Professional Documents
Culture Documents
Lfo Day Tank Calc
Lfo Day Tank Calc
Lfo Day Tank Calc
CIVIL
CONTRACTOR DOCUMENT REVIEW R
E MECH
V
LOG DATE : I
ELEC
IN COMM. NO : E I&C
W
A APPROVED PROCESS
B APPROVED AS NOTED CONTRACTOR
D
C NOT APPROVED I RECORD
S
I INFORMATION T PLN PUSMANKON
R PLN UIP NUSRA
APPROVAL DOES NOT RELIEVE CONTRACTOR I
FROM RESPONSIBILITY FOR ERRORS OR B
DEVIATIONS FROM CONTRACT REQUIREMENTS U
T
BY : DATE: I
O
LOG DATE : N
OUT COMM. No. :
CONTRACTOR
CONSULTANT
GLPP-000200-EGB-P1-CS-006 AREA
JOB NO : 17-12318
PAGE : 2 of 5
DISTRIBUTION LIST
PP PLN
PAGE : 3 of 5
BASIC DESIGN
The basic design and general information for calculation are as follow:
- Storage Tank Cap. : 1 day (BID Doc)
3
- LFO consumption : 2 m /engine/hr (Wartsila Data)
- Number of Gas Engine : 13 engine
REFFERENCE
- API Standard 650, "Welded Tank for Oil Storage".
- Bid Document Lombok GECC/GTCC Power Plant (Peaker) 130 - 150 MW
CALCULATION
1. LFO Consumption
3
LFO Consumption : 2 m /engine/hr
3
LFO Consumption : 26 m /h
3. Operating Level
The operating level of LFO day tank is as folow:
Section Elevation, mm Volume, m3
Bottom to LALL 350 9.9
LALL to LAL 400 1.4
LAL to LAHH 5000 130.1 Net Working Capacity between LAL and LAH
LAH to LAHH 5050 1.4 OK
LAHH to Top angle 5400 9.9
3
Level Setting Elevation, mm Volume, m
LALL 350 9.9
LAL 400 1.4
LAH 5000 130.1
LAHH 5050 1.4
The LFO day tank working volume is sufficient to meet the requirement of LFO daily capacity.
PROCESS CALCULATION FOR LFO DAY TANK