, if require, as per client protocol.
The hot work equipment and work area will be inspected and
tested prior to beginning any hot work operations to ensure safe
working conditions. This includes checking for explosive
atmospheric conditions in all vessels, piping and confined spaces
and documenting the results on the Work Permit. Oxygen and
acetylene cylinders shall be stored valve end up and properly
secured.
Page 76 of 95
A jet of oxygen will not be permitted to strike an oily surface,
greasy cloths or enter a fuel oil or other hydrocarbon storage
tank.
A jet of oxygen will not be used to blow dirt out of boltholes,
sockets, nuts, etc. If objects such as these need to be cleaned,
compressed air will be used instead.
Welding cables with splices within 10 feet of the clamps will not
be used. The welders will not coil or loop welding electrode
cables around parts of the body.
Wherever there are floor openings or cracks that cannot be
closed, precautions will be taken so that no readily combustible
materials below will be exposed to sparks.
During hot work operations outside the Safe Welding Area,
combustible floors will be kept wet, covered with damp sand, or
protected by fire resistant shields.
Hot Work operations will not be permitted in the following
situations:
Page 77 of 95
Keep the load close to your body.
Keep your back straight.
Use your legs, not your back, to lift the load.
Do not twist your body while carrying a heavy load.
Do not try lifting a load that is too heavy - ask for help.
When lifting a load with another person(s), communicate with the
other person(s) before lowering your end of the load.
A. STACKING
Page 78 of 95
bases of these containers are designed to bear the load of the
contents).
Stacks will be positioned at least 0.5m from walls/bulkheads and
will not allow footing for persons to gain access to unguarded
machinery.
Racking will be inspected periodically to determine its condition
and confirm its continuing capability to support the loads for
which it was constructed.
Only purpose-built pallets in good condition and without loose or
broken boards and blocks will be used for transporting loads.
Damaged pallets will be taken out of service and returned for
repair or disposal.
Loads will be secured on pallets with tension strapping, plastic
shrink-wrap, cargo netting or, alternatively, using a box pallet.
B. UNSTACKING
One person only is responsible for the manner in which the stack
is reduced
If the person in charge had no part in the erection of the stack,
he is to familiarize himself before work begins.
The stack is to be taken down tier by tier without "taking bites"
out of it.
Tubular or other fencing around the stack is to be reduced in
height as the stack is reduced.
The area around the stack is to be kept clear of tripping hazards.
GASCO will ensure that all visitors to his worksite in GASCO work sites /
facilities comply with the following requirements as a minimum:
Page 80 of 95
All visitors will undergo a HSE briefing, which will include but is
not limited to the hazards and controls in place as well as the
emergency procedures of the plant or facility.
Page 81 of 95
6.1. GENERAL REQUIREMENTS
6.1.1. INTRODUCTION
Page 82 of 95
provision, licensing of practitioners and the general quality
assurance of service provision.
GASCO will provide with a written copy of the HSE Policy, which
shall contain a clear reference to occupational hygiene, public
health and welfare.
Page 83 of 95
Identify potential emergency scenarios that might arise during
the Contract and procedures typically used in such scenarios.
Examples include:
GASCO will review the risk assessments where there has been a
significant change in the work procedure, or more than one year
has elapsed since the last assessment.
Ensure hygiene and health topics are included in HSE awareness
and training programs i.e. heat and cold stress, MSDS, chemical
hygiene, noise protection, indoor air quality, respiratory
protection, ventilation, lighting, working with computers, manual
handling, vibration, food safety and hygiene, first-aid response
and personal hygiene.
The assessment report will include the health hazards
identification inventory, risk prioritization summary and control
Page 84 of 95
measures, which is to be submitted to GASCO HSE Site Incharge
for review and comments.
Reports and records of all HRA shall be retained for the period of
the project, handed over to GASCO HSE Site Incharge at the end
of the project.
GASCO will provide and keep a register of all chemicals that are
expected to be used in the project, and are known to be
hazardous to health.
The register will be submitted to GASCO HSE Engineer for review
and shall be maintained and updated whenever there is a
significant change in the operations. The register will contain the
following information:
GASCO will ensure that the current MSDS for each hazardous
chemical or a copy thereof is kept in a safe but accessible place
on site and it is carried along during transportation of the
substance.
GASCO will ensure that exposure to any of the hazardous
chemicals does not exceed the Occupational Exposure Limit
specified by the ACGIH for the chemical. The determination of
exposure should be considered with a respirator worn at
assigned protection factor or without any respiratory protection
worn.
All potentially exposed employees will be scheduled for
monitoring program and health surveillance program.
GASCO will ensure that monitoring of the exposure of employees
is repeated at acceptable intervals as determined.
GASCO will implement control measures for the chemical health
hazards through the following hierarchy of steps:
Page 85 of 95
Elimination of the chemical
Substitution with lesser hazardous chemical
Total enclosure of the process and handling systems
Isolation of the affected area to control the release of
the chemical e) Modification of the process
parameters
Application of engineering control equipment
Adoption of safe work systems and practices that
eliminate or minimize the risks to health; and
Page 86 of 95
6.1.4. ILLUMINATION REQUIREMENTS
Page 87 of 95
6.1.6.1. ERGONOMICS
Assess all work associated with the use of hand tools, lifting and
the use of lifting equipment. No employee employed to lift, carry
or move any load too heavy for him or work in awkward postures
so as not to cause bodily injury.
6.1.6.3. VIBRATION
GASCO provide PPE for all its personnel commensurate with the
HSE hazards present in the job and location, as well as in
conformance with the requirements stated in Section 5.3 of these
regulations.
Page 88 of 95
6.1.8. TRANSPORTATION SAFETY
All vehicles which are involved in work site from GASCO accommodation
to site location will be inspected by HSE Representative in according
with pre-mobilization checklist. All vehicles shall obliged approved
route, which shall be provided in journey management plan.
Page 89 of 95
Letter of warning;
Loss of a portion or all of Field Allowance Incentive;
Loss of a portion or all of the annual Performance Bonus;
Loss of a portion or all of the annual merit increase
Termination
These reviews will determine penalties and ensure that actions are
uniformly applied. Modifications will be made to agreements with
vendors who provide personnel who are allowed to drive Company
vehicles. These terms will provide for similar monetary penalties. The
vendor and his employee should share in the cost of the penalty,
especially when the vendor has a responsibility to provide trained
personnel.
GASCO will adopt and enforce work rules and policies in order to assure
compliance with this obligation.
GASCO is reminded that alcohol and illegal drug are totally prohibited.
Page 90 of 95
7. ENVIRONMENT
7.3. HOUSEKEEPING
Page 91 of 95
ABBREVIATION & TERMINOLOGY:
Page 92 of 95
Environmental Aspect: Element of an organization's activities or products or services
that can interact with the environment. (Ref: ISO 14001:2004:
Environmental management systems)
Safe Work Permit: document that identifies the work to be done, the hazard(s)
involved, and the precautions to be taken. It ensures that all
hazards and precautions have been considered
before work begins.
Risk assessment: process of evaluating the risk(s) arising from a hazard(s), taking
into account the adequacy of any existing controls, and deciding
whether or not the risk(s) is acceptable
Acceptable risk: risk that has been reduced to a level that can be tolerated by the
organization having regard to its legal obligations and its own
OH&S policy
Hazard identification: process of recognizing that a hazard exists and defining its
characteristics.
Page 93 of 95
Procedure: specified way to carry out an activity or a process
Safe System of work: a formal procedure which results from systematic examination of
a task in order to identify all the hazards. It
defines safe methods to ensure that hazards are eliminated or
risks minimized.
Page 94 of 95
ANNEXURES:
Page 95 of 95